CN208578316U - A kind of civil construction scaffold - Google Patents
A kind of civil construction scaffold Download PDFInfo
- Publication number
- CN208578316U CN208578316U CN201820567817.0U CN201820567817U CN208578316U CN 208578316 U CN208578316 U CN 208578316U CN 201820567817 U CN201820567817 U CN 201820567817U CN 208578316 U CN208578316 U CN 208578316U
- Authority
- CN
- China
- Prior art keywords
- side wall
- fixed
- connecting rod
- mounting
- link block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of civil construction scaffolds, including link block, one end side wall of the link block offers mounting groove, and the inside of mounting groove is fixedly welded with mounting shell, one end side wall of mounting shell is fixedly installed with limiting device, one end of limiting device is fixedly connected with top plate by screw, one end of top plate is against the side wall of sliding shoe, one end of sliding shoe is placed on the upper wall of fixed block, fixed block fixation is connected in mounting shell, link block is fixed with connection shell close to the sidewall weld of mounting shell, the inside of connection shell is inserted with first connecting rod, the side wall of first connecting rod offers mounting hole, and mounting hole side wall is placed with attachment spacers, attachment spacers internal screw thread is connected with fastening screw, and fastening screw is fixed on the upper end of fastening frame, during being attached installation to scaffold, improve the work of connection installation Make efficiency, reduces the labor intensity that staff installs scaffold, the bearing strength after also improving scaffold connection installation.
Description
Technical field
The utility model relates to technical field of civil more particularly to a kind of civil construction scaffolds.
Background technique
The purpose of civil engineering is required for forming human being's production or life, function is good and the space of Comfortable attractive and
Channel.In Bases in High Building Construction and Reinforced Concrete Bridge process of construction, scaffold is indispensable equipment in construction, with
For high-rise frame civil high-rise buildings, when carrying out certain layer of cast-in-place concrete, pre-buried one section of connecting rod, after concrete setting
After reaching intensity requirement, erecting scaffold is just continued up by the attachment device of scaffold in these pre-buried connecting rods, one
Until the top layer of building.Current means for fastening scaffolding haves the defects that sound construction degree is low, poor reliability, thus can be serious
Influence the security intensity of scaffold entirety, or even the phenomenon that can collapse.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of civil construction proposed is used
Scaffold.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of civil construction scaffold, including link block, one end side wall of the link block offers mounting groove, and pacifies
The inside of tankage is fixedly welded with mounting shell, and one end side wall of mounting shell is fixedly installed with limiting device, one end of limiting device
It is fixedly connected with top plate by screw, one end of top plate is against the side wall of sliding shoe, and one end of sliding shoe is placed on fixed block
Upper wall, fixed block fixation are connected in mounting shell, and link block is fixed with connection shell close to the sidewall weld of mounting shell, connects shell
Inside is inserted with first connecting rod, and the side wall of first connecting rod offers mounting hole, and mounting hole side wall is placed with attachment spacers, even
Connection pad piece internal screw thread is connected with fastening screw, and fastening screw is fixed on the upper end of fastening frame, and one end of fastening frame is welded and fixed
In one end side wall of link block, link block offers limiting slot close to the side wall of fastening frame, and the inside of limiting slot is connected with
Two connecting rods.
Preferably, the outer wall of second connecting rod is socketed with the first limit plate, and the side wall of the first limit plate is connected with
Second limit plate, the first limit plate and the second limit plate are symmetrical to be fixed on two fastening frames.
Preferably, the link block offers connecting hole close to the side wall of limiting slot, and the inside of connecting hole is inserted with stretching
Bar, stretch rod include in limiting device, and limiting device includes fixed link, and the inside of fixed link is placed with spring, and the one of spring
End is welded with mandril, and one end of mandril has been connected by screw to top plate, fixed link is fixed be connected to installation shell side wall open up it is logical
In hole, one end side wall of fixed link offers through-hole, and stretch rod is inserted in through-hole, and stretch rod one end extends to the inside of mandril.
Preferably, the both ends side wall of the link block offers mounting groove, and the inside of mounting groove is fixedly welded with
The internal structure of mounting shell, mounting shell is all the same, other two side wall of link block offers limiting slot, blocks in limiting slot
It is connected to the second connecting rod.
Preferably, the side wall of the first connecting rod is opened up there are four mounting hole, and the side wall of mounting hole passes through connection
Gasket is connected on fastening frame.
Preferably, one end of the first connecting rod is fixed with sliding rail by rivet, and the side walls of sliding rail are connected with
Sliding shoe, one end side wall fixing card of sliding shoe are connected to magnet block, and one end magnetic absorption of magnet block is connected with another magnet
Block, the fixed side wall for being connected to top plate of magnet block.
The beneficial effects of the utility model are:
1, pass through link block, limiting device, mounting shell, sliding rail, first connecting rod, fastening frame, the second connecting rod, the first limit
The setting of position plate and the second limit plate, first connecting rod continue to move into mounting shell, and the side wall of sliding shoe is made to be against mounting shell
Side wall, stretch rod is rotated to pull-out out of mandril manually later, using the elastic reaction of spring, push mandril drive push plate and
Magnet block is mobile to the position of sliding shoe, and sliding shoe is against to the upper end of fixed block along sliding rail linear pushing, fastening frame is utilized
Fastening screw is fixedly connected with first connecting rod, and the installation of first connecting rod is fixed in completion, improves first connecting rod peace
Robustness and crushing resistance after dress.
2, pass through link block, limiting device, mounting shell, sliding rail, first connecting rod, fastening frame, the second connecting rod, the first limit
The setting of position plate and the second limit plate, makes one end side wall of the first limit plate and the second limit plate be against the side wall of fastening frame, so
Fixation is attached respectively at the first limit plate and the second limit plate to fastening frame using positioning pin afterwards, is completed to the second connecting rod
Connection installation, during being attached installation to scaffold, improve connection installation working efficiency, reduce work
Personnel install the labor intensity of scaffold, the bearing strength after also improving scaffold connection installation.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of civil construction scaffold overlooking structure diagram;
Fig. 2 be the utility model proposes a kind of civil construction scaffold local main view structure figure;
Fig. 3 be the utility model proposes a kind of civil construction scaffold partial side structural schematic diagram;
Fig. 4 be the utility model proposes a kind of civil construction scaffold partial enlargement structural representation.
In figure: 1 link block, 2 limiting devices, 21 stretch rods, 22 fixed links, 23 mandrils, 24 springs, 3 attachment spacers, 4 connect
Body contact, 5 fixed blocks, 6 sliding shoes, 7 mounting shells, 8 sliding rails, 9 first connecting rods, 10 fastening frames, 11 first limit plates, 12 second
Connecting rod, 13 second limit plates, 14 top plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Embodiment: referring to Fig.1-4, a kind of civil construction scaffold, in scaffold before use, the state of scaffold is every
Root is mutually contradictory, when civil construction being needed to build, needs to connect each mutually independent connecting rod is stable, right
When scaffold carries out assembly and connection, according to the setting of this scaffold, link block 1 is taken out first, then first by the first connection
The sliding shoe 6 that one end of bar 9 is slidably connected, be slidably connected on the side wall to same level of first connecting rod 9, then hand
First connecting rod 9 is moved in connection shell 4 by dynamic force, and first connecting rod 9 is continued to move into mounting shell 7, makes to slide
The side wall of block 6 is against the side wall of mounting shell 7, and stretch rod 21 is rotated to pull-out out of mandril 23 manually later, utilizes spring 24
Elastic reaction, push mandril 23 to drive push plate and magnet block mobile to the position of sliding shoe 6, by sliding shoe 6 along 8 straight line of sliding rail
The upper end for being against fixed block 5 is pushed, pacifies the side wall of sliding shoe 6 and first connecting rod 9 not in same level to being mounted on
First connecting rod 9 inside dress shell 7 carries out installation fixation, then can be manually rotated and pushes stretch rod 21, makes stretch rod 21 to mandril
23 inside is mobile, is defined to 23 position of mandril after adjustment, guarantees that first connecting rod 9 is mounted in mounting shell 7
Stability the pad of attachment spacers 3 is connect on first connecting rod 9 after first connecting rod 9 is installed, by the benefit of fastening frame 10
It is fixedly connected with fastening screw and first connecting rod 9, the installation of first connecting rod 9 is fixed in completion, improves the first connection
Robustness and crushing resistance after the installation of bar 9, are attached installation to the first connecting rod 9 of another opposite side of link block 1 later, complete
At by the same link block 1, the connection and installation of two reversed scaffolds of installation are connected.
When to the same link block 1, when the installation in another two direction, the fixation of the second connecting rod 12 is connected to limit first
In the slot of position, the first limit plate 11 and the clamping of the second limit plate 13 are covered into the side wall in the second connecting rod 12 again later, connected to second
The position of extension bar 12 is sleeved and fixed, and the first limit plate 11 and one end side wall of the second limit plate 13 is made to be against fastening frame 10
Then side wall is attached fixation respectively at the first limit plate 11 and the second limit plate 13 to fastening frame 10 using positioning pin, complete
The connection of pairs of second connecting rod 12 is installed, subsequent after the connecting rod that four direction opposes on a link block 1 is installed
Recycle another link block 1 next to installation is attached to connecting rod when, can to the installation site of two link blocks 1,
Installed according to mutually orthogonal direction between its internal mounting shell 7, improve scaffold it is mutually contradictory between connecting rod
Mounting stability is connected, during being attached installation to scaffold, the working efficiency of connection installation is improved, reduces
Staff installs the labor intensity of scaffold, the bearing strength after also improving scaffold connection installation.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of civil construction scaffold, including link block (1), which is characterized in that one end side wall of the link block (1) is opened
Inside equipped with mounting groove, and mounting groove is fixedly welded with mounting shell (7), and one end side wall of mounting shell (7) is fixedly installed with limit
Position device (2), one end of limiting device (2) are fixedly connected with top plate (14) by screw, and one end of top plate (14) is against sliding
The side wall of block (6), one end of sliding shoe (6) are placed on the upper wall of fixed block (5), and fixed block (5) fixation is connected to mounting shell (7)
Interior, sidewall weld of the link block (1) close to mounting shell (7) is fixed with connection shell (4), and the inside of connection shell (4) is inserted with the first company
Extension bar (9), the side wall of first connecting rod (9) offers mounting hole, and mounting hole side wall is placed with attachment spacers (3), connection gasket
Piece (3) internal screw thread is connected with fastening screw, and fastening screw is fixed on the upper end of fastening frame (10), one end weldering of fastening frame (10)
One end side wall for being fixed on link block (1) is connect, side wall of the link block (1) close to fastening frame (10) offers limiting slot, and limits
The inside of slot is connected with the second connecting rod (12).
2. a kind of civil construction scaffold according to claim 1, which is characterized in that second connecting rod (12)
Outer wall is socketed with the first limit plate (11), and the side wall of the first limit plate (11) is connected with the second limit plate (13), the first limit
Plate (11) and the second limit plate (13) are symmetrical to be fixed on two fastening frames (10).
3. a kind of civil construction scaffold according to claim 1, which is characterized in that the link block (1) is close to limit
The side wall of position slot offers connecting hole, and the inside of connecting hole is inserted with stretch rod (21), and stretch rod (21) is included in limiting device
(2) in, limiting device (2) includes fixed link (22), and the inside of fixed link (22) is placed with spring (24), one end of spring (24)
It is welded with mandril (23), one end of mandril (23) has been connected by screw to top plate (14), and fixed link (22) fixation is connected to installation
In the through-hole that shell (7) side wall opens up, one end side wall of fixed link (22) offers through-hole, is inserted in through-hole stretch rod (21), draws
Boom (21) one end extends to the inside of mandril (23).
4. a kind of civil construction scaffold according to claim 1, which is characterized in that the both ends of the link block (1)
Side wall offers mounting groove, and the inside of mounting groove is fixedly welded with mounting shell (7), and the internal structure of mounting shell (7) is equal
Identical, other two side wall of link block (1) offers limiting slot, and the second connecting rod (12) are connected in limiting slot.
5. a kind of civil construction scaffold according to claim 1, which is characterized in that the first connecting rod (9)
Side wall is opened up there are four mounting hole, and the side wall of mounting hole passes through attachment spacers (3) and is connected on fastening frame (10).
6. a kind of civil construction scaffold according to claim 1, which is characterized in that the first connecting rod (9)
One end is fixed with sliding rail (8) by rivet, and the side walls of sliding rail (8) are connected with sliding shoe (6), one end of sliding shoe (6)
Side wall is fixed to be connected with magnet block, and one end magnetic absorption of magnet block is connected with another magnet block, and magnet block fixation is connected to
The side wall of top plate (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820567817.0U CN208578316U (en) | 2018-04-20 | 2018-04-20 | A kind of civil construction scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820567817.0U CN208578316U (en) | 2018-04-20 | 2018-04-20 | A kind of civil construction scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208578316U true CN208578316U (en) | 2019-03-05 |
Family
ID=65505725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820567817.0U Expired - Fee Related CN208578316U (en) | 2018-04-20 | 2018-04-20 | A kind of civil construction scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208578316U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112681719A (en) * | 2020-12-20 | 2021-04-20 | 斑马找房(武汉)信息科技有限公司 | Scaffold fixing device of fast block of ability for building |
-
2018
- 2018-04-20 CN CN201820567817.0U patent/CN208578316U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112681719A (en) * | 2020-12-20 | 2021-04-20 | 斑马找房(武汉)信息科技有限公司 | Scaffold fixing device of fast block of ability for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211421882U (en) | Reinforcing bar net piece ligature positioner | |
CN108104832B (en) | underground engineering assembled confined concrete arch center and mechanized construction method | |
CN208578316U (en) | A kind of civil construction scaffold | |
CN115324363B (en) | N-point supporting and sliding method for multiple slide ways of extra-large-span prestressed pipe truss | |
CN117702909B (en) | Steel structure house building spliced connecting component and splicing method | |
CN212004084U (en) | Electrical equipment for assembly type building | |
CN212176083U (en) | Connecting component for assembly type building | |
CN111594234A (en) | Steel frame joint suitable for large-deformation highway tunnel | |
CN209384469U (en) | A kind of Curtain wall frame fixation kit | |
CN209243957U (en) | The pre-buried weldment of curtain wall slot type | |
CN207512940U (en) | The single-column expansion gap device of overlength industrial premises | |
CN105113415A (en) | Hydraulic sliding sash climbing frame | |
CN210209232U (en) | Assembled steel structure high altitude construction is with interim fixing device before full weld | |
CN209799003U (en) | house steel structure supporting structure | |
CN208473065U (en) | A kind of glass curtain wall keel structure | |
CN207794466U (en) | A kind of broken line gangboard | |
CN215888979U (en) | Staggered floor truss reinforcing rib fixing structure | |
CN110805316A (en) | Container assembly type frame steel assembly structure house | |
CN211597055U (en) | Steel structure crossbeam mounting structure | |
CN212562497U (en) | Building engineering template fixing device | |
CN211598461U (en) | Fixing device of fireproof rolling shutter door | |
CN214461467U (en) | Cross plug-in structure for assembled shear wall | |
CN215168273U (en) | Temporary fixing device for external wall construction | |
CN219316492U (en) | Silica gel plug sealing block for outer wall through-wall screw eye | |
CN221030663U (en) | Firmly-connected assembled steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190305 Termination date: 20200420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |