CN220365301U - Ribbon type vertical pipe fixing hanging die - Google Patents

Ribbon type vertical pipe fixing hanging die Download PDF

Info

Publication number
CN220365301U
CN220365301U CN202321838193.9U CN202321838193U CN220365301U CN 220365301 U CN220365301 U CN 220365301U CN 202321838193 U CN202321838193 U CN 202321838193U CN 220365301 U CN220365301 U CN 220365301U
Authority
CN
China
Prior art keywords
ribbon
sleeve
buckle
mould
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321838193.9U
Other languages
Chinese (zh)
Inventor
陈太光
朱朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Original Assignee
Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongcai Pipes Science and Technology Co Ltd filed Critical Zhejiang Zhongcai Pipes Science and Technology Co Ltd
Priority to CN202321838193.9U priority Critical patent/CN220365301U/en
Application granted granted Critical
Publication of CN220365301U publication Critical patent/CN220365301U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a ribbon type vertical pipe fixing hanging die, which comprises: the sleeve pipe, the sleeve pipe outside is equipped with the template, and the template includes a plurality of half mould board that uses the sleeve pipe centre of a circle to make central symmetry, and half mould board is equipped with the ribbon buckle at the tip of sleeve pipe periphery, and the ribbon buckle on a plurality of half mould board aligns each other, is equipped with the ribbon on the ribbon buckle and connects half mould board. The novel steel plate has the advantages of simplicity in installation, convenience in replacement and high strength. The use is more convenient, saves installation time. Can better cooperate with the building surface in the installation, can prevent effectively that cement from oozing out when pouring because of the building surface has protruding and appears great gap in the periphery in the contact part with the template middle part.

Description

Ribbon type vertical pipe fixing hanging die
Technical Field
The utility model belongs to the field of pipeline hanging die devices, and particularly relates to a vertical pipe fixing hanging die which is applied to the field of building drainage and is quickly detached by using a binding belt.
Background
The indoor drainage pipeline of building installs and need reserve pipeline hole or pre-buried sleeve pipe on cast-in-place floor first, after the pipeline installation is accomplished, need to carry out shutoff to reserving pipeline hole and handle, and current pipeline shutoff mould is the split type mould that comprises two semicircle parts mostly, and this kind of mould installation adopts screw or spring etc. to connect, and the process is comparatively complicated, and required installation time is longer, difficult dismouting. The utility model discloses a pipeline reservation hole finished product hangs mould, its publication number CN206707279U discloses "a pipeline reservation hole finished product hangs mould, including bolt one, bolt two, PVC mould one, PVC mould two, arc sleeve pipe one, arc sleeve pipe two, fixing base and retaining member, its characterized in that: the PVC die I and the PVC die II are semicircular, an arc sleeve I is arranged on one side of the PVC die II, an arc sleeve II is arranged on one side of the PVC die II, a fixing seat is arranged on each of the two sides of the arc sleeve I and the arc sleeve II, clamping grooves are formed in the fixing seats, the bolt I and the bolt respectively penetrate through the clamping grooves of the two fixing seats on one side, positioning holes are formed in the tail ends of the bolt I and the bolt II, and the locking piece penetrates through the positioning holes corresponding to the bolt I or the bolt II from the upper side of the fixing seat. The reference file adopts the bolted connection, is not very convenient in the construction process, and cement seeps out in the construction process to influence the engineering progress.
Disclosure of Invention
The utility model aims to solve the technical problems that cement seeps out in the construction process, the installation is inconvenient and the construction is inconvenient. The utility model provides a fixed hanging die of ribbon formula riser has effectively reduced the installation required time for the construction is more convenient.
In order to solve the technical problems, the utility model adopts the following technical scheme: a strap-on riser securement hanging die, comprising: the sleeve is provided with a template outside; the template comprises a plurality of half-mould plates which are symmetrical by taking the center of a sleeve as the center; the end part of the outer periphery of the sleeve is provided with a binding belt buckle; the ribbon buckles on the plurality of half templates are mutually aligned; the ribbon fastener is provided with a ribbon connecting half-template. According to the ribbon type vertical pipe fixing hanging die, 2 half templates are sleeved on the outer side of the sleeve to form a die plate, ribbon buckles on the half templates are aligned with each other, ribbon is additionally arranged, the 2 half templates are connected and fixed through the ribbon, and position fixing is carried out between a screwless structure and the vertical pipe, so that the ribbon type vertical pipe fixing hanging die is more convenient and rapid in construction. Adopt screwless structure, it is more convenient in the use, save installation time. Compared with the existing two-half fixed hanging die, the fixing device is fixed by using the binding tape, is more convenient to install, and can effectively shorten the installation time. After the use, the tie can be cut off for disassembly, and the tie can be reused after being matched with a new tie.
Preferably, the edges of both sides of the template are provided with raised edge strips. The shape and the size of the raised edge strips are the same, so that the cement seepage during pouring caused by larger gaps at the periphery due to the raised contact part of the building surface and the middle part of the template can be effectively prevented,
the template is more matched with the building surface, and larger gaps caused by local bulges of the building surface are prevented.
Preferably, the template is provided with a plurality of reinforcing ribs which are uniformly distributed along the circumferential direction of the sleeve. The reinforcing ribs can strengthen the strength of the vertical pipe fixing hanging die, and avoid fracture caused by the fact that the weight of concrete poured above cannot be born. The strength of the template is further enhanced by the uniform circumferential distribution of the stress.
Preferably, one end of the reinforcing rib is connected with the outer side of the sleeve, and the other end of the reinforcing rib is connected with the inner side of the edge belt. The reinforcing rib is connected with the sleeve and the edge belt, so that the strength of the whole vertical pipe fixing hanging die is enhanced, and breakage caused by insufficient local strength is avoided.
Preferably, the half templates are two, the half templates are semicircular, and holes matched with the vertical pipes are formed in the middle of the half templates. One side of the half mould plate, which is close to the hole, is provided with a sleeve for protecting the vertical pipe, and plays a certain limiting role during installation, the vertical pipe is limited in the hole, the vertical pipe is installed in a round hole spliced by the holes of the two half mould plates, the semicircular suitability is stronger, the vertical pipe is easy to assemble, and the arc can prevent the condition that personnel are injured due to careless collision in the construction process. The sleeve is arranged on the central circumference part of the splicing of the two half templates, the sleeve is arranged on the half templates, the sleeve can be regarded as a part of the half templates, the half templates are semicircular, a semicircle matched with the diameter of the vertical pipe is dug in the middle, so that the half templates are matched with the vertical pipe, and the two half templates can be spliced on the outer side of the vertical pipe well.
Preferably, a slot hole matched with the cross-sectional shape of the binding belt is formed in one side, close to the back-off, of the binding belt buckle. This slotted hole is used for advancing the ribbon inside the ribbon buckle for ribbon and ribbon buckle are mutually supported more firmly, guarantee that the ribbon can not drop, improve the fastness of connection.
Preferably, the tie is provided with barbs; the barb is positioned above the reverse buckle of the binding belt; the barb joint is on the ribbon buckle. The ribbon is designed with barbs to enable the ribbon and the ribbon buckle to be fixed more tightly, so that the stability of connection is improved.
Preferably, the back-off is arranged inside the ribbon buckle; the back-off is matched with the back-off tooth pitch of the binding belt on the binding belt. The inside back-off of ribbon cooperation ribbon back-off tooth saw makes the fixed more stable between two half mould boards, and the tooth saw mutually supports, has increased the atress area of contact, has improved the stability and the intensity of connection.
The beneficial effects of the utility model are as follows: adopt screwless structure, it is more convenient in the use, save installation time. Can better cooperate with the building surface in the installation, can prevent effectively that cement from oozing out when pouring because of the building surface has protruding and appears great gap in the periphery in the contact part with the template middle part. The installation is more convenient, can effectively shorten installation time. After the use, the barb on the binding belt can be cut off for disassembly, and the binding belt can be repeatedly used by matching with a new binding belt.
Drawings
Fig. 1 is a schematic top view of the present utility model.
FIG. 2 is a schematic partial cross-sectional view of a mold half of the present utility model.
Fig. 3 is a schematic view of the tie of the present utility model.
Fig. 4 is a schematic view of the structure of the present utility model.
In the figure: 1. the sleeve comprises a sleeve body, a half sleeve body, a template body, a half template body, a reinforcing rib body, a binding band buckle body, a back-off body, a binding band back-off body, a barb and an edge band.
Detailed Description
The following description of the embodiments of the present utility model will be made with reference to the accompanying drawings.
As shown in fig. 1 to 4, a strap-type riser fixing hanging die includes: the sleeve 1, the outside of the sleeve 1 is provided with a template 2; the template 2 comprises a plurality of half mould plates 201 which are symmetrical with the center of the sleeve 1 as the center; in this embodiment, 2 half mold plates 201 are provided, in this embodiment, the half mold plates 201 are semicircular, and a hole adapted to the riser is provided in the middle of the mold plate 2 formed by combining the half mold plates 201. Sleeve 1 is in the central part of the splice of the two half-moulds 201, in this embodiment sleeve 1 can be understood to be part of the mould plate 2 on the mould plate 2. The half templates 201 are semicircular, and a semicircle matched with the diameter of the vertical pipe is cut in the middle so as to be matched with the vertical pipe, so that the two half templates 201 can be spliced outside the vertical pipe well. In the process, the sleeve 1 plays a role of limiting and protecting, the self-circular stand pipe is externally spliced with two half mould plates 201, the center of the half mould plates 201 is also provided with a half sleeve 101, the two half mould plates 201 are spliced together, the corresponding two half sleeves 101 are spliced into a complete sleeve 1, in the actual installation process, the half sleeve 101 in the middle of one half mould plate 201 is firstly aligned with the circumference of the Ji Liguan, then the other half mould plate 201 is aligned with the ribbon buckle on the first half mould plate 201, and then the two half mould plates 201 are connected together through the ribbon 5, so that the complete mould plate 2 is formed.
The end part of the half template 201 on the periphery of the sleeve 1 is provided with a binding belt buckle 4; the band clips 4 on the two half mold plates 201 are aligned with each other; the inside of the ribbon buckle 4 is provided with a back-off 401; the back-off 401 is matched with the tooth pitch of the band back-off 501 on the band 5. According to the ribbon type vertical pipe fixing hanging die, 2 half templates are sleeved on the outer side of the sleeve 1 to form the template 2, ribbon 5 is additionally arranged after ribbon buckles 4 on the half templates 201 are aligned with each other, the ribbon 5 is used for connecting and fixing the 2 half templates 201, and a screwless structure is used for fixing positions with the vertical pipe, so that the ribbon type vertical pipe fixing hanging die is more convenient and rapid in construction. Adopt screwless structure, it is more convenient in the use, save installation time. Compared with the existing two-half fixed hanging die, the fixing device is fixed by using the binding tape, is more convenient to install, and can effectively shorten the installation time. After the use, the barb 502 on the ribbon 5 can be cut off for disassembly, and the ribbon 5 can be reused after being matched with a new ribbon.
Raised edge strips 6 are provided on both side edges of the form 2 in order to ensure the strength of the form 2. The shape and the size of the raised edge belt 6 are the same, so that cement seepage in pouring caused by the fact that the building surface is raised at the contact part with the middle part of the template and a larger gap appears at the periphery can be effectively prevented, the template 2 is more matched with the building surface, and the large gap caused by the fact that the building surface is raised locally is prevented. The template 2 is provided with a plurality of reinforcing ribs 3, and the reinforcing ribs 3 are uniformly distributed along the circumferential direction of the sleeve 1. The reinforcing ribs 3 can strengthen the strength of the vertical pipe fixing hanging die, and avoid fracture caused by the fact that the weight of concrete poured above cannot be born. The uniform distribution in the circumferential direction makes the stress more uniform and further strengthens the strength of the template 2 itself. One end of the reinforcing rib 3 is connected with the outer side of the sleeve 1, and the other end is connected with the inner side of the edge belt 6. The reinforcing ribs 3 are connected with the sleeve 1 and the edge belt 6, so that the strength of the whole vertical pipe fixing hanging die is reinforced, and breakage caused by insufficient local strength is avoided. The side of the ribbon buckle 4 near the back-off 401 is provided with a slotted hole which is matched with the cross section shape of the ribbon 5. This slotted hole is used for advancing ribbon 5 into ribbon buckle 4 inside for ribbon 5 and ribbon buckle 4 mutually support more firmly, guarantee that ribbon 5 can not drop, improve the fastness of connection. The ribbon 5 is provided with barbs 502; the barb 502 is located above the tie back-off 501; barb 502 is snapped onto strap clip 501. The ribbon 5 is designed with the barb 502 to make the ribbon 5 and the ribbon buckle 4 fixed more tightly, which improves the stability of connection. The foregoing examples illustrate only a few embodiments of the utility model, which are described in detail and are not to be construed as limiting the scope of the utility model. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the utility model, which are all within the scope of the utility model.

Claims (8)

1. A strap-down riser-securing hanging die, comprising: the device comprises a sleeve (1), wherein a template (2) is arranged on the outer side of the sleeve (1);
the template (2) comprises a plurality of half-mould plates (201) which are symmetrical with the center of the sleeve (1) as the center;
the end part of the half mould plate (201) at the periphery of the sleeve (1) is provided with a binding belt buckle (4);
the ribbon buckles (4) on the half mould plates (201) are mutually aligned;
the ribbon buckle (4) is provided with a ribbon (5) connected with the half template (201).
2. A tie-down riser fixing suspension mould according to claim 1, characterised in that the two side edges of the mould plate (2) are provided with raised edge strips (6).
3. A tie-down riser fixing suspension mould according to claim 2, characterized in that the mould plate (2) is provided with a plurality of reinforcing ribs (3), the reinforcing ribs (3) being evenly distributed along the circumference of the sleeve (1).
4. A fixed hanging mould for a ribbon-type vertical pipe according to claim 3, characterized in that one end of the reinforcing rib (3) is connected with the outside of the sleeve (1), and the other end is connected with the inside of the edge belt (6).
5. A strap-type riser-fixing hanging die according to claim 1, 2 or 3, characterized in that the number of half-die plates (201) is two, the half-die plates (201) are semicircular, and holes matched with the risers are arranged in the middle of the half-die plates (201).
6. The ribbon-type vertical pipe fixing hanging die according to claim 1, wherein a slotted hole matched with the cross-sectional shape of the ribbon (5) is formed in one side, close to the back-off buckle (401), of the ribbon buckle (4).
7. A tie-down riser fixation suspension mould according to claim 1 or 6, characterized in that the tie-down (5) is provided with barbs (502); the barb (502) is positioned above the ribbon back-off (501); the barb (502) is clamped on the ribbon buckle (4).
8. A tie-down riser fixation suspension mould according to claim 1 or 6, characterized in that the tie-down buckle (4) is internally provided with a back-off (401); the back-off (401) is matched with the tooth pitch of the ribbon back-off (501) on the ribbon (5).
CN202321838193.9U 2023-07-13 2023-07-13 Ribbon type vertical pipe fixing hanging die Active CN220365301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321838193.9U CN220365301U (en) 2023-07-13 2023-07-13 Ribbon type vertical pipe fixing hanging die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321838193.9U CN220365301U (en) 2023-07-13 2023-07-13 Ribbon type vertical pipe fixing hanging die

Publications (1)

Publication Number Publication Date
CN220365301U true CN220365301U (en) 2024-01-19

Family

ID=89517185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321838193.9U Active CN220365301U (en) 2023-07-13 2023-07-13 Ribbon type vertical pipe fixing hanging die

Country Status (1)

Country Link
CN (1) CN220365301U (en)

Similar Documents

Publication Publication Date Title
CN201786021U (en) Plastic spliced and combined cylindrical building template for casting
CN220365301U (en) Ribbon type vertical pipe fixing hanging die
KR101881914B1 (en) One-touch hanger for spiral duct
CN216446254U (en) Cast-in-place heat preservation template supports mounting and wall structure
CN204299162U (en) To encorbelment steel I-beam anchor structure
CN208235337U (en) A kind of reserved anchor bolt hole locator of bearing pad stone
CN113550595B (en) Bonded prestress construction process for skirt house frame beam construction
CN206408938U (en) A kind of large form back cord attachment fastener
CN213805994U (en) Detachable and reusable assembled building wall surface connecting structure
CN212801942U (en) Assembled prestressed column-beam joint structure
CN210025769U (en) Prestressed reinforcement tensioning and anchoring mechanism for cement electric pole
CN112900862A (en) Formwork support system
CN209755624U (en) Protection tool and protection structure
CN102312568A (en) Injection section combination building template
CN216016300U (en) Quick detach type cable staple bolt
CN214238098U (en) Reinforcing bar sleeve grout connects test piece preparation rack
CN219705615U (en) Manufacturing structure for inner groove of anchor cavity of anchor end of precast beam
CN205421924U (en) Building templates uses novel anchor clamps
KR101769393B1 (en) Easy Removable Of Paper Sleeve of Length Adjustable Type
CN108868835A (en) Buried steel side waterstop installs reinforcement means in a kind of short abutment wall in tunnel
CN203614924U (en) Self-locking double-ring feeder line clamping apparatus
CN213742317U (en) Beam-penetrating embedded sleeve positioning assembly
CN215977989U (en) Detachable steel bar truss floor support plate
CN214662569U (en) Quick reinforcing apparatus of floor delivery pump line
CN111622492A (en) Reserved exposed reinforced concrete surface side mold and use method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant