CN213774463U - Wall body is pour and is used assembled aluminum mould board - Google Patents

Wall body is pour and is used assembled aluminum mould board Download PDF

Info

Publication number
CN213774463U
CN213774463U CN202022455526.2U CN202022455526U CN213774463U CN 213774463 U CN213774463 U CN 213774463U CN 202022455526 U CN202022455526 U CN 202022455526U CN 213774463 U CN213774463 U CN 213774463U
Authority
CN
China
Prior art keywords
aluminum
template
connecting plate
mould board
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022455526.2U
Other languages
Chinese (zh)
Inventor
徐亮
章成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yifeng Aluminum Mould Technology Co ltd
Original Assignee
Anhui Yifeng Aluminum Mould Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yifeng Aluminum Mould Technology Co ltd filed Critical Anhui Yifeng Aluminum Mould Technology Co ltd
Priority to CN202022455526.2U priority Critical patent/CN213774463U/en
Application granted granted Critical
Publication of CN213774463U publication Critical patent/CN213774463U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a wall body is pour and is used assembled aluminum mould board, including first connecting plate and adjusting screw, first connecting plate is installed at first aluminum mould board left end, and has seted up first mounting hole on the first connecting plate, and extension board is all installed at both ends about first aluminum mould board, second aluminum mould board and the third aluminum mould board simultaneously, has seted up first spread groove on the first aluminum mould board, and the third spread groove has been seted up to first aluminum mould board right-hand member, has seted up the second mounting hole on the third connecting plate of second aluminum mould board left end, has seted up the third mounting hole on the fourth connecting plate of third aluminum mould board left end, adjusting screw is connected with the nut through passing the second mounting hole of seting up the third connecting plate on seting up through-hole and the second aluminum mould board on the third aluminum mould board. This wall body is pour and is used assembled aluminum mould board, convenient fast assembly and dismantlement improve work efficiency to and can install firmly to the aluminum mould board in the equipment, dismantle simultaneously and retrieve.

Description

Wall body is pour and is used assembled aluminum mould board
Technical Field
The utility model relates to an intelligent transportation highway correlation technique field specifically is a wall body is pour and is used assembled aluminum mould board.
Background
The building template is a temporary supporting structure, is manufactured according to the design requirement, enables the concrete structure and the components to be shaped according to the specified position and geometric dimension, keeps the correct position, bearing the dead weight of the building template and the external load acting on the building template, and performing template engineering, ensuring the quality and the construction safety of concrete engineering, accelerating the construction progress and reducing the engineering cost, the aluminum template is a new generation template system appearing after a wood template and a steel template, is designed according to modulus and is extruded and molded by special equipment, the aluminum formwork can be freely combined according to different structure sizes, design, research and development and construction application of the aluminum formwork are one-time great development of the building industry, the aluminum formwork system is applied to the building industry, the construction efficiency of building construction engineering is improved, and the construction material and manual arrangement are greatly saved.
The existing aluminum formwork technology for wall pouring has the following problems: unable equipment to the aluminum mould board, it is inconvenient to use at the building site, the inconvenience that also exists in the aluminum mould board transportation, so propose a wall body pour with assembled aluminum mould board.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a wall body is pour and is used assembled aluminum mould board to what put forward in solving above-mentioned background art assembles the aluminum mould board, uses inconveniently in the building site, the inconvenient problem that also exists in the aluminum mould board transportation.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a wall body is pour and is used assembled aluminum mould board, includes first connecting plate and adjusting screw, first connecting plate is installed in first aluminum mould board left end, and has seted up first mounting hole on the first connecting plate, and extension board is all installed at both ends about first aluminum mould board, second aluminum mould board and the third aluminum mould board simultaneously, has seted up first connecting groove on the first aluminum mould board, and the first aluminum mould board right-hand member has seted up the third connecting groove, has seted up the second mounting hole on the third connecting plate of second aluminum mould board left end, has seted up the third mounting hole on the fourth connecting plate of third aluminum mould board left end, adjusting screw is connected with the nut through passing the second mounting hole that sets up on the third aluminum mould board through-hole and the third connecting plate on the second aluminum mould board.
Preferably, the first aluminum template and the second aluminum template are assembled into a whole through the second connecting plate, and the second aluminum template and the third aluminum template are assembled into a whole through the third connecting plate.
Preferably, all install the extension board on the both ends about first aluminium template, second aluminium template and the third aluminium template, and install the fixed plate between the extension board, first supporting groove has vertically been seted up on the first aluminium template, and second supporting groove has vertically been seted up on the second aluminium template, and third supporting groove has vertically been seted up on the third aluminium template.
Preferably, a second connecting groove is formed in the upper end of the second aluminum template, a fourth connecting groove is formed in the right end of the second aluminum template, a through hole is formed in one end of the second connecting groove and one end of the fourth connecting groove, and a nut is installed in the other end of the second connecting groove and the other end of the fourth connecting groove.
Preferably, the third aluminum template and the second aluminum template are assembled and connected with the third aluminum template through a third connecting plate at one end of the second aluminum template, and the second mounting hole and the through hole are inserted through the adjusting screw and connected with the screw cap.
Preferably, the second aluminum template and the first aluminum template are assembled and connected with the second aluminum template through a second connecting plate at one end of the first aluminum template, and the second connecting plate is provided with holes and through holes which are inserted through adjusting screws and connected with nuts.
Compared with the prior art, the beneficial effects of the utility model are that: the assembled aluminum template for wall pouring is convenient and rapid to assemble and disassemble, improves the working efficiency, can firmly install the assembled aluminum template, and can be disassembled and recycled;
1. the first aluminum template and the second aluminum template can be assembled through a second connecting plate arranged at the lower end of the first aluminum template and a mounting groove arranged at the upper end of the second aluminum template, and are connected with a nut through an adjusting bolt after being assembled so as to be fixed after the first aluminum template and the second aluminum template are assembled;
2. the second aluminum template and the third aluminum template can be assembled through a second connecting plate at the left end of the second aluminum template and a mounting groove formed in the right end of the third aluminum template, and then the second aluminum template and the third aluminum template are fixed through an adjusting bolt and a nut;
3. after first aluminum mould board and second aluminum mould board equipment, alternate in first supporting slot and second supporting slot through fixed steel pipe to support first aluminum mould board and second aluminum mould board.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention not assembled;
FIG. 2 is a right side view of the assembled structure of the present invention;
FIG. 3 is a top view of a second aluminum form of the present invention;
fig. 4 is the assembled top view of the second aluminum mold plate and the third aluminum mold plate of the present invention.
In the figure: 1. a first connecting plate; 2. a first mounting hole; 3. an extension plate; 4. a first aluminum template; 5. a first support groove; 6. a fixing plate; 7. a second connecting plate; 8. a second aluminum template; 9. a second support groove; 10. a second mounting hole; 11. a third connecting plate; 12. a third mounting hole; 13. a third support groove; 14. a third aluminum template; 15. a fourth connecting plate; 16. a first connecting groove; 17. a through hole; 18. a nut; 19. a second connecting groove; 20. a third connecting groove; 21. a fourth connecting groove; 22. and adjusting screws.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: an assembled aluminum formwork for wall pouring comprises a first connecting plate 1 and adjusting screws 22, wherein the first connecting plate 1 is installed at the left end of a first aluminum formwork 4, a first mounting hole 2 is formed in the first connecting plate 1, extension plates 3 are installed at the left and right ends of the first aluminum formwork 4, a second aluminum formwork 8 and a third aluminum formwork 14, a first connecting groove 16 is formed in the first aluminum formwork 4, the first aluminum formwork 4 and the second aluminum formwork 8 are assembled into a whole through a second connecting plate 7, and the second aluminum formwork 8 and the third aluminum formwork 14 are assembled into a whole through a third connecting plate 11; a third connecting groove 20 is formed in the right end of the first aluminum template 4, extension plates 3 are mounted at the left and right ends of the first aluminum template 4, the second aluminum template 8 and the third aluminum template 14, the second aluminum template 8 and the first aluminum template 4 are assembled and connected with the second aluminum template 8 through a second connecting plate 7 at one end of the first aluminum template 4, and holes and through holes 17 are formed in the second connecting plate 7 through adjusting screws 22 and connected with nuts 18; a fixing plate 6 is arranged between the extension plates 3, a first supporting groove 5 is vertically formed in the first aluminum template 4, a second supporting groove 9 is vertically formed in the second aluminum template 8, a second connecting groove 19 is formed in the upper end of the second aluminum template 8, a fourth connecting groove 21 is formed in the right end of the second aluminum template 8, one end of each of the second connecting groove 19 and the fourth connecting groove 21 is provided with a through hole 17, and a nut 18 is arranged at the other end of each of the second connecting groove 19 and the fourth connecting groove 21; a third supporting groove 13 is vertically formed in the third aluminum template 14; a third connecting plate 11 at the left end of the second aluminum template 8 is provided with a second mounting hole 10, a fourth connecting plate 15 at the left end of a third aluminum template 14 is provided with a third mounting hole 12, the third aluminum template 14 and the second aluminum template 8 are assembled and connected with the third aluminum template 14 through the third connecting plate 11 at one end of the second aluminum template 8, and are connected with a nut 18 through an adjusting screw 22 penetrating through the second mounting hole 10 and the through hole 17; the adjusting screw 22 is connected with the nut 18 by passing through a through hole 17 formed in the third aluminum mould plate 14 and a second mounting hole 10 formed in a third connecting plate 11 of the second aluminum mould plate 8.
As shown in fig. 1 and 2: 4 left ends of first aluminium template are provided with first connecting plate 1, and 4 lower extremes of first aluminium template are provided with second connecting plate 7, first supporting groove 5 has been seted up on first aluminium template 4 simultaneously, install extension board 3 on the 4 left and right sides of first aluminium template, install fixed plate 6 between the extension board 3, second connecting plate 7 that first aluminium template 4 set up through the lower extreme makes first aluminium template 4 and second aluminium template 8 assemble with the mounting groove of seting up in the 8 upper ends of second aluminium template, second aluminium template 8 assembles through the mounting groove of seting up on the third connecting plate 11 that the left end was installed and the 14 right-hand members of third aluminium template, so as to analogize and to assemble multiunit aluminium template.
As shown in fig. 2: through-hole 17 has been seted up to the second spread groove 19 one end of seting up in second aluminium template 8 upper end, and installs nut 18 on the second spread groove 19 other end, when assembling first aluminium template 4 and second aluminium template 8, through installing second connecting plate 7 with first aluminium template 4 lower extreme inside second spread groove 19, later be connected with nut 18 through adjusting bolt 22 to fix after assembling first aluminium template 4 and second aluminium template 8.
As shown in fig. 4: after the first aluminum formwork 4 and the second aluminum formwork 8 are assembled, the first supporting groove 5 on the first aluminum formwork 4 is communicated with the second supporting groove 9 on the second aluminum formwork 8, and then the first aluminum formwork 4 and the second aluminum formwork 8 are fixed by inserting steel pipes into the first supporting groove 5 and the second supporting groove 9.
The working principle is as follows: when the assembled aluminum formwork for wall pouring is used, when a plurality of groups of aluminum formworks are required to be assembled, the second aluminum formwork 8 and the third aluminum formwork 14 are fixed through the third connection 11 at the left end of the second aluminum formwork 8 and the installation groove formed at the right end of the third aluminum formwork 14, then the second aluminum formwork 8 and the third aluminum formwork 14 are assembled and fixed through the connection of the adjusting screws 22, the second installation holes 10 and the through holes 17 and the nuts 18, the first connecting plate 1 at the lower end of the first aluminum formwork 4 and the second connection groove 19 at the upper end of the second aluminum formwork 8 are installed, then the first aluminum formwork 4 and the second aluminum formwork 8 are fixed through the connection of the adjusting screws 22 and the nuts 18, and finally the first support groove 5 on the first aluminum formwork 4 and the second support groove 9 on the second aluminum formwork 8 are inserted through the steel pipe so as to fix the first aluminum formwork 4 and the second aluminum formwork 8 in the vertical direction, the whole process of using the assembled aluminum formwork for wall pouring is realized.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a wall body is pour and is used assembled aluminum mould board, includes first connecting plate (1) and adjusting screw (22), its characterized in that: the first connecting plate (1) is arranged at the left end of the first aluminum template (4), a first mounting hole (2) is arranged on the first connecting plate (1), meanwhile, the left and right ends of the first aluminum template (4), the second aluminum template (8) and the third aluminum template (14) are respectively provided with an extension plate (3), the first aluminum template (4) is provided with a first connecting groove (16), a third connecting groove (20) is arranged at the right end of the first aluminum template (4), a second mounting hole (10) is arranged on a third connecting plate (11) at the left end of the second aluminum template (8), a third mounting hole (12) is arranged on a fourth connecting plate (15) at the left end of the third aluminum template (14), the adjusting screw (22) is connected with the screw cap (18) through a through hole (17) formed in the third aluminum template (14) and a second mounting hole (10) formed in the third connecting plate (11) on the second aluminum template (8).
2. The assembled aluminum formwork for wall pouring according to claim 1, wherein: the first aluminum template (4) and the second aluminum template (8) are assembled into a whole through the second connecting plate (7), and the second aluminum template (8) and the third aluminum template (14) are assembled into a whole through the third connecting plate (11).
3. The assembled aluminum formwork for wall pouring according to claim 1, wherein: all install extension board (3) on both ends about first aluminum mould board (4), second aluminum mould board (8) and third aluminum mould board (14), and install fixed plate (6) between extension board (3), first supporting groove (5) have vertically been seted up on first aluminum mould board (4), and second supporting groove (9) have vertically been seted up on second aluminum mould board (8), and third supporting groove (13) have vertically been seted up on third aluminum mould board (14).
4. The assembled aluminum formwork for wall pouring according to claim 1, wherein: second spread groove (19) have been seted up to second aluminium template (8) upper end, and fourth spread groove (21) have been seted up to second aluminium template (8) right-hand member, and through-hole (17) have been seted up to second spread groove (19) and fourth spread groove (21) one end, install nut (18) in second spread groove (19) and fourth spread groove (21) the other end.
5. The assembled aluminum formwork for wall pouring according to claim 1, wherein: and the third aluminum template (14) and the second aluminum template (8) are assembled and connected with the third aluminum template (14) through a third connecting plate (11) at one end of the second aluminum template (8), and a second mounting hole (10) and a through hole (17) are inserted through an adjusting screw (22) to be connected with a nut (18).
6. The assembled aluminum formwork for wall pouring according to claim 1, wherein: and the second aluminum template (8) and the first aluminum template (4) are assembled and connected with the second aluminum template (8) through a second connecting plate (7) at one end of the first aluminum template (4), and holes and through holes (17) are arranged on the second connecting plate (7) in an inserting mode through adjusting screws (22) to be connected with nuts (18).
CN202022455526.2U 2020-10-30 2020-10-30 Wall body is pour and is used assembled aluminum mould board Expired - Fee Related CN213774463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022455526.2U CN213774463U (en) 2020-10-30 2020-10-30 Wall body is pour and is used assembled aluminum mould board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022455526.2U CN213774463U (en) 2020-10-30 2020-10-30 Wall body is pour and is used assembled aluminum mould board

Publications (1)

Publication Number Publication Date
CN213774463U true CN213774463U (en) 2021-07-23

Family

ID=76912184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022455526.2U Expired - Fee Related CN213774463U (en) 2020-10-30 2020-10-30 Wall body is pour and is used assembled aluminum mould board

Country Status (1)

Country Link
CN (1) CN213774463U (en)

Similar Documents

Publication Publication Date Title
CN217480405U (en) Assembled steel construction building
CN213774463U (en) Wall body is pour and is used assembled aluminum mould board
CN110847592A (en) Aluminum profile aluminum template convenient to disassemble and used for building
CN219968322U (en) Prefabricated box girder movable outer formwork structure
CN209907931U (en) Support-free primary and secondary beam joint mold sealing system based on assembly type structure
CN111364619A (en) But quick assembly disassembly's steel construction board house
CN212642117U (en) Tool type supporting device for laminated bottom plate supporting system
CN211647278U (en) Aluminum profile aluminum template convenient to disassemble and used for building
CN108412191B (en) Deformation joint double shear wall template assembling and disassembling device and method
CN215859026U (en) Lightweight aluminum formwork for building
CN222632515U (en) Support-free device for main beam and secondary beam of prefabricated part
CN212154139U (en) Building aluminum alloy template balcony integrated configuration
CN221193879U (en) Bearing device for building curtain wall engineering components
CN218375644U (en) Embedded device in the foundation for fixing poles
CN221442102U (en) Can turnover formula shear force wall corner position template reinforcing apparatus
CN212271201U (en) Assembly type building
CN222685793U (en) ALC prefabricated wall connection component assembly
CN222362777U (en) A building steel bar connection structure
CN219710388U (en) Subway platform frame beam prefabricated structure
CN222701334U (en) A lightweight and high-strength prefabricated concrete partition board
CN220014113U (en) Assembled wall structure based on BIM
CN221778983U (en) A template for building construction
CN219060548U (en) Assembled roof node structure
CN221989558U (en) A high-stability connecting member for building steel structure
CN211775701U (en) Building templates convenient to installation is dismantled

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210723