CN220598445U - Pile core pouring device for prefabricated PHC pipe pile - Google Patents

Pile core pouring device for prefabricated PHC pipe pile Download PDF

Info

Publication number
CN220598445U
CN220598445U CN202322225089.9U CN202322225089U CN220598445U CN 220598445 U CN220598445 U CN 220598445U CN 202322225089 U CN202322225089 U CN 202322225089U CN 220598445 U CN220598445 U CN 220598445U
Authority
CN
China
Prior art keywords
block
blocking
pile
outer end
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322225089.9U
Other languages
Chinese (zh)
Inventor
孙霞
胡亚鲁
楚孔胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huihai Power Equipment Co ltd
Original Assignee
Shandong Huihai Power Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huihai Power Equipment Co ltd filed Critical Shandong Huihai Power Equipment Co ltd
Priority to CN202322225089.9U priority Critical patent/CN220598445U/en
Application granted granted Critical
Publication of CN220598445U publication Critical patent/CN220598445U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of pouring devices, and discloses a pile core pouring device for prefabricating PHC pipe piles, which comprises a body mechanism, an adjusting mechanism and an anti-blocking mechanism, wherein the adjusting mechanism is positioned at the outer end of the body mechanism, the anti-blocking mechanism is positioned at the upper end of the adjusting mechanism, the anti-blocking mechanism comprises a mounting frame, a driving piece, a second screw rod, a moving block, an anti-blocking block and a chute frame, the driving piece is fixedly arranged at the upper end of the mounting frame, the second screw rod is fixedly arranged at the transmission end of the driving piece, the moving block is movably arranged at the outer end of the second screw rod, and the anti-blocking block is movably arranged at the lower end of the moving block. This stake core filling device of prefabricated PHC tubular pile starts the driving piece and makes the movable block remove and drive the anti-blocking piece, and the anti-blocking piece can dredge the inside concrete that blocks up of filling a section of thick bamboo, can avoid a large amount of concretes to adhere to the inner wall of filling a section of thick bamboo, leads to filling the problem of blocking up, has improved this stake core filling device's filling environment, has improved the filling effect of device.

Description

Pile core pouring device for prefabricated PHC pipe pile
Technical Field
The utility model relates to the technical field of pouring devices, in particular to a pile core pouring device for prefabricating PHC pipe piles.
Background
Along with the continuous progress of society and science and technology, the requirement of building construction is also higher and higher, under the condition that the requirement time of building construction progress is short, the prestressed high-strength concrete pipe pile which takes only one or two days for forming time, namely PHC pile, is increasingly adopted for carrying out foundation treatment, so that a pouring device is necessary important equipment for pouring the pipe pile, and the common practice is to slowly pour or manufacture a chute by adopting a pump truck for pile core concrete pouring.
But common auxiliary pouring device in the market is inconvenient for reuse, and is inconvenient to reduce the influence of concrete pouring on the steel bars, so that the conventional pile core pouring device is convenient to use and can be used for a second time, and the pouring practicability of the pile core pouring device is increased.
However, the problem of the material characteristics of the concrete pouring in the pouring process of the pile core pouring device can cause adhesion in the concrete pouring process, and the pile core pouring device is easy to block in the concrete pouring process due to long-time accumulation, so that the use efficiency and the pouring work progress of the pile core pouring device are reduced.
Disclosure of Invention
(one) solving the technical problems
The utility model aims to provide a pile core pouring device for prefabricating PHC pipe piles, which solves the problems that in the background art, the pile core pouring device is easy to block due to the fact that adhesion is generated in the concrete pouring process and accumulation is caused for a long time due to the fact that the pile core pouring device is filled with concrete in the pouring process.
(II) technical scheme
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a stake core filling device of prefabricated PHC tubular pile, includes body mechanism, adjustment mechanism and anti-blocking mechanism, adjustment mechanism is located body mechanism's outer end, anti-blocking mechanism is located adjustment mechanism's upper end, anti-blocking mechanism includes mounting bracket, driving piece, lead screw two, movable block, anti-blocking piece and spout frame, driving piece fixed mounting is in the upper end of mounting bracket, lead screw two fixed mounting is at the driving end of driving piece, movable block movable mounting is at the outer end of lead screw two, anti-blocking piece movable mounting is at the lower extreme of movable block, through installation anti-blocking piece and movable block, starts the driving piece and makes the movable block remove and drive anti-blocking piece, and anti-blocking piece can dredge the inside blocked concrete of filling a large amount of concretes are attached to the inner wall of filling a cylinder, lead to the problem of filling the jam, have improved the filling environment of this device, have improved the effect of filling of the device.
Preferably, the sliding chute frame is movably arranged at the outer end of the anti-blocking block, the sliding chute frame is fixedly arranged at the upper end of the mounting frame, and the sliding chute frame can form a limiting structure at the outer end of the anti-blocking block through the installation of the sliding chute frame, so that the stability of moving and adjusting the anti-blocking block is increased.
Preferably, the body mechanism comprises a tubular pile body, a reinforcement cage, a positioning block, a reinforcing block, a connecting piece and a pouring barrel, wherein the reinforcement cage is fixedly arranged at the inner end of the tubular pile body, the positioning block is movably arranged at the outer end of the tubular pile body, the positioning block is arranged, the positioning block is matched with the reinforcing block to enable the tubular pile body and the reinforcement cage to be more stable in the pouring process, and extrusion deformation of the tubular pile body and the reinforcement cage in the pouring process is avoided.
Preferably, the reinforcing block is movably mounted at the outer end of the positioning block, the connecting piece is in threaded connection with the outer end of the reinforcing block, the pouring barrel is movably mounted at the upper end of the reinforcing block, and the connecting piece is mounted and can be used for adding the connecting structure on the basis of the positioning block and the reinforcing block.
Preferably, adjustment mechanism includes reinforcement frame, motor, lead screw one, movable block, spacing groove and link, reinforcement frame movable mounting is at the rear end of locating piece, motor fixed mounting is at the outer end of reinforcement frame, first fixed mounting of lead screw is at the driving end of motor, movable block movable mounting is at the outer end of lead screw one, through installation movable block, start-up motor, lets the movable block remove, makes reinforcement block cooperation locating piece can fix a position according to the tubular pile body of different specifications, lets the device can be suitable for the tubular column of different specifications, can better satisfy the demand in present market.
Preferably, the limiting groove is movably arranged at the outer end of the movable block, the connecting frame is fixedly arranged at the front end of the reinforcing frame, and the limiting groove is arranged to limit the movable block, so that the movable block drives the reinforcing block to be more stable in the moving and adjusting process, and the movable block is prevented from being turned over due to offset.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the pile core pouring device for the prefabricated PHC pipe pile, the anti-blocking blocks and the moving blocks are arranged, the moving blocks move to drive the anti-blocking blocks, the anti-blocking blocks can dredge the concrete blocked in the pouring cylinder, a large amount of concrete can be prevented from adhering to the inner wall of the pouring cylinder, the problem of pouring blocking is solved, the pouring environment of the pile core pouring device is improved, and the pouring effect of the device is improved;
2. according to the pile core pouring device for the prefabricated PHC pipe pile, the positioning blocks are arranged and matched with the reinforcing blocks, so that the reinforcing limiting structures can be formed at the outer ends of the pipe pile body and the reinforcement cage, the pipe pile body and the reinforcement cage are more stable in the pouring process, and extrusion deformation of the pipe pile body and the reinforcement cage in the pouring process is avoided;
3. this stake core filling device of prefabricated PHC tubular pile through the installation movable block, and the movable block removes and makes the cooperation locating piece of reinforcement block can fix a position according to the tubular pile body of different specifications, lets the device can be suitable for the tubular column of different specifications, can better satisfy the demand in present market, lets the better going on of filling engineering, has improved the result of use of device.
Drawings
FIG. 1 is a schematic perspective view of the present utility model;
fig. 2 is a schematic perspective view of a tubular pile body according to the present utility model;
FIG. 3 is a schematic side plan view of the anti-blocking mechanism of the present utility model;
FIG. 4 is a schematic cross-sectional view of a reinforcement frame according to the present utility model;
fig. 5 is an enlarged plan view of the structure of fig. 4 a according to the present utility model.
In the figure: 1. a body mechanism; 101. a tubular pile body; 102. a reinforcement cage; 103. a positioning block; 104. a reinforcing block; 105. a connecting piece; 106. a pouring barrel; 2. an adjusting mechanism; 201. a reinforcing frame; 202. a motor; 203. a first screw rod; 204. a movable block; 205. a limit groove; 206. a connecting frame; 3. an anti-blocking mechanism; 301. a mounting frame; 302. a driving member; 303. a second screw rod; 304. a moving block; 305. anti-blocking blocks; 306. and a chute frame.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, the present utility model provides a technical solution: the utility model provides a pile core pouring device of prefabricated PHC tubular pile, including body mechanism 1, adjustment mechanism 2 and anti-blocking mechanism 3, adjustment mechanism 2 is located the outer end of body mechanism 1, anti-blocking mechanism 3 is located the upper end of adjustment mechanism 2, anti-blocking mechanism 3 includes mounting bracket 301, driver 302, lead screw two 303, movable block 304, anti-blocking block 305 and spout frame 306, driver 302 fixed mounting is in the upper end of mounting bracket 301, lead screw two 303 fixed mounting is in the driving end of driver 302, movable block 304 movable mounting is in the outer end of lead screw two 303, anti-blocking block 305 movable mounting is in the lower extreme of movable block 304, through installing anti-blocking block 305 and movable block 304, start driver 302, driver 302 drives lead screw two 303 and movable block 304 and carries out the screw thread effect, make movable block 304 remove and drive anti-blocking block 305, anti-blocking block 305 can dredge the inside blocked concrete of pouring section 106, can avoid a large amount of concrete to adhere to the inner wall of pouring section of thick bamboo 106, lead to the problem of pouring the jam, the pouring environment of this core pouring device has been improved, the pouring effect of this device has been improved;
the chute frame 306 is movably arranged at the outer end of the anti-blocking block 305, the chute frame 306 is fixedly arranged at the upper end of the mounting frame 301, the chute frame 306 can form a limit structure at the outer end of the anti-blocking block 305 through the installation of the chute frame 306, so that the stability of the movement adjustment of the anti-blocking block 305 is increased, the use of the anti-blocking block 305 is improved, the body mechanism 1 comprises a tubular pile body 101, a reinforcement cage 102, a positioning block 103, a reinforcing block 104, a connecting piece 105 and a pouring barrel 106, the reinforcement cage 102 is fixedly arranged at the inner end of the tubular pile body 101, the positioning block 103 is movably arranged at the outer end of the tubular pile body 101, the positioning block 103 is matched with the reinforcing block 104 through the installation of the positioning block 103, the tubular pile body 101 and the reinforcement cage 102 can form a reinforcing limit structure at the outer ends of the tubular pile body 101 and the reinforcement cage 102, the tubular pile body 101 and the reinforcement cage 102 are more stable in the pouring process, the pouring effect of the pouring device is further increased, the reinforcing block 104 is movably arranged at the outer end of the positioning block 103, the connecting piece 105 is in threaded connection with the outer end of the reinforcing block 104, the pouring barrel 106 is movably arranged at the upper end of the reinforcing block 104, the reinforcing block 104 is further stable through the connection of the connecting piece 105 and the reinforcing block 103, and the reinforcing cage 102 is prevented from being deformed and stable;
the adjusting mechanism 2 comprises a reinforcing frame 201, a motor 202, a first screw rod 203, a movable block 204, a limiting groove 205 and a connecting frame 206, wherein the reinforcing frame 201 is movably installed at the rear end of the positioning block 103, the motor 202 is fixedly installed at the outer end of the reinforcing frame 201, the first screw rod 203 is fixedly installed at the driving end of the motor 202, the movable block 204 is movably installed at the outer end of the first screw rod 203, the motor 202 is started to drive the first screw rod 203 to rotate through installing the movable block 204, so that the first screw rod 203 and the movable block 204 are in threaded action to adjust and drive the reinforcing block 104, the reinforcing block 104 is matched with the positioning block 103 to position according to tubular pile bodies 101 of different specifications, the device can be suitable for tubular piles of different specifications, the requirements of the current market can be met well, the pouring engineering can be better carried out, the using effect of the device is improved, the limiting groove 205 is movably arranged at the outer end of the movable block 204, the connecting frame 206 is fixedly installed at the front end of the reinforcing frame 201, the limiting groove 205 can limit the movable block 204, the movable block 204 is used for enabling the movable block 204 to drive the reinforcing block 104 to be more stably and the reinforcing block 104 to be more stably rotated in the moving and adjusting and overturning and adjusting and positioning of the reinforcing block 104 is avoided.
Working principle: this pile core pouring device of prefabricated PHC tubular pile, when using, firstly place locating piece 103 and reinforcing block 104 in the outer end of tubular pile body 101, start motor 202, can drive first 203 rotations of lead screw, thereby make first 203 screw and movable block 204 carry out the screw action regulation and drive reinforcing block 104, make reinforcing block 104 cooperation locating piece 103 can fix a position according to tubular pile body 101 of different specifications, let the device can be suitable for the tubular column of different specifications, can better satisfy the demand in present market, let the pouring engineering better go on, after the regulation is accomplished, locating piece 103 cooperation reinforcing block 104 can form the reinforcement limit structure at tubular pile body 101 and the outer end of steel reinforcement cage 102 at this moment, let tubular pile body 101 and steel reinforcement cage 102 more stable in the pouring process, avoid tubular pile body 101 and steel reinforcement cage 102 to cause extrusion deformation in the pouring process, let the pouring effect of this pouring device further increase, then carry out the pouring work, drive piece 302 is started to the driving piece 302 drive lead screw second and movable block 304 and carry out the screw action, make movable block 304 carry out the removal and drive the anti-blocking block, anti-blocking block 305 can block up the inside of pouring tube 106 and form the reinforcement limit structure at the outer end of tubular pile body 101 and steel reinforcement cage 102, the problem of this pouring tube 106 is avoided to be blocked up smoothly in the pouring tube 106 to the pouring work that the concrete is carried out the pouring tube is more smoothly.
Finally, it should be noted that the above description is only for illustrating the technical solution of the present utility model, and not for limiting the scope of the present utility model, and that the simple modification and equivalent substitution of the technical solution of the present utility model can be made by those skilled in the art without departing from the spirit and scope of the technical solution of the present utility model.

Claims (6)

1. The utility model provides a stake core filling device of prefabricated PHC tubular pile, includes body mechanism (1), adjustment mechanism (2) and anti-blocking mechanism (3), its characterized in that: the anti-blocking mechanism (3) is located at the upper end of the body mechanism (1), the anti-blocking mechanism (3) comprises a mounting frame (301), a driving piece (302), a screw rod II (303), a moving block (304), an anti-blocking block (305) and a chute frame (306), the driving piece (302) is fixedly installed at the upper end of the mounting frame (301), the screw rod II (303) is fixedly installed at the transmission end of the driving piece (302), the moving block (304) is movably installed at the outer end of the screw rod II (303), and the anti-blocking block (305) is movably installed at the lower end of the moving block (304).
2. The pile core filling device for prefabricating PHC pile according to claim 1, wherein: the chute frame (306) is movably arranged at the outer end of the anti-blocking block (305), and the chute frame (306) is fixedly arranged at the upper end of the mounting frame (301).
3. The pile core filling device for prefabricating PHC pile according to claim 2, wherein: the body mechanism (1) comprises a tubular pile body (101), a reinforcement cage (102), a positioning block (103), a reinforcing block (104), a connecting piece (105) and a pouring barrel (106), wherein the reinforcement cage (102) is fixedly arranged at the inner end of the tubular pile body (101), and the positioning block (103) is movably arranged at the outer end of the tubular pile body (101).
4. A pile core filling apparatus for prefabricating PHC pile according to claim 3, wherein: the reinforcing block (104) is movably mounted at the outer end of the positioning block (103), the connecting piece (105) is connected with the outer end of the reinforcing block (104) in a threaded mode, and the pouring barrel (106) is movably mounted at the upper end of the reinforcing block (104).
5. The pile core filling apparatus for prefabricating PHC pile according to claim 4, wherein: the adjusting mechanism (2) comprises a reinforcing frame (201), a motor (202), a first screw rod (203), a movable block (204), a limiting groove (205) and a connecting frame (206), wherein the reinforcing frame (201) is movably installed at the rear end of the positioning block (103), the motor (202) is fixedly installed at the outer end of the reinforcing frame (201), the first screw rod (203) is fixedly installed at the transmission end of the motor (202), and the movable block (204) is movably installed at the outer end of the first screw rod (203).
6. The pile core filling apparatus for a prefabricated PHC pile of claim 5, wherein: the limiting groove (205) is movably arranged at the outer end of the movable block (204), and the connecting frame (206) is fixedly arranged at the front end of the reinforcing frame (201).
CN202322225089.9U 2023-08-18 2023-08-18 Pile core pouring device for prefabricated PHC pipe pile Active CN220598445U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322225089.9U CN220598445U (en) 2023-08-18 2023-08-18 Pile core pouring device for prefabricated PHC pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322225089.9U CN220598445U (en) 2023-08-18 2023-08-18 Pile core pouring device for prefabricated PHC pipe pile

Publications (1)

Publication Number Publication Date
CN220598445U true CN220598445U (en) 2024-03-15

Family

ID=90175029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322225089.9U Active CN220598445U (en) 2023-08-18 2023-08-18 Pile core pouring device for prefabricated PHC pipe pile

Country Status (1)

Country Link
CN (1) CN220598445U (en)

Similar Documents

Publication Publication Date Title
CN106120584B (en) A kind of box culvert slip form construction device and method
CN220598445U (en) Pile core pouring device for prefabricated PHC pipe pile
CN211472056U (en) Automatic sliding form system for side ditch
CN216266771U (en) Slurry tank for storing concrete material
CN2360518Y (en) Single-side wall climbing formwork
CN115771190A (en) Automatic change wall body panel pouring system
CN217079736U (en) Concrete floating device
CN101629454A (en) Bracket concrete construction formwork
CN114525788A (en) Pressure pouring device for frame lattice beam
CN211114865U (en) Shear force wall concrete replacement is with post-cast in water concrete auxiliary device
CN112681751A (en) Multifunctional efficient concrete pouring device
CN221029510U (en) Crack repairing device
CN114856202B (en) Casting equipment with high automation degree
CN117400389B (en) Concrete member prefabricating equipment
CN217462191U (en) Structural device for applying prestress to tunnel secondary lining formwork support trolley
CN219298773U (en) Engineering door template supporting structure
CN220807903U (en) Concrete slab pouring device for civil engineering construction
CN220813834U (en) Water pile driving frame
CN220464266U (en) Core appurtenance is irritated to prestressing force tubular pile
CN219011992U (en) Built-in fitting positioning die
CN220311600U (en) Prestressed mineral casting beam stretching equipment
CN220847585U (en) But self-cleaning's building pile foundation cementer
CN211143076U (en) Cushion cap pouring device
CN216445966U (en) Pile driver is used in highway engineering construction
CN219973206U (en) Dam body is with high-efficient grout construction equipment

Legal Events