CN220620105U - Pile breaking point active intervention device for building pile foundation construction - Google Patents

Pile breaking point active intervention device for building pile foundation construction Download PDF

Info

Publication number
CN220620105U
CN220620105U CN202322092171.9U CN202322092171U CN220620105U CN 220620105 U CN220620105 U CN 220620105U CN 202322092171 U CN202322092171 U CN 202322092171U CN 220620105 U CN220620105 U CN 220620105U
Authority
CN
China
Prior art keywords
pile
base
rotating
foundation construction
breaking point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322092171.9U
Other languages
Chinese (zh)
Inventor
冯凯奇
张�林
李庚埔
郑康杰
王娟娟
贾贝
胡晓敏
王鹏飞
张峰
常保国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Engineering Group Co Ltd
Original Assignee
Shanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Engineering Group Co Ltd filed Critical Shanxi Construction Engineering Group Co Ltd
Priority to CN202322092171.9U priority Critical patent/CN220620105U/en
Application granted granted Critical
Publication of CN220620105U publication Critical patent/CN220620105U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a pile breaking point active intervention device for building pile foundation construction, which belongs to the field of building construction and aims to solve the problems that the pile breaking point active intervention device for building pile foundation construction adopts the following scheme: the base, the main rod and the rotating block are used for changing the angle of the base when the equipment is used relative to a traditional pile point positioning device, then the base is inserted into the concrete at a vertical angle, then the base is matched with the main rod in a parallel mode, the main rod can be quickly separated from the concrete, the pile point is left, the use effect of the equipment is more perfect, the whole structure is simple, the equipment is convenient to process and manufacture, and the main rods with different lengths can be welded according to actual conditions, so that the application range of the equipment is wider, and the working quality of the equipment is guaranteed; the design is also suitable for the field of concrete pile point construction.

Description

Pile breaking point active intervention device for building pile foundation construction
Technical Field
The utility model relates to the technical field of building construction, in particular to an active intervention device for a pile breaking point for building pile foundation construction.
Background
The building pile refers to a ground pile built when the building construction is carried out, the ground pile is a foundation in the existing building, the traditional site is very important, the pile foundation pile casing length can be lengthened for empty piles, the stability of subsequent use is guaranteed, but pile breaking points still cannot be controlled, deviation occurs in the subsequent use, in addition, in the later earth excavation process, pile breaking can be caused due to mechanical collision and other reasons, the previous work is completely wasted, the whole working efficiency is very influenced, the pile breaking points are not easy to control, and hidden danger can be caused to engineering quality.
Therefore, it is necessary to provide a new active intervention device for the broken pile point for building pile foundation construction to solve the above technical problems.
Disclosure of Invention
In order to solve the technical problems, the utility model provides the pile breaking point active intervention device for building pile foundation construction, which is convenient to position and stable to use.
The utility model provides a pile breaking point active intervention device for building pile foundation construction, which comprises the following components: the device comprises a base, a main rod and a rotating block, wherein the rotating block is symmetrically and rotatably arranged on the surface of the base, the main rod is arranged on the top end of the rotating block, a rotating device is symmetrically and fixedly arranged on the surface of the base, a connecting device is fixedly arranged at the bottom end of the main rod and comprises a land block, a meshing groove and a threaded end, the land block is fixedly arranged on the surface of the rotating block, the meshing groove is formed in the land block, and the threaded end is arranged in the meshing groove through threads.
Preferably, the whole base is circular, and in use, the base is more convenient to insert into the concrete and move to a target position.
Preferably, the main rod further comprises a connecting rod, a handle, connecting blocks and connecting ropes, wherein the connecting rod is arranged at the top end of the rotating block, the handle is fixedly arranged outside the connecting rod, the connecting blocks are fixedly arranged at the top ends of the connecting rods, and the connecting ropes are fixedly arranged between the connecting blocks.
Preferably, the connecting rope is a rope with elasticity, which is used for guaranteeing the stability of the two connecting rods when in use.
Preferably, the rotating device comprises side plates, rotating rods and rotating plates, wherein the side plates are symmetrically and fixedly arranged on the surface of the base, the rotating rods are rotatably arranged between the side plates, the rotating plates are symmetrically and fixedly arranged outside the rotating rods, and the rotating plates are fixedly connected with the rotating blocks.
Preferably, the chamfer is offered to the commentaries on classics piece bottom, and in use is through the seting up of chamfer, makes things convenient for the commentaries on classics piece to carry out the rotation of multi-angle.
Preferably, the connecting device further comprises a connecting end, the connecting end is fixedly arranged at the bottom end of the main rod, and the connecting end is fixedly connected with the threaded end.
Preferably, the connecting end and the threaded end are fixed in a welding mode.
Compared with the related art, the pile breaking point active intervention device for building pile foundation construction has the following beneficial effects:
the utility model provides an active intervention device for a broken pile point for building pile foundation construction, which comprises the following steps:
through rotating device and connecting device's use, can change the angle of base, then let the base insert inside the concrete with the vertically angle, then through the cooperation of mobile jib, let the base with the parallel mode inside the concrete, afterwards can also break away from the mobile jib is quick, leave the stake point for the result of use of equipment self is more perfect, and holistic simple structure, convenient processing, preparation, afterwards can also weld the mobile jib of different length according to actual conditions, make the application scope of equipment self more extensive, guaranteed the operating quality of equipment self.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a second schematic diagram of the overall structure of the present utility model;
FIG. 3 is a third schematic diagram of the overall structure provided by the present utility model;
fig. 4 is a schematic diagram of a main lever structure according to the present utility model;
FIG. 5 is a schematic view of a rotating device according to the present utility model;
fig. 6 is a schematic structural diagram of a connection device according to the present utility model.
Reference numerals in the drawings: 1. a base; 2. a main rod; 21. a connecting rod; 22. a grip; 23. connecting blocks; 24. a connecting rope; 3. a rotating block; 4. a rotating device; 41. a side plate; 42. a rotating lever; 43. a rotating plate; 5. a connecting device; 51. a land block; 52. a meshing groove; 53. a connection end; 54. a threaded end.
Detailed Description
The utility model will be further described with reference to the drawings and embodiments.
Referring to fig. 1, 2, 3, 4, 5 and 6 in combination, the pile breaking point active intervention device for building pile foundation construction comprises: base 1, mobile jib 2 and commentaries on classics piece 3.
Embodiment one:
in the specific implementation process, as shown in fig. 1, 2 and 3, a rotating block 3 is symmetrically and rotatably installed on the surface of a base 1, a main rod 2 is arranged at the top end of the rotating block 3, a rotating device 4 is symmetrically and fixedly installed on the surface of the base 1, a connecting device 5 is fixedly installed at the bottom end of the main rod 2, the connecting device 5 comprises a land block 51, a meshing groove 52 and a threaded end 54, the land block 51 is fixedly installed on the surface of the rotating block 3, a meshing groove 52 is formed in the land block 51, and the threaded end 54 is installed in the meshing groove 52 in a threaded mode.
In use, normally pouring concrete, guiding the overspray to exceed the elevation of the designed pile top, then enabling the angle of the base 1 to be in the vertical direction, then inserting the base 1 into the concrete, after moving to a target degree, enabling the base 1 to be in a parallel state through the cooperation of the rotating device 4, finally dismantling the main rod 2 and the upper end part through the use of the connecting device 5, enabling the base 1 to be left at a set position in the concrete, enabling the position of the base 1 to form a pile breaking point after the concrete is solidified, facilitating subsequent use, enabling the concrete to be broken after finishing, taking out the base 1, and facilitating recycling.
Referring to fig. 1, the base 1 is circular overall, and is more convenient to insert into the concrete in use and move to a target position.
Referring to fig. 4, the main rod 2 further includes a connecting rod 21, a grip 22, a connecting block 23 and a connecting rope 24, the connecting rod 21 is provided at the top end of the rotating block 3, the grip 22 is fixedly mounted at the outside of the connecting rod 21, the connecting block 23 is fixedly mounted at the top end of the connecting rod 21, and the connecting rope 24 is fixedly mounted between the connecting blocks 23.
Referring to fig. 4, the connecting cord 24 is generally a cord having elasticity, and is used to secure stability of the two links 21 during use.
Referring to fig. 5, the rotating device 4 includes side plates 41, rotating rods 42 and rotating plates 43, the side plates 41 are symmetrically and fixedly installed on the surface of the base 1, the rotating rods 42 are rotatably installed between the side plates 41, the rotating plates 43 are symmetrically and fixedly installed outside the rotating rods 42, and the rotating plates 43 are fixedly connected with the rotating blocks 3.
In use, through the changing angle of the upper main rod 2, the rotating block 3 drives the rotating plate 43 to rotate, and because of the matching of the rotating rod 42, the angle of the lower base 1 changes, so that the position and the angle of the base 1 can be conveniently controlled.
Referring to fig. 5, a chamfer is provided at the bottom end of the rotary block 3, and in use, the rotary block 3 can conveniently rotate at multiple angles through the provision of the chamfer.
Referring to fig. 6, the connecting device 5 further includes a connecting end 53, the connecting end 53 is fixedly mounted at the bottom end of the main rod 2, and the connecting end 53 is fixedly connected with the threaded end 54.
In use, the main lever 2 is rotated in the opposite direction, so that the threaded end 54 at the bottom end of the main lever 2 rotates in the opposite direction and gradually disengages from the inside of the engagement groove 52, thereby completing the disengagement of the main lever 2 components.
Referring to fig. 6, the connection end 53 and the screw end 54 are fixed by welding.
Working principle: the pile breaking point active intervention device for building pile foundation construction normally pours concrete when in use, guides the overspray to exceed the designed pile top elevation, then enables the angle of the base 1 to be vertical, inserts the base 1 into the concrete, enables the base 1 to be in a parallel state through the cooperation of the rotating device 4 after moving to a target degree, enables the rotating block 3 to drive the rotating plate 43 to rotate through the changing angle of the upper main rod 2, enables the angle of the lower base 1 to change because of the cooperation of the rotating rod 42, facilitates the operation of the position and the angle of the base 1, finally enables the main rod 2 and the upper end part to be detached through the use of the connecting device 5, enables the threaded end 54 at the bottom end of the main rod 2 to rotate in the opposite direction and gradually breaks away from the inside of the meshing groove 52, thereby completing the detachment of the main rod 2 part, enables the base 1 to be left in the set position inside the concrete, enables the position of the base 1 to form a pile breaking point after the concrete is solidified, and finally enables the concrete to be broken and taken out after the construction, and is convenient for recycling.
The foregoing is only illustrative of the present utility model and is not to be construed as limiting the scope of the utility model, and all equivalent structures or equivalent flow modifications which may be made by the teachings of the present utility model and the accompanying drawings or which may be directly or indirectly employed in other related art are within the scope of the utility model.

Claims (8)

1. The utility model provides a building pile foundation construction is with disconnected stake point initiative intervention device which characterized in that includes: base (1), mobile jib (2) and commentaries on classics piece (3), base (1) surface symmetry rotates installs commentaries on classics piece (3), commentaries on classics piece (3) top is provided with mobile jib (2), base (1) surface symmetry fixed mounting has rotating device (4), mobile jib (2) bottom fixed mounting has connecting device (5), connecting device (5) include parcel (51), meshing groove (52) and screw end (54), commentaries on classics piece (3) surface fixed mounting has parcel (51), meshing groove (52) have been seted up to parcel (51) inside, meshing groove (52) internal thread installs screw end (54).
2. The active intervention device of a pile breaking point for building pile foundation construction according to claim 1, wherein the base (1) is circular as a whole.
3. The pile breaking point active intervention device for building pile foundation construction according to claim 1, wherein the main rod (2) further comprises a connecting rod (21), a grip (22), connecting blocks (23) and connecting ropes (24), the connecting rod (21) is arranged at the top end of the rotating block (3), the grip (22) is fixedly arranged outside the connecting rod (21), the connecting blocks (23) are fixedly arranged at the top end of the connecting rod (21), and the connecting ropes (24) are fixedly arranged between the connecting blocks (23).
4. A pile breaking point active intervention device for building pile foundation construction according to claim 3, characterized in that the connecting rope (24) is generally an elastic rope.
5. The pile breaking point active intervention device for building pile foundation construction according to claim 1, wherein the rotating device (4) comprises side plates (41), rotating rods (42) and rotating plates (43), the side plates (41) are symmetrically and fixedly installed on the surface of the base (1), the rotating rods (42) are rotatably installed between the side plates (41), the rotating plates (43) are symmetrically and fixedly installed outside the rotating rods (42), and the rotating plates (43) are fixedly connected with the rotating blocks (3).
6. The active intervention device of a pile breaking point for building pile foundation construction according to claim 1, wherein a chamfer is formed at the bottom end of the rotary block (3).
7. The active intervention device of a pile breaking point for building pile foundation construction according to claim 1, wherein the connecting device (5) further comprises a connecting end (53), the connecting end (53) is fixedly installed at the bottom end of the main rod (2), and the connecting end (53) is fixedly connected with the threaded end (54).
8. The active intervention device of a pile breaking point for building pile foundation construction according to claim 7, wherein the connecting end (53) and the threaded end (54) are fixed by welding.
CN202322092171.9U 2023-08-04 2023-08-04 Pile breaking point active intervention device for building pile foundation construction Active CN220620105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322092171.9U CN220620105U (en) 2023-08-04 2023-08-04 Pile breaking point active intervention device for building pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322092171.9U CN220620105U (en) 2023-08-04 2023-08-04 Pile breaking point active intervention device for building pile foundation construction

Publications (1)

Publication Number Publication Date
CN220620105U true CN220620105U (en) 2024-03-19

Family

ID=90223146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322092171.9U Active CN220620105U (en) 2023-08-04 2023-08-04 Pile breaking point active intervention device for building pile foundation construction

Country Status (1)

Country Link
CN (1) CN220620105U (en)

Similar Documents

Publication Publication Date Title
CN102182180B (en) Rotary extrusion sleeve anchor rod and construction method thereof
CN106761448B (en) A kind of pile-driving machine
CN220620105U (en) Pile breaking point active intervention device for building pile foundation construction
CN208455628U (en) A kind of piling machine positioning device
CN109183843B (en) Prefabricated and assembled integral type concrete comprehensive pipe gallery and construction method
Tong et al. Research on automatic section cutting control of roadheader
CN216038189U (en) Building construction steel pipe hoist and mount fixing device
CN114876230A (en) Novel civil and industrial building wall reinforcing device and reinforcing method thereof
CN106968177A (en) A kind of bridge equipment
CN209504562U (en) All-direction borehole device in a kind of hydro excavation hole
CN208167734U (en) The auxiliary device abolished for filling pile head
CN206646837U (en) A kind of special limiter of glomeration building prefabricated construction wall piece
CN215857715U (en) Piling fixed point fixing mechanism for constructional engineering
CN207003413U (en) A kind of civil engineering vibratory rammer, vibratory tamper
CN209339151U (en) A kind of fishing device pouring conduit for bored concrete pile
CN211621592U (en) Grouting device for foundation and foundation engineering
CN213416061U (en) Engineering machine tool structure hangs commentaries on classics device
CN112962604B (en) Pile cutter for building disassembly
CN220394538U (en) Construction expansion structure
CN213837716U (en) Mould connecting rod of slip form machine
CN203452736U (en) Cement-based pier type fixing frame for gas drilling sand discharge pipeline
CN217810420U (en) Road and bridge crack reinforced structure
CN220746931U (en) Water conservancy construction cementer
CN221219670U (en) Novel supporting device
CN221095110U (en) Adjustable anti-floating anchor rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant