CN211817153U - Joint formula wall connection structure - Google Patents

Joint formula wall connection structure Download PDF

Info

Publication number
CN211817153U
CN211817153U CN202020302095.3U CN202020302095U CN211817153U CN 211817153 U CN211817153 U CN 211817153U CN 202020302095 U CN202020302095 U CN 202020302095U CN 211817153 U CN211817153 U CN 211817153U
Authority
CN
China
Prior art keywords
clamping
sheet
fixing
hook body
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020302095.3U
Other languages
Chinese (zh)
Inventor
钟红金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuyang Hangzhou Ruddy Plastic Electric Appliance Co ltd
Original Assignee
Fuyang Hangzhou Ruddy Plastic Electric Appliance Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyang Hangzhou Ruddy Plastic Electric Appliance Co ltd filed Critical Fuyang Hangzhou Ruddy Plastic Electric Appliance Co ltd
Priority to CN202020302095.3U priority Critical patent/CN211817153U/en
Application granted granted Critical
Publication of CN211817153U publication Critical patent/CN211817153U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a clamping type wall connecting structure, which comprises a hook body, wherein fixing clamps are arranged on two sides of the hook body; the fixing clamp comprises a supporting sheet, a first clamping sheet and a second clamping sheet, wherein the supporting sheet, the first clamping sheet and the second clamping sheet are all perpendicular to the hook body, and the first clamping sheet and the supporting sheet are integrated; a fixing column is arranged on the hook body, and a through hole is formed in the fixing column; the fixing device is characterized in that the fixing column is provided with a clamping groove, and the clamping groove penetrates through the through hole; and reinforcing ribs are arranged on the hook bodies on two sides of the fixing column. The utility model discloses a through set up the draw-in groove on the fixed column and run through the through-hole, only need block the reinforcing bar through the draw-in groove when the installation couple and carry out the joint installation fixed, it is simple and convenient to install, and construction convenience saves time.

Description

Joint formula wall connection structure
Technical Field
The utility model relates to a wall connection structure specifically indicates a joint formula wall connection structure.
Background
With the rapid development of the construction industry, the kinds of construction materials have become more diversified. The aerated panel becomes one of the most widely used lightweight wall materials at the earliest popularization and application in China because of the advantages of light volume weight, high heat insulation performance, good sound absorption effect and the like. At present, the phenomena of one-step forming incapability, poor stability and high cost generally exist in the production of aerated plates in the prior art in China. Therefore, the conventional mode is that a metal mesh cage structure and a fixing device form a plate internal fixing structure, and then a similar reinforced concrete structure is formed by coating cement to fix, different from a reinforced concrete structure which is cast on site, an aerated plate is processed in a factory and then is conveyed to the site to be spliced, in the pouring process, a mesh cage needs to be spliced firstly to complete fixing, and then is moved to a pouring place to be poured, the process needs to be transported, and the production efficiency is affected because the spliced mesh cage structure is not high in stability and is easy to deform in the moving and transporting process, so that the aerated plate mesh cage structure needs to have stronger stability, the plate can be prevented from being damaged in the transporting process, and the fixing hook of the currently adopted aerated plate has insufficient stability, easily broken condition
CN201520127449.4 a couple for building aerated panel connection production discloses following technical scheme: the upper part is provided with a through hole, and two ends of the upper part are provided with fixing clamps vertical to the upper part; the lower part is provided with a hollow groove fixing port, and two ends of the lower part are provided with fixing clamps vertical to the lower part; the structure is a previous generation product of the applicant, the previous generation product can only be installed from the upper end or the lower end of the steel bar when being installed, but when a hook is found to be needed to be added in the steel bar connection and installation process, the installed and connected steel bar needs to be detached, the installation is carried out again, the time is wasted, and the construction trouble is increased. Therefore, a clamping type wall connecting structure is provided.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a joint formula wall connection structure in order to solve above problem.
In order to achieve the purpose, the utility model provides a clamping type wall connecting structure, which comprises a hook body, wherein fixing clamps are arranged on two sides of the hook body; the fixing clamp comprises a supporting sheet, a first clamping sheet and a second clamping sheet, wherein the supporting sheet, the first clamping sheet and the second clamping sheet are all perpendicular to the hook body, and the first clamping sheet and the supporting sheet are integrated; a fixing column is arranged on the hook body, and a through hole is formed in the fixing column; the fixing device is characterized in that the fixing column is provided with a clamping groove, and the clamping groove penetrates through the through hole; and reinforcing ribs are arranged on the hook bodies on two sides of the fixing column.
Further preferably, the first clamping piece and the second clamping piece are provided with protrusions.
Further preferably, a limiting groove is further formed in the second clamping piece.
The utility model discloses a set up the draw-in groove on the fixed column and run through the through-hole, only need block the reinforcing bar through the draw-in groove when the installation couple and carry out the joint installation fixed, it is simple and convenient to install, and construction convenience saves time.
Drawings
FIG. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the enlarged partial structure of the present invention;
illustration of the drawings: 1. the hook comprises a hook body, 2 and a fixing clamp; 3. a support sheet; 4. a first clamping piece; 5. a second clamping piece; 6. a through hole; 7. fixing a column; 8. reinforcing ribs; 9. a card slot; 10. a protrusion; 11. a limiting groove.
Detailed Description
The following will further describe a clamping type wall connecting structure according to the present invention with reference to the accompanying drawings.
As shown in fig. 1-2, the clamping type wall connecting structure of the present embodiment includes a hook body 1, and fixing clips 2 are disposed on two sides of the hook body 1; the fixing clip 2 comprises a supporting sheet 3, a first clamping sheet 4 and a second clamping sheet 5, the supporting sheet 3, the first clamping sheet 4 and the second clamping sheet 5 are all perpendicular to the hook body 1, and the first clamping sheet 4 and the supporting sheet 3 are integrated; a fixing column 7 is arranged on the hook body 1, and a through hole 6 is formed in the fixing column 7; the fixing device is characterized in that a clamping groove 9 is formed in the fixing column 7, and the clamping groove 9 penetrates through the through hole 6; reinforcing ribs 8 are arranged on the hook bodies 1 on the two sides of the fixed column 7; the first clamping piece 4 and the second clamping piece 5 are provided with bulges 10; and a limiting groove 11 is also arranged on the second clamping piece 5.
The utility model discloses a use: during installation, the hook body 1 is placed in front of a steel bar to be installed by hand, the clamping groove 9 in the hook body 1 corresponds to the position of the steel bar, the hook body 1 is pushed by hand, and the hook body 1 is installed on the steel bar in a clamping mode through the clamping groove 9.
The utility model has the advantages that: the clamping groove 9 is formed in the fixing column 7 and penetrates through the through hole 6, so that the steel bars are clamped, installed and fixed only through the clamping groove 9 when the hook is installed, and the hook is simple and convenient to install, convenient to construct and time-saving; if the steel bar mesh needs to be provided with the hook in the installation process, the hook body 1 only needs to be directly clamped and installed through the clamping groove 9, and the installed steel bar mesh does not need to be detached and then installed.
The scope of the present invention is not limited to the above embodiments and their variations. The present invention is not limited to the above embodiments, and other modifications and substitutions may be made by those skilled in the art.

Claims (3)

1. A clamping type wall connecting structure comprises a hook body (1), wherein fixing clamps (2) are arranged on two sides of the hook body (1); the fixing clamp (2) comprises a supporting sheet (3), a first clamping sheet (4) and a second clamping sheet (5), the supporting sheet (3), the first clamping sheet (4) and the second clamping sheet (5) are all perpendicular to the hook body (1), and the first clamping sheet (4) and the supporting sheet (3) are integrated; a fixing column (7) is arranged on the hook body (1), and a through hole (6) is formed in the fixing column (7); the fixing device is characterized in that a clamping groove (9) is formed in the fixing column (7), and the clamping groove (9) penetrates through the through hole (6); and reinforcing ribs (8) are arranged on the hook bodies (1) on the two sides of the fixing column (7).
2. The clamping type wall connecting structure according to claim 1, wherein: and the first clamping piece (4) and the second clamping piece (5) are provided with bulges (10).
3. The clamping type wall connecting structure according to claim 2, wherein: and a limiting groove (11) is also arranged on the second clamping piece (5).
CN202020302095.3U 2020-03-12 2020-03-12 Joint formula wall connection structure Active CN211817153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020302095.3U CN211817153U (en) 2020-03-12 2020-03-12 Joint formula wall connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020302095.3U CN211817153U (en) 2020-03-12 2020-03-12 Joint formula wall connection structure

Publications (1)

Publication Number Publication Date
CN211817153U true CN211817153U (en) 2020-10-30

Family

ID=73007933

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020302095.3U Active CN211817153U (en) 2020-03-12 2020-03-12 Joint formula wall connection structure

Country Status (1)

Country Link
CN (1) CN211817153U (en)

Similar Documents

Publication Publication Date Title
CN210887275U (en) Concrete pile bearing platform template structure
CN210177511U (en) Foundation ditch steel sheet pile supporting construction
CN211817153U (en) Joint formula wall connection structure
CN111980431A (en) Assembled wallboard supporting box structure
CN214657793U (en) Hook for connecting steel structure in wall for building
CN213806320U (en) A connecting piece for wallboard installation
CN214094950U (en) Heater external mounting fixed establishment
CN115182537A (en) Installation structure and construction method of metal composite wallboard
CN109339439B (en) Constructional column formwork construction device and process
CN204920196U (en) Grout wallboard formwork
CN209891633U (en) External corner splicing section bar
CN213774463U (en) Wall body is pour and is used assembled aluminum mould board
CN219411322U (en) Heat preservation wall and heat preservation fixing device, fixing device's holder
CN211250704U (en) Strenghthened type wall connection structure
CN219654296U (en) Protective layer thickness positioning device for concrete cylinder wall continuous pouring system
CN213234018U (en) Wallboard component limiting steel bar fixing frame
CN215168113U (en) Shear wall template positioning device
CN218597630U (en) Splicing GRC (glass-fiber reinforced composite) line for constructional engineering
CN214144711U (en) Be provided with mould reinforcing apparatus's for building aluminum mould board
CN219672145U (en) Wall form reinforced structure
CN212534682U (en) Curtain installation is with dismantling connecting piece
CN216006923U (en) HPC worker method prefabricated guide wall
CN220814516U (en) Joint formula wall top connection structure
CN214883831U (en) Die for quickly pouring foundation bolt of small winch foundation
CN217557640U (en) Building templates of environmental protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant