CN106996143B - A kind of Steel Truss Beam turns over the construction method of sliding in place - Google Patents

A kind of Steel Truss Beam turns over the construction method of sliding in place Download PDF

Info

Publication number
CN106996143B
CN106996143B CN201710348048.5A CN201710348048A CN106996143B CN 106996143 B CN106996143 B CN 106996143B CN 201710348048 A CN201710348048 A CN 201710348048A CN 106996143 B CN106996143 B CN 106996143B
Authority
CN
China
Prior art keywords
steel truss
jack
sliding
door frame
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710348048.5A
Other languages
Chinese (zh)
Other versions
CN106996143A (en
Inventor
赵娜
秦海翔
刘艳婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Division Steel Structure Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Division Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Division Steel Structure Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201710348048.5A priority Critical patent/CN106996143B/en
Publication of CN106996143A publication Critical patent/CN106996143A/en
Application granted granted Critical
Publication of CN106996143B publication Critical patent/CN106996143B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Abstract

A kind of Steel Truss Beam turns over the construction method of sliding in place, and the construction method includes turn step, sliding step and the step in place that Steel Truss Beam is sequentially completed.The present invention is three times using self-control door frame, door frame is detachably easy to make, it only needs respectively to be arranged one at the both ends of beam, power transmission is carried out by the way that structure is completed, complete a series of constructions to steel structure truss beam, simultaneously because door frame improves the installation accuracy controllability of steel truss close to the position to be installed of Steel Truss Beam in work progress.The participation of large-scale crane is not needed using the present invention, it is only necessary to which the construction of steel structure truss beam can be completed in worker and jack, uses manpower and material resources sparingly.

Description

A kind of Steel Truss Beam turns over the construction method of sliding in place
Technical field
The present invention relates to a kind of construction method of steel construction, the turn sliding in place method of especially a kind of Steel Truss Beam.
Background technique
Building Atrium Structure typically refers to the courtyard space of building interior, and maximum feature forms building interior " exterior space " is that a kind of peculiar form be not only isolated but also merged with exterior space is built in architectural design.Surrounding structure is mixed When Xtah Crude Clay structure, Atrium Structure can reduce beam size using steel structure girder, mitigate self weight, and two parts construction needs week of first constructing Concrete structure is enclosed to construct again the part of steel construction.When surrounding concrete structure size is excessive, crane needs outside building Side lifts Zhongting steel structure girder, there are the crane radius of gyration is big during this, steel structure girder constructional difficulties, can not accurate positioning, The problems such as wasting manpower and material resources.
Summary of the invention
The object of the present invention is to provide the construction methods that a kind of Steel Truss Beam turns over sliding in place, to solve Zhongting steel construction There are the crane radius of gyration is big when beam is installed, steel structure girder constructional difficulties, can not accurate positioning, the technology of wasting manpower and material resources asks Topic.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of Steel Truss Beam turns over the construction method of sliding in place, and the Steel Truss Beam includes waiting pacifying at the Zhongting of building Longitudinal steel truss of dress, longitudinal steel truss are completed structure from surrounding and are completed in structure to Zhongting in place, and knot is around completed The junction that structure is completed in structure and Zhongting is equipped with first structure column, and it includes longitudinal steel truss to be installed that structure, which is completed, in the Zhongting Connect on the first structure crossbeam and the second structural column connected between second structural column of frame, first structure column and the second structural column The absolute altitude of the second structural beams connect, the second structural beams is higher than first structure crossbeam,
The construction method includes turn step, sliding step and the step in place that Steel Truss Beam is sequentially completed,
Steps are as follows for the turn:
Step 1 is completed in structure around and is laid with platform for lining, by the segment of longitudinal steel truss on platform for lining One whole beam is pieced together using prone position, the top boom of longitudinal direction steel truss and lower boom fall and set in platform for lining when split is completed On;
Step 2, is respectively set two the first door frames at two end positions of longitudinal steel truss, and the first door frame is stood Column is fixed with platform for lining, is set on the crossbeam of the first door frame there are two lifting lug, hangs with a jack on each lifting lug, and respectively the One jack and the second jack, with respect to the first jack at Zhongting, the top boom of longitudinal steel truss is located at first and falls the second jack The lower section of chain, the first jack and the second jack are each attached on the top boom of longitudinal steel truss;
Step 3 is lifted top boom by constantly loosening the first jack and straining at the second jack until longitudinal steel truss Frame is pulled to standing position, and longitudinal steel truss is equal to towards movement at Zhongting in whole process, and lower boom falls set in platform for lining always On;
Step 4, installation truss overturning-preventing support, removes the first door frame;
Steps are as follows for the sliding:
Step 5, along first structure crossbeam direction, the first sliding rail beam is installed between two parties on first structure crossbeam, First sliding rail beam is concordant with the absolute altitude that structure is completed in surrounding, one end of the first sliding rail beam and first structure column It is detachably connected, the detachable spreading of the other end has the second sliding rail beam above the second structural column, second sliding The other end of track girder and the side of the second structural beams are detachably connected;
Step 6, the mounting slip vehicle in the first sliding rail beam;
Step 7, is respectively set two the second door frames at two end positions of longitudinal steel truss, the second door frame across Surrounding is completed at structure and Zhongting, and the column of the second door frame is fixed with platform for lining and the first sliding rail beam respectively, and second It is set on the crossbeam of door frame there are two lifting lug, hangs with a jack, respectively third jack and the 4th jack on each lifting lug, the 4th For jack with respect to third jack at Zhongting, the sliding vehicle of alignment lower section, the top boom of longitudinal steel truss is located at third jack Lower section, third jack and the 4th jack are each attached on the top boom of longitudinal steel truss;
Longitudinal steel truss is completed from surrounding by constantly loosening third jack and straining at the 4th jack for step 8 Structure moves at Zhongting;
The top boom of longitudinal steel truss is transferred to sliding on vehicle and connecting with sliding vehicle, then removes second by step 9 Door frame;
Step 10 is slid forward in the first sliding rail beam until the second sliding rail beam using jack traction sliding vehicle On;
It is described that steps are as follows in place:
Step 11, is respectively set two third door frames at two end positions of longitudinal steel truss, and third door frame is horizontal Across the second structural beams and the first sliding rail beam, the column of third door frame respectively with the second structural beams and the first sliding rail Beam is fixed, and the crossbeam of third door frame is equipped with a lifting lug, hangs with the 5th jack on lifting lug, the top boom of longitudinal steel truss is located at The lower section of 5th jack;
Step 12 tenses the 5th jack, longitudinal steel truss is risen, and removes sliding vehicle and the second sliding rail beam;
Step 13: loosening the 5th jack, longitudinal steel truss is transferred, top boom is in place in advance on the second structural column On mounted support, then its support is connected;
Step 14 removes third door frame and the first sliding rail beam.
The platform for lining is floor.
Second door frame is to install to obtain again by translation after the first door frame is removed.
First door frame, the second door frame or third door frame are equipped with support, and the support is skewed horizontal load bar and/or cable Wind rope.
First jack, the second jack, third jack, the 4th jack and the 5th jack are not less than 30 tons.
In the step 10, wirerope is set at the both ends of longitudinal steel truss, wirerope is in tensioning state.
In the step 10, the reference mark in the first sliding rail beam and the second sliding rail beam, sliding first in advance It moves and twice steel plate limit plate is set in track girder and the second sliding rail beam, the width between steel plate limit plate is greater than Steel Truss Beam Width.
The Steel Truss Beam further includes lateral steel truss to be installed at the Zhongting of building, between the first structure column It is connected with first structure stringer, one end of the transverse direction steel truss is connect with longitudinal steel truss, and the other end and first structure column connect It connects, the end of lateral steel truss is connected with and removably mends long girder steel, the mounting means of the transverse direction steel truss and longitudinal steel truss The mode of frame is identical, and the first door frame and the second door frame respectively correspond in respective step and be mounted on longitudinal steel truss and the first knot On structure stringer, the sliding vehicle of the transverse direction steel truss is finally run to longitudinal steel truss and first structure stringer;
The third door frame is suspension scaffold, and column is separately positioned on longitudinal steel truss and first structure stringer, suspension scaffold Crossbeam be equipped with a lifting lug, be connected with the 6th jack on lifting lug, the end of the 6th jack and transverse direction steel truss is fixed and hung It rises, then cuts away and mend the long lateral steel truss of girder steel decentralization, and the side of the end of lateral steel truss and longitudinal steel truss is consolidated Fixed connection.
Compared with prior art the invention has the characteristics that and the utility model has the advantages that
The present invention uses homemade door frame, while the spelling of steel structure truss beam is completed using the completed floor construction of surrounding Then dress uses homemade door frame again, while using completed beam column construction power transmission around close Zhongting to steel construction Girder truss carries out the movement close to Zhongting;Surrounding, which is completed on the beam in structure, is arranged sliding beam, and installs and slide in sliding beam Move vehicle, make steel structure truss beam fall set on sliding vehicle after can continue the whole direction movable steel structure girder truss along beam;So Steel structure truss beam is mounted on predeterminated position using self-control door frame by third time afterwards.
For the present invention three times using self-control door frame, door frame is detachably easy to make, it is only necessary to respectively be arranged one at the both ends of beam It is a, power transmission is carried out by the way that structure is completed, a series of constructions to steel structure truss beam are completed, simultaneously because door in work progress Frame improves the installation accuracy controllability of steel truss close to the position to be installed of Steel Truss Beam.It is not needed greatly using the present invention The participation of type crane, it is only necessary to which the construction of steel structure truss beam can be completed in worker and jack, uses manpower and material resources sparingly.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is the planar structure schematic diagram of construction location of the present invention.
Fig. 2 is that the first door frame is installed schematic diagram in platform for lining and step 2 in step 1 of the present invention.
Fig. 3 is the side structure schematic view of Fig. 2.
Fig. 4 is that jack connect completion schematic diagram with beam in step 2 of the present invention.
Fig. 5 is step 3 central sill posture transformation schematic diagram of the present invention.
Fig. 6 is that schematic diagram is completed in step 3 central sill posture transformation of the present invention.
Fig. 7 is the side structure schematic view of Fig. 6.
Fig. 8 is that step 4 of the present invention completes schematic diagram.
Fig. 9 is that step 7 of the present invention completes schematic diagram.
Figure 10 is step 8 starting schematic diagram of the present invention.
Figure 11 is schematic diagram during step 8 of the present invention.
Figure 12 is that step 8 of the present invention completes schematic diagram.
Figure 13 is the side structure schematic view of Figure 12.
Figure 14 is step 9 decentralization schematic diagram.
Figure 15 is step 10 sliding schematic diagram.
Figure 16 is the side structure schematic view of Figure 15.
Figure 17 is that step 10 completes schematic diagram.
Figure 18 is that step 11 completes schematic diagram.
Figure 19 is that step 12 completes schematic diagram.
Figure 20 is that step 13 completes schematic diagram.
Figure 21 is that step 14 completes schematic diagram.
Figure 22 is lateral steel truss sliding schematic diagram.
Figure 23 is to use suspension scaffold lifting schematic diagram after long girder steel is mended in lateral steel truss excision.
Appended drawing reference: the longitudinal direction 1- steel truss, 2- first structure column, the second structural column of 3-, 4- first structure crossbeam, The second structural beams of 5-, 6- platform for lining, the first door frame of 7-, the first jack of 8-, the second jack of 9-, 10- overturning-preventing branch Support, the first sliding rail beam of 11-, the second sliding rail beam of 12-, 13- sliding vehicle, the second door frame of 14-, 15- third are fallen Chain, the 4th jack of 16-, 17- third door frame, the 5th jack of 18-, 19- support, 20- limit plate, 21- transverse direction steel truss, 22- first structure stringer, 23- mend long girder steel, the 6th jack of 24-.
Specific embodiment
Embodiment is shown in Figure 1, and the installation of steel structure girder, is around completed structure at a kind of Atrium Space of building It is concrete structure.This Steel Truss Beam turns over the construction method of sliding in place, and the Steel Truss Beam includes in building Longitudinal steel truss 1 to be installed, longitudinal steel truss are completed structure from surrounding and are completed in structure to Zhongting in place at front yard, surrounding The junction that structure is completed with Zhongting in structure is completed and is equipped with first structure column 2, it includes wait pacify that structure, which is completed, in the Zhongting Fill the first structure crossbeam 4 that is connected between the second structural column 3, first structure column 2 and the second structural column 3 of longitudinal steel truss 1 with And second the second structural beams 5 that connects on structural column 3, the absolute altitude of the second structural beams 5 are higher than first structure crossbeam 4.
The construction method includes turn step, sliding step and the step in place that Steel Truss Beam is sequentially completed.
Steps are as follows for the turn:
Step 1 referring to fig. 2 shown in -4, is completed in structure around and is laid with platform for lining 6, described in the present embodiment Platform for lining 6 is floor.The segment of longitudinal steel truss is pieced together into one whole beam using prone position on platform for lining 6, split is complete At when longitudinal direction steel truss top boom 1.1 and lower boom 1.2 fall and set 6 on platform for lining.
Step 2, it is shown in Figure 4, two the first door frames 7 are respectively set at two end positions of longitudinal steel truss, The column of first door frame is fixed with platform for lining, is set on the crossbeam of the first door frame there are two lifting lug, hangs with one on each lifting lug Jack, respectively the first jack 8 and the second jack 9, opposite first jack 8 of the second jack 9 at Zhongting, longitudinal steel truss Top boom 1.1 is located at the lower section of the first jack 8, and the first jack 8 and the second jack 9 are each attached to the top boom of longitudinal steel truss On 1.1.
Step 3, referring to shown in Fig. 5-7, by constantly loosening the first jack 8 and straining at the second jack 9, by top boom 1.1 lift until longitudinal steel truss is pulled to standing position, and longitudinal steel truss is equal to towards mobile, lower boom at Zhongting in whole process 1.2 fall set on platform for lining always.
Step 4, shown in Figure 8, installation truss overturning-preventing support 10 removes the first door frame 7.
Steps are as follows for the sliding:
Step 5, it is shown in Figure 8, it is installed between two parties along the direction of first structure crossbeam 4, on first structure crossbeam 4 First sliding rail beam 11, first sliding rail beam 11 is concordant with the absolute altitude that structure is completed in surrounding, the first sliding rail One end of beam 11 is detachably connected with first structure column 2, and the detachable spreading of the other end has second above the second structural column 3 Sliding rail beam 12, the other end of second sliding rail beam 12 and the side of the second structural beams 5 are detachably connected.
Step 6, shown in Figure 9, the mounting slip vehicle 13 in the first sliding rail beam 11.
Step 7, it is shown in Figure 9, two the second door frames are respectively set at two end positions of longitudinal steel truss 14, the second door frame is completed at structure and Zhongting across surrounding, and the column of the second door frame 14 is sliding with platform for lining 6 and first respectively It is fixed to move track girder 11, is set on the crossbeam of the second door frame there are two lifting lug, hangs with a jack, respectively third on each lifting lug Jack 15 and the 4th jack 16, the opposite third jack 15 of the 4th jack 16 are longitudinal at Zhongting, the sliding vehicle 13 of alignment lower section The top boom 1.1 of steel truss is located at the lower section of third jack 15, and third jack 15 and the 4th jack 16 are each attached to longitudinal steel truss On the top boom 1.1 of frame.
Step 8, by constantly loosening third jack 15 and straining at the 4th jack 16, will be indulged referring to shown in Figure 10-13 Structure is completed from surrounding to steel truss to move at Zhongting.
Step 9, it is shown in Figure 14, by the top boom of longitudinal steel truss transfer to sliding vehicle 13 on and with sliding vehicle connect It connects, then removes the second door frame 14.
Step 10 draws sliding vehicle 13 in the first sliding rail beam 11 to advancing slip using jack referring to shown in Figure 15-17 It moves until in the second sliding rail beam 12.To guarantee the stability in longitudinal steel truss slipping, the two of longitudinal steel truss End sets wirerope, and wirerope is in tensioning state, it is ensured that the Outside-plate stabilizing of longitudinal steel truss;To guarantee longitudinal steel truss sliding Synchronism in the process, the reference mark in the first sliding rail beam and the second sliding rail beam in advance, to guarantee longitudinal steel truss Twice steel plate limit plate is arranged in synchronism of the frame in slipping in the first sliding rail beam and the second sliding rail beam 20, the width between steel plate limit plate is greater than the width of Steel Truss Beam.
It is described that steps are as follows in place:
Step 11, it is shown in Figure 18, two third doors are respectively set at two end positions of longitudinal steel truss Frame 17, third door frame 17 is across the second structural beams 5 and the first sliding rail beam 11, and the column of third door frame 17 is respectively with second Structural beams 5 and the first sliding rail beam 11 are fixed, and the crossbeam of third door frame 17 is equipped with a lifting lug, hang with the 5th on lifting lug Jack 18, the top boom 1.1 of longitudinal steel truss are located at the lower section of the 5th jack 18.
Step 12, it is shown in Figure 19, the 5th jack 18 is tensed, longitudinal steel truss is risen, removes sliding 13 He of vehicle Second sliding rail beam 12.
Step 13: it is shown in Figure 20, loosen the 5th jack 18, longitudinal steel truss is transferred, top boom is in place to pre- First on 3 mounted supports 19, then its support is connected on the second structural column.
Step 14 referring to fig. 2 shown in 1, removes third door frame 17 and the first sliding rail beam 11.
Second door frame is installed to obtain again after can removing for the first door frame by translation.First door frame, second Door frame or third door frame are equipped with support, and the support is skewed horizontal load bar and/or cable wind rope.In the present embodiment, described first Door frame is equipped at least four bearing diagonals, and second door frame is equipped at least one bearing diagonal and at least three cable wind ropes, institute Third door frame is stated equipped at least two bearing diagonals and at least two cable wind ropes.First jack, the second jack, third are fallen Chain, the 4th jack and the 5th jack are not less than 30 tons.
Referring to fig. 2 shown in 2, the Steel Truss Beam further includes lateral steel truss 21 to be installed at the Zhongting of building, institute It states and is connected with first structure stringer 22 between first structure column 2, one end of the transverse direction steel truss 21 and longitudinal steel truss 1 connect It connects, the other end is connect with first structure column 2, and the end of lateral steel truss 21, which is connected with, removably mends long girder steel 23, the cross Mounting means to steel truss is identical as longitudinal mode of steel truss, and the first door frame and the second door frame are distinguished in respective step Correspondence is mounted on longitudinal steel truss 1 and first structure stringer 22, and the sliding vehicle of the transverse direction steel truss 21 is finally run to vertical To on steel truss 1 and first structure stringer 22.
Referring to fig. 2 shown in 3, the third door frame is suspension scaffold, and column is separately positioned on longitudinal steel truss 1 and first structure On stringer 22, the crossbeam of suspension scaffold is equipped with a lifting lug, and the 6th jack 24, the 6th jack 24 and lateral steel are connected on lifting lug The end of truss 21 is fixed and is sling, and then cuts away and mends long girder steel 23 and transfer lateral steel truss 21, and by lateral steel truss 21 End be fixedly connected with the side of longitudinal steel truss 1.
Using two curb girders of steel structure girder to be installed as track, gradually all steel structure girders are pacified according to the above construction method It installs into.

Claims (9)

1. a kind of Steel Truss Beam turns over the construction method of sliding in place, the Steel Truss Beam includes to be installed at the Zhongting of building Longitudinal steel truss (1), longitudinal steel truss is completed structure from surrounding and is completed in structure to Zhongting in place, and knot is around completed The junction that structure is completed in structure and Zhongting is equipped with first structure column (2), and it includes longitudinal direction to be installed that structure, which is completed, in the Zhongting The first structure crossbeam connected between the second structural column (3) of steel truss (1), first structure column (2) and the second structural column (3) (4) and on the second structural column (3) the second structural beams (5) connected, it is characterised in that:
The construction method includes turn step, sliding step and the step in place that Steel Truss Beam is sequentially completed,
Steps are as follows for the turn:
Laying platform for lining (6) in structure is completed, by the section of longitudinal steel truss on platform for lining (6) in step 1 around Duan Caiyong prone position pieces together one whole beam, and the top boom (1.1) of longitudinal direction steel truss and lower boom (1.2) fall and set when split is completed On platform for lining (6);
Two the first door frames (7), the column of the first door frame is respectively set in step 2 at two end positions of longitudinal steel truss It fixes, sets on the crossbeam of the first door frame there are two lifting lug with platform for lining, hang with a jack on each lifting lug, respectively first Jack (8) and the second jack (9), the second jack (9) opposite first jack (8) is at Zhongting, the top boom of longitudinal steel truss (1.1) it is located at the lower section of the first jack (8), the first jack (8) and the second jack (9) are each attached to the top boom of longitudinal steel truss (1.1) on;
Step 3 is lifted top boom (1.1) by constantly loosening the first jack (8) and straining at the second jack (9) until vertical It is pulled to standing position to steel truss, longitudinal steel truss is equal to towards movement at Zhongting in whole process, and lower boom (1.2) is fallen always to be set On platform for lining;
Step 4, installation truss overturning-preventing support (10), removes the first door frame (7);
Steps are as follows for the sliding:
Step 5 installs the first sliding rail along the direction of first structure crossbeam (4), on first structure crossbeam (4) between two parties Beam (11), first sliding rail beam (11) is concordant with the absolute altitude that structure is completed in surrounding, the first sliding rail beam (11) One end is detachably connected with first structure column (2), and the detachable spreading of the other end has second above the second structural column (3) to slide It moves track girder (12), the side of the other end and the second structural beams (5) of second sliding rail beam (12) is detachably connected;
Step 6, the mounting slip vehicle (13) on the first sliding rail beam (11);
Step 7, is respectively set two the second door frames (14) at two end positions of longitudinal steel truss, the second door frame across Around be completed at structure and Zhongting, the column of the second door frame (14) respectively with platform for lining (6) and the first sliding rail beam (11) fixed, it is set on the crossbeam of the second door frame there are two lifting lug, hangs with a jack, respectively third jack on each lifting lug (15) and the 4th jack (16), the 4th jack (16) is with respect to third jack (15) at Zhongting, sliding vehicle of alignment lower section (13), the top boom (1.1) of longitudinal steel truss is located at the lower section of third jack (15), third jack (15) and the 4th jack (16) It is each attached on the top boom (1.1) of longitudinal steel truss;
Step 8, by constantly loosening third jack (15) and straining at the 4th jack (16), from surrounding by longitudinal steel truss Structure is completed to move at Zhongting;
The top boom of longitudinal steel truss is transferred to sliding on vehicle (13) and connecting with sliding vehicle, then removes second by step 9 Door frame (14);
Step 10 is drawn sliding vehicle (13) using jack and is slid forward on the first sliding rail beam (11) until the second sliding rail On road beam (12);
It is described that steps are as follows in place:
Two third door frames (17), third door frame is respectively set in step 11 at two end positions of longitudinal steel truss (17) across the second structural beams (5) and the first sliding rail beam (11), the column of third door frame (17) respectively with the second structure Crossbeam (5) and the first sliding rail beam (11) are fixed, and the crossbeam of third door frame (17) is equipped with a lifting lug, and the is hung on lifting lug Five jacks (18), the top boom (1.1) of longitudinal steel truss are located at the lower section of the 5th jack (18);
Step 12 tenses the 5th jack (18), longitudinal steel truss is risen, and removes sliding vehicle (13) and the second sliding rail beam (12);
Step 13: loosening the 5th jack (18), longitudinal steel truss is transferred, top boom is in place in advance on the second structural column (3) on mounted support (19), then its support is connected;
Step 14 removes third door frame (17) and the first sliding rail beam (11).
2. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: described assembled flat Platform (6) is floor.
3. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: described second Frame is to install to obtain again by translation after the first door frame is removed.
4. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: described first Frame, the second door frame or third door frame are equipped with support, and the support is skewed horizontal load bar and/or cable wind rope.
5. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: described first falls Chain, the second jack, third jack, the 4th jack and the 5th jack are not less than 30 tons.
6. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: the step 10 In, wirerope is set at the both ends of longitudinal steel truss, wirerope is in tensioning state.
7. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: the step 10 In, the reference mark in the first sliding rail beam and the second sliding rail beam, slides in the first sliding rail beam and second in advance Twice steel plate limit plate (20) are set on track girder, the width between steel plate limit plate is greater than the width of Steel Truss Beam.
8. the construction method that Steel Truss Beam according to claim 1 turns over sliding in place, it is characterised in that: the steel truss Beam further includes lateral steel truss (21) to be installed at the Zhongting of building, is connected with first between the first structure column (2) Structural rail (22), one end of the transverse direction steel truss (21) are connect with longitudinal steel truss (1), the other end and first structure column (2) it connects, the end of lateral steel truss (21), which is connected with, removably mends long girder steel (23), the installation side of the transverse direction steel truss Formula is identical as longitudinal mode of steel truss, and the first door frame and the second door frame respectively correspond in respective step and be mounted on longitudinal steel On truss (1) and first structure stringer (22), the sliding vehicle of the transverse direction steel truss (21) is finally run to longitudinal steel truss (1) On first structure stringer (22).
9. the construction method that Steel Truss Beam according to claim 8 turns over sliding in place, it is characterised in that: the third door Frame is suspension scaffold, and column is separately positioned on longitudinal steel truss (1) and first structure stringer (22), and the crossbeam of suspension scaffold is equipped with One lifting lug, is connected with the 6th jack (24) on lifting lug, and the end of the 6th jack (24) and lateral steel truss (21) is fixed and hung It rises, then cuts away and mend long girder steel (23) and transfer lateral steel truss (21), and by the end of lateral steel truss (21) and longitudinal steel The side of truss (1) is fixedly connected.
CN201710348048.5A 2017-05-17 2017-05-17 A kind of Steel Truss Beam turns over the construction method of sliding in place Expired - Fee Related CN106996143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710348048.5A CN106996143B (en) 2017-05-17 2017-05-17 A kind of Steel Truss Beam turns over the construction method of sliding in place

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710348048.5A CN106996143B (en) 2017-05-17 2017-05-17 A kind of Steel Truss Beam turns over the construction method of sliding in place

Publications (2)

Publication Number Publication Date
CN106996143A CN106996143A (en) 2017-08-01
CN106996143B true CN106996143B (en) 2019-03-22

Family

ID=59435781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710348048.5A Expired - Fee Related CN106996143B (en) 2017-05-17 2017-05-17 A kind of Steel Truss Beam turns over the construction method of sliding in place

Country Status (1)

Country Link
CN (1) CN106996143B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004270403A (en) * 2003-03-12 2004-09-30 Miyaji Construction & Engineering Co Ltd Lightweight box truss system
CN101324146A (en) * 2008-08-11 2008-12-17 河北建工集团有限责任公司 Construction method for hanging wide span arcuated open-web beam
CN101787678A (en) * 2010-02-08 2010-07-28 中铁一局集团有限公司 Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN102864941A (en) * 2012-09-29 2013-01-09 浙江精工钢结构有限公司 Openable jig frame for assembling triangular truss and construction method
CN103132702A (en) * 2011-12-01 2013-06-05 安徽跨宇钢结构网架工程有限公司 Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN106193618A (en) * 2016-07-15 2016-12-07 中铁建大桥工程局集团第五工程有限公司 A kind of Long span aerial steel structure truss construction
CN106567337A (en) * 2016-11-04 2017-04-19 中交路桥华南工程有限公司 Transportation platform of steel truss girders and construction method of transportation platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004270403A (en) * 2003-03-12 2004-09-30 Miyaji Construction & Engineering Co Ltd Lightweight box truss system
CN101324146A (en) * 2008-08-11 2008-12-17 河北建工集团有限责任公司 Construction method for hanging wide span arcuated open-web beam
CN101787678A (en) * 2010-02-08 2010-07-28 中铁一局集团有限公司 Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN103132702A (en) * 2011-12-01 2013-06-05 安徽跨宇钢结构网架工程有限公司 Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN102864941A (en) * 2012-09-29 2013-01-09 浙江精工钢结构有限公司 Openable jig frame for assembling triangular truss and construction method
CN106193618A (en) * 2016-07-15 2016-12-07 中铁建大桥工程局集团第五工程有限公司 A kind of Long span aerial steel structure truss construction
CN106567337A (en) * 2016-11-04 2017-04-19 中交路桥华南工程有限公司 Transportation platform of steel truss girders and construction method of transportation platform

Also Published As

Publication number Publication date
CN106996143A (en) 2017-08-01

Similar Documents

Publication Publication Date Title
CN203866715U (en) Multi-roof-truss rhombic truss hanging basket for long-cantilever box beam construction
CN208815424U (en) A kind of bridge descending hanging basket
CN101736703B (en) 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway
CN201411900Y (en) Hydraulic die lifter for chimneys
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN202544854U (en) Lining trolley for subway station
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN105113803A (en) High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN104695335A (en) Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN205330690U (en) Cloth welding platform truck is hung to tunnel water proofing board
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN204983693U (en) Hoist device slides in mountain area corridor truss high altitude
CN106996143B (en) A kind of Steel Truss Beam turns over the construction method of sliding in place
CN110344334A (en) Steel reinforced concrete combined bridge construction method is done using two bridgings of dorsal funciculus formula Bridge Erector
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN205932963U (en) Many landing legs tire formula tracklaying crane
CN211713715U (en) Synchronous dislocation method construction hanging basket device for corrugated steel web suspension casting bridge
CN204401473U (en) Upstroke movable framework steel bar overall binding lifting construction device
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN107059654A (en) The compound overlength Hanging basket on front support of single cable plane and its installation method
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN206655139U (en) Wavelike steel webplate SCC engineering methods hang movable hanging basket with car convolution
CN201614550U (en) 3000DWT bridge-erecting machine for full-span erection of steel truss bridge used for both double-layer four-track highway and railway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322