CN219240184U - Dowel bar fixing device - Google Patents

Dowel bar fixing device Download PDF

Info

Publication number
CN219240184U
CN219240184U CN202223117250.2U CN202223117250U CN219240184U CN 219240184 U CN219240184 U CN 219240184U CN 202223117250 U CN202223117250 U CN 202223117250U CN 219240184 U CN219240184 U CN 219240184U
Authority
CN
China
Prior art keywords
steel
dowel bar
channel
dowel
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223117250.2U
Other languages
Chinese (zh)
Inventor
杨少军
黄太林
杨立志
吕凤龙
白鑫
马佳枫
宫庆园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202223117250.2U priority Critical patent/CN219240184U/en
Application granted granted Critical
Publication of CN219240184U publication Critical patent/CN219240184U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The application discloses dowel steel fixing device, including the fixed bolster, the fixed bolster has the cuff, and the cuff disposes to supply the dowel steel to insert, and the both sides of the relative setting of cuff are connected with first joint arm and second joint arm, and first joint arm and second joint arm disposes to run through the web locating hole of channel-section steel at the dowel steel, and inserts and fix two curb plates of back joint channel-section steel respectively in the cuff for the dowel steel is fixed through the fixed bolster after running through the web locating hole of channel-section steel. In the dowel bar fixing device, the fixed support enables the dowel bar to penetrate through the web plate locating holes of the channel steel and then to be fixed through the fixed support, the dowel bar is prevented from being deformed due to external influences, and therefore the phenomenon that the dowel bar cannot freely pass through the locating holes in the web plate of the channel steel and the channel steel is difficult to demould is avoided.

Description

Dowel bar fixing device
Technical Field
The application relates to the field of large-scale concrete terrace construction, in particular to a dowel bar fixing device.
Background
The large-scale concrete terrace is formed by pouring concrete with a reinforcing mesh and a certain strength grade and thickness, and because the concrete terrace has larger area, the terrace is easy to crack due to the thermal expansion and contraction temperature stress and the uneven settlement influence of the foundation, an expansion joint is generally arranged in a certain length range along the longitudinal direction and the transverse direction in the drawing design, dowel bars are added at two ends of the expansion joint, one end of the expansion joint is fixed in a side plate, the other end of the expansion joint can slide in an adjacent side plate, and the expansion joint is used for enabling adjacent concrete blocks to bear force together and increasing the stress transmission between the adjacent concrete blocks so as to prevent the uneven settlement of the concrete terrace.
Because the construction area of the large-scale terrace is large, the construction of the terrace concrete pouring needs to adopt a 'jump bin method', each sub-bin template supporting system generally adopts channel steel with the same thickness as a side die, and the dowel bars penetrating through the channel steel side die are corrected and fixed in four directions up and down and left and right generally by constructors in the terrace pouring process, but the dowel bars which are corrected are easily caused to have the phenomenon of 'upwarp' after final setting due to the shrinkage influence of initial setting and final setting of the concrete and the influence of construction vibration, and the channel steel demolding difficulty is caused due to the fact that the dowel bars which are corrected cannot freely pass through positioning holes on channel steel webs during die removal, so that the terrace edges and corners are damaged due to the influence of die removal work efficiency.
Disclosure of Invention
The utility model provides a dowel steel fixing device can avoid the dowel steel unable free locating hole on the channel-section steel web, cause the difficult phenomenon of channel-section steel drawing of patterns.
The embodiment of the application provides a dowel bar fixing device, including the fixed bolster, the fixed bolster has the cuff, and the cuff is configured to supply the dowel bar to insert, and the both sides of the relative setting of cuff are connected with first joint arm and second joint arm, and first joint arm and second joint arm are configured to run through the web locating hole of channel-section steel at the dowel bar, and insert and fix two curb plates of back joint channel-section steel respectively in the cuff for the dowel bar runs through the web locating hole of channel-section steel after fixed bolster is fixed.
In some of these embodiments, the first clamping arm includes a first clamping section that is disposed in a same plane as the axis of the ferrule and is parallel to the axis of the ferrule such that the first clamping section engages the side plate of the channel.
In some embodiments, the first clamping section is connected with the ferrule via the first connecting section, the second connecting section has a concave structure, and two sides of the second connecting section gradually shrink towards a direction away from the opening of the channel steel.
In some of these embodiments, the second clamping arm includes a second clamping section that is disposed in the same plane as the axis of the ferrule and is parallel to the axis of the ferrule such that the second clamping section engages the side plate of the channel.
In some embodiments, the second clamping section is connected to the ferrule via a second connecting section, the second connecting section has a concave structure, and two sides of the second connecting section gradually shrink toward a direction away from the opening of the channel steel.
In some of these embodiments, the collar is made by bending steel bars around the outer peripheral wall of the dowel.
In some of these embodiments, the rebar surrounds the dowel at least two turns to form a cuff.
In some embodiments, the first and second clamping arms are made of steel bars attached to the inner wall of the channel steel.
In some of these embodiments, the rebar is round steel.
In some of these embodiments, the free ends of the first and second snap arms are both located outside of the channel.
According to the dowel bar fixing device provided by the embodiment of the application, the dowel bar fixing device comprises a fixing support, the fixing support is provided with a hoop, the hoop is configured to be used for inserting a dowel bar, two sides of the opposite arrangement of the hoop are connected with a first clamping arm and a second clamping arm, the first clamping arm and the second clamping arm are configured to penetrate through a web positioning hole of a channel steel at the dowel bar, and are inserted into and fixed in the hoop, and then are respectively clamped with two side plates of the channel steel, so that the dowel bar penetrates through the web positioning hole of the channel steel and is fixed through the fixing support. In the dowel bar fixing device, the fixed support enables the dowel bar to penetrate through the web plate locating holes of the channel steel and then to be fixed through the fixed support, the dowel bar is prevented from being deformed due to external influences, and therefore the phenomenon that the dowel bar cannot freely pass through the locating holes in the web plate of the channel steel and the channel steel is difficult to demould is avoided.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described below, it being obvious that the drawings in the following description are only some embodiments of the present application, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a front view of a dowel bar fixation device according to an embodiment of the present application;
fig. 2 is a cross-sectional view at A-A' in fig. 1.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application will be further described in detail with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the present application.
Referring to fig. 1 and 2, an embodiment of the present application provides a fixing device for a dowel bar 3, which includes a fixing bracket 1, and the fixing bracket is disposed in one-to-one correspondence with the dowel bar 3.
The fixing bracket 1 is used for fixing a dowel bar 3 penetrating through a web 20 positioning hole of the channel steel 2. The fixing bracket 1 is provided with a hoop 10, the hoop 10 is configured to be inserted by the dowel steel 3, two opposite sides of the hoop 10 are connected with a first clamping arm 11 and a second clamping arm 12, the first clamping arm 11 and the second clamping arm 12 are configured to penetrate through a web 20 positioning hole of the channel steel 2 at the dowel steel 3, and are respectively clamped inside two side plates 21 of the channel steel 2 after being inserted and fixed in the hoop 10, at the moment, the fixing bracket 1 is integrally clamped in a groove defined by the channel steel 2, so that the dowel steel 3 penetrates through the web 20 positioning hole of the channel steel 2 and is fixed through the fixing bracket 1, thereby preventing angular deformation during concrete pouring and being repeatedly disassembled and assembled for use.
The first clamping arm 11 comprises a first clamping section 110, wherein the first clamping section 110 and the axis of the ferrule 10 are arranged on the same plane and are parallel to the axis of the ferrule 10, so that the first clamping section 110 is attached to the inner side of the side plate 21 of the channel steel 2. The above arrangement makes the first clamping arm 11 stably clamped inside the side plate 21 of the channel steel 2, and facilitates the clamping operation of the first clamping arm 11 and the detachment of the first clamping arm 11 from the clamping position.
The first clamping section 110 is connected with the ferrule 10 through the first connecting section 111, the second connecting section 121 is of a concave structure, and two sides of the second connecting section 121 gradually shrink towards a direction away from the opening of the channel steel 2. The arrangement enables the first clamping arm 11 to stretch in the radial direction of the dowel bar 3, so that the clamping operation of the first clamping arm 11 is facilitated, and the first clamping arm 11 is separated from the clamping position.
The second clamping arm 12 comprises a second clamping section 120, and the second clamping section 120 is arranged on the same plane with the axis of the hoop 10 and is parallel to the axis of the hoop 10, so that the second clamping section 120 is attached to the inner side of the side plate 21 of the channel steel 2. The above arrangement makes the second clamping arm 12 stably clamped inside the side plate 21 of the channel steel 2, and facilitates the clamping operation of the second clamping arm 12 and the detachment of the second clamping arm 12 from the clamping position.
The second clamping section 120 is connected with the ferrule 10 through a second connecting section 121, the second connecting section 121 is in a concave structure, and two sides of the second connecting section 121 gradually shrink towards a direction away from the opening of the channel steel 2. The arrangement enables the second clamping arm 12 to extend and retract in the radial direction of the dowel 3, so that the clamping operation of the second clamping arm 12 is facilitated, and the second clamping arm 12 is separated from the clamping position.
The hoops 10 are made by bending steel bars around the outer peripheral wall of the dowel bar 3, and the inner diameter of the hoops 10 can be 2mm larger than the outer diameter of the dowel bar 3, so that the dowel bar 3 is ensured not to deviate in the concrete pouring process.
The rebars are looped around the dowel bar 3 at least two, such as two or three, turns to form the collar 10. The above arrangement makes the dowel 3 more stable after insertion into the ferrule 10.
The first clamping arm 11 and the second clamping arm 12 are made by bending the inner wall of the steel bar joint channel steel 2. Through the arrangement, the hoop 10, the first clamping arm 11 and the second clamping arm 12 are formed by stewing the same steel bar, and the formed fixing support 1 is stable in structure and convenient to process.
The steel bar is round steel, such as round steel with the diameter phi of 8 mm. The cambered surface of the round steel facilitates the insertion of the dowel bar 3 into the hoop 10, and simultaneously facilitates the clamping of the fixing support 1 in the groove defined by the channel steel 2 and the detachment from the groove.
The free ends of the first clamping arm 11 and the second clamping arm 12 are located outside the channel steel 2, so that the fixing support 1 can be further clamped in a groove defined by the channel steel 2 and disengaged from the groove.
After the dowel bar 3 fixing device is adopted, when the side die of the channel steel 2 is disassembled, firstly, the fixing support 1 is separated from the clamping part in the side die of the channel steel 2 by pressing downwards and rotating the fixing support 1, secondly, the loosened fixing support 1 is withdrawn from the dowel bar 3 through the hoop 10, the dowel bar 3 does not have angular deformation under the fixing effect of the fixing support 1 due to the arrangement, and the side die of the channel steel 2 can be withdrawn from the dowel bar 3 easily through the positioning holes of the web 20.
In summary, in the dowel bar 3 fixing device, the fixing support 1 enables the dowel bar 3 to penetrate through the web 20 locating holes of the channel steel 2 and then to be fixed through the fixing support 1, so that the dowel bar 3 is prevented from being deformed due to external influences, and the phenomenon that the dowel bar 3 cannot freely pass through the locating holes in the web 20 of the channel steel 2 and the channel steel 2 is difficult to demould is avoided.
The same or similar reference numerals in the drawings of the present embodiment correspond to the same or similar components; in the description of the present application, it should be understood that, if there is an azimuth or positional relationship indicated by terms such as "upper", "lower", "left", "right", etc., based on the azimuth or positional relationship shown in the drawings, this is for convenience of description and simplification of the description, but does not indicate or imply that the apparatus or element to be referred must have a specific azimuth, be constructed and operated in a specific azimuth, and thus terms describing the positional relationship in the drawings are merely used for illustration and are not to be construed as limitations of the present patent, and that the specific meaning of the terms described above may be understood by those of ordinary skill in the art according to the specific circumstances.
The foregoing description of the preferred embodiments of the present application is not intended to be limiting, but is intended to cover any and all modifications, equivalents, and alternatives falling within the spirit and principles of the present application.

Claims (10)

1. A dowel bar fixing apparatus, comprising:
the fixed bolster sets up in the inside of channel-section steel, the fixed bolster has the cuff, the cuff is configured to the dowel steel that runs through the web locating hole of channel-section steel inserts and fixes, the both sides that the relative setting of cuff are connected with first joint arm and second joint arm, first joint arm with second joint arm is configured to the joint respectively the inboard of two curb plates of channel-section steel for the dowel steel that runs through the web locating hole of channel-section steel passes through the fixed bolster is fixed.
2. The dowel bar fixation device of claim 1, wherein,
the first clamping arm comprises a first clamping section, the first clamping section and the axis of the hoop are arranged on the same plane and are parallel to the axis of the hoop, and the first clamping section Duan Tiege is enabled to be connected with the side plate of the channel steel.
3. The dowel bar mounting apparatus of claim 2, wherein,
the first clamping section is connected with the hoop through a first connecting section, the first connecting section is of a concave structure, and two sides of the first connecting section gradually shrink towards a direction away from an opening of the channel steel.
4. The dowel bar fixation device of claim 1, wherein,
the second clamping arm comprises a second clamping section, the second clamping section and the axis of the hoop are arranged on the same plane and are parallel to the axis of the hoop, and the second clamping section Duan Tiege is enabled to be connected with the side plate of the channel steel.
5. The dowel bar mounting apparatus of claim 4, wherein,
the second clamping section is connected with the hoop through a second connecting section, the second connecting section is of a concave structure, and two sides of the second connecting section gradually shrink towards the direction away from the opening of the channel steel.
6. The dowel bar fixation device of claim 1, wherein,
the hoop is formed by bending steel bars around the outer peripheral wall of the dowel bar.
7. The dowel bar mounting apparatus of claim 6, wherein,
the reinforcing steel bar surrounds the dowel steel for at least two circles to form the hoop.
8. The dowel bar mounting apparatus of claim 6, wherein,
the first clamping arm and the second clamping arm are formed by bending the inner wall of the channel steel by attaching the reinforcing steel bars.
9. The dowel bar mounting apparatus of claim 6, wherein,
the steel bars are round steel.
10. The dowel bar fixation device of claim 1, wherein,
the free ends of the first clamping arm and the second clamping arm are located outside the channel steel.
CN202223117250.2U 2022-11-23 2022-11-23 Dowel bar fixing device Active CN219240184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223117250.2U CN219240184U (en) 2022-11-23 2022-11-23 Dowel bar fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223117250.2U CN219240184U (en) 2022-11-23 2022-11-23 Dowel bar fixing device

Publications (1)

Publication Number Publication Date
CN219240184U true CN219240184U (en) 2023-06-23

Family

ID=86839551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223117250.2U Active CN219240184U (en) 2022-11-23 2022-11-23 Dowel bar fixing device

Country Status (1)

Country Link
CN (1) CN219240184U (en)

Similar Documents

Publication Publication Date Title
CN219240184U (en) Dowel bar fixing device
CN216446254U (en) Cast-in-place heat preservation template supports mounting and wall structure
CN205189405U (en) A building templates for frame post expansion joint
CN213296890U (en) Steel bar positioning device
CN220451240U (en) Self-balancing shuttering
CN214657793U (en) Hook for connecting steel structure in wall for building
CN210938892U (en) Motor casing anchor clamps
CN110593554A (en) Be applied to super thick vertical concrete structure template system interior angle reinforced structure
CN221001940U (en) Novel cover and mould circular arc template reinforcement
CN211143745U (en) Frame for building templates and fixture assembly thereof
CN217518787U (en) Prefabricated arc blind hole component, prefabricated shell ring and wind power tower
KR20080005708A (en) Bricks wall reinforcement method
CN220451241U (en) Clamping piece for formwork and formwork comprising clamping piece
CN220395171U (en) Secondary joist square tube, secondary joist square tube assembly and floor formwork joint assembly
CN219034041U (en) Hole template supporting structure and template assembly
CN211622589U (en) Shear wall end template reinforcing apparatus
CN217621227U (en) A mould and wind generating set for fan tower section of thick bamboo
CN218522237U (en) Can have enough to meet need solid fixed sleeving reinforcing apparatus of plank sheathing water supply and drainage
CN218091953U (en) Assembled and reusable embedded ring
CN220203411U (en) Water stop screw rod and template supporting system
KR200423652Y1 (en) Coated wire used at bricks wall reinforcement
CN211817153U (en) Joint formula wall connection structure
CN221001950U (en) Integral template for building deformation joint
CN215594878U (en) Combined building splicing template for building
CN219672145U (en) Wall form reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant