CN220590082U - EP pipe support - Google Patents

EP pipe support Download PDF

Info

Publication number
CN220590082U
CN220590082U CN202321393623.0U CN202321393623U CN220590082U CN 220590082 U CN220590082 U CN 220590082U CN 202321393623 U CN202321393623 U CN 202321393623U CN 220590082 U CN220590082 U CN 220590082U
Authority
CN
China
Prior art keywords
pipe
main board
board body
bracket main
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321393623.0U
Other languages
Chinese (zh)
Inventor
杨海帆
程宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN202321393623.0U priority Critical patent/CN220590082U/en
Application granted granted Critical
Publication of CN220590082U publication Critical patent/CN220590082U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to an EP pipe bracket, which belongs to the technical field of laboratory equipment; the bracket comprises a bracket main board body, wherein a combined splicing structure is arranged on the side surface of the bracket main board body; an EP pipe jack is arranged on the upper surface of the bracket main board body along the length direction of the bracket main board body, and an EP pipe cover placing groove is arranged at the position of the upper surface of the bracket main board body corresponding to the EP pipe jack; according to the utility model, the combined splicing structure is arranged on the side edge of the EP pipe bracket, and the EP pipe cover placing groove is arranged on the upper surface of the bracket main board body, so that the problem that the operation is influenced by the EP pipe cover when the operation such as sampling, dripping reagent and the like is carried out after the EP pipe is placed in the conventional EP pipe bracket is solved, and meanwhile, the problem that the conventional EP pipe bracket is inconvenient to take when a certain row of EP pipes are needed is solved; so that the experimenter can perform the experimental operation more conveniently and conveniently.

Description

EP pipe support
Technical Field
The utility model relates to an EP (EP) pipe bracket, and belongs to the technical field of laboratory equipment.
Background
The EP tube is called a centrifuge tube, and is the most widely used experimental equipment in laboratories; is an indispensable experimental device for molecular biological experiments; the bottom of the EP tube is a conical curved surface and cannot be directly placed on a table top of a laboratory, usually the laboratory adopts an EP tube bracket, the EP tube is placed in the EP tube bracket and then sampling, dripping reagent or DNA, RNA extraction and other operations are performed, but an EP tube cover can block the sampling, dripping reagent and other operations, and an experimenter needs to press the EP tube cover by one hand to prevent the EP tube cover from affecting the sampling, dripping reagent and other operations in the operation process, and the other hand takes droppers and other equipment; and the same batch of experiments can need a plurality of EP pipes of multiple different specifications, when only needing to shift a certain part of EP pipes in a certain experimental process, current EP pipe support can not satisfy the requirement, can have the inconvenient scheduling problem of shifting, and the EP pipe of different specifications needs to be placed on the EP pipe support of different sizes simultaneously, all puts dissatisfaction on every EP pipe support, causes the wasting of resources, occupies a large amount of laboratory mesa, and the EP pipe that uses in the same experiment can not concentrate together, causes easily to mix up, lose, can not form the experimental phenomenon contrast that washs clearly.
For example, chinese patent publication No. CN 218962701U discloses an EP tube holder comprising a base plate, a support block, and an elastic sheet, the EP tube being held by the elastic sheet; because the connecting piece is arranged between the EP pipe and the EP pipe cover, the connecting piece can enable the EP pipe cover to move towards the pipe orifice of the EP pipe, and the EP pipe cover is blocked in the operation processes of sampling, dripping reagent and the like, so that the operation is inconvenient; and when the next experimental operation only needs one row of EP pipes, the structure causes the problem of inconvenient taking; thus, there is a need for a convenient and easy to use EP tube holder.
Disclosure of Invention
The utility model aims at the problems in the prior art, and provides an EP (EP) pipe bracket which is used for solving the problem that the operation is influenced by an EP pipe cover when operations such as sampling, dripping reagent and the like are carried out after the EP pipe is placed in the existing EP pipe bracket, and simultaneously solving the problem that the existing EP pipe bracket is inconvenient to take when a certain row of EP pipes are needed; the experimental operation is more convenient.
The utility model aims at realizing the technical scheme that the EP pipe bracket comprises a bracket main board body, wherein a combined splicing structure is arranged on the side surface of the bracket main board body; the upper surface of support mainboard body is equipped with EP pipe jack along its length direction, and the upper surface of support mainboard body is equipped with EP tube cap standing groove with the position that EP pipe jack corresponds.
Preferably, the combined splicing structure comprises a clamping groove and a clamping block, wherein the clamping block is clamped in the clamping groove, and the clamping groove and the clamping block are sequentially distributed on the side face of the bracket main board body in a staggered mode.
Preferably, one side of the bracket main board body is distributed in sequence according to the rule of clamping grooves and clamping blocks, and the opposite side of the bracket main board body is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side of the bracket main board body is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side of the bracket main board body is correspondingly distributed according to the rule of clamping grooves and clamping blocks.
The combined splicing structure is arranged on the side face of the EP pipe bracket, in the using process of experimental operation, the EP pipe with samples in the same batch and the same size can be inserted into the EP pipe bracket, then the EP pipe brackets with the samples in different sizes or different experimental stages in the same experiment are combined and spliced together through the matching of the clamping grooves and the clamping joints, the subsequent EP pipe transfer in the experimental process is facilitated, the experiments of sample performance under different stages or research factors can be clearly and clearly compared and observed, a large number of laboratory tables are not occupied, and the use and the observation are convenient; and when the EP tube filled with the sample is required to be sampled, the reagent is dripped or the performance analysis is carried out under the same batch or the same parameters, the single row or a plurality of rows can be moved for carrying out the experiment, so that confusion with the rest of the sample, interference of the rest of the sample on the next experiment or pollution of the rest of the sample during the next operation are avoided.
Preferably, the EP tube cap placing groove includes a connecting piece placing groove and a sealing cap placing groove, and the connecting piece placing groove is connected with the sealing cap placing groove in a penetrating way; the upper surface of the bracket main board body is provided with a fixed board; the connecting piece standing groove and the sealing cover standing groove are both arranged on the upper surface of the fixing plate, and the connecting piece standing groove and the sealing cover standing groove are correspondingly arranged with the EP pipe jack.
Preferably, a notch is arranged at one end of the sealing cover placing groove far away from the connecting piece placing groove, and the notch is in through connection with the sealing cover placing groove.
After the EP pipe is inserted into the EP pipe jack of the EP pipe bracket, the EP pipe cover is placed in the EP pipe cover placing groove, the EP pipe cover is clamped by the connecting piece placing groove and the sealing cover placing groove, so that the EP pipe cover is prevented from moving the sealing cover towards the pipe orifice direction of the EP pipe under the action of the connecting piece when an experimenter performs operations such as sampling, dripping reagent and the like, and a series of operations are interfered by the experimenter; because the orifice of the EP pipe is not completely flush with the orifice of the EP pipe jack after the EP pipe is inserted into the EP pipe jack, an experimenter can conveniently fix the EP pipe cover by arranging the fixing plate; the experimenter is in accomplishing a series of operation mouths, covers the EP tube cap again, and the notch is convenient for the experimenter to take out the EP tube cap from sealed lid standing groove.
Preferably, the EP tube cover standing groove is a groove, and the groove is correspondingly arranged with the EP tube jack.
Preferably, a support plate is arranged below the support main plate body, and a support rod is arranged between the support plate and the support main plate body; the upper surface of the supporting plate is provided with a fixing groove corresponding to the EP pipe jack; the thickness of support mainboard body is less than the height of EP pipe.
Preferably, the fixing groove is provided with an anti-slip pad.
In the experiment, an experimenter often needs to observe the reaction condition of a sample in the EP pipe, the support main board body is used for fixing the upper part of the EP pipe, the support board is used for providing a certain supporting force for the lower part of the EP pipe, and the middle part is convenient for the experimenter to observe the sample; the anti-slip pad in the groove prevents the bottom of the EP tube from moving, resulting in the EP tube sliding out of the EP tube holder.
Preferably, the width and length of the support plate are smaller than the width and length of the support main board body, or the width and length of the support plate are the same as the width and length of the support main board body, and the side surface of the support plate is provided with a combined splicing structure. The bracket is convenient to complete splicing.
Preferably, the support main board body is made of transparent materials. The sample condition in the EP pipe is conveniently observed by an experimenter.
The utility model has the following beneficial effects: (1) According to the utility model, the combined splicing structure is arranged on the side edge of the EP tube support, so that EP tubes in the same batch, the same size or under the same reaction condition in an experiment are placed together, then the EP tube supports of the EP tubes with samples in different sizes or different experiment stages in the same experiment are combined and spliced together through the matching of the clamping grooves and the clamping joints, the subsequent transfer of the EP tubes in the experiment process is facilitated, clear comparison and observation can be carried out in different stages or in the experiment of researching the sample performance under different factors, a large number of laboratory tables are not occupied, and the use and observation are convenient.
(2) According to the utility model, the EP tube cover placing groove is formed in the upper surface of the support main board body, so that an experimenter can conveniently fix the EP tube cover when sampling, dripping reagent and the like, the EP tube cover is prevented from influencing experimental operation, the current situation that one hand is used for sampling and the like, and the other hand is used for pinching the EP tube cover is changed, and the experimenter can operate more conveniently.
Drawings
FIG. 1 is a schematic view showing the structure of an EP tube holder according to embodiment 2 of the present utility model;
FIG. 2 is a schematic view showing the structure of an EP tube holder for holding an EP tube in accordance with embodiment 2 of the present utility model;
FIG. 3 is a schematic structural view of an EP tube holder according to embodiment 3 of the present utility model;
FIG. 4 is a schematic view showing a state in which an EP tube is placed in an EP tube holder in example 3 of the present utility model;
FIG. 5 is a schematic view showing the structure of an EP tube holder in embodiment 4 of the present utility model;
fig. 6 is a schematic structural view of an EP tube holder in example 5 of the present utility model.
In the figure: 1. a bracket main board body; 2. EP tube insertion holes; 3. a clamping groove; 4. a clamping block; 5. a connecting piece placing groove; 6. a seal cover placing groove; 7. a notch; 8. a fixing plate; 9. a groove; 10. a support plate; 11. a support rod; 12. a fixing groove; 13. EP tube.
Detailed Description
The utility model is further described with reference to the accompanying drawings.
Example 1
The EP pipe bracket comprises a bracket main board body 1, wherein a combined splicing structure is arranged on the side surface of the bracket main board body, the combined splicing structure comprises a clamping groove 3 and a clamping block 4, the clamping block 4 is clamped in the clamping groove 3, and the clamping groove 3 and the clamping block 4 are sequentially and alternately distributed on the side surface of the bracket main board body 1; one side of the bracket main board body 1 is distributed in turn according to the rule of clamping grooves and clamping blocks, and then the opposite side of the bracket main board body 1 is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side surface of the bracket main board body 1 is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side surface of the bracket main board body 1 is correspondingly distributed according to the rule of clamping grooves and clamping blocks;
the upper surface of the bracket main board body 1 is provided with an EP pipe jack 2 along the length direction, the position of the upper surface of the bracket main board body 1 corresponding to the EP pipe jack 2 is provided with an EP pipe cover placing groove, the EP pipe cover placing groove comprises a connecting piece placing groove 5 and a sealing cover placing groove 6, and the connecting piece placing groove 5 is in through connection with the sealing cover placing groove 6; the upper surface of the bracket main board body 1 is provided with a fixed board 8; the connecting piece standing groove 5 and the sealing cover standing groove 6 are arranged on the upper surface of the fixing plate 8, and the connecting piece standing groove 5 and the sealing cover standing groove 6 are correspondingly arranged with the EP pipe jack 2.
Example 2
As shown in fig. 1 and 2, an EP tube bracket comprises a bracket main board body 1, wherein a combined splicing structure is arranged on the side surface of the bracket main board body, the combined splicing structure comprises a clamping groove 3 and a clamping block 4, the clamping block 4 is clamped in the clamping groove 3, and the clamping groove 3 and the clamping block 4 are sequentially and alternately distributed on the side surface of the bracket main board body 1; one side of the bracket main board body 1 is distributed in turn according to the rule of clamping grooves and clamping blocks, and then the opposite side of the bracket main board body 1 is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side surface of the bracket main board body 1 is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side surface of the bracket main board body 1 is correspondingly distributed according to the rule of clamping grooves and clamping blocks;
the upper surface of the bracket main board body 1 is provided with an EP pipe jack 2 along the length direction, the position of the upper surface of the bracket main board body 1 corresponding to the EP pipe jack 2 is provided with an EP pipe cover placing groove, the EP pipe cover placing groove comprises a connecting piece placing groove 5 and a sealing cover placing groove 6, and the connecting piece placing groove 5 is in through connection with the sealing cover placing groove 6; the upper surface of the bracket main board body 1 is provided with a fixed board 8; the connecting piece placing groove 5 and the sealing cover placing groove 6 are arranged on the upper surface of the fixing plate 8, and the connecting piece placing groove 5 and the sealing cover placing groove 6 are correspondingly arranged with the EP pipe jack 2;
one end of the sealing cover placing groove 6 far away from the connecting piece placing groove 5 is provided with a notch 7, and the notch 7 is in through connection with the sealing cover placing groove 6.
When the device is used, an EP pipe filled with a sample or an empty EP pipe is inserted into an EP pipe jack, an EP pipe cover is broken off and pressed into an EP cover placing groove, a connecting piece is positioned in the connecting piece placing groove, and a sealing cover is placed in the sealing cover placing groove; then carrying out the following experimental operation; taking out the EP pipe cover through the notch after the experimental operation is finished, and sealing the pipe orifice of the EP pipe; in the same experiment, the EP pipe with different sizes is adopted, the EP pipe bracket is used for carrying out different parameter researches on the sample, after experimental operation is carried out respectively, the EP pipe bracket is combined and spliced together through the structures of the clamping grooves and the clamping blocks, the subsequent experimental steps are convenient, the confusion of the EP pipe can not be caused, and a large amount of instrument resources and laboratory tables are avoided being occupied.
Example 3
As shown in fig. 3 and 4, an EP tube bracket comprises a bracket main board body 1, wherein a combined splicing structure is arranged on the side surface of the bracket main board body, the combined splicing structure comprises a clamping groove 3 and a clamping block 4, the clamping block 4 is clamped in the clamping groove 3, and the clamping groove 3 and the clamping block 4 are sequentially and alternately distributed on the side surface of the bracket main board body 1; one side of the bracket main board body 1 is distributed in turn according to the rule of clamping grooves and clamping blocks, and then the opposite side of the bracket main board body 1 is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side surface of the bracket main board body 1 is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side surface of the bracket main board body 1 is correspondingly distributed according to the rule of clamping grooves and clamping blocks;
the upper surface of support mainboard body 1 is equipped with EP pipe jack 2 along its length direction, and the upper surface of support mainboard body 1 is equipped with EP tube cap standing groove with the position that EP pipe jack 2 corresponds, and EP tube cap standing groove is recess 9, and recess 9 corresponds the setting with EP pipe jack 2.
Example 4
The EP pipe bracket comprises a bracket main board body 1, wherein a combined splicing structure is arranged on the side surface of the bracket main board body, the combined splicing structure comprises a clamping groove 3 and a clamping block 4, the clamping block 4 is clamped in the clamping groove 3, and the clamping groove 3 and the clamping block 4 are sequentially and alternately distributed on the side surface of the bracket main board body 1; one side of the bracket main board body 1 is distributed in turn according to the rule of clamping grooves and clamping blocks, and then the opposite side of the bracket main board body 1 is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side surface of the bracket main board body 1 is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side surface of the bracket main board body 1 is correspondingly distributed according to the rule of clamping grooves and clamping blocks;
the upper surface of the bracket main board body 1 is provided with an EP pipe jack 2 along the length direction, the position of the upper surface of the bracket main board body 1 corresponding to the EP pipe jack 2 is provided with an EP pipe cover placing groove, the EP pipe cover placing groove comprises a connecting piece placing groove 5 and a sealing cover placing groove 6, and the connecting piece placing groove 5 is in through connection with the sealing cover placing groove 6; the upper surface of the bracket main board body 1 is provided with a fixed board 8; the connecting piece placing groove 5 and the sealing cover placing groove 6 are arranged on the upper surface of the fixing plate 8, and the connecting piece placing groove 5 and the sealing cover placing groove 6 are correspondingly arranged with the EP pipe jack 2;
a notch 7 is formed in one end, far away from the connecting piece placing groove 5, of the sealing cover placing groove 6, and the notch 7 is in through connection with the sealing cover placing groove 6;
a supporting plate 10 is arranged below the bracket main board body 1, and a supporting rod 11 is arranged between the supporting plate 10 and the bracket main board body 1; the upper surface of the supporting plate 10 is provided with a fixing groove 12 corresponding to the EP pipe insertion hole 2; the thickness of the bracket main board body 1 is smaller than the height of the EP pipe 13; the fixing groove 12 is provided with an anti-slip pad;
the width and length of the support plate 10 are smaller than those of the bracket main plate body 1.
Example 5
As shown in fig. 5, an EP tube bracket comprises a bracket main board body 1, wherein a combined splicing structure is arranged on the side surface of the bracket main board body, the combined splicing structure comprises a clamping groove 3 and a clamping block 4, the clamping block 4 is clamped in the clamping groove 3, and the clamping groove 3 and the clamping block 4 are sequentially and alternately distributed on the side surface of the bracket main board body 1; one side of the bracket main board body 1 is distributed in turn according to the rule of clamping grooves and clamping blocks, and then the opposite side of the bracket main board body 1 is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side surface of the bracket main board body 1 is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side surface of the bracket main board body 1 is correspondingly distributed according to the rule of clamping grooves and clamping blocks;
the upper surface of the bracket main board body 1 is provided with an EP pipe jack 2 along the length direction, the position of the upper surface of the bracket main board body 1 corresponding to the EP pipe jack 2 is provided with an EP pipe cover placing groove, the EP pipe cover placing groove comprises a connecting piece placing groove 5 and a sealing cover placing groove 6, and the connecting piece placing groove 5 is in through connection with the sealing cover placing groove 6; the upper surface of the bracket main board body 1 is provided with a fixed board 8; the connecting piece placing groove 5 and the sealing cover placing groove 6 are arranged on the upper surface of the fixing plate 8, and the connecting piece placing groove 5 and the sealing cover placing groove 6 are correspondingly arranged with the EP pipe jack 2;
a notch 7 is formed in one end, far away from the connecting piece placing groove 5, of the sealing cover placing groove 6, and the notch 7 is in through connection with the sealing cover placing groove 6;
a supporting plate 10 is arranged below the bracket main board body 1, and a supporting rod 11 is arranged between the supporting plate 10 and the bracket main board body 1; the upper surface of the supporting plate 10 is provided with a fixing groove 12 corresponding to the EP pipe insertion hole 2; the thickness of the bracket main board body 1 is smaller than the height of the EP pipe 13; the fixing groove 12 is provided with an anti-slip pad;
the width and length of the support plate 10 are the same as those of the support main plate body 1, and the side surface of the support plate 10 is provided with a combined splicing structure which can be referred to
Example 6
As shown in fig. 6, an EP tube bracket comprises a bracket main board body 1, wherein a combined splicing structure is arranged on the side surface of the bracket main board body, the combined splicing structure comprises a clamping groove 3 and a clamping block 4, the clamping block 4 is clamped in the clamping groove 3, and the clamping groove 3 and the clamping block 4 are sequentially and alternately distributed on the side surface of the bracket main board body 1; one side of the bracket main board body 1 is distributed in turn according to the rule of clamping grooves and clamping blocks, and then the opposite side of the bracket main board body 1 is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side surface of the bracket main board body 1 is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side surface of the bracket main board body 1 is correspondingly distributed according to the rule of clamping grooves and clamping blocks;
the upper surface of the bracket main board body 1 is provided with an EP pipe jack 2 along the length direction, the position of the upper surface of the bracket main board body 1 corresponding to the EP pipe jack 2 is provided with an EP pipe cover placing groove, the EP pipe cover placing groove comprises a connecting piece placing groove 5 and a sealing cover placing groove 6, and the connecting piece placing groove 5 is in through connection with the sealing cover placing groove 6; the upper surface of the bracket main board body 1 is provided with a fixed board 8; the connecting piece placing groove 5 and the sealing cover placing groove 6 are arranged on the upper surface of the fixing plate 8, and the connecting piece placing groove 5 and the sealing cover placing groove 6 are correspondingly arranged with the EP pipe jack 2;
a notch 7 is formed in one end, far away from the connecting piece placing groove 5, of the sealing cover placing groove 6, and the notch 7 is in through connection with the sealing cover placing groove 6;
a supporting plate 10 is arranged below the bracket main board body 1, and a supporting rod 11 is arranged between the supporting plate 10 and the bracket main board body 1; the upper surface of the supporting plate 10 is provided with a fixing groove 12 corresponding to the EP pipe insertion hole 2; the thickness of the bracket main board body 1 is smaller than the height of the EP pipe 13; the fixing groove 12 is provided with an anti-slip pad; the bracket main board body 1 is made of transparent materials.
The foregoing description is only of the preferred embodiments of the present utility model, and is not intended to limit the utility model, but any modifications, equivalents, improvements, etc. made to the above embodiments according to the technical substance of the present utility model should be included in the scope of the present utility model.

Claims (8)

1. An EP pipe bracket is characterized by comprising a bracket main board body (1), wherein the side surface of the bracket main board body is provided with a combined splicing structure; an EP pipe jack (2) is arranged on the upper surface of the bracket main board body (1) along the length direction of the bracket main board body, and an EP pipe cover placing groove is arranged at the position of the upper surface of the bracket main board body (1) corresponding to the EP pipe jack (2);
the combined splicing structure comprises a clamping groove (3) and clamping blocks (4), wherein the clamping blocks (4) are clamped in the clamping groove (3), and the clamping grooves (3) and the clamping blocks (4) are sequentially distributed on the side face of the bracket main board body (1) in a staggered mode;
one side surface of the bracket main board body (1) is distributed in sequence according to the rule of clamping grooves and clamping blocks, and then the opposite side surface of the bracket main board body (1) is correspondingly distributed according to the rule of clamping blocks and clamping grooves; or one side of the bracket main board body (1) is distributed in sequence according to the rule of clamping blocks and clamping grooves, and the opposite side of the bracket main board body (1) is correspondingly distributed according to the rule of clamping grooves and clamping blocks.
2. An EP tube holder according to claim 1, characterized in that the EP tube cap placement groove comprises a connector placement groove (5) and a sealing cap placement groove (6), the connector placement groove (5) being in through connection with the sealing cap placement groove (6); the upper surface of the bracket main board body (1) is provided with a fixed board (8); the connecting piece standing groove (5) and the sealing cover standing groove (6) are arranged on the upper surface of the fixed plate (8), and the connecting piece standing groove (5) and the sealing cover standing groove (6) are arranged corresponding to the EP pipe jack (2).
3. An EP pipe holder according to claim 2, characterized in that the end of the sealing cover placement groove (6) remote from the connecting piece placement groove (5) is provided with a notch (7), the notch (7) being in through connection with the sealing cover placement groove (6).
4. An EP pipe holder according to claim 1, characterized in that the EP pipe cap placement groove is a groove (9), the groove (9) being arranged in correspondence with the EP pipe insertion hole (2).
5. An EP tube holder according to claim 1, characterized in that a support plate (10) is arranged below the holder main plate body (1), and a support rod (11) is arranged between the support plate (10) and the holder main plate body (1); the upper surface of the supporting plate (10) is provided with a fixing groove (12) corresponding to the EP pipe insertion hole (2); the thickness of the bracket main board body (1) is smaller than the height of the EP pipe (13).
6. An EP tube holder according to claim 5, characterized in that the fixing groove (12) is provided with a non-slip mat.
7. An EP tube holder according to claim 5, characterized in that the width and length of the support plate (10) are smaller than the width and length of the holder main plate body (1), or the width and length of the support plate (10) are the same as the width and length of the holder main plate body (1), and the side surfaces of the support plate (10) are provided with a combined splicing structure.
8. An EP tube holder according to claim 1, wherein the holder main plate body (1) is of transparent material.
CN202321393623.0U 2023-06-02 2023-06-02 EP pipe support Active CN220590082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321393623.0U CN220590082U (en) 2023-06-02 2023-06-02 EP pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321393623.0U CN220590082U (en) 2023-06-02 2023-06-02 EP pipe support

Publications (1)

Publication Number Publication Date
CN220590082U true CN220590082U (en) 2024-03-15

Family

ID=90179103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321393623.0U Active CN220590082U (en) 2023-06-02 2023-06-02 EP pipe support

Country Status (1)

Country Link
CN (1) CN220590082U (en)

Similar Documents

Publication Publication Date Title
US4565100A (en) Pipette device
EP1340982A3 (en) Assay work station
JPS5871462A (en) Pipet sampler and device containing said sampler
CN220590082U (en) EP pipe support
US6240984B1 (en) Foot seal for liquid handler
JPH0867B2 (en) Inoculator and assembly
US20240053370A1 (en) Device for sample pretreatment
CN216284562U (en) Medical science inspection smear processor
CN214830378U (en) Biological experiment operating equipment
CN214716756U (en) Capillary tube liquid transfer device and die thereof
CN216870384U (en) Basic-level full-automatic body fluid inspection platform and automatic body fluid analysis system
CN211712585U (en) Reaction tube device of uncapping
CN210109128U (en) TIP head multiplexing loading device applied to IVD automation equipment and IVD automation equipment
CN113416636A (en) Biological experiment operation equipment and use method thereof
CN214384549U (en) Reagent push-pull frame for immunohistochemical dyeing machine
CN217249019U (en) Liquid extracting device
CN217341488U (en) Sample cell storage rack
CN216368059U (en) Special manual sample introduction sample placing disc for liquid phase
CN215087256U (en) Sample transfer equipment for bio-manufacturing convenient to transfer fast
CN211963331U (en) Support for liquid filtration
CN210115085U (en) Biological operation platform
CN211612783U (en) Comprehensive micro-pipetting device placing rack
CN217774178U (en) Supplementary remove device of abandonment rifle head of liquid-transfering work station
CN214525635U (en) Reagent pre-installation storage tube for detection
CN219273115U (en) 96-hole plate sample adding anti-pollution device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant