- Publication number
- CN107178224B CN107178224B CN201710373789.9A CN201710373789A CN107178224B CN 107178224 B CN107178224 B CN 107178224B CN 201710373789 A CN201710373789 A CN 201710373789A CN 107178224 B CN107178224 B CN 107178224B
- Authority
- CN
- China
- Prior art keywords
- pond
- support frame
- solar panel
- garden landscape
- pool wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H4/00—Swimming or splash baths or pools
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
- E03F5/103—Naturals or landscape retention bodies, e.g. ponds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Photovoltaic Devices (AREA)
Abstract
The invention discloses a kind of garden landscape pond, it is advantageous that voluntarily can be powered to fountain apparatus.A kind of garden landscape pond, including bottom of pond and pool wall, fountain apparatus is provided with the middle part of the bottom of pond, the pool wall is spliced to form by splicing component, the splicing component includes the solar panel to fountain apparatus power supply, the side of support frame as described above is provided with the base shaft with support frame rotation connection, the base shaft when being turned to horizontality and support frame side abut fix, the base shaft is provided with the datum hole in vertical state in base shaft down tilt backwards to support frame one end, the opposite side of support frame as described above is provided with vertical slide rail, the slide rail is provided with the moving block moved along slide direction, the moving block is provided with the motion bar with moving block rotation connection, the motion bar is provided with the inserted link that can be inserted in datum hole backwards to the side of moving block one end.
Description
Technical field
The present invention relates to gardens construction field, more particularly to a kind of garden landscape pond.
Background technology
Authorization Notice No. is that CN204753491U utility model patent discloses a kind of landscape pond in diversion cofferdam.The hair
The bright side wall that landscape pond is spliced to form by arc enclosing and plane enclosing, such construction period is shorter, and needs to landscape
After arc enclosing and plane enclosing being removed when transformation cooperatively form new shape.
But there is problems with the invention:Set in landscape pond and also need to fill to fountain in addition when fountain apparatus
Put and be equipped with external power supply electric wire.
The content of the invention
One of purpose of the present invention is to provide a kind of garden landscape pond, it is advantageous that fountain apparatus can voluntarily be given
Power supply.
The present invention above-mentioned technical purpose technical scheme is that:A kind of garden landscape pond, including
Bottom of pond and pool wall, the bottom of pond middle part are provided with fountain apparatus, and the pool wall is spliced to form by splicing component, the splicing component bag
The solar panel to fountain apparatus power supply is included, the side of support frame as described above is provided with the base shaft with support frame rotation connection, institute
State base shaft when being turned to horizontality and support frame side abut fix, the base shaft backwards to support frame one end be provided with base
Datum hole in vertical state during bar down tilt, the opposite side of support frame as described above are provided with vertical slide rail, the slide rail be provided with along
The moving block of slide direction motion, the moving block are provided with the motion bar with moving block rotation connection, and the motion bar is backwards
The side of moving block one end is provided with the inserted link that can be inserted in datum hole.
By using above-mentioned technical proposal, pool wall is set to be spliced to form pool wall as splicing component by solar panel,
Landscape pond need reconstruction when can will splicing component remove after be used for new landscape pond pool wall, will not as it is brick into
Landscape pond like that reconstruction when need completely demolition rebuild.Solar panel has good waterproof effect therefore can
Used using the panel as pool wall, and solar panel is converted solar energy into electrical energy as pool wall and supplied to fountain apparatus
Electricity, it is not necessary to additionally meet supply line to fountain apparatus.Support frame plays a part of supporting solar panel, passes through inserted link card
Enter in datum hole and base shaft and motion bar link together, by whole splicings after the base shaft and motion bar of whole link together
Component is all linked together so that solar panel will not outwards be offset in the presence of hydraulic pressure.
The present invention is further arranged to:Between the solar panel be provided be used for seal connected solar panel it
Between gap rubber seal.
By using above-mentioned technical proposal, the gap between solar panel is sealed by rubber seal, prevented
Water is spilt out from the gap between solar panel.Sealed simultaneously by rubber weather strip, splicing group is separated removing
Solar panel will not be caused to damage as splicing concrete when part.
The present invention is further arranged to:The both sides of the solar panel are equipped with close to the position of positive and negative both sides panel
Elastic clip, the elastic clip tilt backwards to solar panel direction toward the direction of adjacent spring intermediate plate, the elastic clip
Maximum spacing between piece is more than the thickness of rubber seal, minimum spacing is less than the thickness of rubber seal.
By using above-mentioned technical proposal, due to the maximum spacing between elastic clip be more than rubber seal thickness,
Minimum spacing is less than the thickness of rubber seal, therefore the position that can be placed on rubber seal between two panels elastic clip,
Rubber seal is matched for clamping tightly by two panels elastic clip.
The present invention is further arranged to:The elastic clip is provided with smooth surface transition backwards to one end of solar panel
Chuck.
By using above-mentioned technical proposal, cause rubber seal when clamping rubber seal in order to avoid elastic clip
Part is damaged, and sets the chuck of smooth surface transition to be matched for clamping tightly rubber seal, when rubber seal is clamped just not
Because having sharp portion and rubber seal contact rubber seal can be caused to be damaged.
The present invention is further arranged to:The abutting for supporting elastic clip in advance is provided between elastic clip described in two panels
Block.
By using above-mentioned technical proposal, first two panels elastic clip is supported by abutting block, so rubber is close
It is more convenient during the position between two panels elastic clip that sealing is put into, and can will abut after rubber seal installation
Block takes out so that the two panels elastic clip of rubber seal both sides clamps to centre rubber seal being fixed on two blocks of solar energy
Position between cell panel so that the gap between rubber seal and solar panel can be tightly sealed.
The present invention is further arranged to:The steel wire rope for abutting block and being provided through abutting block, the both ends of the steel wire rope
It is equipped with limited block.
By using above-mentioned technical proposal, by both ends after steel wire penetrating abutting block with limited block come spacing steel
Cord will not deviate from from limited block, and can by limited block easily will abut block pull come.
The present invention is further arranged to:The solar panel tilts to the direction away from pond center from the bottom up.
By using above-mentioned technical proposal, set solar panel to tilt installation, on the one hand to take out solar-electricity
Pond plate is bigger to the collection surface of sunshine, higher to the collection efficiency of solar energy, and the pool wall being on the other hand obliquely installed to enclose
Hold together mound the active force of pool wall to pond center position is not easy to make solar panel cave in.
The present invention is further arranged to:The outside of the splicing component is provided with and crowds around mound, described to crowd around mound upper position
The side platform of large-scale stone formation is provided with the pool wall position of one week.
By using above-mentioned technical proposal, by crowding around the space on the outside of mound filling splicing component, support splicing is played
The effect of component.It is compacted crowd around mound by side platform simultaneously, avoiding crowding around the pine excessively of the soil in mound causes the branch that can be born
Support force is smaller, it is difficult to offsets the pressure to caused by splicing component of the water in landscape pond.
The present invention is further arranged to:The bottom of pond is spliced to form by reflective mirror, and the bottom of pond is in middle high surrounding bottom
Arch, the cambered surface of the bottom of pond is less than pool wall lowest point and the line of opposite side pool wall highest side position.
By using above-mentioned technical proposal, bottom of pond is spliced to form come reflected solar energy by reflective mirror so that sunshine passes through
Crossing after bottom of pond reflects to be irradiated on the solar panel of pool wall, increase the inversion quantity of solar panel.Noon
When the sun it is the most sufficient, when at this time sunshine is also closest to vertical, solar panel at this moment due to too
It is fewer on the contrary into larger angle, the solar energy of conversion between sunlight.Arch minute surface bottom of pond allows bottom plate partly to connect
Nearly vertical sunshine is reflexed on solar panel.The cambered surface of bottom of pond is less than pool wall lowest point and opposite side pool wall most
The line of high side position, avoid arch bottom of pond in the morning with blocked when the dusk irradiation solar panel sunshine.
It is a further object to provide a kind of construction method in garden landscape pond.
The present invention above-mentioned technical purpose technical scheme is that:A kind of construction in garden landscape pond
Method, including
Step a:Line setting;
Step b:Pond excavation of foundation pit;
Step c:Bottom of pond is constructed;
Step d:Pool wall spicing forming type;
Solar panel splicing is crowded around to the pool wall to form landscape pond, filled out rubber seal while pool wall is formed
Between entering elastic clip, the position between every two pieces of solar panels digs downwards one and avoids hole to be easy to the limit of lower section
Position block takes out.Block taking-up will be abutted by pullling steel wire rope by limited block so that and elastic clip clamps rubber seal and forms sealing,
Fill and lead up avoidance hole.
Step e:Mound is crowded around to tamp;
Step f:Bottom of pond minute surface is installed;
Step g:Gap water-proofing treatment.
By using above-mentioned technical proposal, above-mentioned garden landscape pond can be built up by above-mentioned construction method.
In summary, beneficial effects of the present invention are:
1st, powered by solar panel to collect solar energy to fountain apparatus;
2nd, bottom of pond is spliced to form by reflective mirror so that being irradiated to the sunshine of bottom of pond has part energy after reflection
Enough it is irradiated on solar panel, increases the solar energy inversion quantity of solar panel.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment;
Fig. 2 is that embodiment hides the structural representation crowded around after mound and side platform;
Fig. 3 is the structural representation of solar panel in embodiment;
Fig. 4 is to be caught in structural representation when abutting block in embodiment between elastic clip;
Fig. 5 is the schematic cross-sectional view of embodiment;
Fig. 6 is the structural representation of support frame in embodiment.
Reference:1st, bottom of pond;2nd, pool wall;3rd, fountain apparatus;4th, solar panel;5th, mound is crowded around;6th, side platform;7、
Elastic clip;8th, rubber seal;9th, chuck;10th, support frame;11st, reflective mirror;12nd, block is abutted;13rd, steel wire rope;14th, it is spacing
Block;15th, base shaft;16th, motion bar;17th, datum hole;18th, slide rail;19th, moving block;20th, inserted link.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art
Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this
All protected in the right of invention by Patent Law.
Embodiment 1:As depicted in figs. 1 and 2, a kind of garden landscape pond, including bottom of pond 1 and pool wall 2, the middle part peace of bottom of pond 1
Equipped with fountain apparatus 3.Pool wall 2 is spliced to form by splicing component, and the splicing component includes the solar cell as the panel of pool wall 2
Plate 4.Solar energy is absorbed by solar panel 4 and is converted into electric energy to be powered to fountain apparatus 3.The outside of pool wall 2, which is filled with, encloses
Hold together mound 5 to play a part of supporting pool wall 2, large-scale stone conduct is placed with above mound 5 in crowding around of making a circle for 2 weeks of pool wall
Side platform 6 is compacted crowd around mound 5.
As shown in figure 3, the both sides of solar panel 4 are respectively connected with a piece of elastic clip close to the position of positive and negative both sides panel
Piece 7, elastic clip 7 tilt backwards to solar panel 4 toward close to the direction of adjacent spring intermediate plate 7.Two blocks of adjacent solar energy
Linked together between cell panel 4 by the rubber seal 8 of strip, in order to avoid elastic clip 7 extrudes rubber seal 8
Cause rubber seal 8 to damage, set elastic clip 7 to form the chuck 9 of cylinder backwards to one end of solar panel 4.
As shown in Figure 3 and Figure 4, inserted between adjacent solar battery plate 4 before rubber seal 8, the two of the same side
The square abutting block 12 for strutting two panels elastic clip 7 is installed between piece elastic clip 7.Abut block 12 and be provided with two pieces and difference altogether
Positioned at the upper and lower ends of flexure strip, steel wire rope 13 is from two end faces up and down of block 12 are abutted through afterwards at the both ends of steel wire rope 13
Two limited blocks 14 are set, and block 12 can will easily be abutted from two panels elastic clip 7 by pullling steel wire rope 13 by limited block 14
Between take out so that two panels elastic clip 7 to centre collapse extruding rubber seal 8 formed sealing.
As shown in Figure 1 and Figure 5, in order to increase the solar energy inversion quantity of solar panel 4, solar panel 4 is set
Offset from the bottom up to the direction away from pond center so that solar panel 4 has bigger inclination angle, gathers the effect of sunlight
More preferably.The pool wall 2 being obliquely installed simultaneously make it that crowd around mound 5 is not easy to make solar energy to the active force of pool wall 2 to pond center position
Cell panel 4 caves in.Splicing component also includes passing through branch towards the support frame 10 for crowding around the direction of mound 5 positioned at solar panel 4
Support 10 make it that solar panel 4 will not also move to the direction of mound 5 is crowded around when rainstorm weather water level is deeper.
As shown in fig. 6, the left and right sides of support frame 10 is separately installed with base shaft 15 and motion bar 16, base shaft 15 and support frame
The 10 rotation connections and end face of base shaft 15 and support frame 10 are abutted and completed when down tilt, base shaft 15 backwards to support frame 10 one
End is provided with the datum hole 17 in vertical state in 15 down tilt of base shaft.The side of support frame 10 is provided with vertical slide rail 18, living
One end of lever 16 is rotatablely connected with moving block 19, and moving block 19 and slide rail 18 coordinate and only can be along on the directions of slide rail 18
Lower movement.Motion bar 16 forms inserted link 20 backwards to the side of the one end of moving block 19, when base shaft 15 is turned to horizontal state,
Along the slide downward of slide rail 18 inserted link 20 is inserted in datum hole 17 motion bar 16, pass through base shaft 15 between multiple support frames 10
With cooperating together for motion bar 16 so that support frame 10 will not outwards break away in the presence of the hydraulic pressure in landscape pond
Move.
As shown in Figure 1 and Figure 5, bottom of pond 1 is spliced by reflective mirror 11 and formed come reflected sunlight so that solar panel 4
The solar energy received is more.The sun is the most sufficient when noon, when at this time sunshine is also closest to vertical, too
Positive energy cell panel 4 is at this moment due to fewer on the contrary into larger angle, the solar energy of conversion between sunshine.Therefore set
Bottom of pond 1 is middle arch high, surrounding is low so that part can be reflexed to solar energy by reflective mirror 11 close to vertical sunshine
On cell panel 4.Company of the cambered surface of arch bottom of pond 1 less than the lowest point of pool wall 2 and the highest side position of opposite side pool wall 2 simultaneously
Line, avoid arch bottom of pond 1 in the morning with sunshine that direct projection solar panel 4 is blocked when the dusk.
Embodiment 2:A kind of construction method in the garden landscape pond for described in embodiment 1.
Step a:Line setting
Unwrapping wire position is defined by the landscape pond design edge line 1m that stretches out.
Step b:Pond excavation of foundation pit
Substrate is tamped after digging to designed elevation:Percent 93,200 thick grade sand-gravel cushions of compactness, 100 thick C20 elements are mixed
Solidifying soil padding, 2 solid cement based penetration crystallization type water proofing paint waterproof layers.Ponding occurs in work progress in bottom of pond 1 then to be needed to adopt
Taking and discharging measure, temporary drain is dug along the base side of bottom of pond 1, is taken away after the ponding of bottom of pond 1 is directed at one with suction pump.
Step c:Bottom of pond is constructed
HPB235 levels and HRB335 level splices colligation form basic unit, and mould plate crowds around reinforcing bar basic unit and forms the upper of arch
Surface, fill concrete are molded to form bottom of pond 1.Concrete cement dosage is no less than 320 kilograms every cubic metre, and silt content is preferably hundred
/ 35 to 40, cement-sand ratio 1:2 ~ 2.5, the ratio of mud is less than 0.6, should use Anti-seepage Waterproofing Concrete of the seepage-resistant grade for P6.
Step d:Pool wall spicing forming type
Solar panel 4 is spliced and crowds around the pool wall 2 to form landscape pond, by rubber seal while pool wall 2 are formed
Part 8 is inserted between elastic clip 7, the position between every two pieces of solar panels 4 downwards dig one avoid hole come be easy to by
The limited block 14 of lower section takes out.Steel wire rope 13 is pullled by limited block 14 to take out block 12 is abutted so that elastic clip 7 clamps rubber
Glue seal 8 forms sealing, fills and leads up avoidance hole.
Step e:Mound is crowded around to tamp
The position excavated after line is crowded around into mound 5 to fill and lead up more, also support frame 10 is embedded in and crowded around in mound 5, afterwards
Crowd around mound 5 to tamp, compactness percent 93.Large-scale stone is laid above mound 5 around the position that pool wall 2 one encloses crowding around
Side platform 6 is formed, mound 5 is crowded around in compacting.
Step f:Bottom of pond minute surface is installed
Reflective mirror 11 is installed in bottom of pond 1, concrete sump bottom 1 of the reflective mirror 11 along arch laid, and ultimately form arch
The minute surface bottom of pond 1 of shape.
Step g:Gap water-proofing treatment
Fit clearance between gap between the reflective mirror 11 of bottom of pond 1 and bottom of pond 1, pool wall 2 is passed through into JS composite water-proofs
Coating filling sealing.
Claims (9)
1. a kind of garden landscape pond, including bottom of pond (1) and pool wall (2), bottom of pond (1) middle part is provided with fountain apparatus (3), and it is special
Sign is:The pool wall (2) is spliced to form by splicing component, and the splicing component includes the solar energy to fountain apparatus (3) power supply
Cell panel (4) and the support frame (10) positioned at solar panel (4) backwards to pond center side, the side of support frame as described above (10)
Provided with the base shaft (15) being rotatablely connected with support frame (10), the base shaft (15) is when being turned to horizontality and support frame (10)
Side abut fix, the base shaft (15) backwards to support frame (10) one end be provided be in vertical state in base shaft (15) down tilt
Datum hole (17), the opposite side of support frame as described above (10) is provided with vertical slide rail (18), and the slide rail (18) is provided with along slide rail
(18) moving block (19) of direction motion, the moving block (19) are provided with the motion bar with moving block (19) rotation connection
(16), the motion bar (16) is provided with the inserted link (20) that can be inserted in datum hole (17) backwards to the side of moving block (19) one end.
2. garden landscape pond according to claim 1, it is characterized in that:It is provided with and is used between the solar panel (4)
The rubber seal (8) in gap between the connected solar panel (4) of sealing.
3. garden landscape pond according to claim 2, it is characterized in that:The both sides of the solar panel (4) are close to just
The position of anti-both sides panel is equipped with elastic clip (7), and the elastic clip (7) is backwards to solar panel (4) direction toward phase
The direction of adjacent elastic clip (7) tilts, the maximum spacing between the elastic clip (7) be more than rubber seal (8) thickness,
Minimum spacing is less than the thickness of rubber seal (8).
4. garden landscape pond according to claim 3, it is characterized in that:The elastic clip (7) is backwards to solar panel
(4) one end is provided with the chuck (9) of smooth surface transition.
5. garden landscape pond according to claim 3, it is characterized in that:It is provided between elastic clip described in two panels (7) by bullet
The abutting block (12) that property intermediate plate (7) supports in advance.
6. garden landscape pond according to claim 5, it is characterized in that:The abutting block (12) is provided through abutting block (12)
Steel wire rope (13), the both ends of the steel wire rope (13) are equipped with limited block (14).
7. garden landscape pond according to claim 1, it is characterized in that:The solar panel (4) is from the bottom up to remote
Direction from pond center tilts.
8. garden landscape pond according to claim 7, it is characterized in that:The outside of the splicing component is provided with and crowds around mound
(5) it is, described to crowd around the side platform (6) for being provided with the formation of large-scale stone above mound (5) positioned at the pool wall position of (2) one weeks.
9. garden landscape pond according to claim 1, it is characterized in that:The bottom of pond (1) is spliced to form by reflective mirror (11),
The bottom of pond (1) is in the arch at middle high surrounding bottom, and the cambered surface of the bottom of pond (1) is less than pool wall (2) lowest point and relative
The line of side pool wall (2) highest side position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710373789.9A CN107178224B (en) | 2017-05-24 | 2017-05-24 | A kind of garden landscape pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710373789.9A CN107178224B (en) | 2017-05-24 | 2017-05-24 | A kind of garden landscape pond |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107178224A CN107178224A (en) | 2017-09-19 |
CN107178224B true CN107178224B (en) | 2018-03-09 |
Family
ID=59831499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710373789.9A Active CN107178224B (en) | 2017-05-24 | 2017-05-24 | A kind of garden landscape pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107178224B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236405B (en) * | 2020-02-25 | 2021-01-01 | 广州隆盛景观建设有限公司 | Landscape pool construction method |
CN111677348B (en) * | 2020-04-23 | 2021-08-24 | 浙江晶天建设有限公司 | Afforestation view pond structure |
CN111636744A (en) * | 2020-06-08 | 2020-09-08 | 广东中都建筑集团有限公司 | Landscape pool construction method |
CN115247425A (en) * | 2022-05-13 | 2022-10-28 | 珠海华发城市研究院有限公司 | Construction method of fountain pool landscape |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4932085A (en) * | 1984-07-09 | 1990-06-12 | Allmark Industries, Inc. | Above ground swimming pool with improved rib structure and modular deck panels for solar heating of pool water |
US7997828B2 (en) * | 2004-12-06 | 2011-08-16 | Cornelis Elizabeth Rijlaarsdam | Retaining wall |
CN201874264U (en) * | 2010-07-28 | 2011-06-22 | 绍兴豪德斯电暖科技有限公司 | House using solar energy as heat source |
GB2507303B (en) * | 2012-10-25 | 2015-03-11 | James Murphy | Solar energy system |
US20140166076A1 (en) * | 2012-12-17 | 2014-06-19 | Masimo Semiconductor, Inc | Pool solar power generator |
CN204690781U (en) * | 2015-05-14 | 2015-10-07 | 刘月华 | A kind of construction of hydro project retaining wall |
CN104924832A (en) * | 2015-07-08 | 2015-09-23 | 无锡市翱宇特新科技发展有限公司 | Photovoltaic power supplied landscape spray pond |
CN204753491U (en) * | 2015-07-27 | 2015-11-11 | 新疆师范大学 | Landscape pool in diversion cofferdam |
-
2017
- 2017-05-24 CN CN201710373789.9A patent/CN107178224B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107178224A (en) | 2017-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107178224B (en) | A kind of garden landscape pond | |
CN207160039U (en) | A kind of Tenon prefabricated PC open caisson | |
CN102518453B (en) | Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels | |
CN110004991B (en) | Underground structure anti-floating system based on convex wing foot plate and construction method | |
CN105951876A (en) | Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof | |
CN107059946A (en) | A kind of basement drain plate and its construction | |
KR100915679B1 (en) | Solar cell module assembly | |
CN105756091B (en) | A kind of Metro station excavation construction method of control adjacent building composition deformation | |
CN109750681B (en) | Filling side slope frame micro-tensioning support anchor plate supporting structure and construction method thereof | |
CN110820793A (en) | Composite foundation for collapsible loess area and construction method | |
CN113250240A (en) | Combined side slope protection structure and process of layered net type gabion and concrete | |
CN114484073B (en) | Artificial pipe jacking construction method | |
WO2013044977A1 (en) | A wall element system for an offshore power storage facility | |
CN205776154U (en) | A kind of high-strength prestressed concrete flute profile sheet pile | |
CN110820756A (en) | Shield well and vertical shaft deep foundation pit excavation safety construction method | |
CN1639426A (en) | Method of construction | |
CN109972632A (en) | Recoverable soil nail pin-connected panel flexible cladding wall construction method | |
CN214940168U (en) | High-efficient cementer of pile foundation | |
CN205557538U (en) | Assembled underground structure system based on prefabricated component | |
CN211421139U (en) | Shield constructs well crown beam bearing structure | |
CN210887256U (en) | Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam | |
CN211498867U (en) | A envelope for underground works excavation foundation ditch engineering on a large scale | |
CN205387721U (en) | Highway retaining wall reinforced structure | |
CN202164579U (en) | Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation | |
CN112523232B (en) | Prefabricated adjustable skirting wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |