CN220747166U - Buffer collecting and stacking construction structure - Google Patents

Buffer collecting and stacking construction structure Download PDF

Info

Publication number
CN220747166U
CN220747166U CN202322528338.1U CN202322528338U CN220747166U CN 220747166 U CN220747166 U CN 220747166U CN 202322528338 U CN202322528338 U CN 202322528338U CN 220747166 U CN220747166 U CN 220747166U
Authority
CN
China
Prior art keywords
buffer
inclined plate
embedded groove
water pipe
stacking construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322528338.1U
Other languages
Chinese (zh)
Inventor
柴起平
丁鹏
尚玉龙
蒋耀樟
高支付
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202322528338.1U priority Critical patent/CN220747166U/en
Application granted granted Critical
Publication of CN220747166U publication Critical patent/CN220747166U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The application discloses a pile up construction structure is collected to buffer includes: the embedded ditch is used for laying and placing the water pipe; the inclined plate is obliquely arranged in the embedded groove, the top of the inclined plate is in contact with the embedded groove, and the bottom edge of the inclined plate and the embedded groove are pressed and stacked by the buffer substance at intervals; and the buffer material is stacked in the interval between the bottom edge of the inclined plate and the embedded groove by taking the inclined plate obliquely arranged in the embedded groove as a guide extrusion way to form a thickness layer. Because the buffer extrusion stacks and forms the thickness layer in the interval of swash plate base and pre-buried ditch, when the water pipe is from top to bottom, buffer parcel water pipe bottom surface descends and rubble side contact, and the buffer lateral extrusion pushes away the rubble, has avoided rubble pointed end to break through with the water pipe towards the buffer contact, solves the problem that the stone breaks through tiling buffer damage water pipe pointed end up.

Description

Buffer collecting and stacking construction structure
Technical Field
The utility model relates to a buffer collecting and stacking construction structure, and belongs to the technical field of building construction.
Background
When photovoltaic power plant builds, in order to realize the cleanness of later stage to photovoltaic board, need excavate outlet pipe pre-buried ditch in construction site, when the photovoltaic board transported to construction site in, can blow out photovoltaic board extranal packing paper shell and plastics etc. to the pre-buried ditch in tiling under the strong wind effect, because pre-buried ditch 11 has pointed end up rubble 12 in the bottom when the excavation, can expand tiling to rubble 12 when buffer 13 such as packing paper shell and plastic packaging blow into pre-buried ditch 11 in, as shown in fig. 2, buffer 13 can expand tiling thickness thinner, when water pipe 14 is put from top to bottom, there is the stone up pointed end break through tiling buffer damage water pipe's problem.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a buffer collecting and stacking construction structure.
The utility model is realized by the following technical scheme.
The utility model provides a buffer collection stacking construction structure, which comprises the following components:
the embedded ditch is used for laying and placing the water pipe;
the inclined plate is obliquely arranged in the embedded groove, the top of the inclined plate is in contact with the embedded groove, and the bottom edge of the inclined plate and the embedded groove are pressed and stacked by the buffer substance at intervals;
and the buffer material is stacked in the interval between the bottom edge of the inclined plate and the embedded groove by taking the inclined plate obliquely arranged in the embedded groove as a guide extrusion way to form a thickness layer.
The buffer is paper shell and/or plastic.
The inclined plate bottom surface is fixed with the cooperation post, and cooperation post externally mounted has the cutting ferrule, has the rubber body that provides elasticity buffering between cutting ferrule and the cooperation post.
The bottom of the clamping sleeve is fixedly connected with a supporting rod, the bottom of the supporting rod is fixedly provided with a mounting plate, and the mounting plate is fixedly provided with a foot nail inserted into rock soil.
The middle part of the supporting rod is hinged with an inclined support, and the end part of the inclined support can be rotatably hinged to the bottom surface of the inclined plate.
One end of the inclined support is rotatably hinged to the bottom surface of the inclined plate through a hinge, and the other end of the inclined support is detachably inserted and rotatably installed in a hinge hole formed in the middle of the support rod through a bolt.
The utility model has the beneficial effects that: because the buffer extrusion stacks and forms the thickness layer in the interval of swash plate base and pre-buried ditch, when the water pipe is from top to bottom, buffer parcel water pipe bottom surface descends and rubble side contact, and the buffer lateral extrusion pushes away the rubble, has avoided rubble pointed end to break through with the water pipe towards the buffer contact, solves the problem that the stone breaks through tiling buffer damage water pipe pointed end up.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of the prior art;
in the figure: 11-embedding grooves; 12-breaking stone; 13-buffer; 14-a water pipe; 2-sloping plates; 21-mating columns; 22-cutting sleeve; 23-rubber body; 24-a support rod; 25-mounting plates; 26-foot nails; 27-inclined support; 28-plug pins.
Detailed Description
The technical solution of the present utility model is further described below, but the scope of the claimed utility model is not limited to the above.
As shown in fig. 1.
The utility model provides a pile up construction structure is collected to buffer, include:
an embedded ditch 11 is dug downwards at a construction site by an excavator, and the embedded ditch 11 is used for laying a water pipe 14;
the inclined plate 2 is formed by wood materials, the inclined plate 2 is obliquely arranged in the embedded groove 11, the top of the inclined plate 2 is in contact with the embedded groove 11, and the bottom edge of the inclined plate 2 and the embedded groove 11 are pressed and stacked by a buffer 13 at intervals;
and a buffer 13 made of paper, plastic or the like, wherein the buffer 13 is pressed and stacked in a distance between the bottom edge of the sloping plate 2 and the embedded groove 11 by using the sloping plate 2 obliquely installed in the embedded groove 11 as a guide to form a thickness layer after the buffer 13 is blown onto the sloping plate 2 by wind.
Because the buffer 13 is extruded and stacked in the interval between the bottom edge of the inclined plate 2 and the embedded groove 11 to form a thickness layer, when the water pipe 14 is put down from top to bottom, the buffer 13 wraps the bottom surface of the water pipe 14 and is put down to be in contact with the side edge of the broken stone 12, the buffer 13 is extruded and pushed down laterally to push the broken stone 12, the broken stone 12 tip breaks through contact with the water pipe 14 towards the buffer 13, and the problem that the broken stone breaks through the tiled buffer to damage the water pipe is solved.
The bottom surface bolt of swash plate 2 is fixed with the cooperation post 21, and cooperation post 21 externally mounted has cutting ferrule 22, has the rubber body 23 that provides elasticity buffering between cutting ferrule 22 and the cooperation post 21.
The bottom of the clamping sleeve 22 is fixedly connected with a supporting rod 24, a mounting plate 25 is fixed at the bottom of the supporting rod 24, and a foot nail 26 inserted into rock soil is fixed on the mounting plate 25.
The middle part of the supporting rod 24 is hinged with an inclined support 27, and the end part of the inclined support 27 is rotatably hinged on the bottom surface of the inclined plate 2; one end of the inclined support 27 is rotatably hinged to the bottom surface of the inclined plate 2 through a hinge, and the other end of the inclined support 27 is detachably inserted and rotatably installed in a hinge hole formed in the middle of the supporting rod 24 through a bolt 28.

Claims (6)

1. A buffer collection stacking construction structure, comprising:
the embedded ditch (11) is used for laying a water pipe (14);
the inclined plate (2) is obliquely arranged in the embedded groove (11), the top of the inclined plate (2) is in joint contact with the embedded groove (11), and the bottom edge of the inclined plate (2) and the embedded groove (11) are pressed and stacked by a buffer (13) at intervals;
and the buffer material (13) is stacked in the interval between the bottom edge of the inclined plate (2) and the embedded groove (11) by guiding and extruding by using the inclined plate (2) obliquely arranged in the embedded groove (11) to form a thickness layer.
2. The buffer collection stacking construction of claim 1, wherein: the buffer (13) is paper shell and/or plastic.
3. The buffer collection stacking construction of claim 1, wherein: the bottom surface of the sloping plate (2) is fixed with a matching column (21), a clamping sleeve (22) is arranged outside the matching column (21), and a rubber body (23) for providing elastic buffering is arranged between the clamping sleeve (22) and the matching column (21).
4. A buffer-collecting stacking construction as claimed in claim 3, characterized in that: the bottom of the clamping sleeve (22) is fixedly connected with a supporting rod (24), the bottom of the supporting rod (24) is fixedly provided with a mounting plate (25), and the mounting plate (25) is fixedly provided with a foot nail (26) inserted into rock soil.
5. The buffer collection stacking construction of claim 4, wherein: the middle part of the supporting rod (24) is hinged with an inclined support (27), and the end part of the inclined support (27) can be rotatably hinged to the bottom surface of the inclined plate (2).
6. The buffer collection stacking construction of claim 5, wherein: one end of the inclined support (27) is rotatably hinged to the bottom surface of the inclined plate (2) through a hinge, and the other end of the inclined support (27) is detachably inserted and rotatably installed in a hinge hole formed in the middle of the supporting rod (24) through a bolt (28).
CN202322528338.1U 2023-09-18 2023-09-18 Buffer collecting and stacking construction structure Active CN220747166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322528338.1U CN220747166U (en) 2023-09-18 2023-09-18 Buffer collecting and stacking construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322528338.1U CN220747166U (en) 2023-09-18 2023-09-18 Buffer collecting and stacking construction structure

Publications (1)

Publication Number Publication Date
CN220747166U true CN220747166U (en) 2024-04-09

Family

ID=90564401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322528338.1U Active CN220747166U (en) 2023-09-18 2023-09-18 Buffer collecting and stacking construction structure

Country Status (1)

Country Link
CN (1) CN220747166U (en)

Similar Documents

Publication Publication Date Title
CN108661044B (en) Plastic drainage plate and construction method for drainage consolidation of soft soil foundation
CN220747166U (en) Buffer collecting and stacking construction structure
CN210421081U (en) Reinforced structure of concrete foundation pile
CN107178224B (en) A kind of garden landscape pond
CN102134842B (en) Method for building fishpond protecting slope
CN214725017U (en) Be used for ornamental trees and shrubs branch shredding device
CN202124863U (en) Screw anchor excavated composite foundation
CN201496070U (en) Construction equipment of refuse filler gas-gathering well of refuse landfill site
CN216360910U (en) Waterproofing membrane lays and pastes compaction device
CN215253002U (en) Large-volume retaining wall structure based on long glass fiber composite material template
CN212714810U (en) Ecological bank slope protective structure of hydraulic engineering
CN112663634A (en) Geotechnical engineering slope reinforcement device and method
CN209523185U (en) The plastic-steel sheet pile foundation of antiseepage under a kind of bottom plate for soft soil foundation lock station
CN113585355B (en) Construction process for preventing basement exterior wall waterproof layer protection plate from being pasted and toppled
CN215252048U (en) Soft foundation reinforcing apparatus for highway engineering construction
CN214739380U (en) Non-asphalt-based polymer pre-paved waterproof coiled material
CN217923538U (en) Screw pile for foundation stabilization of high-rise building
CN220848053U (en) Waterproof coiled material fixing ring
CN214883839U (en) Concrete retaining wall with bearing structure and be convenient for assembly
CN215245861U (en) Waterproofing membrane packing plant
CN214245589U (en) Combined type soil and water conservation net for hydraulic engineering
CN216920410U (en) Universal large anti-buoyancy foundation structure
CN219508614U (en) Slope protection net and slope fixing mechanism
CN218028194U (en) Connecting structure between module and civil engineering structure
CN214423301U (en) Hydraulic engineering protects bearing structure with ecological bank protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant