CN220727826U - Site mapping device for project engineering planning - Google Patents

Site mapping device for project engineering planning Download PDF

Info

Publication number
CN220727826U
CN220727826U CN202322417710.1U CN202322417710U CN220727826U CN 220727826 U CN220727826 U CN 220727826U CN 202322417710 U CN202322417710 U CN 202322417710U CN 220727826 U CN220727826 U CN 220727826U
Authority
CN
China
Prior art keywords
bearing
screw
plate
project engineering
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322417710.1U
Other languages
Chinese (zh)
Inventor
吴昊达
王晶
毛育俊
王月恒
秦瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyuan International Investment Consulting Center Co ltd
Original Assignee
Zhongyuan International Investment Consulting Center Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyuan International Investment Consulting Center Co ltd filed Critical Zhongyuan International Investment Consulting Center Co ltd
Priority to CN202322417710.1U priority Critical patent/CN220727826U/en
Application granted granted Critical
Publication of CN220727826U publication Critical patent/CN220727826U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses a site mapping device for project engineering planning, which comprises a second lifting plate and a mounting plate, wherein both ends of the bottom of the mounting plate are provided with hinge shafts, the bottoms of the hinge shafts are hinged with supporting legs, the bottoms of the supporting legs are provided with universal wheels, a first screw hole is formed in the middle position of the mounting plate, a second screw is arranged in the internal thread of the first screw hole, a first rotating rod is arranged at the bottom of the second screw, a first bearing is arranged on the outer side of the first rotating rod, a first lifting plate is arranged at the bottom of the first bearing, a U-shaped plate is arranged at the top of the mounting plate, a sliding component is arranged at one end of the inner part of the U-shaped plate, and a supporting plate is arranged in a sliding manner in the inner side of the sliding component. The utility model is provided with the supporting legs and the universal wheels, when the device is moved, the universal wheels can be contacted with the ground, and the device can be moved through the universal wheels, so that the device can be conveniently transported to a designated position for mapping.

Description

Site mapping device for project engineering planning
Technical Field
The utility model relates to the technical field of project engineering mapping equipment, in particular to a site mapping device for project engineering planning.
Background
The surveying instrument is an instrument and a device for acquiring, processing, outputting and the like of data designed and manufactured for surveying operation, and is used for planning various orientations, ranging, mapping, photogrammetry and the like required by measuring operation in the engineering construction, construction and management stages, and the surveying instrument is required to measure required data in the process of planning the engineering design of a building.
The support is installed to surveying device bottom, during the use, supports the surveying instrument through the support, and device overall weight is great, when transporting surveying device, needs the staff to carry for surveying device's removal is comparatively inconvenient, and although partial surveying device is used for removing through installing the universal wheel, but in the survey and drawing process, surveying device is difficult for placing subaerial firm, makes the device receive external force influence easily and removes, leads to the fact the influence to the survey and drawing result easily.
Disclosure of Invention
The present utility model is directed to a field mapping device for project engineering planning, which solves the problems set forth in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a site survey and drawing device for project engineering planning, includes second lifter plate and mounting panel, the articulated shaft is all installed at the both ends of mounting panel bottom, and the bottom of articulated shaft all articulates there is the stabilizer blade, the universal wheel is all installed to the bottom of stabilizer blade, the intermediate position department of mounting panel is provided with first screw, and the internal thread of first screw installs the second screw, first dwang is installed to the bottom of second screw, and installs first bearing in the outside of first dwang, first lifter plate is installed to the bottom of first bearing, the U template is installed at the top of mounting panel, and the inside one end of U template is installed to the slip subassembly, the backup pad is installed in the inside slip of slip subassembly, the backup pad passes the U template, and the second lifter plate is installed at the top of backup pad, the one end that slip subassembly was kept away from to the U template top is provided with the second screw, and the internal thread of second screw installs first screw, the intermediate position department at second lifter plate top installs the second bearing, and the internally mounted of second bearing has the pivot, the top of carousel is installed at the top of pivot, and the pivot is installed at the top of carousel.
Preferably, fixed inserted bars are uniformly arranged at the bottom of the first lifting plate.
Preferably, the inner sides of the support legs are hinged with connecting rods, and one ends of the connecting rods, which are far away from the support legs, are hinged with the first lifting plate.
Preferably, a third bearing is arranged at one end, close to the first screw rod, of the bottom of the second lifting plate, a second rotating rod is arranged in the third bearing, and one end, far away from the third bearing, of the second rotating rod is connected with the first screw rod.
Preferably, a handle is arranged at the top of the second screw rod, and an anti-slip rubber sleeve is arranged at the outer side of the handle.
Preferably, the outer side of the first rotating rod is provided with a rust-proof layer.
Preferably, the outer side of the turntable is uniformly provided with anti-slip protrusions.
Compared with the prior art, the utility model has the beneficial effects that:
1. the on-site mapping device for project engineering planning is provided with the supporting legs and the universal wheels, when the device is moved, the universal wheels can be contacted with the ground, and the device can be moved through the universal wheels, so that the device can be conveniently transported to a designated position for mapping;
2. the on-site mapping device for project engineering planning is provided with the fixed inserted link, the connecting rod, the first lifting plate, the first bearing, the second screw rod and the first rotating rod, when the on-site mapping device is used, the second screw rod is rotated clockwise, so that the first lifting plate moves downwards, the fixed inserted link can be pushed to move downwards, the fixed inserted link is inserted into the ground, the device can be prevented from being influenced by external force to move in the mapping process, the stability of the device is improved, and the accuracy of a mapping result is ensured;
3. this a scene mapping device for project engineering planning installs slip subassembly, backup pad, first screw rod, second bull stick and third bearing, in the use, through rotating first screw rod for first screw rod passes through the screw thread and removes, can adjust the height of second lifter plate, can adjust the mapping appearance to appointed high use, and the adjustability of device is stronger, and the suitability is stronger.
Drawings
FIG. 1 is a schematic view in front cross-section of the present utility model;
FIG. 2 is a schematic front view of the present utility model;
fig. 3 is an enlarged view of the structure of fig. 1 at a in accordance with the present utility model.
In the figure: 1. a support leg; 2. fixing the inserted link; 3. a connecting rod; 4. a first lifting plate; 5. a first bearing; 6. a first screw hole; 7. a U-shaped plate; 8. a sliding assembly; 9. a support plate; 10. a second lifting plate; 11. a second bearing; 12. a turntable; 13. a mapping instrument; 14. a rotating shaft; 15. a second screw hole; 16. a first screw; 17. a second screw; 18. a mounting plate; 19. a first rotating lever; 20. a hinge shaft; 21. a universal wheel; 22. a second rotating rod; 23. and a third bearing.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, an embodiment of the present utility model is provided: the utility model provides a site mapping device for project engineering planning, including second lifter plate 10 and mounting panel 18, articulated shaft 20 is all installed at the both ends of mounting panel 18 bottom, and articulated shaft 20's bottom all articulates there is stabilizer blade 1, universal wheel 21 is all installed to stabilizer blade 1's bottom, the intermediate position department of mounting panel 18 is provided with first screw hole 6, and the internal thread of first screw hole 6 installs second screw rod 17, first bull stick 19 is installed to the bottom of second screw rod 17, and first bearing 5 is installed in the outside of first bull stick 19, first lifter plate 4 is installed to the bottom of first bearing 5, U template 7 is installed at the top of mounting panel 18, and the inside one end of U template 7 is installed and is slided subassembly 8, backup pad 9 passes U template 7, and the top of backup pad 9 installs second lifter plate 10, the one end that slide subassembly 8 was kept away from at the U template 7 top is provided with second screw hole 15, and the internal thread of second screw hole 15 installs first screw rod 16, second lifter plate 11 installs second bull stick 11 in the intermediate position department at the top, and the top of second lifter plate 11 installs first bearing 5, the pivot 14 is installed at the top of second bearing 11, the pivot 12 is installed at the top of second bearing 12, the pivot 12 is installed at the top of 14, the pivot 12 is installed at the top of the pivot instrument is installed at the top of the pivot 14.
In this embodiment:
further, fixed inserted bar 2 is evenly installed to the bottom of first lifter plate 4, inserts fixed inserted bar 2 subaerial, can prevent at the survey and drawing in-process that the device from receiving external force influence and removing, is favorable to improving the stability of device, ensures the accuracy of survey and drawing result.
Further, the inboard of stabilizer blade 1 all articulates there is connecting rod 3, and the one end that stabilizer blade 1 was kept away from to connecting rod 3 all articulates with first lifter plate 4, first lifter plate 4 drives two sets of connecting rods 3 and removes together for two sets of stabilizer blades 1 are pushed to 3 atress of two sets of connecting rods, make stabilizer blade 1 atress and along its articulated position department with articulated shaft 20 for the centre of a circle rotation, can adjust the inclination of stabilizer blade 1, make stabilizer blade 1 outside rotate, can make mounting panel 18 move downwards, make the focus of mounting panel 18 reduce, be favorable to improving the stability of device.
Further, a third bearing 23 is installed at one end of the bottom of the second lifting plate 10, which is close to the first screw 16, and a second rotating rod 22 is installed in the third bearing 23, one end of the second rotating rod 22, which is far away from the third bearing 23, is connected with the first screw 16, the first screw 16 drives the second rotating rod 22 to move, and the second rotating rod 22 can drive the second lifting plate 10 to move together through the third bearing 23.
Further, a handle is installed at the top of the second screw rod 17, and an anti-slip rubber sleeve is installed on the outer side of the handle, so that a worker can conveniently rotate the second screw rod 17.
Further, the outer side of the first rotating rod 19 is provided with a rust-proof layer, which is beneficial to prolonging the service life of the first rotating rod 19.
Further, anti-slip protrusions are uniformly arranged on the outer side of the rotary table 12, so that workers can conveniently rotate the rotary table 12.
Working principle:
when in use, the device is moved to a designated position for use by moving the device through the universal wheel 21;
then, a worker can rotate the second screw rod 17 clockwise, the second screw rod 17 drives the first rotating rod 19 to rotate, the first rotating rod 19 rotates in the first bearing 5, and the first rotating rod 19 does not drive the first lifting plate 4 to rotate through the first bearing 5;
the second screw rod 17 moves downwards through threads, the second screw rod 17 drives the first rotating rod 19 to move together, the first rotating rod 19 drives the first lifting plate 4 to move downwards through the first bearing 5, the first lifting plate 4 drives the fixed inserted rod 2 to move, and the fixed inserted rod 2 can be inserted into the ground, so that the device can be fixed;
meanwhile, the first lifting plate 4 drives the two groups of connecting rods 3 to move together, so that the two groups of connecting rods 3 are forced to push the two groups of support legs 1, the support legs 1 are forced and rotate along the hinging positions of the support legs and the hinging shafts 20 as circle centers, the inclination angle of the support legs 1 can be adjusted, the support legs 1 rotate outwards, the mounting plate 18 can be moved downwards, the gravity center of the mounting plate 18 is lowered, and the stability of the device is improved;
in the use process, a worker can rotate the first screw rod 16, the first screw rod 16 drives the second rotating rod 22 to rotate, the second rotating rod 22 rotates in the third bearing 23, and the second rotating rod 22 does not drive the second lifting plate 10 to rotate through the third bearing 23;
the first screw rod 16 moves through threads, the first screw rod 16 drives the second rotating rod 22 to move together, the second rotating rod 22 drives the second lifting plate 10 to move together through the third bearing 23, and the surveying instrument 13 can be driven to move, and the surveying instrument 13 can be moved to a designated height for use;
staff accessible surveying instrument 13 survey, and in the survey and drawing process, pivot 14 can be at the inside rotation of second bearing 11, and staff accessible carousel 12 drives surveying instrument 13 and rotates, is convenient for adjust the survey and drawing direction of surveying instrument 13.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. A site mapping device for project engineering planning, comprising a second lifting plate (10) and a mounting plate (18), characterized in that: the utility model discloses a U-shaped plate (8) is installed on the bottom of mounting panel (18), articulated shaft (20) are all installed at both ends of mounting panel (18) bottom, and articulated shaft (20) bottom all articulates has stabilizer blade (1), universal wheel (21) are all installed to the bottom of stabilizer blade (1), intermediate position department of mounting panel (18) is provided with first screw (6), and the inside screw thread of first screw (6) installs second screw rod (17), first pivot (19) are installed to the bottom of second screw rod (17), and first bearing (5) are installed in the outside of first pivot (19), first lifter plate (4) are installed to the bottom of first bearing (5), U-shaped plate (7) are installed at the top of mounting panel (18), and sliding component (8) are installed to the inside one end of U-shaped plate (7), backup pad (9) pass U-shaped plate (7), and the top of backup pad (9) is installed to the sideslip, second lifter plate (10), first bearing (15) are installed at the top of second screw rod (15) is kept away from sliding component (8) top, and intermediate position (15) are installed at second bearing (16), and the inside of the second bearing (11) is provided with a rotating shaft (14), the top of the rotating shaft (14) is provided with a rotary table (12), and the top of the rotary table (12) is provided with a surveying instrument (13).
2. A site mapping apparatus for project engineering planning as claimed in claim 1, wherein: the bottom of the first lifting plate (4) is uniformly provided with fixed inserted bars (2).
3. A site mapping apparatus for project engineering planning as claimed in claim 1, wherein: the inner sides of the supporting legs (1) are hinged with connecting rods (3), and one ends of the connecting rods (3) far away from the supporting legs (1) are hinged with the first lifting plates (4).
4. A site mapping apparatus for project engineering planning as claimed in claim 1, wherein: a third bearing (23) is arranged at one end, close to the first screw rod (16), of the bottom of the second lifting plate (10), a second rotating rod (22) is arranged in the third bearing (23), and one end, far away from the third bearing (23), of the second rotating rod (22) is connected with the first screw rod (16).
5. A site mapping apparatus for project engineering planning as claimed in claim 1, wherein: the top of the second screw rod (17) is provided with a handle, and the outer side of the handle is provided with an anti-slip rubber sleeve.
6. A site mapping apparatus for project engineering planning as claimed in claim 1, wherein: the outer side of the first rotating rod (19) is provided with a rust-proof layer.
7. A site mapping apparatus for project engineering planning as claimed in claim 1, wherein: and anti-slip protrusions are uniformly arranged on the outer side of the rotary table (12).
CN202322417710.1U 2023-09-06 2023-09-06 Site mapping device for project engineering planning Active CN220727826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322417710.1U CN220727826U (en) 2023-09-06 2023-09-06 Site mapping device for project engineering planning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322417710.1U CN220727826U (en) 2023-09-06 2023-09-06 Site mapping device for project engineering planning

Publications (1)

Publication Number Publication Date
CN220727826U true CN220727826U (en) 2024-04-05

Family

ID=90488008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322417710.1U Active CN220727826U (en) 2023-09-06 2023-09-06 Site mapping device for project engineering planning

Country Status (1)

Country Link
CN (1) CN220727826U (en)

Similar Documents

Publication Publication Date Title
CN213394381U (en) Construction machinery engineering measuring instrument with adjusting function
CN220727826U (en) Site mapping device for project engineering planning
CN213271900U (en) Surveying instrument support
CN112902927A (en) Surveying instrument positioning device for surveying and mapping engineering and positioning method thereof
CN212672857U (en) Total station
CN213812305U (en) Measuring instrument for land resource management
CN212079199U (en) Drilling device for plane fixation in installation process of slope monitoring system
CN115126974A (en) Measuring device for intelligently detecting verticality of bridge pier column
CN216643692U (en) Mapping instrument positioning device for engineering mapping
CN215169732U (en) Drilling equipment is used in road bridge municipal construction with locate function
CN215865220U (en) On-spot mapping device is used to engineering cost
CN217930301U (en) Accurate mapping device for engineering survey
CN218178316U (en) Special frame of portable city planning design
CN211118555U (en) A on-spot mapping device for building engineering cost
CN213629558U (en) Novel geographical survey and drawing device
CN210774068U (en) Measuring device for landscape design
CN220828724U (en) Quiet record appearance that surveys
CN216243353U (en) A on-spot mapping device for real estate survey and drawing
CN213748139U (en) Rural planning is field measuring device for quick mark
CN218462161U (en) Dismantlement formula engineering cost toolbox
CN113404982B (en) On-spot mapping device of building engineering cost
CN214275135U (en) Land planning measuring instrument for improving measuring precision
CN219736378U (en) Mapping tool table positioning and clamping device
CN215447888U (en) Level detection device for periodic inspection
CN211468472U (en) Instrument box convenient to move

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant