CN220474116U - Be applied to fixed establishment on geological disaster early warning equipment - Google Patents
Be applied to fixed establishment on geological disaster early warning equipment Download PDFInfo
- Publication number
- CN220474116U CN220474116U CN202321975460.7U CN202321975460U CN220474116U CN 220474116 U CN220474116 U CN 220474116U CN 202321975460 U CN202321975460 U CN 202321975460U CN 220474116 U CN220474116 U CN 220474116U
- Authority
- CN
- China
- Prior art keywords
- early warning
- geological disaster
- disaster early
- fixed
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 22
- 238000009434 installation Methods 0.000 claims description 11
- 238000000034 method Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 4
- 238000012806 monitoring device Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Abstract
The utility model relates to the technical field of geological disaster early warning and discloses a fixing mechanism applied to geological disaster early warning equipment, which comprises a bracket, wherein the surface of the bracket is connected with a fixing component, the surface of the fixing component is provided with a limiting structure, the limiting structure is connected with the bracket, the surface of the limiting structure is provided with an adjusting group mechanism, the surface of the adjusting group mechanism is provided with a geological disaster early warning device, the surface of the adjusting group mechanism is provided with a leveling component, and the leveling component is connected with the geological disaster early warning device.
Description
Technical Field
The utility model relates to the technical field of geological disaster early warning, in particular to a fixing mechanism applied to geological disaster early warning equipment.
Background
Geological disasters are one of many common disaster types, and the damage is extremely large, so in order to monitor the geological disasters, geological disaster early warning devices are usually arranged in certain regions, and a fixing mechanism is needed when the devices are arranged.
In the chinese patent of the publication No. CN217178113U, a fixing device for geological disaster monitoring equipment is disclosed, the device is through setting up bottom fixed disk, mounting cylinder, sliding disk, driving motor, screw thread post, toper positioning cylinder and locating cone, make the device at the in-process of actual installation, after fixing a position of bottom fixed disk through the locating cone earlier, start driving motor, driving motor's rotation drives screw thread post rotation, screw thread post's rotation drives the toper positioning cylinder through the sliding disk and inserts and go deep into underground, thereby realize the quick installation to monitoring equipment, it is simple convenient, provide just for installer.
The following drawbacks exist in the above patents: but in the in-service use, the fixed mode of going up and down in the citation device can be because of resistance factors such as earth, leads to the motor load great, makes it receive the loss to cause extra economic loss to current device is in the geographical environment of installing the slope, and monitoring devices can follow whole framework and level and personally submit the inclination state, and this state can cause certain influence to data acquisition precision, and for this reason, proposes a fixed establishment who is applied to on the geological disaster early warning equipment.
Disclosure of Invention
The utility model aims to provide a fixing mechanism applied to geological disaster early warning equipment, so as to solve the problems that in the prior art, in the actual use process, the lifting fixing mode in a referencing device can cause larger motor load and loss due to resistance factors such as soil, thereby causing additional economic loss, and in the prior art, when the prior art is installed in an inclined geographic environment, a monitoring device can follow an integral framework to form an inclined state with a horizontal plane, and the state can cause certain influence on data acquisition precision.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a be applied to fixed establishment on geological disaster early warning equipment, includes the support, the surface connection of support has fixed subassembly, fixed subassembly's surface is provided with limit structure, limit structure and support interconnect, limit structure's surface is provided with adjusts group mechanism, adjust group mechanism's surface and be provided with geological disaster early warning device, adjust group mechanism's surface and be provided with the part of making level, the part of making level and geological disaster early warning device interconnect.
The fixing assembly comprises a screw, a conical positioning cylinder and a motor, wherein the screw penetrates through the internal threads of the bracket, the conical positioning cylinder is fixed at the bottom of the screw, and the top of the screw is fixedly connected with a driving shaft of the motor.
The limiting structure comprises a mounting block, vertical rods and a top plate, wherein two mounting blocks are arranged on two sides of the motor, the vertical rods are installed in the mounting blocks in a penetrating mode, the bottoms of the vertical rods are fixedly connected with the support, and the top of the vertical rods is fixedly provided with the top plate.
The adjusting group mechanism comprises a rotating shaft, bolts, vertical plates, a bottom plate and sliding grooves, wherein the rotating shaft is arranged on the surface of the top plate, the bolts are fixed on the surface of the rotating shaft in a friction mode, the vertical plates are connected with the surfaces of the bolts in a threaded mode, the vertical plates are fixedly connected with the top plate, the bottom plate is fixed at the top of the rotating shaft, and the sliding grooves are reserved on the surface of the bottom plate.
As a limitation, the geological disaster early warning device comprises a base, a mounting plate and a geological disaster early warning device main body, wherein the base is fixed on the top surface of the bottom plate, the mounting plate is hinged to the surface of the base, and the geological disaster early warning device main body is arranged on the surface of the mounting plate.
As a limitation, the leveling component comprises a screw rod, a knob, a slide block, a base and a connecting rod, wherein the screw rod is connected with an inner bearing of the sliding groove, the end part of the screw rod penetrates through the bottom plate, the knob is fixed at the end part of the screw rod, the slide block is connected with the surface of the screw rod in a threaded manner, the side of the slide block is tightly attached to the inner wall of the sliding groove, the base is fixed on the surfaces of the slide block and the mounting plate, and the connecting rod is hinged between the bases.
Compared with the prior art, the technical scheme provided by the utility model has the following technical effects:
1. according to the utility model, through the mutual matching of the parts such as the bracket, the fixing component and the limiting structure, the conical positioning cylinder can make a rotary lifting movement track when the device is fixed, so that the self hole drilling efficiency is improved, and the problem that the existing device simply lifts and lowers the hole to easily damage the motor due to load operation is solved.
2. According to the utility model, through the mutual matching of the components such as the adjusting group mechanism, the geological disaster early warning device and the leveling component, the device can keep a horizontal state in any geographical environment in the using process, and the problem that the data acquisition accuracy is affected due to the inclined installation of equipment in the slope geographical environment of the conventional device is solved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic elevational view of the present utility model;
FIG. 2 is a schematic illustration of the front cross-section of the present utility model;
FIG. 3 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
fig. 4 is a schematic top view of the mounting plate of the present utility model.
Reference numerals illustrate: 1. a bracket; 2. a fixing assembly; 201. a screw; 202. a conical positioning cylinder; 203. a motor; 3. a limit structure; 301. a mounting block; 302. a vertical rod; 303. a top plate; 4. an adjustment group mechanism; 401. a rotating shaft; 402. a bolt; 403. a riser; 404. a bottom plate; 405. a chute; 5. geological disaster early warning device; 501. a base; 502. a mounting plate; 503. a geological disaster early warning device main body; 6. a leveling component; 601. a screw rod; 602. a knob; 603. a slide block; 604. a base; 605. and a connecting rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
It will be understood that when an element is referred to as being "fixed" or "disposed" on another element, it can be directly on the other element or be indirectly on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or be indirectly connected to the other element.
It is to be understood that the terms "length," "width," "upper," "lower," "front," "rear," "first," "second," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate an orientation or positional relationship based on that shown in the drawings, merely for convenience of description and to simplify the description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be construed as limiting the present application.
It should be understood that the structures, proportions, sizes, etc. shown in the drawings are for illustration purposes only and should not be construed as limiting the scope of the present disclosure, since any structural modifications, proportional changes, or dimensional adjustments made by those skilled in the art should not be made in the present disclosure without affecting the efficacy or achievement of the present disclosure.
Examples
In the chinese patent with publication number CN217178113U, in the actual use, the lifting and fixing manner in the referencing device will cause a larger motor load due to resistance factors such as soil, so that the motor load will be lost, thereby causing additional economic loss, and the existing device is installed in an inclined geographical environment, the monitoring device will follow the whole frame and the horizontal plane to form an inclined state, and the state will have a certain influence on the data acquisition accuracy.
Referring to fig. 1-4, the present utility model provides the following technical solutions: the utility model provides a be applied to fixed establishment on geological disaster early warning equipment, including support 1, in order to avoid the device at fixed in-process, motor 203 leads to the damage because of the load operation, support 1's internal thread runs through there is screw 201, screw 201's bottom is fixed with toper positioning tube 202, screw 201's top and motor 203's drive shaft fixed connection, in order to carry out spacingly to motor 203, make it can not follow screw 201 rotation when self moves, motor 203's both sides are provided with two installation pieces 301, installation piece 301's inside runs through installs montant 302, montant 302's bottom and support 1 fixed connection, montant 302's top is fixed with roof 303.
In order to adjust the angle of data acquisition of equipment and increase the accuracy of prediction, the surface of a top plate 303 is provided with a rotating shaft 401, the surface friction of the rotating shaft 401 is fixedly provided with a bolt 402, the surface thread of the bolt 402 is connected with a vertical plate 403, the vertical plate 403 is fixedly connected with the top plate 303, the top of the rotating shaft 401 is fixedly provided with a bottom plate 404, a sliding groove 405 is reserved on the surface of the bottom plate 404, the levelness of the equipment can be adjusted according to different geographic environments conveniently, a base 501 is fixed on the top surface of the bottom plate 404, a mounting plate 502 is hinged to the surface of the base 501, a geological disaster early warning equipment main body 503 is arranged on the surface of the mounting plate 502, a screw rod 601 is connected to an inner bearing of the sliding groove 405 for providing power output for the horizontal adjustment, the end part of the screw rod 601 penetrates through the inside of the bottom plate 404, a knob 602 is fixed at the end part of the screw rod 601, a sliding block 603 is screwed on the surface of the screw rod 601, the side of the sliding block 603 is tightly attached to the inner wall of the sliding groove 405, a base 604 is fixed on the surface of the sliding block 603, and a connecting rod 605 is hinged between the sliding block 603 and the base 502.
The model of the geological disaster early warning device body 503 is AR-SS-SZY02.
The working principle or the structure principle is that firstly, after a worker carries equipment to a designated installation position, the motor 203 can be started to drive the screw 201 to rotate, because the screw 201 is in threaded connection with the bracket 1, and the motor 203 is limited by the installation block 301 and the vertical rod 302, the screw 201 and the conical positioning cylinder 202 are driven to do rotary displacement motion when the motor 203 rotates, thus the ground is subjected to hole operation, fixed operation is realized, if the environment is in an inclined geographic form such as a slope, the worker can drive the screw 601 to rotate by rotating the knob 602, the thread on the surface can drive the sliding block 603 to displace in the rotating process of the screw 601, and when the sliding block 603 displaces, the base 604 and the connecting rod 605 can drive the installation plate 502 and the geological disaster early warning equipment body 503 on the surface to perform angle adjustment, so that leveling operation is realized, the geological disaster early warning equipment body 503 can keep a horizontal state, and then various geological disaster data can be collected by using the geological disaster early warning equipment body 503, so that early warning operation is conveniently realized.
If the direction or angle of collection needs to be adjusted, the worker can rotate the bolt 402 first to separate the bolt from the rotating shaft 401 in a friction fixing state, then the adjustment of the collection angle of the geological disaster early warning device body 503 is realized through the rotating shaft 401, and after the adjustment is completed, the bolt 402 is used for fixing again.
The device has the advantages of higher efficiency in the fixing process, adjustable collection angle and the like.
Thus, embodiments of the present utility model have been described in detail with reference to the accompanying drawings. It should be noted that, in the drawings or the text of the specification, implementations not shown or described are all forms known to those of ordinary skill in the art, and not described in detail. Furthermore, the above definitions of the components are not limited to the specific structures, shapes or modes mentioned in the embodiments, and may be simply modified or replaced by those of ordinary skill in the art.
Those skilled in the art will appreciate that the features recited in the various embodiments of the utility model and/or in the claims may be combined in various combinations and/or combinations, even if such combinations or combinations are not explicitly recited in the utility model. In particular, the features recited in the various embodiments of the utility model and/or in the claims can be combined in various combinations and/or combinations without departing from the spirit and teachings of the utility model. All such combinations and/or combinations fall within the scope of the utility model.
The foregoing description of the embodiments has been provided for the purpose of illustrating the general principles of the utility model, and is not meant to limit the utility model thereto, but to limit the utility model thereto, and any modifications, equivalents, improvements and equivalents thereof may be made without departing from the spirit and principles of the utility model.
Claims (6)
1. Be applied to fixed establishment on geological disaster early warning equipment, including support (1), its characterized in that: the utility model discloses a geological disaster early warning device, including support (1), fixed subassembly (2)'s surface is provided with limit structure (3), limit structure (3) interconnect with support (1), limit structure (3)'s surface is provided with regulation group mechanism (4), regulation group mechanism (4) surface is provided with geological disaster early warning device (5), regulation group mechanism (4) surface is provided with leveling part (6), leveling part (6) interconnect with geological disaster early warning device (5).
2. The fixing mechanism applied to geological disaster early warning equipment according to claim 1, wherein: the fixing assembly (2) comprises a screw (201), a conical positioning cylinder (202) and a motor (203), wherein the screw (201) penetrates through internal threads of the support (1), the conical positioning cylinder (202) is fixed at the bottom of the screw (201), and the top of the screw (201) is fixedly connected with a driving shaft of the motor (203).
3. The fixing mechanism applied to geological disaster early warning equipment according to claim 2, wherein: limit structure (3) are including installation piece (301), montant (302) and roof (303), the both sides of motor (203) are provided with two installation piece (301), the inside of installation piece (301) runs through and installs montant (302), the bottom and the support (1) fixed connection of montant (302), the top of montant (302) is fixed with roof (303).
4. A fixing mechanism for use in a geological disaster warning device according to claim 3, wherein: the adjusting group mechanism (4) comprises a rotating shaft (401), bolts (402), vertical plates (403), a bottom plate (404) and sliding grooves (405), wherein the rotating shaft (401) is arranged on the surface of the top plate (303), the bolts (402) are fixed on the surface of the rotating shaft (401) in a friction mode, the vertical plates (403) are connected with the surfaces of the bolts (402) in a threaded mode, the vertical plates (403) are fixedly connected with the top plate (303), the bottom plate (404) is fixed on the top of the rotating shaft (401), and the sliding grooves (405) are reserved on the surface of the bottom plate (404).
5. The fixing mechanism applied to geological disaster early warning equipment according to claim 4, wherein: geological disaster early warning device (5) include base (501), mounting panel (502) and geological disaster early warning equipment main part (503), the top surface of bottom plate (404) is fixed with base (501), the surface of base (501) articulates there is mounting panel (502), the surface of mounting panel (502) is provided with geological disaster early warning equipment main part (503).
6. The fixing mechanism applied to geological disaster early warning equipment according to claim 4, wherein: the leveling component (6) comprises a screw rod (601), a knob (602), a sliding block (603), a base (604) and a connecting rod (605), wherein the screw rod (601) is connected with an inner bearing of the sliding groove (405), the end part of the screw rod (601) penetrates through the bottom plate (404), the knob (602) is fixed at the end part of the screw rod (601), the sliding block (603) is connected with the surface of the screw rod (601) in a threaded manner, the side of the sliding block (603) is tightly attached to the inner wall of the sliding groove (405), the base (604) is fixed on the surface of the sliding block (603) and the surface of the mounting plate (502), and the connecting rod (605) is hinged between the bases (604).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321975460.7U CN220474116U (en) | 2023-07-26 | 2023-07-26 | Be applied to fixed establishment on geological disaster early warning equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321975460.7U CN220474116U (en) | 2023-07-26 | 2023-07-26 | Be applied to fixed establishment on geological disaster early warning equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220474116U true CN220474116U (en) | 2024-02-09 |
Family
ID=89774506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321975460.7U Active CN220474116U (en) | 2023-07-26 | 2023-07-26 | Be applied to fixed establishment on geological disaster early warning equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220474116U (en) |
-
2023
- 2023-07-26 CN CN202321975460.7U patent/CN220474116U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111696317A (en) | Automatic monitoring and early warning device for mine geological disasters | |
CN220474116U (en) | Be applied to fixed establishment on geological disaster early warning equipment | |
CN211648017U (en) | Exploration drilling equipment suitable for complex stratum | |
CN107677501A (en) | A kind of performance test sample obtains mechanism | |
CN115749623B (en) | Drilling device for construction engineering investigation | |
CN218628229U (en) | Heavy-load lightweight wheel thickness detection device | |
CN215639411U (en) | Building slope warning device for building monitoring | |
CN215104771U (en) | A plant muscle perforating device for bridge construction | |
CN214035537U (en) | Deviation device is prevented with probing to geotechnical engineering reconnaissance | |
CN211714050U (en) | Foundation pit deformation monitoring device | |
CN205798515U (en) | The auxiliary device of inclined hole at the generator unit stator that drills and reams | |
CN219909097U (en) | Quick erection device of building pile foundation detection benchmark stake | |
CN111855285A (en) | Geotechnical sampling mechanical device for civil engineering | |
CN105464308A (en) | Column angle adjusting base | |
CN219196084U (en) | Pile foundation coring detection monitoring device | |
CN220167883U (en) | Drilling guiding device for multifunctional coal field investigation | |
CN219841976U (en) | Measuring device with adjustable structure | |
CN217276142U (en) | Settlement observation device for building engineering detection | |
CN220248077U (en) | Drilling depth detector | |
CN213087920U (en) | Engineering geology investigation positioner | |
CN216207507U (en) | Impact drill performance testing device with high pressure resistance | |
CN220473012U (en) | Rock sampler | |
CN216690967U (en) | Foundation drilling positioning mechanism for civil engineering construction | |
CN220599009U (en) | Assembled landscape building | |
CN209263910U (en) | A kind of device for churning driven drilled-hole inspecting hole depth |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |