CN220486530U - Temporary plugging structure for two ends or reserved intersection of open cut tunnel - Google Patents

Temporary plugging structure for two ends or reserved intersection of open cut tunnel Download PDF

Info

Publication number
CN220486530U
CN220486530U CN202322207660.4U CN202322207660U CN220486530U CN 220486530 U CN220486530 U CN 220486530U CN 202322207660 U CN202322207660 U CN 202322207660U CN 220486530 U CN220486530 U CN 220486530U
Authority
CN
China
Prior art keywords
temporary plugging
wall
tunnel
outer side
water stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322207660.4U
Other languages
Chinese (zh)
Inventor
李建林
孙烨
周长林
吴金刚
郭淞
王浩春
张金波
李婧
张智航
刘世行
祁亚雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing General Municipal Engineering Design and Research Institute Co Ltd filed Critical Beijing General Municipal Engineering Design and Research Institute Co Ltd
Priority to CN202322207660.4U priority Critical patent/CN220486530U/en
Application granted granted Critical
Publication of CN220486530U publication Critical patent/CN220486530U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a temporary plugging structure for two ends or reserved intersections of an open cut tunnel, which comprises a tunnel structure top plate, a tunnel structure bottom plate, a tunnel structure side wall and a temporary plugging wall, and further comprises the following components: the steel edge rubber water stop belt is paved on the outer side of the temporary plugging wall; the first brick wall is arranged at the outer side of the steel edge rubber water stop; the full-package waterproof layer is arranged on the outer side of the first brick wall; the second brick wall is arranged at the outer side of the full-package waterproof layer; the interior of the temporary plugging wall adopts glass fiber reinforced plastics. The utility model provides an excellent choice for effectively applying the temporary plugging structure type of the open-cut tunnel, and when the temporary plugging structure is adopted for plugging, the temporary plugging structure can be conveniently detached, the manufacturing cost is reduced, the sealing property of the structure is ensured, and the effective water stop is realized.

Description

Temporary plugging structure for two ends or reserved intersection of open cut tunnel
Technical Field
The utility model relates to a temporary blocking wall structure for a tunnel constructed by an open cut method.
Background
Along with the large number of construction of underground open cut tunnels, the crossing situation is more and more unavoidable, so that the construction time sequence difference between different tunnels can be generated, and interfaces are required to be reserved at the end parts of the tunnels and the positions of intersections; in addition, due to the requirements of construction conditions and construction progress, the tunnel can be subjected to sectional construction, so that temporary plugging is needed to be performed at the end part of the tunnel, at a reserved interface or at a sectional part, the safety and the integrity of a tunnel structure are ensured, and temporary plugging is removed when the tunnel is constructed to the position in the later stage, so that the whole tunnel is penetrated.
In order to facilitate connection on a later newly-built tunnel structure, temporary plugging of the tunnel is usually arranged at the deformation joint. At present, a temporary plugging structure for an underground open cut tunnel is mainly filled with flexible materials at the position of a buried water stop belt in the end part of the tunnel, the water stop belt is protected, and then a steel plate or cast concrete is used for plugging at the outer side of the plugging structure.
The disadvantage of this form of construction is that: a. the shutoff wall in tunnel tip outside can not effectually be connected with tunnel main part structure, and overall stability is poor. b. The flexible material filled in the water stop is easy to be extruded and deformed, so that the performance of the water stop is affected.
Therefore, in the existing temporary plugging structure, when plugging is performed, the integrity of the main structure is protected, but the sealing effect of the plugging structure is poor, and the waterproof effect is poor.
Disclosure of Invention
The utility model aims to provide a temporary plugging structure for two ends or reserved intersections of an open cut tunnel, which can solve the technical problems.
The utility model provides a temporary plugging structure for two ends or reserved intersections of an open cut tunnel, which comprises a tunnel structure top plate, a tunnel structure bottom plate, a tunnel structure side wall and a temporary plugging wall, and further comprises the following components: the steel edge rubber water stop belt is paved on the outer side of the temporary plugging wall; the first brick wall is arranged at the outer side of the steel edge rubber water stop; the full-package waterproof layer is arranged on the outer side of the first brick wall; and the second brick wall is arranged at the outer side of the full-package waterproof layer.
Preferably, the interior of the temporary plugging wall adopts glass fiber reinforced plastic.
Preferably, the glass fiber reinforced plastic is pre-buried at the intersection of the tunnel structure top plate and the temporary plugging wall, the intersection of the tunnel structure bottom plate and the temporary plugging wall and the intersection of the tunnel structure side wall and the temporary plugging wall.
Preferably, the fiberglass tendon meets the anchoring length requirement.
Preferably, the glass fiber ribs are firmly bound by adopting iron wires or nylon ropes.
Preferably, the outer part of the steel edge rubber water stop is flush with the first brick wall.
Preferably, the lower part of the tunnel structure bottom plate further comprises a lower cushion layer of the tunnel structure bottom plate, and the lower cushion layer is used for dispersing load pressure.
The utility model discloses a temporary plugging structure for two ends or reserved intersections of an open cut tunnel. The temporary plugging structure comprises a tunnel structure top plate, a tunnel structure bottom plate, a tunnel structure side wall and a temporary plugging wall, wherein the temporary plugging structure further comprises: the steel edge rubber water stop belt is paved on the outer side of the temporary plugging wall; the first brick wall is arranged at the outer side of the steel edge rubber water stop; the full-package waterproof layer is arranged on the outer side of the first brick wall; and the second brick wall is arranged at the outer side of the full-package waterproof layer. The temporary plugging structure of the end or the reserved intersection of the tunnel is an indispensable link in the construction process, and the existing plugging structure is difficult to disassemble in the later period, so that the cost is usually increased, the main structure is damaged, or the sealing effect is poor, and the water stopping performance is poor. When the temporary plugging structure is used for plugging, the temporary plugging structure can be conveniently detached, the manufacturing cost is reduced, and the sealing property and the effective water stop of the structure can be ensured, so that the temporary plugging structure provides an excellent choice for the effective application of the temporary plugging structure of the open-cut tunnel.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the utility model and do not constitute a limitation on the utility model. In the drawings:
fig. 1 is a plan structure diagram of temporary plugging structures at two ends or reserved intersections of an open cut tunnel according to an embodiment of the utility model;
fig. 2 is a vertical view structure diagram of temporary plugging structures at two ends or reserved intersections of an open cut tunnel according to an embodiment of the utility model.
In the figure: 1. a tunnel structure roof; 2. a tunnel structure bottom plate; 3. a tunnel structure side wall; 4. temporary plugging walls; 5. a first brick wall; 6. a second brick wall; 7. a steel edge rubber water stop; 8. glass fiber ribs; 9. a full-package waterproof layer; 2-1, a cushion layer at the lower part of the bottom plate of the tunnel structure.
Detailed Description
It should be noted that, in the case of no conflict, the embodiments and features in the embodiments may be combined with each other. The utility model will be described in detail below with reference to the drawings in connection with embodiments.
Reference will now be made in detail to the various embodiments of the utility model, examples of which are illustrated in the accompanying drawings and described below. For convenience in explanation and accurate definition in the appended claims, the terms "upper", "lower", "inner" and "outer" are used to describe features of the exemplary embodiments with reference to the positions of such features as displayed in the figures.
As shown in fig. 1 and 2, the utility model provides a temporary plugging structure for both ends or reserved intersections of an open cut tunnel, which comprises a tunnel structure top plate 1, a tunnel structure bottom plate 2, a tunnel structure side wall 3 and a temporary plugging wall 4, and further comprises: the steel edge rubber water stop belt 7 is paved on the outer side of the temporary plugging wall 4; the first brick wall 5 is arranged at the outer side of the steel edge rubber water stop 7; the full-package waterproof layer 9 is arranged on the outer side of the first brick wall 5; and the second brick wall 6 is arranged outside the full-covered waterproof layer 9.
In the related art, flexible materials are filled at the position of a buried water stop at the end part of a tunnel to protect the water stop, and then the outside of the plugging structure is plugged by utilizing a steel plate or poured concrete, so that the structure has the defects of poor overall stability, poor water stop performance and the like. In the embodiment of the utility model, the steel edge rubber water stop and the waterproof layer are arranged to be lapped and sealed, and the two brick walls are arranged, so that the water stop can be fully protected while the stress support is met, and a good water stop and waterproof effect is achieved.
According to the embodiment of the utility model, the inner part of the temporary plugging wall 4 adopts glass fiber reinforced plastic 8. In the related art, the casting and later dismantling construction difficulties of the reinforced concrete wall are large, so that the engineering cost is increased, and the safety and the integrity of the main structure are influenced by the dismantling of the wall. In the embodiment of the utility model, the glass fiber reinforced plastic is adopted to replace common steel bars, the concrete plugging wall is poured, and the glass fiber reinforced plastic is relatively simple in dismantling while meeting the stress requirement, so that the damage to the main structure can be greatly reduced.
According to the embodiment of the utility model, the glass fiber reinforced plastic 8 is pre-buried at the intersection of the tunnel structure top plate 1 and the temporary plugging wall 4, the intersection of the tunnel structure bottom plate 2 and the temporary plugging wall 4 and the intersection of the tunnel structure side wall 3 and the temporary plugging wall 4. In the related art, the plugging structure is difficult to disassemble in the later period, and the plugging structure can realize the effects of convenience in disassembly and low cost by adopting the mode for plugging.
According to an embodiment of the utility model, the glass fiber reinforcement 8 meets the anchoring length requirements.
According to the embodiment of the utility model, the glass fiber reinforced plastic 8 is firmly bound by adopting iron wires or nylon ropes.
According to an embodiment of the utility model, the outer part of the steel edge rubber water stop 7 is flush with the first brick wall 5.
According to the embodiment of the utility model, the lower part of the tunnel structure bottom plate 2 also comprises a lower cushion layer 2-1 of the tunnel structure bottom plate, which is used for dispersing load pressure.
The following examples are given for the purpose of illustration only and are not intended to limit the embodiments of the utility model. Various other changes, modifications, substitutions, and alterations herein will become apparent to those skilled in the art without departing from the spirit and scope of the utility model as defined by the appended claims.
Embodiments of the present utility model are further described with reference to fig. 1 and 2. Fig. 1 is a temporary plugging plane structure diagram of an open cut tunnel end or a reserved intersection, fig. 2 is a vertical structure diagram, and the main technical scheme is as follows:
as shown in fig. 1 and 2, the temporary plugging structure for the end part or the reserved intersection of the open cut tunnel comprises: tunnel structure roof 1, tunnel structure bottom plate 2, tunnel structure side wall 3 and interim shutoff wall 4 still include: the steel edge rubber water stop belt 7 is paved on the outer side of the temporary plugging wall 4; the first brick wall 5 is arranged at the outer side of the steel edge rubber water stop 7; the full-package waterproof layer 9 is arranged on the outer side of the first brick wall 5; and the second brick wall 6 is arranged outside the full-covered waterproof layer 9.
When the open-cut tunnel is constructed to the two ends or the reserved intersection position, before the temporary plugging wall 4 is constructed, the glass fiber ribs 8 are pre-embedded in the top, the bottom and the side walls of the intersection with the plugging wall, and the glass fiber ribs 8 in the structure are required to meet the requirement of the anchoring length; finally binding glass fiber ribs 8 in the plugging wall and pouring concrete of the plugging wall; the glass fiber reinforced plastic 8 is easy to shift or deform due to light weight when concrete is poured, so specific measures are needed to ensure the accuracy of the binding position of the glass fiber reinforced plastic 8, and the specific measures can use iron wires or nylon ropes and the like to firmly bind the glass fiber reinforced plastic 8.
The overhanging part of the steel edge rubber water stop 7 is flush with the protection brick wall, namely the first brick wall 5, a waterproof layer 9 is arranged outside the brick wall, and the second brick wall 6 is used for protecting the waterproof layer. When the brick protection wall is dismantled in the follow-up construction, special attention must be paid to the damage of pre-buried waterstop.
It should be noted that in this document, relational terms such as "first" and "second" and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (7)

1. The utility model provides an open cut tunnel both ends or reserve interim block structure of intersection, includes tunnel structure roof (1), tunnel structure bottom plate (2), tunnel structure side wall (3) and interim block wall (4), its characterized in that still includes:
the steel edge rubber water stop belt (7) is paved on the outer side of the temporary plugging wall (4);
the first brick wall (5) is arranged at the outer side of the steel edge rubber water stop belt (7);
the full-package waterproof layer (9) is arranged on the outer side of the first brick wall (5);
the second brick wall (6) is arranged at the outer side of the full-package waterproof layer (9).
2. Temporary plugging structure according to claim 1, characterized in that the interior of the temporary plugging wall (4) is made of glass fiber reinforced plastic (8).
3. Temporary plugging structure according to claim 2, characterized in that the glass fiber ribs (8) are pre-buried at the intersections of the tunnel structure top plate (1) and the temporary plugging wall (4), at the intersections of the tunnel structure bottom plate (2) and the temporary plugging wall (4) and at the intersections of the tunnel structure side walls (3) and the temporary plugging wall (4).
4. A temporary plugging structure according to claim 3, wherein the glass fiber ribs (8) meet the requirement of an anchoring length.
5. Temporary plugging structure according to claim 4, characterized in that the glass fiber reinforcement (8) is firmly bound by iron wires or nylon ropes.
6. Temporary plugging structure according to claim 1, characterized in that the outer portion of the steel edge rubber water stop (7) is flush with the first brick wall (5).
7. Temporary plugging structure according to claim 1, characterized in that the tunnel structure floor (2) further comprises a tunnel structure floor lower cushion layer (2-1) for distributing load pressure below.
CN202322207660.4U 2023-08-16 2023-08-16 Temporary plugging structure for two ends or reserved intersection of open cut tunnel Active CN220486530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322207660.4U CN220486530U (en) 2023-08-16 2023-08-16 Temporary plugging structure for two ends or reserved intersection of open cut tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322207660.4U CN220486530U (en) 2023-08-16 2023-08-16 Temporary plugging structure for two ends or reserved intersection of open cut tunnel

Publications (1)

Publication Number Publication Date
CN220486530U true CN220486530U (en) 2024-02-13

Family

ID=89832858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322207660.4U Active CN220486530U (en) 2023-08-16 2023-08-16 Temporary plugging structure for two ends or reserved intersection of open cut tunnel

Country Status (1)

Country Link
CN (1) CN220486530U (en)

Similar Documents

Publication Publication Date Title
CN206545228U (en) A kind of piping lane with waterproof construction
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN104480846B (en) A kind of construction method splicing bridge
CN109026079B (en) Tunnel joint waterproof structure and waterproof construction method
CN103821180B (en) The two water-stopping structure of a kind of concrete extension joint
CN103774663A (en) Waterproof structure and construction method of basement anti-floating anchor bar
CN108660952A (en) A kind of Incremental Launching Method that the prefabricated car case of assembly concrete is logical
KR101167511B1 (en) Underpass using precast concrete pile and method for constructing the same
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN220486530U (en) Temporary plugging structure for two ends or reserved intersection of open cut tunnel
KR20120029625A (en) Construction method of steel composite girder bridge applying precast deck
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN108589507A (en) Spelling fills precast concrete beam bridge superstructure and its construction method
CN111139863B (en) Waterproof construction method for open cut half reverse construction method tunnel surrounding purlin node
JP4093428B2 (en) High-strength reinforced concrete precast plate
CN208685424U (en) Spelling fills precast concrete beam bridge superstructure
CN117090241A (en) Temporary plugging structure for two ends or reserved intersection of open cut tunnel and construction method
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
KR100319592B1 (en) Manufacture Rigid Pavement
CN109338897A (en) Bridge structure object bottom leakproof sizing device and its construction method
CN212223970U (en) Prefabricated apron post-cast strip stagnant water temporary enclosed construction
KR101523634B1 (en) Environment friendly arch structure of long-span steel composite earth works
CN212477466U (en) Large-span culvert structure and prefabricated box culvert
CN210597400U (en) Induced joint structure of concrete overlength structure
CN111917092A (en) Reinforced resin material assembled cable trench structure and manufacturing method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant