CN220789612U - Environment-friendly grid greening ecological slope - Google Patents

Environment-friendly grid greening ecological slope Download PDF

Info

Publication number
CN220789612U
CN220789612U CN202321197816.9U CN202321197816U CN220789612U CN 220789612 U CN220789612 U CN 220789612U CN 202321197816 U CN202321197816 U CN 202321197816U CN 220789612 U CN220789612 U CN 220789612U
Authority
CN
China
Prior art keywords
board
ecological slope
grid
greening ecological
environment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321197816.9U
Other languages
Chinese (zh)
Inventor
杨波
丁天君
徐露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Haochuan Water Conservancy And Hydropower Engineering Co ltd
Original Assignee
Hubei Haochuan Water Conservancy And Hydropower Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Haochuan Water Conservancy And Hydropower Engineering Co ltd filed Critical Hubei Haochuan Water Conservancy And Hydropower Engineering Co ltd
Priority to CN202321197816.9U priority Critical patent/CN220789612U/en
Application granted granted Critical
Publication of CN220789612U publication Critical patent/CN220789612U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model relates to the technical field of ecological slope banks and provides an environment-friendly grid greening ecological slope bank, which comprises a first deck, wherein round grooves are formed in the middle parts of two sides of the first deck, a second deck is arranged on one side of the first deck, round grooves are formed in the middle parts of two sides of the second deck, and the diameters of the round grooves on two sides of the first deck are consistent with those of the round grooves on two sides of the second deck.

Description

Environment-friendly grid greening ecological slope
Technical Field
The utility model relates to the technical field of ecological banks, in particular to an environment-friendly grid greening ecological bank.
Background
Landslide easily causes soil foundation to roll down, damages to low buildings, rivers and road surfaces, and slope protection is mainly realized by embedding a fastening structure in the slope and adopting a tree planting mode in the slope to reduce the conditions that the roadbed side is washed by rain water and the soil foundation loosens and cracks to cause the roadbed side to produce landslide
The application number is CN202222386949.2, which discloses an environment-friendly grid greening ecological slope, wherein the transverse wood piles and the longitudinal wood piles are longitudinally staggered and tightly arranged, the transverse wood piles are transversely arranged on the slope, the same row of transverse wood piles are sequentially connected and are close together, the fixed wood piles are inserted into/buried into the slope, the top of each fixed wood pile is exposed out of the slope, a space is reserved between the same row of fixed wood piles, planting soil is filled in part or all planting frames, and nursery stocks are planted in the planting frames with the planting soil filled in part or all. The planting frame has a stable integral structure, can effectively stabilize the soil on the slope, enhance the stability of the slope, weaken the flushing of rainwater and surface runoff to the slope from all directions, gradually develop root systems along with the growth of seedlings, consolidate the soil, gradually replace wood piles to consolidate the slope, not only can keep water and soil stable, avoid water and soil loss, but also can promote the landscape effect and beautify the environment.
However, the existing environment-friendly grid greening ecological slope still has the following problems that when the land on the surface of the slope is uneven, the paved slope protection net cannot be completely attached to the slope, particularly, the protection net at the position cannot be effectively attached to a certain block with a lower topography, so that landslide is easily caused at the position, the integral slope protection net is enabled to slide due to soil blocks generated by infirm paving at the position, and the integral slope protection net is damaged.
Disclosure of Invention
The utility model provides an environment-friendly grid greening ecological slope, which solves the problem that a slope protection net cannot be effectively attached to a soil foundation when encountering uneven topography of the slope.
The technical scheme of the utility model is as follows: the utility model provides an ecological bank of environmental protection type net afforestation, includes first board, round slotting has been run through in the both sides middle part of first board, the second board is installed to one side of first board, round slotting has been run through in the both sides middle part of second board, round slotting in both sides of first board is unanimous with the round slotting aperture in both sides of second board, swing joint has the nylon rope in the round slotting in one side of laminating second board.
Preferably, an insert is mounted on one side of the first deck.
Preferably, the middle part of the insertion block is provided with a circular slot in a penetrating way.
Preferably, a circular slot is formed in one side of the top of the insert block in a penetrating manner, and a first metal sleeve is fixedly connected in the circular slot in one side of the top of the insert block.
Preferably, the first metal sleeve is movably connected with a first drill pile, and a first metal cone is fixedly connected with the outer side of the bottom of the first drill pile.
Preferably, a circular slot is formed in the other side of the top of the insertion block in a penetrating manner.
Preferably, the other side of the top of the insertion block penetrates through the circular groove and is fixedly connected with a second metal sleeve.
Preferably, a second drill pile is movably connected in the second metal sleeve, and a second metal cone is fixedly connected to the bottom of the outer side of the second drill pile.
Preferably, a mud guard is installed on one side of the second pavement board, the middle part of the mud guard penetrates through the equidistant through holes, the bottom of the mud guard is fixedly connected with a plugboard, and round grooves are formed in the side surfaces of the plugboard in a penetrating mode.
Preferably, the nylon rope penetrates through the middle part of the plugboard and penetrates through the circular slot so that the nylon rope is movably connected to the inner side of the second pavement.
The utility model has the technical effects and advantages that:
1. according to the utility model, the nylon ropes are sleeved in the grooves in the middle parts of the first and second planks for movable connection, so that the single first and second planks can be turned around the nylon ropes at a certain angle, the whole device can be correspondingly attached even when encountering uneven terrain, and the stability of the whole device after being fixed is improved.
2. According to the utility model, the mud guard is arranged at the position with lower topography, and is fixed at the position by passing through the nylon rope to carry out transverse discharge, so that broken stones or soil blocks can be effectively blocked from rushing to the region with lower topography.
Drawings
Fig. 1 is a schematic view of the whole device structure of the present utility model.
Fig. 2 is a schematic structural view of a fender device according to the present utility model.
Fig. 3 is an enlarged view of area a of fig. 1.
Fig. 4 is a schematic view of the structure of the earth boring pile.
Fig. 5 is a schematic view of the bottom structure of the earth boring pile.
Fig. 6 is a schematic structural view of a single first deck and a single second deck.
The reference numerals are: 1. a first decking; 2. a second decking; 3. nylon ropes; 4. a first drill pile; 401. a first metal cone; 5. a second drilling pile; 501. a second metal cone; 6. a mud guard; 601. a through hole; 602. inserting plate; 7. inserting blocks; 701. a first metal sleeve; 702. and a second metal sleeve.
Detailed Description
The technical solutions in the embodiments of the present utility model will be clearly and completely described in the following in conjunction with the embodiments of the present utility model, and it is obvious that the described embodiments are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1, fig. 3 and fig. 6, the utility model provides an environment-friendly grid greening ecological slope, which comprises a first plate 1, round grooves are formed in the middle parts of two sides of the first plate 1, a second plate 2 is installed on one side of the first plate 1, round grooves are formed in the middle parts of two sides of the second plate 2, the round grooves on two sides of the first plate 1 are consistent with the round groove on two sides of the second plate 2 in diameter, nylon ropes 3 are movably connected in the round grooves on one side of the first plate 1, which is shown in the figure, only part of the first plate 1 and the second plate 2 are in series connection through the nylon ropes 3, the middle parts of the first plate 1 and the second plate 2 are designed to be opened, after the whole device is paved, workers can plant trees through the middle grooves of the first plate 1 and the second plate 2, the environment-friendly requirement is met, the stability of the slope protection is increased, the number of the second plates 2 of the first plate 1 is required to be determined according to the actual size of the slope, the number of the second plates 2 can be fixedly sleeved in the corresponding lifting devices of the first plate 1 and the second plate 2 can not be fixedly sleeved in the middle part of the first plate 2 through the nylon ropes, and the nylon ropes can be fixedly connected in the whole device 1 and the whole device can not be sleeved in the middle part of the first plate 2.
Referring to fig. 1 and 3, an insert 7 is installed at one side of the first deck 1.
Referring to fig. 3 and 4, a circular slot is formed in the middle of the insert block 7 in a penetrating manner, and the insert block 7 is specifically arranged in such a manner that the insert block 7 is sleeved into the nylon rope 3 through the through slot in the middle of the insert block 7 at the middle position of each group of the first planker 1 and the second planker 2.
Referring to fig. 3 and 4, a circular slot is formed through the top side of the insert block 7, and a first metal sleeve 701 is fixedly connected in the circular slot on the top side of the insert block 7.
Referring to fig. 3 and 4, a first drill pile 4 is movably connected to the inside of the first metal sleeve 701, and a first metal cone 401 is fixedly connected to the outer side of the bottom of the first drill pile 4.
Referring to fig. 3 and 4, a circular slot is formed through the other side of the top of the insert block 7.
Referring to fig. 3 and 4, a second metal sleeve 702 is fixedly connected to the other side of the top of the insert block 7 through the circular slot.
Referring to fig. 3 and 4, the second metal sleeve 702 is movably connected with the second drilling pile 5, the second metal cone 501 is fixedly connected with the outer bottom of the second drilling pile 5, and double through circular grooves are formed in the top of the insert block 7, so that each insert block 7 can be inserted into two drilling piles at most, stability of the device during overall drilling soil fixation is improved, collar designs are arranged in the two through circular grooves of the insert block 7, damage to the through circular grooves of the insert block 7 caused by the drilling piles can be effectively prevented when the drilling soil is performed, and the damage to the bottom cone of the drilling pile caused by hard stone blocks when the drilling soil piles are driven into soil can be effectively protected.
Referring to fig. 1 and 2, a fender 6 is mounted on one side of the second deck 2, the middle of the fender 6 penetrates through an equidistant through hole 601, the bottom of the fender 6 is fixedly connected with a plugboard 602, and a circular slot is formed in the side surface of the plugboard 602 in a penetrating manner.
Referring to fig. 1 and 2, nylon rope 3 passes the middle part of picture peg 602 and runs through circular fluting and make nylon rope 3 swing joint in the inboard of second bed plate 2, and this device is through being equipped with fender 6, carries out horizontal emission through passing nylon rope 3 with fender 6 in the lower position of topography and fixes in this place, can effectively block rubble or soil block towards the lower district of topography.
The working principle of the utility model is as follows: firstly, the size of slope protection is measured by a worker, then, the first planking 1, the second planking 2, the nylon ropes 3 and the mud flaps 6 with corresponding numbers are taken out respectively, the vertical positions adopt the arrangement mode that the first planking 1 and the second planking 2 are ABABABAB, the nylon ropes 3 are taken out after the apertures of the first planking 1 and the second planking 2 are corresponding to each other, the nylon ropes 3 are respectively inserted into circular grooves at the positions where the first planking 1 and the second planking 2 are attached, then, the inserting blocks 7 are taken out, the nylon ropes 3 are sleeved through the through circular grooves at one side of the inserting blocks 7, the inserting blocks 7 are sleeved between each vertical row through the nylon ropes 3, the mud flaps 6 are sleeved on the position, which is close to the lowest ground, according to the whole device, the nylon ropes 3 are adopted, the sleeved number is determined according to the transverse size of the bank, after the pile is sleeved, the worker uses the top of the tamping mud flaps 6 until the mud flaps 602 at the bottoms of the mud flaps 6 are inserted into soil foundations, then, the worker takes out the first drilling tool 4 and the second drilling tool 4 corresponding to the number of the inserting blocks 7, and the second drilling tool 4 is inserted into the first drilling pile 5 and the second pile 5 through the first drilling tool 4 and the second drilling tool 4 until the first pile 5 and the top of the first pile and the second pile 4 are inserted into the pile 5 is completely, and the pile 5 is completely inserted into the pile 5.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the utility model.

Claims (10)

1. The utility model provides an ecological bank of environmental protection type net afforestation, includes first board (1), its characterized in that, round slotting has been run through in the both sides middle part of first board (1), second board (2) are installed to one side of first board (1), round slotting has been run through in the both sides middle part of second board (2), round slotting in both sides of first board (1) is unanimous with round slotting aperture in both sides of second board (2), swing joint has nylon rope (3) in round slotting in one side of laminating second board (2) first board (1).
2. An environmentally friendly grid greening ecological slope according to claim 1, wherein an insert (7) is mounted on one side of said first deck (1).
3. An environmental protection grid greening ecological slope according to claim 2, characterized in that the middle part of the insert block (7) is provided with a circular slot.
4. The environment-friendly grid greening ecological slope according to claim 2, wherein a circular slot is formed in the top side of the insertion block (7) in a penetrating manner, and a first metal sleeve (701) is fixedly connected in the circular slot in the top side of the insertion block (7).
5. The environment-friendly grid greening ecological slope as defined in claim 4, wherein a first drill pile (4) is movably connected to the inside of the first metal sleeve (701), and a first metal cone (401) is fixedly connected to the outer side of the bottom of the first drill pile (4).
6. An environmental protection grid greening ecological slope according to claim 2, wherein the other side of the top of the insert block (7) is provided with a circular slot.
7. An environmental protection grid greening ecological slope according to claim 2, wherein a second metal sleeve (702) is fixedly connected in a circular slot penetrating through the other side of the top of the plug block (7).
8. The environment-friendly grid greening ecological slope as defined in claim 7, wherein a second drill pile (5) is movably connected to the inside of the second metal sleeve (702), and a second metal cone (501) is fixedly connected to the bottom of the outer side of the second drill pile (5).
9. The environment-friendly grid greening ecological slope according to claim 1, wherein a mud guard (6) is installed on one side of the second pavement board (2), an equidistant through hole (601) is formed in the middle of the mud guard (6), a plugboard (602) is fixedly connected to the bottom of the mud guard (6), and circular grooves are formed in the side faces of the plugboard (602) in a penetrating mode.
10. An environmental protection grid greening ecological slope according to claim 9, wherein the nylon rope (3) penetrates through the middle of the plugboard (602) and penetrates through the circular slot to enable the nylon rope (3) to be movably connected to the inner side of the second pavement board (2).
CN202321197816.9U 2023-05-18 2023-05-18 Environment-friendly grid greening ecological slope Active CN220789612U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321197816.9U CN220789612U (en) 2023-05-18 2023-05-18 Environment-friendly grid greening ecological slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321197816.9U CN220789612U (en) 2023-05-18 2023-05-18 Environment-friendly grid greening ecological slope

Publications (1)

Publication Number Publication Date
CN220789612U true CN220789612U (en) 2024-04-16

Family

ID=90633340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321197816.9U Active CN220789612U (en) 2023-05-18 2023-05-18 Environment-friendly grid greening ecological slope

Country Status (1)

Country Link
CN (1) CN220789612U (en)

Similar Documents

Publication Publication Date Title
CN101790931B (en) Restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir
CN201162218Y (en) Grass planting bricks
CN102138428A (en) Vegetation restoration method adopting plant fiber blanket with assist of slurry spraying
CN108166520A (en) Electric power transmission line engineering construction soil and water conservation method
CN111173006A (en) Ecological slope protection method for reinforcing hilly soil by combining permeable retaining wall and sounding type bar planting belt
CN104594445A (en) Method for performing water retention and wetting irrigation by use of horizontal water storage tanks with contour line and structure
CN112854260B (en) Ecological concrete rock-soil slope protection structure and construction method
CN220789612U (en) Environment-friendly grid greening ecological slope
CN217694666U (en) Coastline landscape repair system
US3412561A (en) Reed-trench terracing
CN202139595U (en) Short-pipe-type ecological slope protective structure
RU2449078C2 (en) Method to erect erosion-preventive structure of biopositive design
KR100884017B1 (en) Method of Constructing Bank Walls with Recovering Natural Environment
KR20190103772A (en) Waste stone chapter restoration construction method
CN210561967U (en) Channel structure for improving flood control standard of existing river levee
CN109896632B (en) Ecological restoration method for degraded wetland in karst mountain area
CN113529753A (en) Construction method for quickly treating collapse hillock by fast-setting high polymer grouting
CN218813812U (en) Ecological protection system applied to steep slope
CN111501788A (en) Vegetation anchor rod slope fixing structure and method
KR100709103B1 (en) The mega green block
CN217678882U (en) A multi-functional ecological bank protection structure of standing vertically for city river course
CN209975538U (en) Dredged silt sintering-free ceramsite concrete plant-growing building block
KR100989662B1 (en) stone structure and this construction technique for bank protection
CN217325241U (en) Pile foundation gabion ecological retaining wall structure
CN114263197B (en) Green environment-friendly ecological slope protection structure and construction method thereof