CN220747166U - Buffer collecting and stacking construction structure - Google Patents
Buffer collecting and stacking construction structure Download PDFInfo
- Publication number
- CN220747166U CN220747166U CN202322528338.1U CN202322528338U CN220747166U CN 220747166 U CN220747166 U CN 220747166U CN 202322528338 U CN202322528338 U CN 202322528338U CN 220747166 U CN220747166 U CN 220747166U
- Authority
- CN
- China
- Prior art keywords
- buffer
- inclined plate
- embedded groove
- water pipe
- stacking construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 19
- 239000000463 material Substances 0.000 claims abstract description 4
- 239000004033 plastic Substances 0.000 claims description 5
- 229920003023 plastic Polymers 0.000 claims description 5
- 230000003139 buffering effect Effects 0.000 claims description 3
- 239000011435 rock Substances 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 239000004575 stone Substances 0.000 abstract description 8
- 238000001125 extrusion Methods 0.000 abstract description 6
- 239000012928 buffer substance Substances 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The application discloses a pile up construction structure is collected to buffer includes: the embedded ditch is used for laying and placing the water pipe; the inclined plate is obliquely arranged in the embedded groove, the top of the inclined plate is in contact with the embedded groove, and the bottom edge of the inclined plate and the embedded groove are pressed and stacked by the buffer substance at intervals; and the buffer material is stacked in the interval between the bottom edge of the inclined plate and the embedded groove by taking the inclined plate obliquely arranged in the embedded groove as a guide extrusion way to form a thickness layer. Because the buffer extrusion stacks and forms the thickness layer in the interval of swash plate base and pre-buried ditch, when the water pipe is from top to bottom, buffer parcel water pipe bottom surface descends and rubble side contact, and the buffer lateral extrusion pushes away the rubble, has avoided rubble pointed end to break through with the water pipe towards the buffer contact, solves the problem that the stone breaks through tiling buffer damage water pipe pointed end up.
Description
Technical Field
The utility model relates to a buffer collecting and stacking construction structure, and belongs to the technical field of building construction.
Background
When photovoltaic power plant builds, in order to realize the cleanness of later stage to photovoltaic board, need excavate outlet pipe pre-buried ditch in construction site, when the photovoltaic board transported to construction site in, can blow out photovoltaic board extranal packing paper shell and plastics etc. to the pre-buried ditch in tiling under the strong wind effect, because pre-buried ditch 11 has pointed end up rubble 12 in the bottom when the excavation, can expand tiling to rubble 12 when buffer 13 such as packing paper shell and plastic packaging blow into pre-buried ditch 11 in, as shown in fig. 2, buffer 13 can expand tiling thickness thinner, when water pipe 14 is put from top to bottom, there is the stone up pointed end break through tiling buffer damage water pipe's problem.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a buffer collecting and stacking construction structure.
The utility model is realized by the following technical scheme.
The utility model provides a buffer collection stacking construction structure, which comprises the following components:
the embedded ditch is used for laying and placing the water pipe;
the inclined plate is obliquely arranged in the embedded groove, the top of the inclined plate is in contact with the embedded groove, and the bottom edge of the inclined plate and the embedded groove are pressed and stacked by the buffer substance at intervals;
and the buffer material is stacked in the interval between the bottom edge of the inclined plate and the embedded groove by taking the inclined plate obliquely arranged in the embedded groove as a guide extrusion way to form a thickness layer.
The buffer is paper shell and/or plastic.
The inclined plate bottom surface is fixed with the cooperation post, and cooperation post externally mounted has the cutting ferrule, has the rubber body that provides elasticity buffering between cutting ferrule and the cooperation post.
The bottom of the clamping sleeve is fixedly connected with a supporting rod, the bottom of the supporting rod is fixedly provided with a mounting plate, and the mounting plate is fixedly provided with a foot nail inserted into rock soil.
The middle part of the supporting rod is hinged with an inclined support, and the end part of the inclined support can be rotatably hinged to the bottom surface of the inclined plate.
One end of the inclined support is rotatably hinged to the bottom surface of the inclined plate through a hinge, and the other end of the inclined support is detachably inserted and rotatably installed in a hinge hole formed in the middle of the support rod through a bolt.
The utility model has the beneficial effects that: because the buffer extrusion stacks and forms the thickness layer in the interval of swash plate base and pre-buried ditch, when the water pipe is from top to bottom, buffer parcel water pipe bottom surface descends and rubble side contact, and the buffer lateral extrusion pushes away the rubble, has avoided rubble pointed end to break through with the water pipe towards the buffer contact, solves the problem that the stone breaks through tiling buffer damage water pipe pointed end up.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of the prior art;
in the figure: 11-embedding grooves; 12-breaking stone; 13-buffer; 14-a water pipe; 2-sloping plates; 21-mating columns; 22-cutting sleeve; 23-rubber body; 24-a support rod; 25-mounting plates; 26-foot nails; 27-inclined support; 28-plug pins.
Detailed Description
The technical solution of the present utility model is further described below, but the scope of the claimed utility model is not limited to the above.
As shown in fig. 1.
The utility model provides a pile up construction structure is collected to buffer, include:
an embedded ditch 11 is dug downwards at a construction site by an excavator, and the embedded ditch 11 is used for laying a water pipe 14;
the inclined plate 2 is formed by wood materials, the inclined plate 2 is obliquely arranged in the embedded groove 11, the top of the inclined plate 2 is in contact with the embedded groove 11, and the bottom edge of the inclined plate 2 and the embedded groove 11 are pressed and stacked by a buffer 13 at intervals;
and a buffer 13 made of paper, plastic or the like, wherein the buffer 13 is pressed and stacked in a distance between the bottom edge of the sloping plate 2 and the embedded groove 11 by using the sloping plate 2 obliquely installed in the embedded groove 11 as a guide to form a thickness layer after the buffer 13 is blown onto the sloping plate 2 by wind.
Because the buffer 13 is extruded and stacked in the interval between the bottom edge of the inclined plate 2 and the embedded groove 11 to form a thickness layer, when the water pipe 14 is put down from top to bottom, the buffer 13 wraps the bottom surface of the water pipe 14 and is put down to be in contact with the side edge of the broken stone 12, the buffer 13 is extruded and pushed down laterally to push the broken stone 12, the broken stone 12 tip breaks through contact with the water pipe 14 towards the buffer 13, and the problem that the broken stone breaks through the tiled buffer to damage the water pipe is solved.
The bottom surface bolt of swash plate 2 is fixed with the cooperation post 21, and cooperation post 21 externally mounted has cutting ferrule 22, has the rubber body 23 that provides elasticity buffering between cutting ferrule 22 and the cooperation post 21.
The bottom of the clamping sleeve 22 is fixedly connected with a supporting rod 24, a mounting plate 25 is fixed at the bottom of the supporting rod 24, and a foot nail 26 inserted into rock soil is fixed on the mounting plate 25.
The middle part of the supporting rod 24 is hinged with an inclined support 27, and the end part of the inclined support 27 is rotatably hinged on the bottom surface of the inclined plate 2; one end of the inclined support 27 is rotatably hinged to the bottom surface of the inclined plate 2 through a hinge, and the other end of the inclined support 27 is detachably inserted and rotatably installed in a hinge hole formed in the middle of the supporting rod 24 through a bolt 28.
Claims (6)
1. A buffer collection stacking construction structure, comprising:
the embedded ditch (11) is used for laying a water pipe (14);
the inclined plate (2) is obliquely arranged in the embedded groove (11), the top of the inclined plate (2) is in joint contact with the embedded groove (11), and the bottom edge of the inclined plate (2) and the embedded groove (11) are pressed and stacked by a buffer (13) at intervals;
and the buffer material (13) is stacked in the interval between the bottom edge of the inclined plate (2) and the embedded groove (11) by guiding and extruding by using the inclined plate (2) obliquely arranged in the embedded groove (11) to form a thickness layer.
2. The buffer collection stacking construction of claim 1, wherein: the buffer (13) is paper shell and/or plastic.
3. The buffer collection stacking construction of claim 1, wherein: the bottom surface of the sloping plate (2) is fixed with a matching column (21), a clamping sleeve (22) is arranged outside the matching column (21), and a rubber body (23) for providing elastic buffering is arranged between the clamping sleeve (22) and the matching column (21).
4. A buffer-collecting stacking construction as claimed in claim 3, characterized in that: the bottom of the clamping sleeve (22) is fixedly connected with a supporting rod (24), the bottom of the supporting rod (24) is fixedly provided with a mounting plate (25), and the mounting plate (25) is fixedly provided with a foot nail (26) inserted into rock soil.
5. The buffer collection stacking construction of claim 4, wherein: the middle part of the supporting rod (24) is hinged with an inclined support (27), and the end part of the inclined support (27) can be rotatably hinged to the bottom surface of the inclined plate (2).
6. The buffer collection stacking construction of claim 5, wherein: one end of the inclined support (27) is rotatably hinged to the bottom surface of the inclined plate (2) through a hinge, and the other end of the inclined support (27) is detachably inserted and rotatably installed in a hinge hole formed in the middle of the supporting rod (24) through a bolt (28).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322528338.1U CN220747166U (en) | 2023-09-18 | 2023-09-18 | Buffer collecting and stacking construction structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322528338.1U CN220747166U (en) | 2023-09-18 | 2023-09-18 | Buffer collecting and stacking construction structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220747166U true CN220747166U (en) | 2024-04-09 |
Family
ID=90564401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322528338.1U Active CN220747166U (en) | 2023-09-18 | 2023-09-18 | Buffer collecting and stacking construction structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220747166U (en) |
-
2023
- 2023-09-18 CN CN202322528338.1U patent/CN220747166U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108661044B (en) | Plastic drainage plate and construction method for drainage consolidation of soft soil foundation | |
CN220747166U (en) | Buffer collecting and stacking construction structure | |
CN210421081U (en) | Reinforced structure of concrete foundation pile | |
CN107178224B (en) | A kind of garden landscape pond | |
CN102134842B (en) | Method for building fishpond protecting slope | |
CN214725017U (en) | Be used for ornamental trees and shrubs branch shredding device | |
CN202124863U (en) | Screw anchor excavated composite foundation | |
CN201496070U (en) | Construction equipment of refuse filler gas-gathering well of refuse landfill site | |
CN216360910U (en) | Waterproofing membrane lays and pastes compaction device | |
CN215253002U (en) | Large-volume retaining wall structure based on long glass fiber composite material template | |
CN212714810U (en) | Ecological bank slope protective structure of hydraulic engineering | |
CN112663634A (en) | Geotechnical engineering slope reinforcement device and method | |
CN209523185U (en) | The plastic-steel sheet pile foundation of antiseepage under a kind of bottom plate for soft soil foundation lock station | |
CN113585355B (en) | Construction process for preventing basement exterior wall waterproof layer protection plate from being pasted and toppled | |
CN215252048U (en) | Soft foundation reinforcing apparatus for highway engineering construction | |
CN214739380U (en) | Non-asphalt-based polymer pre-paved waterproof coiled material | |
CN217923538U (en) | Screw pile for foundation stabilization of high-rise building | |
CN220848053U (en) | Waterproof coiled material fixing ring | |
CN214883839U (en) | Concrete retaining wall with bearing structure and be convenient for assembly | |
CN215245861U (en) | Waterproofing membrane packing plant | |
CN214245589U (en) | Combined type soil and water conservation net for hydraulic engineering | |
CN216920410U (en) | Universal large anti-buoyancy foundation structure | |
CN219508614U (en) | Slope protection net and slope fixing mechanism | |
CN218028194U (en) | Connecting structure between module and civil engineering structure | |
CN214423301U (en) | Hydraulic engineering protects bearing structure with ecological bank protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |