CN220741714U - Auxiliary tool for drilling bar planting - Google Patents
Auxiliary tool for drilling bar planting Download PDFInfo
- Publication number
- CN220741714U CN220741714U CN202321342026.5U CN202321342026U CN220741714U CN 220741714 U CN220741714 U CN 220741714U CN 202321342026 U CN202321342026 U CN 202321342026U CN 220741714 U CN220741714 U CN 220741714U
- Authority
- CN
- China
- Prior art keywords
- rod
- telescopic rod
- fixed
- drilling
- auxiliary tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 29
- 210000002435 tendon Anatomy 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 16
- 230000036541 health Effects 0.000 abstract description 3
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
Landscapes
- Drilling And Boring (AREA)
Abstract
The utility model discloses an auxiliary tool for drilling a bar, which belongs to the technical field of building construction equipment, and comprises an electric drill fixing frame, a jacking upright rod, a telescopic rod, a fixing upright rod and a base which are arranged from top to bottom; the electric drill fixing frame is vertically arranged at the top end of the jacking upright rod; the bottom end of the jacking upright rod is movably connected with the top end of the telescopic rod through a connecting sleeve; the bottom end of the telescopic rod is fixedly clamped with the top end of the fixed upright rod; the bottom of fixed pole setting is connected with base fixed. The utility model has simple structure and convenient operation, can solve the problems of low working efficiency, high labor intensity, large safety and health hidden trouble and the like caused by adopting the movable scaffold for the post top of the secondary constructional post of the traditional building, and improves the construction efficiency.
Description
Technical Field
The utility model belongs to the technical field of building construction equipment, and particularly relates to an auxiliary tool for drilling a reinforcement.
Background
After the construction of the main body of the building structure is completed, the secondary structure and the vertical reinforcing steel bar of the filling wall are mainly planted, the work of vertical reinforcing steel bar planting is required to be related to constructional columns and the like, and holes are required to be formed in the top or the bottom of a structural beam slab. Generally, because the top of the structural beam slab is relatively high in distance from the ground, construction is organized by setting up an operation frame.
At present, a movable door type scaffold is common on site, but the movable door type scaffold is inconvenient to use, at least two persons are required to cooperate, the efficiency of drilling and bar planting is low, and a large safety risk exists in the operation. Meanwhile, in the drilling construction process on the upper part of the operation frame, a large amount of smoke dust can be generated, and if a construction worker does not wear the dustproof mask, the human health can be seriously affected.
Disclosure of Invention
In view of the above, the utility model provides an auxiliary tool for drilling the bar, which has a simple structure and is convenient to operate, and the problems of low working efficiency, high labor intensity, large safety and health hidden trouble and the like caused by the adoption of a movable scaffold for the bar planting at the top of a secondary constructional column of a traditional building can be solved.
The utility model is realized by the following technical scheme:
an auxiliary tool for drilling a bar comprises an electric drill fixing frame, a jacking upright rod, a telescopic rod, a fixing upright rod and a base which are arranged from top to bottom; the electric drill fixing frame is vertically arranged at the top end of the jacking upright rod; the bottom end of the jacking upright rod is movably connected with the top end of the telescopic rod through a connecting sleeve; the bottom end of the telescopic rod is detachably connected and fixed with the top end of the fixed vertical rod; the bottom of fixed pole setting with base fixed connection.
Compared with the prior art, the utility model has at least the following beneficial effects:
according to the utility model, the jacking upright rod, the telescopic rod and the fixed upright rod are arranged, and all the rods are linked in the vertical plane, so that a constructor can finish the punching operation on the ground without high-place operation, all the rods are movably connected, the installation, the adjustment and the disassembly are convenient, the time and the labor are saved in the construction process, the safety and the reliability are realized, and the working efficiency is effectively improved.
Further, the top and bottom of the connecting sleeve are respectively provided with an internal thread, and the bottom side wall of the jacking upright rod and the top side wall of the telescopic rod are respectively provided with an external thread matched with the connecting sleeve. The rod piece is formed by the threaded connection of the inner wall of the connecting sleeve between the jacking upright rod and the telescopic rod, and the total length of the rod piece can be adjusted by the connecting sleeve so as to meet the drilling requirements of the bar planting of the walls with different heights.
Further, the top of the fixed vertical rod is provided with a groove, and the bottom of the telescopic rod is matched with the groove to be inserted and arranged at the top of the fixed vertical rod. The telescopic rod is inserted into the groove at the top of the fixed vertical rod, so that the jacking vertical rod, the telescopic rod and the fixed vertical rod form an integral rod piece in the vertical plane.
Further, the inner wall of the groove is provided with a clamping piece, and the clamping piece is in abutting connection with the bottom end of the telescopic rod. The clamping piece is arranged in the groove, so that the telescopic rod is prevented from falling off, and meanwhile, the telescopic rod is prevented from being damaged when the electric drill works.
Further, an operation assembly is further arranged on the outer wall of the telescopic rod, the operation assembly comprises an operation rod and a connecting rod, one end of the operation rod is hinged to the outer wall of the telescopic rod, and two ends of the connecting rod are respectively hinged to the operation rod and the side wall of the fixed vertical rod. After determining the approximate height of the auxiliary tool, constructors realize the expansion and contraction of the jacking upright rod by controlling the pressing down and lifting up of the operating rod, finely adjust the position of the electric drill and finish the work of the bar planting point.
Further, the middle part of the operating rod, the telescopic rod and the side wall of the fixed vertical rod are both convexly provided with hinge seats, one end of the operating rod is connected with the side wall pin shaft of the telescopic rod through the hinge seats, and two ends of the connecting rod are respectively connected with the middle part of the operating rod and the side wall pin shaft of the fixed vertical rod through the hinge seats.
Further, an adjusting vertical rod is further arranged between the fixed vertical rod and the base, the top end of the adjusting vertical rod is in spiral connection with the bottom end of the fixed vertical rod, and the other end of the adjusting vertical rod is fixedly connected with the base.
Further, a pressing sheet and a spring are arranged at the bottom of the groove. The bottom of fixed pole setting recess sets up spring and preforming, and the spring is in compression state under the effect of pole piece gravity, and when high existence certain less error appears in the use, can be through the accurate positioning of spring to drilling position to play the effect of buffering when drilling.
Further, the electric drill fixing frame is a flat plate fixing frame, and an inverted U-shaped bayonet is arranged at the top of the electric drill fixing frame.
Further, the outer sides of the jacking upright rod, the telescopic rod and the fixing upright rod are provided with wire grooves along the opposite positions of the axis direction. The fixed upright post, the jacking upright post and the telescopic rod are connected through threads, so that the installation and the disassembly are convenient, meanwhile, the maximum amount of the telescopic rod extending into the movable sleeve can be limited, namely, after the height is adjusted, the distance between the electric drill and the column top can be ensured to be smaller than the maximum amount of the movable sleeve into which the telescopic rod extends, and the punching accuracy is ensured; in addition, according to the actual requirements of the site, the length of each rod piece is adjusted by pressing the operation rod, and then the rod pieces are limited by the buckle, so that the height of the whole device is ensured to be matched with the working site.
The utility model has the advantages of simple structure, convenient operation, low construction cost, no need of scaffold and high-altitude operation, safer construction and effective improvement of construction efficiency.
Drawings
Fig. 1 is a schematic structural diagram of an auxiliary tool for tendon drilling according to the present utility model.
Fig. 2 is a schematic structural view of an electric drill fixing frame in an auxiliary tool for drilling a tendon according to the present utility model.
Fig. 3 is a schematic diagram of installation and use of an auxiliary tool for tendon drilling according to the present utility model.
Wherein, the drawings show that the device comprises a 1-fixed upright rod and a 2-telescopic rod; 3-lifting the vertical rod; 4-an electric drill fixing frame; 5-connecting the sleeve; 6-an operation rod; 7-connecting rods; 8-hinging seats; 9-a base; 10-adjusting the vertical rod; 11-clamping pieces; 12-a spring; 13-electric drill; 14-wire slots; 21-grooves; 41-plate; 42-inverted U-shaped bayonet.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings, but the described embodiments are only some embodiments, but not all embodiments of the present utility model, and the scope of protection of the present utility model is not limited thereto.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "upper", "lower", "inner", "outer", "left", "right", etc., are directions or positional relationships based on those shown in the drawings, or are directions or positional relationships conventionally put in use of the inventive product, are merely for convenience of describing the present utility model and simplifying the description, and are not indicative or implying that the apparatus or element to be referred to must have a specific direction, be configured and operated in a specific direction, and thus should not be construed as limiting the present utility model.
Referring to fig. 1-3, the embodiment provides an auxiliary tool for drilling a tendon, which comprises an electric drill fixing frame 4, a jacking upright 3, a telescopic rod 2, a fixing upright 1 and a base 9 which are arranged from top to bottom; the electric drill fixing frame 4 is vertically arranged at the top end of the jacking upright rod 3; the bottom end of the jacking upright rod 3 is movably connected with the top end of the telescopic rod 2 through a connecting sleeve 5; the bottom end of the telescopic rod 2 is fixedly clamped with the top end of the fixed upright 1; the bottom end of the fixed upright 1 is fixedly connected with the base 9; an operation component is also arranged on the outer wall of the telescopic rod 2; each rod piece is linked on a vertical plane, and meanwhile, the operation assembly controls the lifting upright rod 3 to stretch out and draw back, so that the bar planting and drilling work is completed.
Specifically, zinc-plated steel pipe of diameter 25mm is adopted in jacking pole setting 3, the external screw thread has been seted up to its bottom lateral wall, zinc-plated steel pipe of diameter 20mm is adopted in telescopic link 2, the external screw thread has been seted up to its top lateral wall, set up the internal screw thread that matches with the external screw thread on the both ends inner wall of movable sleeve 5, the bottom of jacking pole setting 3 and the top of telescopic link 2 are connected through the both ends of screw thread and connecting sleeve 5 respectively, thereby make jacking pole setting 3, connecting sleeve 5 and telescopic link 2 assemble into an organic whole in same vertical plane structure, and the overall length of jacking pole setting 3, connecting sleeve 5 and telescopic link 2 is 1000 ~ 1500mm, operating personnel can adjust total length between each member according to the demand, adapt to more different occasions.
Specifically, fixed pole setting 1 adopts the galvanized steel pipe that the diameter is 20mm, and its top sets up the recess, and the bottom of telescopic link 2 can peg graft in the recess to protruding fastener 11 that is equipped with on the recess inner wall, fastener 11 contradicts with telescopic link 2 and is connected fixedly, when avoiding telescopic link 2 to drop, guarantees that telescopic link 2 can not take place to damage when the electric drill during operation, reduces the loss rate of equipment.
The clip 11 in this embodiment is an elastic clip.
Specifically, as shown in fig. 2, the electric drill fixing frame 4 is a p-square flat plate fixing frame, and comprises a flat plate 41 and an inverted U-shaped bayonet 42, wherein the bottom of the flat plate 41 is perpendicularly welded and fixed at the top end of the jacking upright rod 3, the inverted U-shaped bayonet 42 is arranged at the top, the inverted U-shaped bayonet 42 is used for fixing the electric drill 13, and the electric drill 13 can be fixed on the electric drill fixing frame 4 through bolts.
The base 9 of the present embodiment is a rubber base.
Based on the above scheme, the application process of the auxiliary tool in the actual construction operation is as follows:
before construction, constructors install and fix the electric drill 13 on the electric drill fixing frame 4, then assemble the rod pieces such as the jacking upright rod 3, the telescopic rod 2 and the fixing upright rod 1 with the base 9, adjust the length of the whole tool according to the layer height of each floor, start the electric drill 13, and finish the drilling work of the bar planting point.
The whole construction process is economical, efficient, time-saving, labor-saving, flexible and safe, and can be applied to the construction fields of secondary structure top plate bar planting drilling, decoration and fitment ceiling engineering, cantilever component lower drilling and the like.
In this embodiment, still be provided with operating unit on the outer wall of telescopic link 2, operating unit includes action bars 6 and connecting rod 7, and the protruding articulated seat that is equipped with in middle part of action bars 6, all protruding articulated seat 8 that are equipped with in outer wall department and the lateral wall department on fixed pole setting 1 top of hugging closely recess 21 on the telescopic link 2 simultaneously, the articulated seat 8 round pin hub connection on the one end of action bars 6 and telescopic link 2, the articulated seat 8 round pin hub connection in middle part and fixed pole setting 1 outer wall department of connecting rod 7's both ends respectively. When the concrete construction operation, constructor drives the telescopic link 2 to move in the vertical direction by pressing down the operating lever 6, and further accurately adjusts the position of the tool, so that the jacking upright 3 drives the electric drill 13 at the top to complete the drilling work.
In this embodiment, have spring and preforming in proper order at the recess bottom on fixed pole setting 1 top, the bottom and the preforming direct contact of telescopic link 2, the spring is in compression state under the effect of pole piece gravity, when the in-process appears highly having certain less error, can be through the accurate positioning of spring to drilling position to play the effect of buffering when drilling. During specific operation, constructors drive the pressing sheets through pressing the operating rod 6, so that the springs are compressed, and the auxiliary tools are accurately aligned with the drilling positions to perform construction.
In an embodiment, as shown in fig. 1, an adjusting upright rod 10 can be additionally arranged between the fixed upright rod 1 and the base 9, the adjusting upright rod 10 is fixedly connected with the bottom of the fixed upright rod 1 through a bolt, the other end of the adjusting upright rod 10 is fixedly connected with the base 9 so as to prolong the height of the rod, and the adjusting upright rod is convenient to adjust in the specific construction process and cooperates with the height of the whole auxiliary tool.
In one embodiment, as shown in fig. 3, a wire slot 14 is formed at a position opposite to each rod member outer wall of the auxiliary tool along the axial direction, and the wire slot 14 is used for placing the electric wire of the fixed electric drill 13. The electric drill 13 is provided with a switch stay rope which is arranged in the wire slot 14, and a constructor pulls the switch stay rope to open the electric drill 13.
The various technical features in the above embodiments may be arbitrarily combined as long as there is no conflict or contradiction between the combinations of features, but are not described one by one at a time in the description.
The present utility model is not limited to the above-described embodiments, but is intended to include modifications and variations if they fall within the scope of the claims and the equivalents thereof, without departing from the spirit and scope of the present utility model.
Claims (6)
1. An auxiliary tool for drilling a bar is characterized by comprising an electric drill fixing frame, a jacking upright rod, a telescopic rod, a fixing upright rod and a base which are arranged from top to bottom; the electric drill fixing frame is vertically arranged at the top end of the jacking upright rod; the bottom end of the jacking upright rod is movably connected with the top end of the telescopic rod through a connecting sleeve; the top end of the fixed vertical rod is provided with a groove, and the bottom end of the telescopic rod is spliced with the groove in a matched manner and is arranged at the top of the fixed vertical rod; the inner wall of the groove is provided with a clamping piece which is in abutting connection with the bottom end of the telescopic rod; the bottom of the groove is provided with a pressing sheet and a spring; the outer wall of the telescopic rod is also provided with an operation assembly, the operation assembly comprises an operation rod and a connecting rod, one end of the operation rod is hinged with the outer wall of the telescopic rod, and two ends of the connecting rod are respectively hinged with the operation rod and the side wall of the fixed upright rod; the bottom of fixed pole setting with base fixed connection.
2. The auxiliary tool for tendon drilling according to claim 1, wherein the top and bottom ends of the connecting sleeve are respectively provided with internal threads, and the bottom side wall of the jacking upright rod and the top side wall of the telescopic rod are respectively provided with external threads matched with the connecting sleeve.
3. The auxiliary tool for tendon drilling according to claim 1, wherein hinge seats are respectively and convexly arranged on the middle part of the operating rod and the side walls of the telescopic rod and the fixed upright rod, one end of the operating rod is connected with the side wall pin shaft of the telescopic rod through the hinge seats, and two ends of the connecting rod are respectively connected with the middle part of the operating rod and the side wall pin shaft of the fixed upright rod through the hinge seats.
4. An auxiliary tool for drilling a bar according to claim 1, wherein an adjusting vertical rod is further arranged between the fixed vertical rod and the base, the top end of the adjusting vertical rod is spirally connected with the bottom end of the fixed vertical rod, and the other end of the adjusting vertical rod is fixedly connected with the base.
5. An auxiliary tool for drilling a bar according to claim 1, wherein the electric drill fixing frame is a flat plate fixing frame, and an inverted U-shaped bayonet is arranged at the top of the electric drill fixing frame.
6. The auxiliary tool for drilling the tendons according to claim 1, wherein the outer sides of the jacking upright rod, the telescopic rod and the fixing upright rod are provided with wire grooves along the opposite positions of the axis direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321342026.5U CN220741714U (en) | 2023-05-29 | 2023-05-29 | Auxiliary tool for drilling bar planting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321342026.5U CN220741714U (en) | 2023-05-29 | 2023-05-29 | Auxiliary tool for drilling bar planting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220741714U true CN220741714U (en) | 2024-04-09 |
Family
ID=90557081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321342026.5U Active CN220741714U (en) | 2023-05-29 | 2023-05-29 | Auxiliary tool for drilling bar planting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220741714U (en) |
-
2023
- 2023-05-29 CN CN202321342026.5U patent/CN220741714U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220741714U (en) | Auxiliary tool for drilling bar planting | |
CN112093635A (en) | Steel column construction-based hoisting device, construction method and supervision method thereof | |
CN202450761U (en) | Overhanging type scaffold | |
CN214995799U (en) | Tool type wall hanging cantilever frame | |
CN112695918B (en) | Composite prefabricated outer wall structure of prefabricated building and construction method thereof | |
CN211143839U (en) | Assembled side top supporting device | |
CN208578316U (en) | A kind of civil construction scaffold | |
CN209478612U (en) | A kind of scalable auxiliary tool of movable type for vertically drilling | |
CN206550967U (en) | The dust-proof telescope support of electric hammer punching | |
CN220955383U (en) | Quick and simple metal railing of installation connection | |
CN215551020U (en) | Waterproof concrete wall plastic slab welding equipment | |
CN219034601U (en) | Multipurpose light climbing ladder capable of being installed and removed | |
CN115949183B (en) | Bearing beam structure is built in room | |
CN218518936U (en) | Auxiliary tool for bar planting at top of constructional column | |
CN113309339B (en) | Frame beam lower scaffold structure with complex structure | |
CN218396045U (en) | Auxiliary mechanism for drilling of embedded steel bars of constructional columns | |
CN216109657U (en) | High-rise climbing frame attachment point reinforcing member for house construction | |
CN219887637U (en) | Temporary protective fence for decoration | |
CN220909224U (en) | Building structure reinforcing assembly | |
CN213773788U (en) | Mounting structure of steel structure | |
CN221095768U (en) | Scaffold frame pole butt joint location structure | |
CN211597055U (en) | Steel structure crossbeam mounting structure | |
CN219690754U (en) | Angle steel convenient to splice | |
CN215441463U (en) | Civil engineering bridge construction support bracket | |
CN220162361U (en) | Assembled jib mounting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |