CN220427423U CN202322109384.8U CN202322109384U CN220427423U CN 220427423 U CN220427423 U CN 220427423U CN 202322109384 U CN202322109384 U CN 202322109384U CN 220427423 U CN220427423 U CN 220427423U
Authority
CN
China
Prior art keywords
pipeline
portal frame
installation
equipment body
cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322109384.8U
Other languages
Chinese (zh)
Inventor
周飞
周锦涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Chuangfanda Machinery Co ltd
Original Assignee
Suzhou Chuangfanda Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Chuangfanda Machinery Co ltd filed Critical Suzhou Chuangfanda Machinery Co ltd
Priority to CN202322109384.8U priority Critical patent/CN220427423U/en
Application granted granted Critical
Publication of CN220427423U publication Critical patent/CN220427423U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses an auxiliary pipeline installation all-in-one machine which comprises an equipment body, wherein an operation table is arranged in the equipment body, a support is arranged at the bottom of the equipment body, a portal frame is installed at the top of the support, a sliding rail is arranged outside the portal frame, a left cantilever and a right cantilever are installed outside the sliding rail, permanent magnets are arranged at the bottoms of the left cantilever and the right cantilever, the bottoms of the permanent magnets are connected with a pipeline in an adsorption mode, and a handle is arranged outside the permanent magnets. This auxiliary installation all-in-one of pipeline through setting up the portal frame to be equipped with left cantilever and right cantilever in the outside of portal frame, during the use, only need rotatory handle, the permanent magnet alright adsorb the pipeline, promote it by the portal frame again, then drive equipment goes to the place that needs to install, then can install the pipeline, only needs an equipment just so can accomplish the purpose of high altitude installation pipeline, reduces input cost, reduces workman intensity of labour, reduces the potential safety hazard.

Description

Pipeline auxiliary installation all-in-one
Technical Field
The utility model belongs to the technical field of pipeline installation, and particularly relates to an auxiliary pipeline installation integrated machine.
Background
Pipeline installation refers to an operation for installing pipelines indoors and outdoors in a building site, wherein the pipeline installation comprises common data, pipes, pipe fittings, basic operation technology of pipeline installation, pipeline connection, bracket and compensator installation, valve, building water supply and drainage pipeline installation, heating system installation, pipeline pressure test and cleaning, common industrial pipeline installation, nonferrous metal pipeline and stainless steel pipeline installation, common nonmetallic pipeline and pipeline installation, instrument pipeline installation and corrosion prevention and heat insulation of pipelines.
The pipeline installation on the market has the following problems when in use: the traditional pipeline is installed in the actual operation process, because the traditional pipeline is not provided with equipment capable of conveniently installing the pipeline, the traditional pipeline is usually manually installed in a construction mode, workers are often connected with the pipeline on the ground, then the pipeline is lifted by a forklift and placed on a climbing vehicle, the pipeline is transported to a place where the pipeline needs to be installed, and then the pipeline is manually installed by the workers on the climbing vehicle, so that more equipment is needed, the production efficiency is lower, and certain potential safety hazards exist.
Disclosure of Invention
The utility model aims to provide a pipeline auxiliary installation integrated machine so as to solve the technical problems in the background technology.
In order to achieve the above purpose, the specific technical scheme of the utility model is as follows: the utility model provides an auxiliary installation all-in-one of pipeline, includes the equipment body, the inside of equipment body is equipped with the operation panel, the bottom of equipment body is equipped with the support, the portal frame is installed at the top of support, the outside of portal frame is equipped with the slide rail, the outside installation left cantilever and the right cantilever of slide rail, the bottom of left cantilever and right cantilever is equipped with the permanent magnet, the bottom of permanent magnet is through absorbing mode connecting tube, the outside of permanent magnet is equipped with the handle.
Preferably, the surface of the equipment body is connected with the observation window in an inlaid mode, the surface of the equipment body is provided with the warning lamp, and the side surface of the equipment body is provided with the perforation.
Preferably, the top of left cantilever and right cantilever all installs the electric jar, the telescopic link is installed to the side of electric jar.
Preferably, the bottom of the bracket is respectively provided with a driving wheel and a steering wheel, and the bottom of the portal frame is provided with a front wheel.
Preferably, a supporting hydraulic cylinder is arranged at the top of the bracket, and the other end of the supporting hydraulic cylinder is arranged outside the portal frame.
Preferably, a flange plate is arranged between the portal frame and the sliding rail support, and a mounting plate is arranged at the bottom of the telescopic rod.
The auxiliary installation integrated machine for the pipeline has the following advantages: this pipeline auxiliary installation all-in-one is through setting up the portal frame to be equipped with left cantilever and right cantilever in the outside of portal frame, and install the permanent magnet in the bottom of left cantilever and right cantilever, during the use, only need rotatory handle, then the permanent magnet alright adsorb the pipeline, promote it by the portal frame again, then the drive equipment body makes it travel to the place that needs to install, then can install the pipeline, rotatory handle again after the installation finishes, alright be separated with the pipeline at this moment, just so only need a equipment just can accomplish the purpose of high altitude installation pipeline, reduced input cost, and reduced workman's intensity of labour, reduced the potential safety hazard.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present utility model, the drawings that are needed in the embodiments will be briefly described below, it being understood that the following drawings only illustrate some examples of the present utility model and therefore should not be considered as limiting the scope, and other related drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of a sliding track structure according to the present utility model;
FIG. 3 is a schematic view of a driving wheel structure according to the present utility model;
FIG. 4 is a schematic view of a gantry structure of the present utility model;
the figure indicates: 1. an equipment body; 2. an operation table; 3. supporting a hydraulic cylinder; 4. a warning light; 5. a portal frame; 6. a slide rail; 7. a flange plate; 8. an electric cylinder; 9. a left cantilever; 10. a right cantilever; 11. a mounting plate; 12. an observation window; 13. a driving wheel; 14. a front wheel; 15. a steering wheel; 16. a permanent magnet; 17. a pipe; 18. a handle; 19. a bracket; 20. a telescopic rod.
Detailed Description
Hereinafter, only certain exemplary embodiments are briefly described. As will be recognized by those of skill in the pertinent art, the described embodiments may be modified in numerous different ways without departing from the spirit or scope of the embodiments of the present utility model. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive.
In the description of the embodiments of the present utility model, it should be understood that the terms "length," "vertical," "horizontal," "top," "bottom," and the like indicate an orientation or a positional relationship based on that shown in the drawings, and are merely for convenience in describing the embodiments of the present utility model and to simplify the description, rather than to indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the embodiments of the present utility model.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the embodiments of the present utility model, the meaning of "plurality" is two or more, unless explicitly defined otherwise.
In the embodiments of the present utility model, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "secured" and the like are to be construed broadly and include, for example, either permanently connected, removably connected, or integrally formed; the device can be mechanically connected, electrically connected and communicated; can be directly connected or indirectly connected through an intermediate medium, and can be communicated with the inside of two elements or the interaction relationship of the two elements. The specific meaning of the above terms in the embodiments of the present utility model will be understood by those of ordinary skill in the art according to specific circumstances.
The following disclosure provides many different implementations, or examples, for implementing different configurations of embodiments of the utility model. In order to simplify the disclosure of embodiments of the present utility model, components and arrangements of specific examples are described below. Of course, they are merely examples and are not intended to limit embodiments of the present utility model. Furthermore, embodiments of the present utility model may repeat reference numerals and/or letters in the various examples, which are for the purpose of brevity and clarity, and which do not themselves indicate the relationship between the various embodiments and/or arrangements discussed.
For a better understanding of the objects, structures and functions of the present utility model, a pipe auxiliary installation integrated machine according to the present utility model will be described in further detail with reference to the accompanying drawings.
As shown in figures 1-4, the pipeline auxiliary installation all-in-one machine comprises an equipment body 1, an operation table 2 is arranged in the equipment body 1, a support 19 is arranged at the bottom of the equipment body 1, a portal frame 5 is arranged at the top of the support 19, a sliding rail 6 is arranged outside the portal frame 5, a left cantilever 9 and a right cantilever 10 are arranged outside the sliding rail 6, permanent magnets 16 are arranged at the bottoms of the left cantilever 9 and the right cantilever 10, the pipelines 17 can be conveniently and quickly connected and separated through the arranged permanent magnets 16, the bottoms of the permanent magnets 16 are connected with the pipelines 17 in an adsorption mode, handles 18 are arranged outside the permanent magnets 16, and when the pipeline auxiliary installation all-in-one machine is used, the pipelines 17 can be adsorbed by the permanent magnets 16 only by rotating the handles 18, then the portal frame 5 is lifted, then the equipment body 1 is driven to drive the equipment body to a place needing to be installed, then the pipelines 17 can be installed, the handles 18 can be separated from the pipelines 17 after the installation is completed, the purposes of installing the pipelines 17 at high altitude can be completed by only one piece of equipment, the labor intensity of workers is reduced, and the safety hazards are reduced.
The observation window 12 is connected through the mode of inlaying to the surface of equipment body 1, and the surface mounting warning light 4 of equipment body 1, the perforation is seted up to the side of equipment body 1, through the observation window 12 of setting, can be convenient for observe the promotion situation of pipeline 17.
The electric cylinder 8 is all installed at the top of left cantilever 9 and right cantilever 10, and the telescopic link 20 is installed to the side of electric cylinder 8, through the electric cylinder 8 that sets up, can make left cantilever 9 and right cantilever 10 stretch out and draw back to the different actual conditions of cooperation.
The bottom of the bracket 19 is respectively provided with a driving wheel 13 and a steering wheel 15, the bottom of the portal frame 5 is provided with a front wheel 14, and the steering purpose can be realized through the steering wheel 15, so that the vehicle can conveniently run on a working site.
The top of support 19 is equipped with and supports pneumatic cylinder 3, and the outside at portal frame 5 is installed to the other end of supporting pneumatic cylinder 3, thereby through setting up supporting pneumatic cylinder 3, can be convenient for adjust the angle of portal frame 5 slope and adjust the angle that pipeline 17 was installed.
Be equipped with ring flange 7 between portal frame 5 and slide rail 6 support 19, telescopic link 20's bottom is equipped with mounting panel 11, through the mounting panel 11 of setting up, can be convenient for install drilling equipment and punch pipeline 17.
The working principle of the pipeline auxiliary installation integrated machine is as follows: during the use, the inside of equipment body 1 is equipped with operation panel 2, the bottom of equipment body 1 is equipped with support 19, the top installation portal frame 5 of support 19, the outside of portal frame 5 is equipped with slide rail 6, the outside installation left socle 9 of slide rail 6 and right socle 10, the bottom of left socle 9 and right socle 10 is equipped with permanent magnet 16, pipeline 17 is connected through the absorbing mode in the bottom of permanent magnet 16, the outside of permanent magnet 16 is equipped with handle 18, the top of support 19 is equipped with support pneumatic cylinder 3, the other end at support pneumatic cylinder 3 is installed in the outside of portal frame 5, be equipped with flange 7 between portal frame 5 and the support of slide rail 6 19, the top of left socle 9 and right socle 10 is all installed electronic jar 8, electronic jar 8's side installation telescopic link 20 is started earlier in the use, slide left socle 9 and right socle 10 to suitable position again, again rotatory handle 18, 16 alright adsorb pipeline 17 with it by portal frame 5 again, then drive equipment body 1 makes its place that needs to install according to the actual conditions, install at the other end at the time, install the pipeline 17 is installed in the outside of portal frame 5, the pipeline 17 can be installed to the proper installation pipeline 17 with the proper installation pipeline 17, the cost of installing the pipeline 17 is just can be reduced, the cost of installing the installation panel is just 17 can be reduced in order to the bottom of installing the pipeline 17, the hole-punching equipment is realized simultaneously, the cost is reduced, the hole-punching equipment is installed to the bottom 17 is just like 17, the cost is just can be installed to the bottom the hole 17.
It will be understood that the utility model has been described in terms of several embodiments, and that various changes and equivalents may be made to these features and embodiments by those skilled in the art without departing from the spirit and scope of the utility model. In addition, many modifications may be made to adapt a particular situation or material to the teachings of the utility model without departing from the essential scope thereof. Therefore, it is intended that the utility model not be limited to the particular embodiment disclosed, but that the utility model will include all embodiments falling within the scope of the appended claims.

Claims (6)

1. The utility model provides an auxiliary installation all-in-one of pipeline which characterized in that: including equipment body (1), the inside of equipment body (1) is equipped with operation panel (2), the bottom of equipment body (1) is equipped with support (19), portal frame (5) are installed at the top of support (19), the outside of portal frame (5) is equipped with slide rail (6), the outside installation left side cantilever (9) and the right cantilever (10) of slide rail (6), the bottom of left side cantilever (9) and right cantilever (10) is equipped with permanent magnet (16), pipeline (17) are connected through absorbing mode in the bottom of permanent magnet (16), the outside of permanent magnet (16) is equipped with handle (18).
2. The pipe assisted installation all-in-one machine according to claim 1, wherein: the surface of equipment body (1) is connected with observation window (12) through the mode of inlaying, surface mounting warning light (4) of equipment body (1), the perforation is seted up to the side of equipment body (1).
3. The pipe assisted installation all-in-one machine according to claim 1, wherein: the electric cylinders (8) are arranged at the tops of the left cantilever (9) and the right cantilever (10), and telescopic rods (20) are arranged on the side surfaces of the electric cylinders (8).
4. The pipe assisted installation all-in-one machine according to claim 1, wherein: the bottom of the bracket (19) is respectively provided with a driving wheel (13) and a steering wheel (15), and the bottom of the portal frame (5) is provided with a front wheel (14).
5. The pipe assisted installation all-in-one machine according to claim 1, wherein: the top of support (19) is equipped with support pneumatic cylinder (3), the other end of support pneumatic cylinder (3) is installed in the outside of portal frame (5).
6. A pipe assisted attachment all-in-one machine according to claim 3, wherein: a flange plate (7) is arranged between the portal frame (5) and the support (19) of the sliding rail (6), and a mounting plate (11) is arranged at the bottom of the telescopic rod (20).
CN202322109384.8U 2023-08-07 2023-08-07 Pipeline auxiliary installation all-in-one Active CN220427423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322109384.8U CN220427423U (en) 2023-08-07 2023-08-07 Pipeline auxiliary installation all-in-one

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322109384.8U CN220427423U (en) 2023-08-07 2023-08-07 Pipeline auxiliary installation all-in-one

Publications (1)

Publication Number Publication Date
CN220427423U true CN220427423U (en) 2024-02-02

Family

ID=89699905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322109384.8U Active CN220427423U (en) 2023-08-07 2023-08-07 Pipeline auxiliary installation all-in-one

Country Status (1)

Country Link
CN (1) CN220427423U (en)

Similar Documents

Publication Publication Date Title
CN205675087U (en) A kind of high-altitude pipe transporting mounting vehicle
CN106738305A (en) Automatic dismounting pipe die all-in-one
CN108161619A (en) A kind of end face grinding device of stainless steel tube
CN220427423U (en) Pipeline auxiliary installation all-in-one
CN203921193U (en) detachable multi-axis aircraft
CN105329050B (en) Using the tire mounting apparatus and its method of Electronic control
CN213562281U (en) Tool for installing movable equipment by using jack
CN205461146U (en) Categorised recovery unit of residual oil liquid
CN206290487U (en) Pump Quick Release protective cover
CN220741179U (en) Mining stepping type movable pipeline assembling and disassembling vehicle
CN106629539B (en) A kind of lifting device for steel pipe movement
CN205904631U (en) High efficiency automobile punching part welds location clamping mechanism of clamping utensil
CN211839467U (en) Hub bracket for automobile repair
CN209393780U (en) The processing unit (plant) of lightning protection telescopic joint
CN201989117U (en) Tool for mounting connecting shaft
CN209335535U (en) A kind of dedicated hydraulic plate pulling device of sewage apparatus maintenance
CN205255913U (en) Automobile tire installs dismounting device
CN209782004U (en) Pipeline exhaust valve convenient to installation is fixed
CN209027836U (en) A kind of soil pollution heavy metal sampling equipment
CN219655681U (en) Tailing pond on-line monitoring device
CN205638515U (en) A screen roof beam for hydraulic support
CN202631056U (en) Ultrasonic level gauge mounting bracket
CN219819503U (en) Fastening device for maintenance platform of motor vehicle engine
CN109038970A (en) Permanent magnet synchronous motor packer
CN202963928U (en) Chassis assembly tool device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant