CN220318893U - Unit type curtain wall vertical splicing system - Google Patents

Unit type curtain wall vertical splicing system Download PDF

Info

Publication number
CN220318893U
CN220318893U CN202322241405.1U CN202322241405U CN220318893U CN 220318893 U CN220318893 U CN 220318893U CN 202322241405 U CN202322241405 U CN 202322241405U CN 220318893 U CN220318893 U CN 220318893U
Authority
CN
China
Prior art keywords
frame
curtain wall
bearing frame
lifting device
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322241405.1U
Other languages
Chinese (zh)
Inventor
赖嘉维
周江
梁全雷
袁金康
冯云
刘佐
陈翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Division South China Construction Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
China Construction Fourth Engineering Division South China Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, China Construction Fourth Engineering Division South China Construction Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202322241405.1U priority Critical patent/CN220318893U/en
Application granted granted Critical
Publication of CN220318893U publication Critical patent/CN220318893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a unitized curtain wall erects and pieces together system, the system includes mount, hoisting device and hoisting device, mounting, bearing frame and panel; the lifting device is positioned outside the fixed frame and is used for disassembling and assembling the bearing frame; the bearing frame is fixedly connected with the fixing frame through a fixing piece; the surface material is arranged on the bearing frame; the lifting device is arranged on the fixing frame and used for lifting the plane materiel so as to facilitate the plane materiel to be installed on the bearing frame. Compared with the prior art, the lifting device lifts the bearing frame and is fixed on the fixing frame through the fixing piece so as to be convenient for installing the surface material on the bearing frame, and as the lifting device lifts the bearing frame, the perpendicularity of the bearing frame can be detected when the bearing frame is connected with the fixing frame through the fixing piece so as to improve the precision and the quality of the unit curtain wall; the plane materiel is lifted to a proper height through the lifting device, the plane materiel is further conveniently installed on the bearing frame, the pressure of lifting the plane materiel by workers is reduced, and the efficiency of assembling the unitized curtain wall is improved.

Description

Unit type curtain wall vertical splicing system
Technical Field
The application relates to the technical field of buildings, in particular to a unitized curtain wall vertical splicing system.
Background
The unitized curtain wall is a building curtain wall which is made into a complete curtain wall structure basic unit by various wall panels and supporting frames in factories and is directly arranged on a main body structure. When the existing unit curtain wall is assembled, the unit curtain wall is assembled by a horizontal assembling method; when the unit curtain wall is assembled by the method, the occupied area is the length or the width multiplied by the height of the section of the unit curtain wall (the maximum size of the unit curtain wall is usually the height of the unit curtain wall), so that the occupied area is larger; and because when the level was assembled, the unitized curtain wall always had a face and ground contact, not only led to this face to be difficult to assemble the plane materiel, required upset unitized curtain wall moreover, and from this, whole assembly process is comparatively complicated, leads to the efficiency of assembling relatively low.
Disclosure of Invention
The embodiment of the application provides a unitized curtain wall erects and pieces together system to solve the problem that the correlation technique exists, technical scheme is as follows:
a unitized curtain wall vertical splicing system comprises a fixed frame, a lifting device, a fixing piece, a bearing frame and a surface material; the lifting device is positioned outside the fixing frame and is used for disassembling and assembling the bearing frame; the bearing frame is fixedly connected with the fixing frame through the fixing piece; the surface material is arranged on the bearing frame; the lifting device is arranged on the fixing frame and used for lifting the plane material so that the plane material is arranged on the bearing frame.
The application is further configured to: the fixing frame comprises a supporting frame and supporting bars, the supporting bars are fixed on the ground, the supporting frames are located above the supporting bars, and the bearing frames are respectively connected with the supporting frames and the supporting bars through fixing pieces.
The application is further configured to: the lifting device comprises a winch and a clamp, wherein the winch is arranged on the supporting frame and located above the supporting bar, the winch is connected with the clamp, and the clamp is used for clamping the plane material.
The application is further configured to: the operation frame is positioned on one side of the fixing frame and is used for assisting in installing the surface material on the bearing frame.
The application is further configured to: the support frame is provided with a connecting part, and the connecting part is connected with the bearing frame through the fixing piece.
The application is further configured to: the connecting part comprises two connecting lugs, a first connecting rod is arranged on the bearing frame, the first connecting rod is arranged between the two connecting lugs, and the connecting lugs are connected with the first connecting rod through the fixing piece.
The application is further configured to: the support bar is equipped with the splice, the splice is equipped with the splice groove, it is equipped with the second connecting rod to bear the frame, the second connecting rod is arranged in the splice groove, the splice pass through the mounting with the second connecting rod is connected.
A vertical splicing method of a unitized curtain wall vertical splicing system, which is applied to the unitized curtain wall vertical splicing system as claimed in the claims, and comprises the following steps:
lifting a plurality of bearing frames by using the lifting device, placing the bearing frames between the supporting bars and the supporting frames, and respectively connecting the bearing frames with the supporting frames and the supporting bars through the fixing pieces;
the surface material is clamped by a clamp, and is driven to be lifted to a proper position by a winch, so that a worker can conveniently install the surface material on the bearing frame on the ground; when a worker cannot mount the surface material on the bearing frame on the ground, the worker is assisted to mount the surface material on the bearing frame through the operation frame until the surface material is mounted on the side surface of the bearing frame so as to form a unitized curtain wall;
and lifting the unitized curtain wall by using the lifting device and detaching the fixing piece so as to detach the unitized curtain wall from the fixing frame.
In summary, the beneficial effects of the application are:
compared with the prior art, the lifting device is used for lifting the bearing frame and fixing the bearing frame on the fixing frame through the fixing piece so as to conveniently install the surface material on the bearing frame, and as the lifting device is used for lifting the bearing frame, when the bearing frame is connected with the fixing frame through the fixing piece, the perpendicularity of the bearing frame can be detected so as to improve the precision, thereby guaranteeing the construction quality and the quality of the unit curtain wall; the plane materiel is lifted to a proper height through the lifting device, the plane materiel is further conveniently installed on the bearing frame, the pressure of lifting the plane materiel by workers is reduced, and the efficiency of assembling the unitized curtain wall is improved. Through hoisting device and hoisting device cooperation equipment unitized curtain wall, realize standardized operation, the degree of pipelining is high to promote the efficiency of equipment unitized curtain wall, be worth promoting. Because hoisting device and hoisting apparatus promote plane materiel and carrier respectively for the length and the width and the ground contact of unit formula curtain, and the occupation of land of mount is also less, with the occupation of land when reducing the assembled unit formula curtain, compare with the horizontal assembled unit formula curtain, the system of vertically piecing together of this application has the advantage that area is little. In addition, because the bottom of bearing frame is grounded, four sides of bearing frame are not grounded for the side of unitized curtain wall is all not grounded, so that the unitized curtain wall is assembled, and need not to overturn the unitized curtain wall, be favorable to promoting and assemble efficiency.
Still include the operation frame, when the workman stands on the ground can't install the plane materiel on the carriage, the workman can climb to the operation frame on and place the operation frame in with the suitable distance of carriage to on the carriage is installed the plane materiel to promote the efficiency of equipment plane materiel.
The foregoing summary is for the purpose of the specification only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments, and features described above, further aspects, embodiments, and features of the present application will become apparent by reference to the drawings and the following detailed description.
Drawings
In the drawings, the same reference numerals refer to the same or similar parts or elements throughout the several views unless otherwise specified. The figures are not necessarily drawn to scale. It is appreciated that these drawings depict only some embodiments according to the disclosure and are not therefore to be considered limiting of its scope.
Fig. 1 is a schematic structural diagram of the system of the present application.
Fig. 2 is an enlarged view at a in fig. 1.
Fig. 3 is an enlarged view at B in fig. 1.
In the figure: 1. a fixing frame; 11. a support frame; 111. a connection part; 112. a connecting lug; 12. a support bar; 121. splicing blocks; 122. a splice groove; 2. a lifting device; 21. a hoist; 22. a clamp; 3. a fixing member; 4. a carrier; 41. a first connecting rod; 42. a second connecting rod; 5. a surface material; 6. an operating frame.
Detailed Description
Hereinafter, only certain exemplary embodiments are briefly described. As will be recognized by those of skill in the pertinent art, the described embodiments may be modified in various different ways without departing from the spirit or scope of the present application. Accordingly, the drawings and description are to be regarded as illustrative in nature and not as restrictive.
Referring to fig. 1 to 3, a unitized curtain wall erects system disclosed in the present application comprises a fixing frame 1, a lifting device 2, a lifting device, a fixing piece 3, a bearing frame 4 and a plane material 5. The fixing frame 1 comprises a supporting frame 11 and supporting bars 12, wherein the supporting frame 11 is arranged in a concave shape with an opening facing the ground, the supporting bars 12 are fixed on the ground, the supporting frame 11 is fixed on the ground, and the supporting frame 11 is positioned above the supporting bars 12. The lifting device is located outside the fixing frame 1, and can be a gantry crane, an automobile crane or other suitable lifting machinery, and is used for lifting the bearing frame 4 or the unit curtain wall, and is used for assisting in installing the bearing frame 4 on the fixing frame 1 and for assisting in detaching the bearing frame 4 from the fixing frame 1. The bearing frame 4 is a steel frame, the bearing frame 4 is fixedly connected with the fixing frame 1 through the fixing piece 3, namely, the top and the bottom of the bearing frame 4 are respectively connected with the supporting frame 11 and the supporting bar 12 through the fixing piece 3; the fixing piece 3 is a bolt and nut assembly, and the fixing piece 3 can also be a screw and nut assembly (two nuts). The face material 5 is used for being mounted on the bearing frame 4; the lifting devices 2 are arranged on the fixing frame 1, more specifically, the lifting devices 2 are arranged on the top of the supporting frame 11, wherein a plurality of lifting devices 2 can be arranged, and the lifting devices 2 are fixedly connected with the supporting frame 11; the lifting device 2 can also be provided one, and the lifting device 2 is connected with the supporting frame 11 in a sliding way in the horizontal direction; the lifting device 2 is used to hoist the facestock 5 to facilitate the worker's mounting of the facestock 5 on the carrier 4.
Compared with the prior art, the lifting device is used for lifting the bearing frame 4 and fixing the bearing frame 4 on the fixing frame 1 through the fixing piece 3 so as to conveniently install the surface material 5 on the bearing frame 4, and as the lifting device is used for lifting the bearing frame 4, when the bearing frame 4 is connected with the fixing frame 1 through the fixing piece 3, the perpendicularity of the bearing frame 4 can be detected so as to improve the precision, thereby guaranteeing the construction quality and quality of the unit curtain wall; the plane materiel 5 is lifted to a proper height through the lifting device 2, the plane materiel 5 is further conveniently installed on the bearing frame 4, the pressure of the plane materiel 5 lifted by workers is reduced, and the efficiency of the assembled unitized curtain wall is improved. Through hoisting device 2 and hoisting apparatus cooperation equipment unitized curtain wall, realize standardized operation, the degree of pipelining is high to promote the efficiency of equipment unitized curtain wall, be worth promoting. Because hoisting device 2 and hoisting apparatus promote plane materiel 5 and carrier 4 respectively for the length and the width and the ground contact of unit formula curtain, and the occupation of land of mount 1 is also less, with the occupation of land when reducing to assemble unit formula curtain, compare with the unit formula curtain is assembled to the level, the system is pieced together to the erects of this application has the advantage that area is little. In addition, because the bottom of the bearing frame 4 is grounded, the four sides of the bearing frame 4 are not grounded, so that the sides of the unit curtain wall are not grounded, the unit curtain wall is assembled conveniently, the unit curtain wall does not need to be turned over, and the assembling efficiency is improved.
In some embodiments, the lifting device 2 includes a hoist 21 and a clamp 22, the hoist 21 being mounted on the support frame 11 above the support bar 12, the hoist 21 being connected to the clamp 22, the clamp 22 being for clamping the facestock 5. When the lifting device is used, the winch 21 lowers the clamp 22 to the ground so that the clamp 22 clamps the plane material 5, and the winch 21 drives the clamp 22 to lift so as to drive the plane material 5 to lift; when the facestock 5 is raised to the proper position, the hoist 21 stops the lifting jig 22 to facilitate mounting the facestock 5 at the proper height of the carrier 4; after the facestock 5 is mounted on the carrier 4, the clamp 22 is actuated to no longer clamp the facestock 5 to effect lifting of the facestock 5 and mounting of the facestock 5 on the carrier 4.
In some embodiments, the apparatus further comprises a handling frame 6, the handling frame 6 being located at one side of the fixing frame 1, the handling frame 6 being used to assist in mounting the facestock 5 on the carrier 4. When a worker is standing on the ground and cannot mount the facestock 5 to the carrier 4, the worker may climb onto the handling frame 6 and place the handling frame 6 at a suitable distance from the carrier 4 to facilitate mounting the facestock 5 to the carrier 4, thereby improving the efficiency of assembling the facestock 5.
In some embodiments, the supporting frame 11 is provided with a plurality of connecting parts 111, the connecting parts 111 are located above the supporting bars 12 and at the top of the bearing frame 4, and the connecting parts 111 are connected with the bearing frame 4 through the fixing pieces 3. Each connecting part 111 comprises two connecting lugs 112, the bearing frame 4 is provided with a first connecting rod 41, the first connecting rod 41 is arranged between the two connecting lugs 112, and the connecting lugs 112 are connected with the first connecting rod 41 through the fixing pieces 3 so as to realize the connection of the bearing frame 4 and the supporting frame 11.
In some embodiments, the support bar 12 is provided with a splice block 121, the splice block 121 is provided with a splice groove 122, the carrier 4 is provided with a second connecting rod 42, the second connecting rod 42 is placed in the splice groove 122, and the splice block 121 is connected with the second connecting rod 42 by the fixing member 3, so as to realize connection of the carrier 4 with the support bar 12.
The application also provides a vertical splicing method of the unit curtain wall vertical splicing system, which is applied to the system and comprises the following steps:
s1: the plurality of bearing frames 4 are hoisted by a hoisting device and are placed between the supporting bars 12 and the supporting bars 11, gaps exist between two adjacent bearing frames 4, and the bearing frames 4 are respectively connected with the supporting bars 11 and the supporting bars 12 through the fixing pieces 3.
In some embodiments, the first carrier 4 is lifted by a lifting device and the carrier 4 is placed between the support bar 12 and the support frame 11, so that the second connecting rod 42 at the bottom of the carrier 4 is driven to be inserted into the splicing groove 122 and the first connecting rod 41 at the top of the carrier 4 is driven to be inserted between the two connecting lugs 112; the splicing block 121 is connected with the second connecting rod 42 through the fixing piece 3, and the two connecting lugs 112 are connected with the first connecting rod 41 through the fixing piece 3 so as to realize that the bearing frame 4 is respectively connected with the supporting frame 11 and the supporting bar 12; in order to raise the perpendicularity of the carrier 4 and to raise the quality of the unit curtain wall, in the process that the splicing block 121 is connected with the second connecting rod 42 through the fixing member 3 and the two connecting lugs 112 are connected with the first connecting rod 41 through the fixing member 3, the perpendicularity of the carrier 4 is detected and adjusted so that the carrier 4 is perpendicular to the ground in the vertical direction.
In order to assemble a plurality of unitized curtain walls at the same time, after a first carriage 4 is installed between a supporting bar 11 and a supporting bar 12, a second carriage 4 is lifted by a lifting device and the carriage 4 is placed between the supporting bar 12 and the supporting bar 11, and a gap exists between the first carriage 4 and the second carriage 4; the second connecting rod 42 at the bottom of the bearing frame 4 is driven to be inserted into the splicing groove 122, and the first connecting rod 41 at the top of the bearing frame 4 is driven to be inserted between the two connecting lugs 112; the splicing block 121 is connected with the second connecting rod 42 through the fixing piece 3, and the two connecting lugs 112 are connected with the first connecting rod 41 through the fixing piece 3 so as to realize that the bearing frame 4 is respectively connected with the supporting frame 11 and the supporting bar 12; in order to raise the perpendicularity of the carrier 4 and to raise the quality of the unit curtain wall, in the process that the splicing block 121 is connected with the second connecting rod 42 through the fixing member 3 and the two connecting lugs 112 are connected with the first connecting rod 41 through the fixing member 3, the perpendicularity of the carrier 4 is detected and adjusted so that the carrier 4 is perpendicular to the ground in the vertical direction. And so on until a suitable number of carriers 4 are connected between the support frame 11 and the support bars 12. Regardless of the number of carriers 4 between the support frame 11 and the support bar 12, a gap exists between two adjacent carriers 4.
S2: the surface material 5 is clamped by the clamp 22, and the surface material 5 is driven to be lifted to a proper position by the winch 21, so that a worker can conveniently install the surface material 5 on the bearing frame 4 on the ground; when the worker cannot mount the facestock 5 on the carrier 4 on the ground, the worker mounts the facestock 5 on the carrier 4 with the aid of the operation frame 6 until the facestocks 5 are mounted on the plurality of carriers 4 to form the unitized curtain wall.
In some embodiments, the face stock 5 may be mounted to the bottom of the carrier 4 by a worker standing on the ground, as the gap between the bottom of the carrier 4 and the ground is small; after the face material 5 is mounted on the bottom of the bearing frame 4, in order to relieve the pressure of workers, the clamp 22 can be put down to the ground through the winch 21 so that the clamp 22 clamps the face material 5, and the clamp 22 is lifted through the winch 21 so as to lift the face material 5; after the facestock 5 is lifted to the proper height, the hoist 21 is actuated to stop the lifting jig 22 so that the facestock 5 is placed at the height to facilitate mounting the facestock 5 to the carrier 4. As the height of the facestock 5 mounted on the carrier 4 becomes higher, a worker stands on the ground and cannot fix the facestock 5 on the carrier 4; for this reason, the worker may climb onto the operation frame 6 so that there is a space between the worker and the ground so that the worker installs the facer 5 on the carrier 4, thereby improving the efficiency of assembling the unit curtain wall. Typically, the four sides of the carrier 4 are each provided with a face material 5, wherein the face material 5 on three sides is stone material, and the face material 5 on the other side is a metal plate.
S3: the unitized curtain wall is lifted by the lifting device and the fixing piece 3 is detached, so that the unitized curtain wall is detached from the fixing frame 1.
In some embodiments, when the facer 5 is installed to form a unitized curtain wall, it is also necessary to install other curtain wall components or accessories, such as a troffer, styling profile, ventilator, back panel, and the like. When other curtain wall parts or accessories of the unitized curtain wall are installed, the unitized curtain wall is integrally hoisted by a hoisting device, and the fixing piece 3 is detached, so that the bearing frame 4 can be separated from the supporting frame 11 and the supporting bar 12 respectively, and the unitized curtain wall is detached from the fixing frame 1. Lifting the unitized curtain wall integrally by a lifting device, placing the unitized curtain wall on a freight bracket, and covering the unitized curtain wall by using a plastic film to protect the unitized curtain wall; the unitized curtain wall can then be transported to a suitable location as desired.
In the description of the present specification, a description referring to terms "one embodiment," "some embodiments," "examples," "specific examples," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present application. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, the different embodiments or examples described in this specification and the features of the different embodiments or examples may be combined and combined by those skilled in the art without contradiction.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the present application, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Any process or method description in a flowchart or otherwise described herein may be understood as representing modules, segments, or portions of code which include one or more executable instructions for implementing specific logical functions or steps of the process. And the scope of the preferred embodiments of the present application includes additional implementations in which functions may be performed in a substantially simultaneous manner or in an opposite order from that shown or discussed, including in accordance with the functions that are involved.
Logic and/or steps represented in the flowcharts or otherwise described herein, e.g., a ordered listing of executable instructions for implementing logical functions, can be embodied in any computer-readable medium for use by or in connection with an instruction execution system, apparatus, or device, such as a computer-based system, processor-containing system, or other system that can fetch the instructions from the instruction execution system, apparatus, or device and execute the instructions.
It is to be understood that portions of the present application may be implemented in hardware, software, firmware, or a combination thereof. In the above-described embodiments, the various steps or methods may be implemented in software or firmware stored in a memory and executed by a suitable instruction execution system. All or part of the steps of the methods of the embodiments described above may be performed by a program that, when executed, comprises one or a combination of the steps of the method embodiments, instructs the associated hardware to perform the method.
In addition, each functional unit in each embodiment of the present application may be integrated in one processing module, or each unit may exist alone physically, or two or more units may be integrated in one module. The integrated modules may be implemented in hardware or in software functional modules. The integrated modules described above, if implemented in the form of software functional modules and sold or used as a stand-alone product, may also be stored in a computer-readable storage medium. The storage medium may be a read-only memory, a magnetic or optical disk, or the like.
The foregoing is merely specific embodiments of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art can easily think of various changes or substitutions within the technical scope of the present application, and these should be covered in the scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.

Claims (7)

1. The unit curtain wall vertical splicing system is characterized by comprising a fixing frame (1), a lifting device (2), a lifting device, a fixing piece (3), a bearing frame (4) and a panel (5); the lifting device is positioned outside the fixing frame (1) and is used for disassembling and assembling the bearing frame (4); the bearing frame (4) is fixedly connected with the fixing frame (1) through the fixing piece (3); the surface material (5) is arranged on the bearing frame (4); the lifting device (2) is arranged on the fixing frame (1), and the lifting device (2) is used for lifting the plane material (5) so that the plane material (5) is conveniently installed on the bearing frame (4).
2. The unitized curtain wall erects system of claim 1, wherein the mount (1) includes support frame (11) and support bar (12), support bar (12) are fixed in ground, support frame (11) are located support bar (12) top, carrier (4) pass through mounting (3) respectively with support frame (11) and support bar (12).
3. The unitized curtain wall erectting system of claim 2, wherein the lifting device (2) includes a hoist (21) and a clamp (22), the hoist (21) being mounted on the support bracket (11) above the support bar (12), the hoist (21) being connected to the clamp (22), the clamp (22) being for clamping the facestock (5).
4. A modular curtain wall erectting system as claimed in claim 3, further comprising an operating frame (6), the operating frame (6) being located on one side of the mounting bracket (1), the operating frame (6) being adapted to assist in mounting the facer (5) on the carrier (4).
5. The unitized curtain wall erects and pieces system according to claim 2, characterized in that the supporting frame (11) is provided with a connecting part (111), the connecting part (111) is connected with the bearing frame (4) through the fixing piece (3).
6. The unitized curtain wall erectting system of claim 5, wherein the connecting portion (111) includes two connecting lugs (112), the carrier (4) is provided with a first connecting rod (41), the first connecting rod (41) is disposed between the two connecting lugs (112), and the connecting lugs (112) are connected with the first connecting rod (41) through the fixing piece (3).
7. The unitized curtain wall erects and pieces system according to claim 2, characterized in that support bar (12) is equipped with splice block (121), splice block (121) is equipped with splice groove (122), carrier (4) is equipped with second connecting rod (42), second connecting rod (42) are arranged in splice groove (122), splice block (121) is connected with second connecting rod (42) through mounting (3).
CN202322241405.1U 2023-08-18 2023-08-18 Unit type curtain wall vertical splicing system Active CN220318893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322241405.1U CN220318893U (en) 2023-08-18 2023-08-18 Unit type curtain wall vertical splicing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322241405.1U CN220318893U (en) 2023-08-18 2023-08-18 Unit type curtain wall vertical splicing system

Publications (1)

Publication Number Publication Date
CN220318893U true CN220318893U (en) 2024-01-09

Family

ID=89424138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322241405.1U Active CN220318893U (en) 2023-08-18 2023-08-18 Unit type curtain wall vertical splicing system

Country Status (1)

Country Link
CN (1) CN220318893U (en)

Similar Documents

Publication Publication Date Title
CN220318893U (en) Unit type curtain wall vertical splicing system
CN111119461A (en) A operation platform that is used for steel construction elevator well installation top hoisting point
CN116838005A (en) Unit type curtain wall vertical splicing system and method
KR100947452B1 (en) Jig for dismantal of scaffolding big girder
JPH05178561A (en) Installation method for guide rail for elevator
JP5059567B2 (en) Wall panel assembly apparatus and wall panel assembly method
US6364067B1 (en) Method and apparatus for installing elevator components
JP5192444B2 (en) Wall panel fixing structure
JP2015016941A (en) Elevator heavy substance lifting method, and elevator hoist lifting method
CN114075878A (en) Assembled superimposed sheet installation device
JP3462576B2 (en) Method and apparatus for narrow space construction of exterior finishing panel
JP2012180178A (en) Method for installing elevator
JP2513802B2 (en) Auxiliary device for lifting elevator guide rails
JP2000038836A (en) Scaffold for working in elevator's lift shaft
JPH0742979A (en) Installation method of fan filter unit
CN217838071U (en) Support mobile device of hoist and mount air compressor machine
CN217111468U (en) Take car coupler test bench of perpendicular pivot angle device
KR20150000608A (en) Riser gantry crane installation method
CN219343913U (en) Firm type wall building stand for room construction engineering
CN217458358U (en) Well crossbeam for elevator
JPH0383782A (en) Maintenance device for elevator
CN219196766U (en) Track assembly type attached lifting unloading platform
JPH09202563A (en) Installation method for elevator
JP2018009365A (en) Panel transportation jig and panel transportation method
CN112437586B (en) Cabinet air conditioner, cabinet and installation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant