CN220467356U - Unit curtain wall hoisting system - Google Patents

Unit curtain wall hoisting system Download PDF

Info

Publication number
CN220467356U
CN220467356U CN202322160308.XU CN202322160308U CN220467356U CN 220467356 U CN220467356 U CN 220467356U CN 202322160308 U CN202322160308 U CN 202322160308U CN 220467356 U CN220467356 U CN 220467356U
Authority
CN
China
Prior art keywords
curtain wall
plate
unit curtain
structural floor
unitized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322160308.XU
Other languages
Chinese (zh)
Inventor
王京
王攀龙
马明飞
王红兵
赵志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xinxing Baoxin Construction Engineering Co ltd
Original Assignee
Beijing Xinxing Baoxin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xinxing Baoxin Construction Engineering Co ltd filed Critical Beijing Xinxing Baoxin Construction Engineering Co ltd
Priority to CN202322160308.XU priority Critical patent/CN220467356U/en
Application granted granted Critical
Publication of CN220467356U publication Critical patent/CN220467356U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application relates to unitized curtain wall hoist and mount system, it includes: the system comprises a mounting mechanism, at least two unit curtain walls, lifting equipment and a cable rope, wherein the mounting mechanism is used for being mounted on a first structural floor; every two adjacent unit curtain walls are fixedly connected through the mounting mechanism, and the mounting mechanism is arranged on the back surface of the unit curtain wall; the lifting equipment is arranged on a second structural floor, and the telescopic end of the lifting equipment is fixedly connected with the unit curtain wall; one end of the cable rope is bound on the installation mechanism, and the other end of the cable rope is used for being held by constructors. The construction personnel who stands on ground have handheld cable rope, can avoid the unit curtain to rock in the sky, and the construction personnel who is in on the first structure floor can handheld installation mechanism to unit curtain force to the convenient technological effect to the installation of unit curtain.

Description

Unit curtain wall hoisting system
Technical Field
The application relates to the technical field of curtain construction, in particular to a unitized curtain wall hoisting system.
Background
The unit curtain wall is widely applied to high-rise buildings, in actual construction, the unit curtain wall can be lifted up from bottom to top, the hooks of the unit curtain wall are required to be aligned with the hanging holes of the specific floors, the matching buckle of the hooks and the hanging holes is realized, in the process, constructors can hardly apply force to the unit curtain wall in the air, and the hooks of the unit curtain wall are installed on the hanging holes of the specific floors.
Disclosure of Invention
The application aims at solving the technical problems that constructors in the prior art can hardly apply force to the unit curtain wall in the air and install the unit curtain wall. Therefore, the application provides a unitized curtain wall hoisting system.
The application provides a unitized curtain wall hoist and mount system, include:
the installation mechanism is used for being installed on the first structural floor;
the installation mechanism is arranged on the back surface of the unit curtain wall;
the lifting equipment is arranged on the second structural floor, and the telescopic end of the lifting equipment is fixedly connected with the unit curtain wall;
the cable rope, one end ligature of cable rope is in on the installation mechanism, the other end of cable rope is used for being held by constructor.
Through adopting above-mentioned technical scheme, according to the unitized curtain wall hoist and mount system that this application embodiment provided, the constructor of standing on ground holds the cable rope, can avoid unitized curtain wall to rock in the sky, and constructor that is in on the first structure floor can handheld installation mechanism to unitized curtain wall power to the convenience is installed unitized curtain wall.
According to an embodiment of the application, the back fixedly connected with couple of curtain body, installation mechanism includes: a first plate and a second plate connected to the first plate;
the first plate is provided with a first through hole for hanging the hook, and the second plate is clamped with the first plate, is used for being installed on the first structural floor.
Through adopting above-mentioned technical scheme, with the couple clamp that two unit curtain correspond between second board and first board, can improve the connection stability to two unit curtain.
According to one embodiment of the present application, the hook comprises: a connecting plate and a hook plate;
the connecting plate install in the back of curtain body, the hook plate fixed connection in the connecting plate deviates from the one end of curtain body, the bottom of hook plate passes first through-hole, the second board is equipped with the confession the top of hook plate passes the second through-hole, the second board with first board presss from both sides establishes the connecting plate.
Through adopting above-mentioned technical scheme, the bottom and the top of hook plate pass the first through-hole of first board and the second through-hole of second board respectively, and the connecting plate is pressed from both sides with first board to the second board, can further improve the connection stability to two unit curtain like this.
According to one embodiment of the application, one end of the first plate facing away from the curtain wall body is mounted on the first structural floor through a first connecting structure, and one end of the first plate, which is close to the curtain wall body, is connected with the second plate through a second connecting structure.
Through adopting above-mentioned technical scheme, the second board is installed on first board through second connection structure for press from both sides and establish the connecting plate, realize spacing to the installation of couple, first board is installed on first structure floor through first connection structure, is used for realizing spacing to the installation of two curtain bodies.
According to one embodiment of the application, the guy wires are lashed between the second plate and the first plate.
According to one embodiment of the present application, the unitized curtain wall hoist system further comprises: an annular track beam and a moving mechanism;
the annular track beam is arranged on one side of the second structural floor, the rolling wheel of the moving mechanism is connected with the annular track beam in a guiding manner, and the shell of the moving mechanism is fixedly connected with the lifting equipment.
According to one embodiment of the present application, the unitized curtain wall hoist system further comprises: a plurality of cantilever beams;
the cantilever beams are fixedly connected with the second structural floor and protrude out of the side face of the second structural floor, and the annular track beams are arranged below the cantilever beams.
Through adopting above-mentioned technical scheme, lifting by crane equipment can remove along annular track roof beam with the help of moving mechanism to carry out the installation of unit curtain to the first structure floor of second structure floor below, the installation rate of unit curtain that like this can be further improved.
According to one embodiment of the present application, the unitized curtain wall hoist system further comprises: a plurality of said steel codes;
the steel code is arranged on the third structural floor, and a safety rope is connected between the steel code and the corresponding cantilever beam.
Through adopting above-mentioned technical scheme, design like this and be used for increasing the security and the stability of cantilever beam.
According to one embodiment of the present application, the unitized curtain wall hoist system further comprises: a controller;
the controller is respectively in communication connection with the moving mechanism and the lifting equipment.
Through adopting above-mentioned technical scheme, be used for making things convenient for constructor to control the position that unit curtain was located through moving mechanism and lifting by crane equipment like this to unit curtain installs smoothly.
According to an embodiment of the application, the through hole has been seted up at the top of unit curtain, lifting by crane equipment's flexible end respectively with two adjacent unit curtain's through-hole fixed connection.
In summary, the present application includes at least one of the following beneficial technical effects: according to the unitized curtain wall hoisting system provided by the embodiment of the application, constructors standing on the ground hold the cable wind rope, so that the unitized curtain wall can be prevented from shaking in the air, and constructors on the first structural floor can hold the installing mechanism to apply force to the unitized curtain wall, so that the unitized curtain wall is convenient to install.
Drawings
Fig. 1 is one of schematic structural diagrams of a unit curtain wall hoisting system provided in an embodiment of the present application;
FIG. 2 is a second schematic structural view of a unitized curtain wall lifting system according to one embodiment of the present disclosure;
FIG. 3 is an enlarged partial view of portion A of FIG. 2;
FIG. 4 is a third schematic structural view of a unitized curtain wall hoist system according to one embodiment of the present disclosure;
FIG. 5 is an enlarged partial view of portion B of FIG. 4;
FIG. 6 is a schematic view of a structure of a unit curtain wall according to an embodiment of the present disclosure;
fig. 7 is a schematic structural view of a mounting mechanism and a hanger according to an embodiment of the present application.
Reference numerals:
100. a mounting mechanism; 110. a first plate; 111. a first connection structure; 120. a second plate; 121. a second connection structure; 200. a unit curtain wall; 210. a hook; 211. a connecting plate; 212. a hook plate; 300. hoisting equipment; 400. a cable rope; 500. an annular rail beam; 600. a moving mechanism; 700. a cantilever beam; 800. a safety rope; a. a first structural floor; b. a second structural floor; c. and a third structural floor.
Detailed Description
Embodiments of the present application are described in detail below, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the drawings are exemplary only for the purpose of explaining the present application and are not to be construed as limiting the present application.
As shown in fig. 1 and 2, the unit curtain wall lifting system includes: the installation mechanism 100, at least two unit curtain walls 200, the lifting equipment 300 and the cable ropes 400.
Every two adjacent unit curtain walls 200 are fixedly connected through the mounting mechanism 100, and the mounting mechanism 100 is positioned on the back surface of the unit curtain walls 200.
The lifting device 300 is installed on the second structural floor b, and the telescopic end of the lifting device 300 is fixedly connected with the unit curtain walls 200, so that two unit curtain walls 200 are lifted at the same time, and the corresponding installation mechanisms 100 of two adjacent unit curtain walls 200 are installed on the first structural floor a.
One end of the cable rope 400 is tied to the installation mechanism 100 or the unit curtain wall 200, and the other end of the cable rope 400 is used to be held by a constructor.
In the related art, the lifting apparatus 300 lifts the unit curtain wall 200 from the bottom to the top, for example, the unit curtain wall 200 is to be installed on one side of the first structural floor a, so that the hooks 210 of the unit curtain wall 200 are aligned with the hanging holes of the installation mechanism 100 on the first structural floor a, and the matching fastening of the hooks 210 and the hanging holes is achieved.
Because the unit curtain wall 200 lacks a gripper for supporting a constructor, the constructor can hardly apply force to the unit curtain wall 200 in the air, and the hook 210 of the unit curtain wall 200 can hardly be aligned with the hanging hole of the installation mechanism 100 of the first structural floor a, so that the hook 210 and the hanging hole can be matched and buckled.
In the above embodiment of the present application, in the process of lifting two unit curtain walls 200 to the first structural floor a, the constructor standing on the ground holds the cable rope 400, so that the unit curtain walls 200 can be prevented from shaking in the air, and meanwhile, the constructor on the first structural floor a can hold the installation mechanism 100 to apply force to the unit curtain walls 200, thereby facilitating installation of the unit curtain walls 200.
It should be understood that, in the present application, the installation mechanism 100 may be connected with two adjacent unit curtain walls 200 in advance, and then the installation mechanism 100 is installed on the first structural floor a, so that compared with the related art, the installation difficulty of the installation mechanism 100 and the unit curtain walls 200 is greatly reduced, and on the other hand, the installation speed is also improved by lifting two unit curtain walls 200 at a time.
To sum up, according to the unitized curtain wall hoisting system provided by the embodiment of the application, the constructor standing on the ground holds the cable rope 400, so that the unitized curtain wall 200 can be prevented from shaking in the air, and the constructor on the first structural floor a can hold the installing mechanism 100 to apply force to the unitized curtain wall 200, so that the unitized curtain wall 200 is convenient to install, and the installation speed of the unitized curtain wall 200 is accelerated due to the fact that the two unitized curtain walls 200 are hoisted once.
As shown in fig. 2 and 3, in some embodiments, the unitized curtain wall hoist system further comprises: an endless track beam 500, a moving mechanism 600, and an overhanging beam 700.
The circular track beam 500 is installed at one side of the second structural floor b, the rolling wheel of the moving mechanism 600 is connected with the circular track beam 500 in a guiding manner, and the housing of the moving mechanism 600 is fixedly connected with the lifting device 300.
The plurality of cantilever beams 700 are fixedly connected with the second structural floor b and protrude out of the side surface of the second structural floor b, and the annular track beam 500 is installed below the plurality of cantilever beams 700.
In this embodiment, the lifting apparatus 300 may move along the circular track beam 500 by means of the moving mechanism 600, so that the installation of the unit curtain wall 200 is performed on the first structural floor a below the second structural floor b, and thus the installation speed of the unit curtain wall 200 may be further improved.
As shown in fig. 4, in some embodiments, the unitized curtain wall hoist system further comprises: and (5) steel stacking.
The steel yards are installed on the third structural floor c, and safety ropes 800 are connected between the steel yards and the corresponding cantilever beams 700. This is designed to increase the safety and stability of the cantilever beam 700.
In actual implementation, the unitized curtain wall hoisting system further comprises: and a controller.
The controller is communicatively coupled to the movement mechanism 600 and the lifting apparatus 300, respectively. This is for facilitating the constructor to control the position of the unit curtain wall 200 through the moving mechanism 600 and the lifting apparatus 300 so that the unit curtain wall 200 is smoothly installed.
In actual implementation, through holes are formed in the top of the unit curtain walls 200, and the telescopic ends of the lifting devices 300 are respectively connected with the through holes of two adjacent unit curtain walls 200.
As shown in fig. 5, for example, the telescopic end of the lifting device 300 may be a limiting hook, and the limiting hook is respectively hung and connected with the through holes of the two adjacent unit curtain walls 200.
As shown in fig. 5 and 6, in some embodiments, the back of the curtain wall body is fixedly connected with a hook 210, and the installation mechanism 100 includes: a first plate 110 and a second plate 120.
The first board 110 is provided with a first through hole for hanging the hook 210, the hook 210 is clamped between the second board 120 and the first board 110, and the second board 120 is fixedly connected with the first board 110 and used for being installed on the first structural floor a.
In this embodiment, the hooks 210 corresponding to the two unit curtain walls 200 are sandwiched between the second plate 120 and the first plate 110, so as to improve the connection stability of the two unit curtain walls 200.
As shown in fig. 6 and 7, in some embodiments, the hook 210 includes: a connecting plate 211 and a hook plate 212.
The connecting plate 211 is installed in the back of curtain body, and the hook plate 212 is fixed in the one end that connecting plate 211 deviates from the curtain body, and first through-hole is passed to the bottom of hook plate 212, and second board 120 is equipped with the second through-hole that supplies the top of hook plate 212 to pass, and second board 120 presss from both sides with first board 110 and establishes connecting plate 211.
In this embodiment, the bottom and top ends of the hook plate 212 respectively pass through the first through hole of the first plate 110 and the second through hole of the second plate 120, and the second plate 120 and the first plate 110 sandwich the connecting plate 211, so that the connection stability of the two unit curtain walls 200 can be further improved.
As shown in fig. 5, in some embodiments, an end of the first panel 110 facing away from the curtain wall body is mounted on the first structural floor a by a first connection structure 111, and an end of the first panel 110 adjacent to the curtain wall body is connected to the second panel 120 by a second connection structure 121.
In this embodiment, the second board 120 is mounted on the first board 110 through the second connection structure 121, and is used for sandwiching the connection board 211, so as to realize the mounting limitation of the hook 210, and the first board 110 is mounted on the first structural floor a through the first connection structure 111, so as to realize the mounting limitation of the two curtain wall bodies.
In actual execution, the guy wires 400 are lashed between the second plate 120 and the first plate 110.
In actual implementation, the first connection structure 111 and the second connection structure 121 may be selected from screws or bolts.
The foregoing are all preferred embodiments of the present application, and are not intended to limit the scope of the present application in any way, therefore: all equivalent changes in structure, shape and principle of this application should be covered in the protection scope of this application.

Claims (10)

1. A unitized curtain wall hoist and mount system, comprising:
-a mounting mechanism (100), the mounting mechanism (100) being for mounting at a first structural floor (a);
the unit curtain walls (200) are fixedly connected with each other through the mounting mechanisms (100), and the mounting mechanisms (100) are arranged on the back surfaces of the unit curtain walls (200);
the lifting device (300) is arranged on the second structural floor (b), and the telescopic end of the lifting device (300) is fixedly connected with the unit curtain wall (200);
the cable rope (400), one end of cable rope (400) is tied up on unit curtain wall (200) or installation mechanism (100), and the other end of cable rope (400) is used for being held by constructors.
2. The unitized curtain wall hoist system of claim 1, characterized in that the back of the unitized curtain wall (200) is fixedly connected with a hanger (210), the mounting mechanism (100) comprising: a square first plate (110) and a second plate (120) connected to the first plate (110);
the first plate (110) is provided with a first through hole for hanging the hook (210), and the second plate (120) and the first plate (110) are clamped by the hook (210) and are used for being installed on the first structural floor (a).
3. The unitized curtain wall hoist system of claim 2, characterized in that the hanger (210) comprises: a connecting plate (211) and a hook plate (212);
the utility model discloses a unit curtain wall, including connecting plate (211), hook plate (212), connecting plate (212), hook plate (212) are installed in the back of unit curtain wall (200), hook plate (211) in deviating from the one end of unit curtain wall (200), the bottom of hook plate (212) is passed first through-hole, second board (120) are equipped with the confession hook plate (212) top is passed the second through-hole, second board (120) with first board (110) clamp establishes connecting plate (211).
4. A curtain wall hoisting system according to claim 3, characterized in that one end of the first plate (110) facing away from the curtain wall (200) is mounted on the first structural floor (a) by means of a first connection structure (111), and one end of the first plate (110) adjacent to the curtain wall (200) is connected to the second plate (120) by means of a second connection structure (121).
5. A modular curtain wall lifting system as claimed in claim 3, characterized in that the guy wires (400) are lashed between the second plate (120) and the first plate (110).
6. The modular curtain wall hoist system of any one of claims 1-5, further comprising: an endless track beam (500) and a moving mechanism (600);
the annular track beam (500) is arranged on one side of the second structural floor (b), rolling wheels of the moving mechanism (600) are connected with the annular track beam (500) in a guiding mode, and a shell of the moving mechanism (600) is fixedly connected with the lifting equipment (300).
7. The unitized curtain wall hoist system of claim 6, further comprising: a plurality of cantilever beams (700);
the cantilever beams (700) are fixedly connected with the second structural floor (b) and protrude out of the side face of the second structural floor (b), and the annular track beam (500) is arranged below the cantilever beams (700).
8. The unitized curtain wall hoist system of claim 7, further comprising: a plurality of steel codes;
the steel code is arranged on a third structural floor (c), and a safety rope (800) is connected between the steel code and the corresponding cantilever beam (700).
9. The unitized curtain wall hoist system of claim 7, further comprising: a controller;
the controller is respectively in communication connection with the moving mechanism (600) and the lifting device (300).
10. The unitized curtain wall hoisting system of any one of claims 1-5, characterized in that the top of the unitized curtain wall (200) is provided with a through hole, and the telescopic end of the hoisting device (300) is fixedly connected with the through holes of two adjacent unitized curtain walls (200) respectively.
CN202322160308.XU 2023-08-10 2023-08-10 Unit curtain wall hoisting system Active CN220467356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322160308.XU CN220467356U (en) 2023-08-10 2023-08-10 Unit curtain wall hoisting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322160308.XU CN220467356U (en) 2023-08-10 2023-08-10 Unit curtain wall hoisting system

Publications (1)

Publication Number Publication Date
CN220467356U true CN220467356U (en) 2024-02-09

Family

ID=89798256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322160308.XU Active CN220467356U (en) 2023-08-10 2023-08-10 Unit curtain wall hoisting system

Country Status (1)

Country Link
CN (1) CN220467356U (en)

Similar Documents

Publication Publication Date Title
CN210528272U (en) Hoisting equipment for prefabricated parts
WO2014066705A1 (en) Hoisting platform system
CN211569911U (en) Plate hoisting system for curtain wall installation
CN101243231A (en) A self-erecting suspension platform system
CN220467356U (en) Unit curtain wall hoisting system
JP2909413B2 (en) Suspension device for building exterior walls
CN201250058Y (en) Improved lifting trolley
CN210885016U (en) Combined lifting machine
CN112252741A (en) Full-rail crane for super high-rise unit curtain wall and installation and use method thereof
CN210763900U (en) Single-point hoisting balance adjusting device
CN210001454U (en) Purlin lifting device
CN203257106U (en) Multifunctional power-driven walking type walking system
CN214062384U (en) Full-rail crane for super high-rise unit curtain wall
CN215248971U (en) Hoisting construction device for large-scale overweight electromechanical equipment of high-rise and super high-rise building
CN212154622U (en) Outer wall plate mounting ladder stand for steel structure factory building
CN211366784U (en) Integral hoisting system in narrow space
CN212581331U (en) Shaft bus duct hoisting mechanism
CN218058210U (en) House building assembled I-beam lifting device
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
CN220228131U (en) High-altitude pavement
CN221587805U (en) Wallboard lifting machine
SU1472403A1 (en) Hoisting member of a rope lift
CN110683457A (en) Lifting appliance, lifting device and method for quickly overturning pipe piece
CN211081059U (en) Hoisting device for unit plate of curtain wall with curved outer vertical surface
CN217417980U (en) Simple cantilever hoisting equipment

Legal Events

Date Code Title Description
GR01 Patent grant