CN220667211U - Construction engineering construction fence with splicing and combining functions - Google Patents

Construction engineering construction fence with splicing and combining functions Download PDF

Info

Publication number
CN220667211U
CN220667211U CN202322274879.6U CN202322274879U CN220667211U CN 220667211 U CN220667211 U CN 220667211U CN 202322274879 U CN202322274879 U CN 202322274879U CN 220667211 U CN220667211 U CN 220667211U
Authority
CN
China
Prior art keywords
plate
fixedly connected
cross beam
connecting plate
splicing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322274879.6U
Other languages
Chinese (zh)
Inventor
傅春红
谢红英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhiyun Construction Engineering Co ltd
Original Assignee
Shanghai Zhiyun Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhiyun Construction Engineering Co ltd filed Critical Shanghai Zhiyun Construction Engineering Co ltd
Priority to CN202322274879.6U priority Critical patent/CN220667211U/en
Application granted granted Critical
Publication of CN220667211U publication Critical patent/CN220667211U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a construction engineering construction enclosure with a splicing and combining function, which comprises a bottom plate and upright posts, wherein the top of the bottom plate is fixedly connected with the upright posts, the bottom end of the inner side of each upright post is fixedly connected with a lower cross beam, and the top end of the inner side of each upright post is fixedly connected with an upper cross beam. The utility model has the advantages that: after bottom plate, stand are deployed, fix a position entablature, and with the surrounding shield card simultaneously between entablature, synchronous top of entablature has put water pipe and ferrule, connecting plate, joint, fixed plate and side ear laminating this moment, and the through-hole on connecting plate, joint, fixed plate and the side ear aligns, only need use the bolt to run through behind the through-hole on connecting plate, joint, fixed plate and the side ear this moment, tightening nut, can realize the synchronous connection equipment of entablature, ferrule, stand, need not unnecessary connecting elements, reduce the component and use, the equipment is fast, efficient, save the manual work, can be fast with surrounding the barricade deployment completion.

Description

Construction engineering construction fence with splicing and combining functions
Technical Field
The utility model relates to the technical field of construction fences, in particular to a construction engineering construction fence with a splicing and combining function.
Background
The construction fence is a temporary wall body which needs to be erected in the construction process of a building or a construction project, and isolates a construction operation site from an external environment, so that the construction site becomes a relatively closed space, noise, dust and messy conditions in the construction process are avoided from being exposed, and safe civilized construction is ensured.
The utility model provides a fender is enclosed in construction of prior art CN217151525U, it includes many fixed posts that are fixed in the construction ground and sets up the protection baffle between adjacent fixed post, fixed post perpendicular to construction ground sets up, the protection baffle includes two fixed laths that are parallel to each other and sets up the protection lath between two fixed laths.
The prior art is in a common enclosure form and consists of an upright post and two horizontal battens between the upright posts, and an enclosure panel, wherein the upright post and the two battens are connected by a group of components, then, the top of the enclosure is additionally provided with a water pipe and a spray head for dust fall, and other components are additionally required to be fixedly assembled, so that the assembly components of the enclosure need at least three groups or even more groups, the enclosure assembly procedures are more, the deployment speed is low, and the assembly is troublesome, so that a new enclosure for construction engineering construction with a splicing and combining function is provided.
Disclosure of Invention
The object of the present utility model is to solve at least one of the technical drawbacks.
Therefore, an object of the present utility model is to provide a construction engineering construction fence with a splicing and combining function, so as to solve the problems mentioned in the background art and overcome the defects existing in the prior art.
In order to achieve the above purpose, an embodiment of an aspect of the present utility model provides a construction engineering construction enclosure with a splicing and combining function, which comprises a bottom plate and upright posts, wherein the top of the bottom plate is fixedly connected with the upright posts, the bottom end of the inner side of each upright post is fixedly connected with a lower cross beam, the top end of the inner side of each upright post is fixedly connected with an upper cross beam, and the end parts of the two sides of each lower cross beam are fixedly connected with connecting plates;
joints are fixedly connected to two sides of the upper cross beam, and the top surfaces of the joints and the top surfaces of the connecting plates are higher than the top surfaces of the stand columns;
the edge of the top surface of the upright post is fixedly connected with a fixing plate, the top of the upper cross beam is fixedly connected with a pipe hoop, the pipe hoop is in an inverted U shape, two sides of the pipe hoop are fixedly connected with side lugs, the fixing plate, the connecting plate, the connector and the side lugs are sequentially attached, and through holes are formed in the fixing plate, the connecting plate, the connector and the side lugs;
the through hole is inserted with a bolt, the end part of the bolt is connected with a nut in a threaded manner, and the nut is screwed on the side surface of the fixing plate;
the inner side of the pipe hoop is hooped with a water pipe, and one side of the water pipe is fixedly connected with a plurality of spray heads;
and a surrounding baffle is clamped between the lower cross beam and the upper cross beam, and two sides of the surrounding baffle are attached to the side surfaces of the upright posts.
By any of the above-mentioned aspects, it is preferable that the bottom plate is fixed on the ground by anchor bolts and fixing nuts, wherein the anchor bolts are inserted into the bottom plate, and the fixing nuts are screwed on the top surface of the bottom plate.
The technical scheme is adopted: the device main body consists of a bottom plate, an upright post, a lower cross beam, an upper cross beam, a water pipe and a surrounding baffle plate, wherein the surrounding baffle plate is preferably formed by a double-layer plastic inner clamping foam plate, and the inside of the surrounding baffle plate is of a porous structure, so that sound absorption and noise reduction can be effectively realized, and the pollution of noise on a construction site to the outside can be reduced.
By any of the above schemes, preferably, the top surface of the bottom plate is welded with the bottom surface of the upright post, the vertical section shape of the lower beam is U-shaped, and the vertical section shape of the upper beam is inverted U-shaped.
The technical scheme is adopted: the construction fence is applied to the field of construction engineering, and particularly the device is deployed at the edge of a construction engineering site.
By any of the above schemes, it is preferable that the connecting plate is vertically arranged, and the connecting plate, the joint, the fixing plate and the side lugs are all penetrated by bolts.
The technical scheme is adopted: the device is of a splicing type, the field welding type is abandoned, the field rapid splicing and assembly of the enclosure can be realized, the use of components is reduced, and the deployment speed of the enclosure is improved.
By any of the above schemes, it is preferable that the connecting plate is welded to both sides of the lower beam, and the back surface of the connecting plate abuts against the side surface of the upright post.
The technical scheme is adopted: the core structure of this device is: the pipe clamp comprises a lower cross beam, an upper cross beam, a connecting plate, a joint, a fixing plate, a pipe clamp, side lugs, through holes, bolts and nuts. The device has the core advantages that: the fence is integrally formed by a plurality of components, the on-site welding type assembly can be abandoned, the on-site rapid splicing and assembling of the fence can be realized, the use of the components is reduced, the deployment speed of the fence is improved, specifically, after the bottom plate and the upright post are deployed, the upper cross beam and the upper cross beam are positioned, the fence is clamped between the upper cross beam and the lower cross beam, the water pipe and the pipe clamp are synchronously arranged above the upper cross beam, at the moment, the connecting plate, the joint, the fixing plate and the side lugs are attached, and through holes on the connecting plate, the joint, the fixing plate and the side lugs are aligned, at the moment, the synchronous connection and the assembly of the lower cross beam, the upper cross beam, the pipe clamp and the upright post can be realized only by using bolts after the through holes on the connecting plate, the joint, the fixing plate and the side lugs are tightly screwed, the unnecessary connecting components are not needed, the use of the components is reduced, the assembly speed is high, the efficiency is high, the labor is saved, and the fence can be rapidly deployed.
By any of the above schemes, it is preferable that the through holes formed on the fixing plate, the connecting plate, the joint and the side ears are aligned.
Compared with the prior art, the utility model has the following advantages and beneficial effects:
this construction engineering construction encloses fender with concatenation combination function, through the cooperation setting of bottom end rail, the entablature, the connecting plate, connect, the fixed plate, the ferrule, the side ear, the through-hole, the bolt, the nut, enclose the fender wholly by a plurality of component constitution, use site welding formula is abandoned, can realize enclosing the on-the-spot quick concatenation equipment of fender, reduce the use of component, improve the deployment speed of enclosing the fender, specifically, after bottom plate, the stand is deployed, the entablature is fixed a position, the entablature, and with enclose the baffle and block simultaneously between entablature, the bottom end rail, water pipe and ferrule have been put to synchronous entablature top, connecting plate at this moment, connect, the laminating of fixed plate and side ear, and the through-hole alignment on connecting plate, connect, fixed plate and the side ear, only need use the bolt to run through the through-hole on connecting plate, after last nut, can realize the synchronous connection equipment of bottom end rail, the entablature, the ferrule, the stand need not unnecessary connecting component, reduce the component use, the assembly speed is fast, high efficiency, save the manual work and can be deployed the barricade rapidly.
Additional aspects and advantages of the utility model will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the utility model.
Drawings
The foregoing and/or additional aspects and advantages of the utility model will become apparent and may be better understood from the following description of embodiments taken in conjunction with the accompanying drawings in which:
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic illustration of the present utility model when not assembled;
FIG. 3 is an enlarged schematic view of the structure of FIG. 1A according to the present utility model;
fig. 4 is an enlarged schematic view of the structure of fig. 2B according to the present utility model.
In the figure: the spray head comprises a bottom plate 1, a vertical column 2, a lower beam 3, an upper beam 4, a connecting plate 5, a connector 6, a fixing plate 7, a pipe hoop 8, a side lug 9, a through hole 10, a bolt 11, a nut 12, a water pipe 13, a spray head 14 and a surrounding baffle 15.
Detailed Description
Embodiments of the present utility model are described in detail below, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to like or similar elements or elements having like or similar functions throughout. The embodiments described below by referring to the drawings are illustrative and intended to explain the present utility model and should not be construed as limiting the utility model.
In the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
As shown in fig. 1-4, the construction engineering construction enclosure with the splicing and combining functions comprises a bottom plate 1 and upright posts 2, wherein the top of the bottom plate 1 is fixedly connected with the upright posts 2, the bottom end of the inner side of each upright post 2 is fixedly connected with a lower cross beam 3, the top end of the inner side of each upright post 2 is fixedly connected with an upper cross beam 4, and the end parts of two sides of each lower cross beam 3 are fixedly connected with connecting plates 5;
the two sides of the upper cross beam 4 are fixedly connected with connectors 6, and the top surfaces of the connectors 6 and the top surfaces of the connecting plates 5 are higher than the top surfaces of the upright posts 2;
the edge of the top surface of the upright post 2 is fixedly connected with a fixing plate 7, the top of the upper cross beam 4 is fixedly connected with a pipe hoop 8, the pipe hoop 8 is in an inverted U shape, both sides of the pipe hoop 8 are fixedly connected with side lugs 9, the fixing plate 7, the connecting plate 5, the joint 6 and the side lugs 9 are sequentially attached, and through holes 10 are formed in the fixing plate 7, the connecting plate 5, the joint 6 and the side lugs 9;
a bolt 11 is inserted into the through hole 10, a nut 12 is connected with the end part of the bolt 11 in a threaded manner, and the nut 12 is screwed on the side surface of the fixed plate 7;
the inner side of the pipe hoop 8 is hooped with a water pipe 13, and one side of the water pipe 13 is fixedly connected with a plurality of spray heads 14;
a surrounding baffle 15 is clamped between the lower cross beam 3 and the upper cross beam 4, and two sides of the surrounding baffle 15 are clung to the side surfaces of the upright posts 2.
Example 1: the bottom plate 1 is fixed on the ground through the rag bolt and the fixation nut, wherein the rag bolt is inserted into the bottom plate 1, and the fixation nut is screwed on the top surface of the bottom plate 1. The device main body comprises a bottom plate 1, upright posts 2, a lower cross beam 3, an upper cross beam 4, a water pipe 13 and a surrounding baffle 15, wherein the surrounding baffle 15 is preferably formed by a double-layer plastic inner clamping foam plate, and the inside of the surrounding baffle is of a porous structure, so that sound absorption and noise reduction can be effectively realized, and the pollution of construction site noise to the outside is reduced.
Example 2: the top surface of the bottom plate 1 is welded with the bottom surface of the upright post 2, the vertical section of the lower cross beam 3 is U-shaped, and the vertical section of the upper cross beam 4 is inverted U-shaped. The construction fence is applied to the field of construction engineering, and particularly the device is deployed at the edge of a construction engineering site. The connecting plate 5 is vertically arranged, and the connecting plate 5, the connector 6, the fixing plate 7 and the side lugs 9 are all penetrated by bolts 11. The device is of a splicing type, the field welding type is abandoned, the field rapid splicing and assembly of the enclosure can be realized, the use of components is reduced, and the deployment speed of the enclosure is improved.
Example 3: the connecting plate 5 is welded with two sides of the lower cross beam 4, and the back surface of the connecting plate 5 is abutted against the side surface of the upright post 2. The fixing plate 7, the connecting plate 5, the joint 6 and the through holes 10 arranged on the side lugs 9 are aligned.
The working principle of the utility model is as follows:
s1, the device main body consists of a bottom plate 1, upright posts 2, a lower cross beam 3, an upper cross beam 4, a water pipe 13 and a surrounding baffle 15, wherein the surrounding baffle 15 is preferably formed by a double-layer plastic inner-clamping foam plate, and the inside of the surrounding baffle is of a porous structure, so that sound absorption and noise reduction can be effectively realized, and the pollution of noise on a construction site to the outside can be reduced;
s2, a water pipe 13 is connected with a water pump and a water source, a spray head 14 sprays water mist towards the inner side of a construction engineering site, the water mist and dust are combined and settled, and the dust in the site is prevented from being diffused to the outside;
s3, after the bottom plate 1 and the stand columns are deployed, the upper cross beam 3 and the upper cross beam 4 are positioned, the surrounding baffle 15 is clamped between the upper cross beam 3 and the lower cross beam 4, the water pipe 13 and the pipe hoop 8 are synchronously arranged above the upper cross beam 3, at the moment, the connecting plate 5, the joint 6, the fixing plate 7 and the side lugs 9 are attached, through holes 10 on the connecting plate 5, the joint 6, the fixing plate 7 and the side lugs 9 are aligned, at the moment, the surrounding baffle 15 is clamped between the upper cross beam 3 and the upper cross beam 4 by tightening nuts 12 after penetrating through the through holes 10 on the connecting plate 5, the joint 6, the fixing plate 7 and the side lugs 9 by using bolts 11, and at the moment, the synchronous connection assembly of the lower cross beam 3, the upper cross beam 4, the pipe hoop 8 and the stand columns 2 can be realized.
Compared with the prior art, the utility model has the following beneficial effects compared with the prior art:
this construction engineering construction with concatenation combination function encloses fender, through the cooperation setting of bottom end rail 3, entablature 4, connecting plate 5, connect 6, fixed plate 7, ferrule 8, side ear 9, through-hole 10, bolt 11, nut 12, enclose the fender whole and constitute by a plurality of component, use spot welding formula is abandoned, can realize enclosing the quick concatenation equipment in scene of fender, reduce the use of component, improve the deployment rate who encloses the fender, specifically, after bottom plate 1, the stand is deployed, the entablature 3 is located, entablature 4, and with enclose baffle 15 card simultaneously between entablature 3, bottom end rail 4, synchronous top end rail 3 puts water pipe 13 and ferrule 8, at this moment, connect 6, fixed plate 7 and side ear 9 laminating, and connecting plate 5, connect 6, behind through-hole 10 on fixed plate 7 and the side ear 9, only need run through connecting plate 5 at this moment, connect 6, fixed plate 7 and the side ear 9, tight nut 12 is gone up in the tight 12, can realize the bottom end rail 3, entablature 4, the stand is disposed, the stand is 8, the stand is connected to synchronous, can accomplish the efficiency, can be accomplished, high-speed is accomplished and is assembled, the unnecessary and is assembled.

Claims (6)

1. The utility model provides a construction engineering construction encloses fender with concatenation combination function, includes bottom plate (1), stand (2), the top fixedly connected with stand (2) of bottom plate (1), its characterized in that, the bottom fixedly connected with bottom end beam (3) of stand (2) inboard, the top fixedly connected with entablature (4) of stand (2) inboard, the tip fixedly connected with connecting plate (5) of bottom end beam (3) both sides;
the two sides of the upper cross beam (4) are fixedly connected with connectors (6), and the top surfaces of the connectors (6) and the top surfaces of the connecting plates (5) are higher than the top surfaces of the upright posts (2);
the fixing device is characterized in that a fixing plate (7) is fixedly connected to the edge of the top surface of the upright post (2), a pipe hoop (8) is fixedly connected to the top of the upper cross beam (4), the pipe hoop (8) is in an inverted U shape, side lugs (9) are fixedly connected to the two sides of the pipe hoop (8), the fixing plate (7), the connecting plate (5), the joint (6) and the side lugs (9) are sequentially attached, and through holes (10) are formed in the fixing plate (7), the connecting plate (5), the joint (6) and the side lugs (9); a bolt (11) is inserted into the through hole (10), a nut (12) is connected with the end part of the bolt (11) in a threaded manner, and the nut (12) is screwed on the side surface of the fixed plate (7);
a water pipe (13) is hooped on the inner side of the pipe hoop (8), and a plurality of spray heads (14) are fixedly connected to one side of the water pipe (13);
and a surrounding baffle plate (15) is clamped between the lower cross beam (3) and the upper cross beam (4), and two sides of the surrounding baffle plate (15) are attached to the side surfaces of the upright posts (2).
2. The construction engineering construction fence with splicing and combining functions as set forth in claim 1, wherein: the bottom plate (1) is fixed on the ground through the foundation bolts and the fixing nuts, wherein the foundation bolts are inserted into the bottom plate (1), and the fixing nuts are screwed on the top surface of the bottom plate (1).
3. The construction engineering construction fence with the splicing and combining functions as set forth in claim 2, wherein: the top surface of bottom plate (1) welds with the bottom surface of stand (2), the vertical section shape of bottom beam (3) is the U-shaped, the vertical section shape of entablature (4) is the inverted U-shaped.
4. A construction engineering construction fence with splicing and combining functions as set forth in claim 3, wherein: the connecting plate (5) is vertically arranged, and the connecting plate (5), the connector (6), the fixing plate (7) and the side lugs (9) are penetrated by bolts (11).
5. The construction engineering construction fence with the splicing and combining functions as set forth in claim 4, wherein: the connecting plates (5) are welded with the two sides of the lower cross beam (3), and the back surfaces of the connecting plates (5) are abutted against the side surfaces of the upright posts (2).
6. The construction engineering construction fence with the splicing and combining functions as set forth in claim 5, wherein: through holes (10) formed in the fixing plate (7), the connecting plate (5), the connector (6) and the side lugs (9) are aligned.
CN202322274879.6U 2023-08-23 2023-08-23 Construction engineering construction fence with splicing and combining functions Active CN220667211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322274879.6U CN220667211U (en) 2023-08-23 2023-08-23 Construction engineering construction fence with splicing and combining functions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322274879.6U CN220667211U (en) 2023-08-23 2023-08-23 Construction engineering construction fence with splicing and combining functions

Publications (1)

Publication Number Publication Date
CN220667211U true CN220667211U (en) 2024-03-26

Family

ID=90342207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322274879.6U Active CN220667211U (en) 2023-08-23 2023-08-23 Construction engineering construction fence with splicing and combining functions

Country Status (1)

Country Link
CN (1) CN220667211U (en)

Similar Documents

Publication Publication Date Title
CN220667211U (en) Construction engineering construction fence with splicing and combining functions
GB2596130A (en) A modular building unit
CN209975736U (en) Lap joint assembly type energy-saving building
CN210002821U (en) Guide frame standard knot of aluminum alloy guide frame climbing type lifting working platform
CN101806124B (en) Guardrail
CN214737661U (en) Water smoke dust-proof safety enclosure device for building construction
CN212427537U (en) Assembled steel construction building fixed establishment
CN113550518A (en) Stand structure of steel construction installation
CN214738747U (en) Assembled steel beam fixing device
CN213421059U (en) Steel structure fastening support suitable for boiler
CN210927519U (en) Embedded support fixing table post for small solar power supply electric system
CN219754263U (en) Building construction safety guard rail
CN218324237U (en) Engineering protective fence
CN215889064U (en) Stand structure of steel construction installation
CN214365229U (en) Steel construction factory building skeleton that crossbeam is adjustable
CN218970846U (en) Conveniently-detached site fence
CN215168699U (en) Safety device for building engineering
CN215563420U (en) Rectangular pipe beam column connection assembly type node
CN214615855U (en) Multifunctional enclosure
CN218562698U (en) Connecting structure of stone beam and glass curtain wall upright post
CN213015731U (en) Dust suppression device for building construction
CN219394738U (en) Solar photovoltaic panel bracket
CN217870969U (en) Low-rise building steel member connecting device
CN215843830U (en) Framework supporting structure for coating open station
CN220954991U (en) Building protection device for building engineering management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant