CN220645136U - Lifting platform special for chimney steel beam construction - Google Patents

Lifting platform special for chimney steel beam construction Download PDF

Info

Publication number
CN220645136U
CN220645136U CN202322267967.3U CN202322267967U CN220645136U CN 220645136 U CN220645136 U CN 220645136U CN 202322267967 U CN202322267967 U CN 202322267967U CN 220645136 U CN220645136 U CN 220645136U
Authority
CN
China
Prior art keywords
lifting
auxiliary
chimney
construction
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322267967.3U
Other languages
Chinese (zh)
Inventor
史春城
庞继勇
刘勇
徐海明
赵小伟
夏成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
SEPCO Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO Electric Power Construction Co Ltd filed Critical SEPCO Electric Power Construction Co Ltd
Priority to CN202322267967.3U priority Critical patent/CN220645136U/en
Application granted granted Critical
Publication of CN220645136U publication Critical patent/CN220645136U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to chimney construction equipment, in particular to a special lifting platform for chimney steel beam construction, which comprises a roof beam, a construction platform, two groups of lifting systems and an auxiliary installation system, wherein the roof beam is fixedly arranged at the top opening of a chimney; the lifting system comprises a lifting winch, a guide fixed pulley II, a plurality of lifting fixed pulleys arranged on the roof beam and a lifting movable pulley connected to the construction platform. The auxiliary installation system comprises an auxiliary winch, a guide fixed pulley I, a plurality of auxiliary fixed pulleys and an auxiliary lifting hook pulley, wherein the auxiliary lifting hook pulley is positioned in the chimney and used for hoisting steel beam workpieces. The lifting platform has the advantages of being stable in operation, simple and convenient to operate, efficient in construction, low in manufacturing cost and the like.

Description

Lifting platform special for chimney steel beam construction
Technical Field
The utility model relates to the technical field of chimney construction, in particular to a lifting platform special for chimney steel beam construction.
Background
The construction platform design structure adopted in the prior art needs to comprehensively consider the operation of a construction elevator and the vertical transportation of a steel beam, has a plurality of reserved holes, needs to pay close attention to the collision problem between the operation of the elevator and the lifting process of the steel beam and the construction platform, and has the advantages of simple structure and imperfect safety facilities of the construction platform, thus burying potential safety hazards for the high-altitude operation of constructors. The construction platform is lifted by manually operating the lever block by constructors, and a plurality of constructors are required to operate simultaneously to meet the problem of platform stability, so that the construction platform runs up and down slowly.
Disclosure of Invention
In order to solve the problems, the utility model provides the special lifting platform for the chimney steel beam construction, and simultaneously has the triple properties of vertical transportation of the steel beam, the construction platform, the up and down of operators and the like, so that an integral solution can be provided for the steel beam installation engineering, and the lifting construction platform has the characteristics of stable operation, simple and direct control, high construction efficiency, low manufacturing cost and the like. The technical scheme adopted by the utility model is as follows:
the lifting platform special for the construction of the chimney steel beam comprises a roof beam, a construction platform, two groups of lifting systems and an auxiliary installation system, wherein the roof beam is fixedly arranged at the top opening of a chimney;
the lifting system comprises a lifting winch, a guide fixed pulley II, a plurality of lifting fixed pulleys arranged on the roof beam and a lifting movable pulley connected to the construction platform, wherein the lifting winch and the guide fixed pulley II are arranged on the ground outside a chimney, and the lifting winch, the guide fixed pulley II and the lifting movable pulley are in traction transmission through a steel wire rope II;
the auxiliary installation system comprises an auxiliary winch, a guide fixed pulley I, a plurality of auxiliary fixed pulleys and an auxiliary lifting hook pulley, wherein the auxiliary winch and the guide fixed pulley I are installed on the ground outside the chimney, and the auxiliary lifting hook pulley is located in the chimney and used for hoisting steel beam workpieces. The auxiliary fixed pulleys are arranged on the roof beam, and the auxiliary winch, the guide fixed pulleys I, the auxiliary fixed pulleys and the auxiliary lifting hook pulleys are in traction transmission through a steel wire rope I.
Above-mentioned special lift platform of chimney girder steel construction, construction platform is truss radiation beam structure, including a central section of thick bamboo and a plurality of radiation beam, the radiation beam is the circular radiation welding at central section of thick bamboo circumference.
The beneficial effects of the utility model are as follows: the lifting platform is provided with the lifting and auxiliary installing system, so that the problem of vertical transportation of the chimney steel beam workpiece is solved, and the steel beam construction efficiency is greatly improved. Meanwhile, the lifting platform provides a safe and reliable operation environment for constructors, and the construction platform meets the installation requirements of steel beams at different diameters of the chimney through a variable diameter structure, so that the high-altitude installation operation efficiency is greatly improved, and the construction period of the steel beams of the chimney is shortened.
Drawings
FIG. 1 is a schematic diagram of an embodiment of the present utility model;
fig. 2 is a view in the direction a in fig. 1.
In the figure: the auxiliary fixed pulley is 1, the guide rope is 2, the chimney cylinder wall is 3, the steel wire rope is 4, the auxiliary lifting hook pulley is 5, the guide fixed pulley is 6, the auxiliary winch is 7, the lifting fixed pulley is 8, the steel wire rope is 9, the lifting movable pulley is 10, the construction platform is 11, the guide fixed pulley is 12, the lifting winch is 13, the roof beam is 14, the central cylinder is 15, and the radiation beam is 16.
Detailed Description
The technical contents of the present utility model will be described in detail with reference to the accompanying drawings.
The embodiment is a special lifting platform for chimney steel beam construction, which comprises a roof beam 14, a construction platform 11, a lifting system and an auxiliary installation system, wherein the roof beam 14 is fixedly arranged at the top opening of a chimney.
The construction platform 11 is a truss radiation beam structure, as shown in fig. 2, the radiation beams 16 are welded on the circumference of the central cylinder 15 to form a platform, so that the strength and the overall stability of the construction platform are greatly improved. Meanwhile, the truss type radiation structure has an extension scope, so that the operation range of the construction platform 11 is conveniently expanded, the diameter of a chimney is gradually increased along with downward construction, the original reserved radiation beam 16 can be lengthened, the edge safety facility of the construction platform 11 is perfected, and the construction personnel can conveniently install all layers of steel beams of the chimney. According to the design load of the construction platform 11, the dynamic load and static load test work is completed, and all safety technical indexes meet the design requirements and then can be put into use. It should be noted that the chimney steel beam is placed on the construction platform 11 during construction, so that unbalanced load and overload are prevented, and reliable fixing is performed.
The lifting system comprises a lifting winch 13, a guide fixed pulley II 12, a plurality of lifting fixed pulleys 8 arranged on a roof beam 14 and a lifting movable pulley 10 connected to a construction platform 11, wherein the lifting winch 13 and the guide fixed pulley II 12 are arranged on the ground outside a chimney, and the lifting winch 13, the guide fixed pulley II 12, the lifting fixed pulleys 8 and the lifting movable pulley 10 are in traction transmission through a steel wire rope II 9. The guide fixed pulley II 12 is used for directly hoisting the construction platform 11. The lifting system can be provided with a plurality of groups, so that the construction platform 11 is synchronously and symmetrically lifted, and the lifting efficiency is improved.
The auxiliary installation system is used for hoisting and moving workpieces and the like during the construction of the chimney steel beam, and the auxiliary installation system is matched with workers to complete the steel beam construction safely, conveniently and efficiently on the construction platform 11. The auxiliary installation system comprises an auxiliary winch 7, a guide fixed pulley I6, a plurality of auxiliary fixed pulleys 1 and an auxiliary lifting hook pulley 5, wherein the auxiliary winch 7 and the guide fixed pulley I6 are all installed on the ground outside a chimney, and the auxiliary lifting hook pulley 5 is positioned in the chimney and used for hoisting steel beam workpieces. The auxiliary fixed pulleys 1 are arranged on the roof beam 14, and the auxiliary hoist 7, the guide fixed pulleys I6, the auxiliary fixed pulleys 1 and the auxiliary lifting hook pulleys 5 are in traction transmission through the steel wire rope I4.
The pulleys and the windlass at each point are comprehensively maintained, and the good performance of the pulleys and the windlass is ensured. The whole lifting platform is comprehensively and carefully inspected, and the important conditions include platform welding, an electrical system, safety facilities, ground anchor fixation and the like. The selected steel is verified by accounting by using the principle of material mechanics, the supervision and inspection of the welding process are strict, and the used steel wire ropes all need to meet the safety factor of 8 times, so that the whole system is ensured to run more safely and reliably. This lift construction platform compromise simultaneously construction, girder steel vertical transportation and constructor threes attribute such as about, can reuse in the chimney girder steel engineering of same type, promotes chimney girder steel installation efficiency of construction greatly, can once only with many girder steel handling to appointed working face, reduces girder steel vertical transportation round trip time, promotes girder steel installation efficiency of construction.

Claims (2)

1. The utility model provides a special lift platform of chimney girder steel construction which characterized in that: the construction method comprises a roof beam (14), a construction platform (11), two groups of lifting systems and an auxiliary installation system, wherein the roof beam (14) is fixedly arranged at the top opening of a chimney;
the lifting system comprises a lifting winch (13), a guide fixed pulley II (12), a plurality of lifting fixed pulleys (8) arranged on a roof beam (14) and a lifting movable pulley (10) connected to a construction platform (11), wherein the lifting winch (13) and the guide fixed pulley II (12) are arranged on the ground outside a chimney, and the lifting winch (13), the guide fixed pulley II (12) and the lifting fixed pulleys (8) are in traction transmission through a steel wire rope II (9);
the auxiliary installation system comprises an auxiliary winch (7), a guide fixed pulley I (6), a plurality of auxiliary fixed pulleys (1) and an auxiliary lifting hook pulley (5), wherein the auxiliary winch (7) and the guide fixed pulley I (6) are all installed on the ground outside a chimney, the auxiliary lifting hook pulley (5) is located in the chimney and used for hoisting a steel beam workpiece, the auxiliary fixed pulley (1) is installed on a roof beam (14), and the auxiliary winch (7), the guide fixed pulley I (6), the plurality of auxiliary fixed pulleys (1) and the auxiliary lifting hook pulley (5) are in traction transmission through a steel wire rope I (4).
2. The lifting platform special for chimney steel beam construction according to claim 1, wherein: the construction platform (11) is of a truss radiation beam structure and comprises a central cylinder (15) and a plurality of radiation beams (16), wherein the radiation beams (16) are welded on the circumference of the central cylinder (15) in a circular radiation manner.
CN202322267967.3U 2023-08-23 2023-08-23 Lifting platform special for chimney steel beam construction Active CN220645136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322267967.3U CN220645136U (en) 2023-08-23 2023-08-23 Lifting platform special for chimney steel beam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322267967.3U CN220645136U (en) 2023-08-23 2023-08-23 Lifting platform special for chimney steel beam construction

Publications (1)

Publication Number Publication Date
CN220645136U true CN220645136U (en) 2024-03-22

Family

ID=90286286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322267967.3U Active CN220645136U (en) 2023-08-23 2023-08-23 Lifting platform special for chimney steel beam construction

Country Status (1)

Country Link
CN (1) CN220645136U (en)

Similar Documents

Publication Publication Date Title
CN201228206Y (en) Self-made small-sized hoisting machine
CN203373014U (en) Static load loading apparatus of overhead and gantry crane
CN101858163B (en) Method for installing flare tower frame in bulk
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN101618835B (en) Hoisting platform capable of being lifted and disassembled and application method thereof
CN202274981U (en) Static force loading device of high-power blade test bench
CN220645136U (en) Lifting platform special for chimney steel beam construction
CN213015280U (en) Movable material loading platform
CN110747307A (en) Large steam drum hoisting method in converter energy-saving and environment-friendly reconstruction
CN112758803B (en) Method for hanging prefabricated box girder and changing hooks in air
CN111071925B (en) Hoisting sheave platform for installing derrick crane and crane installation method
CN108545629A (en) Utilize the construction method of tower crane lifting girder truss
CN210505201U (en) Equipment for hoisting reinforcing steel bars in batches
CN211169496U (en) Take quick hoist device of PC wallboard of counter weight
CN114822890A (en) Nuclear power station equipment gate installation method
CN211472175U (en) Aerial working platform device suitable for steel bridge construction
CN112499482A (en) Intelligent monitoring high-precision positioning steam drum hoisting device and hoisting method applied by same
CN111042538A (en) Hoisting and mounting method of buckling restrained brace
CN201980890U (en) Herringbone hoisting mast for hoisting under special situation of high altitude
CN216235766U (en) High-rise building steel vestibule hoisting device
CN214653128U (en) Intelligent monitoring high-precision positioning steam drum hoisting device
CN215854693U (en) Platform rail mounted hoist device
CN111377371B (en) System and method for mounting travelling beam by means of factory building column in closed factory building
CN105712213B (en) AP1000 nuclear power superposed type dome lifting and fixing construction methods
CN109457613B (en) Bridge maintenance truss vehicle installation construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant