CN220365276U - Construction structure of daylighting well interior wall - Google Patents

Construction structure of daylighting well interior wall Download PDF

Info

Publication number
CN220365276U
CN220365276U CN202320119541.0U CN202320119541U CN220365276U CN 220365276 U CN220365276 U CN 220365276U CN 202320119541 U CN202320119541 U CN 202320119541U CN 220365276 U CN220365276 U CN 220365276U
Authority
CN
China
Prior art keywords
construction
frame
well
daylighting
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320119541.0U
Other languages
Chinese (zh)
Inventor
王泽林
闫团结
张耀鹏
赵磊
贺新琦
李倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Construction Engineering Group Co ltd
Original Assignee
Xi'an Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Construction Engineering Group Co ltd filed Critical Xi'an Construction Engineering Group Co ltd
Priority to CN202320119541.0U priority Critical patent/CN220365276U/en
Application granted granted Critical
Publication of CN220365276U publication Critical patent/CN220365276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction structure of an inner wall of a lighting well, which comprises a lifting mechanism arranged on the ground, a construction frame hung on the lifting mechanism through a steel wire rope and positioned in the lighting well, and a construction platform arranged on the construction frame, wherein a plurality of support beams which are arranged in parallel are arranged on the construction frame, the support beams are positioned below the construction platform, the end parts of the support beams are provided with telescopic rods which extend and retract along the length direction of the support beams, and the cantilever ends of the telescopic rods are lapped in reserved holes of side walls of the lighting well. According to the utility model, the telescopic rod is arranged on the supporting beam, the telescopic rod is stretched to realize the lap joint between the construction frame and the reserved hole of the inner wall of the daylighting well, the shortened telescopic rod is convenient for rapidly moving the construction frame, and the construction platform is not required to be repeatedly disassembled, so that the construction efficiency is greatly improved, and the labor intensity of workers is reduced.

Description

Construction structure of daylighting well interior wall
Technical Field
The utility model belongs to the technical field of lighting well construction, and particularly relates to a construction structure of a lighting well inner wall.
Background
When the inner wall of the lighting well is constructed (such as plastering the inner wall surface, etc.), a hole is formed in the inner wall of the lighting well of one floor, two ends of a steel pipe are lapped in the hole, then a construction platform is built on the steel pipe, a construction worker stands on the construction platform for construction, after the construction of the inner wall of the lighting well of a certain floor is completed, the construction platform is required to be dismantled, the dismantled material is conveyed into the building, the material is conveyed to the floor to be constructed next through a construction elevator, and finally the construction platform is built again, so that the construction worker stands on the construction platform for construction; the operation is repeated until the construction of the inner wall of the lighting well of the whole building is completed, and the mode is complex in operation, low in efficiency and high in labor intensity. Therefore, a construction structure of a lighting well inner wall which does not need repeated disassembly and construction should be provided.
Disclosure of Invention
The utility model aims to solve the technical problems in the prior art, and provides a construction structure of an inner wall of a lighting well, which has reasonable structure and ingenious design, and by arranging the telescopic rods on the supporting beams, the telescopic rods which are extended can realize the lap joint between a construction frame and a reserved hole of the inner wall of the lighting well, and the shortened telescopic rods are convenient for quickly moving the construction frame, so that the construction efficiency is greatly improved, and the labor intensity of workers is reduced.
In order to solve the technical problems, the utility model adopts the following technical scheme: the utility model provides a construction structure of daylighting well interior wall which characterized in that: including laying subaerial elevating system, through wire rope hoist on elevating system is in just be located the inside construction frame of daylighting well and set up construction platform on the construction frame, be provided with a plurality of supporting beams that lay in parallel on the construction frame, supporting beam is located construction platform's below, the tip setting of supporting beam is followed the telescopic link of length direction of supporting beam, the cantilever end overlap joint of telescopic link is in the reservation entrance to a cave of the side wall of daylighting well.
Foretell a daylighting well interior wall's construction structure, its characterized in that: the telescopic rod comprises a fixed rod fixedly connected with the supporting beam and a movable rod in sliding connection with the fixed rod, a waist-shaped hole is formed in the movable rod, a sliding column is fixedly arranged on the fixed rod, and the sliding column penetrates through the waist-shaped hole.
Foretell a daylighting well interior wall's construction structure, its characterized in that: the lifting mechanism is tower crane equipment arranged on a platform at the top of the lighting well.
Compared with the prior art, the beneficial effects of the application are as follows:
1. according to the utility model, the construction frame is hoisted by the lifting mechanism, and the lifting mechanism can enable the construction frame to move up and down in the lighting well, so that the position of the construction platform is changed.
2. According to the utility model, the telescopic rod is arranged on the supporting beam, so that when the telescopic rod extends out, the lap joint between the construction frame and the reserved hole of the inner wall of the daylighting well can be realized, and the construction platform is ensured to be reliably fixed during construction; when the telescopic link is retracted, the construction frame is convenient to move rapidly, so that the construction platform does not need to be disassembled and built repeatedly, the construction platform can move rapidly, the construction efficiency is improved greatly, and the labor intensity of workers is reduced.
3. The utility model has simple structure, time and labor saving and high universality.
In summary, in the utility model, by arranging the telescopic rod on the supporting beam, when the telescopic rod extends out, the lap joint between the construction frame and the reserved hole of the inner wall of the daylighting well can be realized, and the construction platform is ensured to be reliably fixed during construction; when the telescopic rod is retracted, the construction frame is convenient to move rapidly, so that the construction efficiency is greatly improved, and the labor intensity of workers is reduced.
The utility model is described in further detail below with reference to the drawings and examples.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic view of a telescopic rod;
reference numerals illustrate:
1-a lifting mechanism; 2, constructing a frame; 2-1, a construction platform;
3-a telescopic rod; 3-1-a fixed rod; 3-2-a movable rod;
3-sliding column; 3-4-waist-shaped holes; 3-5-supporting beams;
4-a lighting well; 5-a steel wire rope.
Detailed Description
As shown in fig. 1 to 2, the utility model comprises a lifting mechanism 1 arranged on the ground, a construction frame 2 which is hoisted on the lifting mechanism 1 through a steel wire rope 5 and is positioned in a lighting well 4, and a construction platform 2-1 arranged on the construction frame 2, wherein a plurality of support beams 3-5 which are arranged in parallel are arranged on the construction frame 2, the support beams 3-5 are positioned below the construction platform 2-1, the end parts of the support beams 3-5 are provided with telescopic rods 3 which are telescopic along the length direction of the support beams 3-5, and the cantilever ends of the telescopic rods 3 are lapped in reserved holes of side walls of the lighting well 4.
In this embodiment, utilize elevating system 1 hoist and mount construction frame 2 to reciprocate in daylighting well 4, through set up telescopic link 3 on supporting beam 3-5, when telescopic link 3 stretches out, can realize the overlap joint between the reserved entrance to a cave of construction frame 2 and daylighting well 4 interior wall, when telescopic link 3 withdraw, be convenient for quick travel construction frame 2, need not tear open repeatedly and build construction platform 2-1, can let construction platform 2-1 quick travel, thereby improve the efficiency of construction by a wide margin, reduce workman's intensity of labour.
In actual use, the telescopic rod 3 can be an electric telescopic rod or a hydraulic telescopic rod or a mechanical telescopic rod.
In actual use, the construction frame 2 has a rectangular frame structure, and can be arranged into other structures as required. The work frame 2 has at least one layer of work platform 2-1, typically preferably 2-4 layers, but is not limited to 2-4 layers.
As shown in fig. 2, the telescopic rod 3 comprises a fixed rod 3-1 fixedly connected with the supporting beam 3-5 and a movable rod 3-2 slidably connected with the fixed rod 3-1, a waist-shaped hole 3-4 is formed in the movable rod 3-2, a sliding column 3-3 is fixedly arranged on the fixed rod 3-1, and the sliding column 3-3 is arranged in the waist-shaped hole 3-4 in a penetrating mode.
In this embodiment, the waist-shaped hole 3-4 formed on the movable rod 3-2 is utilized, and the sliding column 3-3 fixedly arranged on the fixed rod 3-1 can slide in the waist-shaped hole 3-4, so that the movable rod 3-2 slides in the fixed rod 3-1, and the telescopic rod 3 can realize telescopic movement along with the sliding of the movable rod 3-2, so that the length of the telescopic rod 3 is adjustable.
In this embodiment, as shown in fig. 2, the fixed rod 3-1 is manufactured by machining with i-steel, and the movable rod 3-2 is manufactured by machining with channel steel.
In the present embodiment, as shown in fig. 1, the lifting mechanism 1 is a tower crane apparatus.
As shown in fig. 1, in actual use, before construction operation, the telescopic rod 3 is operated to extend, the cantilever ends of the telescopic rod 3 are overlapped with reserved holes of two pairs of walls of the daylighting well 4, the construction frame 2 is supported by the supporting beams 3-5, a worker stands on the construction platform 2-1 to perform construction operation, such as plastering the inner wall surface of the daylighting well, after construction of the inner wall of the daylighting well 4 on a certain floor is completed, the worker stands on the construction platform 2-1, the telescopic rod 3 is operated to shorten in length, the ends of the telescopic rod 3 are separated from the reserved holes of the two pairs of walls of the daylighting well 4, the lifting mechanism 1 is operated to slowly lift the construction frame 2 in the daylighting well 4 until reaching a target layer, the construction frame 2 is suspended in the daylighting well 4, the worker on the construction platform 2-1 again operates the telescopic rod 3, and the cantilever ends of the telescopic rod 3 are extended, and the reserved holes of the two pairs of walls of the daylighting well 4 are overlapped.
The foregoing is only a preferred embodiment of the present utility model, and is not intended to limit the present utility model, and any simple modification, variation and equivalent structural changes of the foregoing embodiments according to the technical matter of the present utility model still fall within the scope of the technical solution of the present utility model.

Claims (3)

1. The utility model provides a construction structure of daylighting well interior wall which characterized in that: including laying subaerial elevating system (1), hoist and mount through wire rope (5) on elevating system (1) and be located construction frame (2) and the setting of daylighting well (4) inside construction platform (2-1) on construction frame (2), be provided with a plurality of supporting beams (3-5) that lay in parallel on construction frame (2), supporting beam (3-5) are located the below of construction platform (2-1), the tip setting of supporting beam (3-5) is followed telescopic link (3) of the length direction of supporting beam (3-5), the cantilever end overlap joint of telescopic link (3) is in the reservation entrance to a cave of the side wall of daylighting well (4).
2. A construction structure for a daylighting well interior wall as defined in claim 1, wherein: the telescopic rod (3) comprises a fixed rod (3-1) fixedly connected with the supporting beam (3-5) and a movable rod (3-2) slidably connected with the fixed rod (3-1), a waist-shaped hole (3-4) is formed in the movable rod (3-2), a sliding column (3-3) is fixedly arranged on the fixed rod (3-1), and the sliding column (3-3) penetrates through the waist-shaped hole (3-4).
3. A construction structure for a daylighting well interior wall as defined in claim 1, wherein: the lifting mechanism (1) is tower crane equipment.
CN202320119541.0U 2023-01-18 2023-01-18 Construction structure of daylighting well interior wall Active CN220365276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320119541.0U CN220365276U (en) 2023-01-18 2023-01-18 Construction structure of daylighting well interior wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320119541.0U CN220365276U (en) 2023-01-18 2023-01-18 Construction structure of daylighting well interior wall

Publications (1)

Publication Number Publication Date
CN220365276U true CN220365276U (en) 2024-01-19

Family

ID=89520753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320119541.0U Active CN220365276U (en) 2023-01-18 2023-01-18 Construction structure of daylighting well interior wall

Country Status (1)

Country Link
CN (1) CN220365276U (en)

Similar Documents

Publication Publication Date Title
CN109057835B (en) Multi-arch support trolley
CN110306776A (en) A kind of hoistable platform for construction of elevator shaft in high-rise building
CN110759246B (en) Novel fixed mining hydraulic lifting device
CN109534214B (en) Gate-type reaction frame with adjustable loading height
CN220365276U (en) Construction structure of daylighting well interior wall
CN105060198A (en) Automatic lifting tower for forest fireproof observation
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN218434629U (en) Lifting frame for tower type pier construction
CN217148358U (en) Linear steel structure lifting device for telescopic narrow space
CN115818458A (en) Standard knot assembling and disassembling system and operation method
CN109236211A (en) A kind of production rig
CN212799260U (en) Converter steam pocket hoisting device based on hydraulic lifter
CN110878549B (en) Dam gallery construction method
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN219363014U (en) Hoisting tool for high-current sleeve and cooler heat exchange cylinder
CN202170231U (en) Mobile pulling bar
CN210341680U (en) Door type corrugated steel web plate installation and overhanging type hanging bracket structure
CN101463728A (en) Hoisting stand for mining
CN106996143B (en) A kind of Steel Truss Beam turns over the construction method of sliding in place
CN114014176B (en) Indoor and outdoor universal crane applicable to various building models and hoisting method
CN211421843U (en) Steel platform hoisting point spandrel girder
CN215633052U (en) Underground hydraulic support dismounting device and integrated platform thereof
CN220851268U (en) Auxiliary via hole device of drainage pipeline inspection robot
CN218491327U (en) Climbing operation system for elevator shaft
WO2023178638A1 (en) Pile frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant