CN220203463U CN202321754303.3U CN202321754303U CN220203463U CN 220203463 U CN220203463 U CN 220203463U CN 202321754303 U CN202321754303 U CN 202321754303U CN 220203463 U CN220203463 U CN 220203463U
Authority
CN
China
Prior art keywords
steel pipe
pipe column
gasket
plate body
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321754303.3U
Other languages
Chinese (zh)
Inventor
余鹏
赵冲冲
宋恩民
马骋慧
贾凯达
王霞光
田红波
王晓波
付贝贝
张凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Construction Group Co Ltd
Priority to CN202321754303.3U priority Critical patent/CN220203463U/en
Application granted granted Critical
Publication of CN220203463U publication Critical patent/CN220203463U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a reinforcing structure for pouring construction of a steel pipe column, which comprises a first screw rod used for penetrating the left side and the right side of the steel pipe column, wherein a first gasket and a second gasket are respectively arranged at the left end and the right end of the first screw rod, and are screwed by nuts; the first screw rods are arranged at intervals in the up-down direction; the second gasket comprises a plate body and a support column, the support column is perpendicular to the plate body, the plate body is used for being attached to purlines on one side of the steel pipe column, and the purlines are vertically arranged on one side of the steel pipe column; the second gasket is clamped on the purline. After the reinforcing structure is adopted, the steel pipe column is reinforced and then poured, so that the problem that the pouring construction possibly generates larger deformation can be solved.

Description

Reinforced structure for pouring construction of steel pipe column
Technical Field
The utility model relates to the technical field of concrete pouring, in particular to a reinforcing structure for steel pipe column pouring construction.
Background
The steel pipe concrete is a structural form between a steel structure and a reinforced concrete structure, and has the advantages of the two structures. The traditional construction is to pour concrete from the top of the steel pipe column, a construction platform is required to be manufactured during construction, a large crane is occupied for a long time, the high-altitude operation amount is large, and the construction personnel are unsafe. The top part is filled with concrete, so that the phenomenon of non-compaction of the concrete in the pipe can be caused. The construction method for pumping the jacking concrete is relatively simple in construction, and meanwhile, the high-altitude work load is reduced. The utility model patent of the publication No. CN109610842B discloses a jacking concrete pumping construction method which mainly comprises the steps of high-pressure pump pipe installation, transition pipe installation, concrete jacking and related treatment after pouring is completed.
By adopting the pumping jacking concrete construction method, the phenomenon that the bottom steel pipe column deforms when the column top is in slurry overflow sometimes occurs in practical application, and the deformation reaches approximately 20mm, so that the construction quality requirement is not met.
Disclosure of Invention
The utility model aims to provide a reinforcing structure for steel pipe column pouring construction, which aims to solve the problem of deformation possibly occurring in the construction process by adopting a pumping jacking concrete construction method.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the reinforcing structure for the pouring construction of the steel pipe column comprises a first screw rod which is used for penetrating the left side and the right side of the steel pipe column, wherein a first gasket and a second gasket are respectively arranged at the left end and the right end of the first screw rod, and are screwed by nuts; the first screw rods are arranged at intervals in the up-down direction; the second gasket comprises a plate body and a support column, the support column is perpendicular to the plate body, the plate body is used for being attached to purlines on one side of the steel pipe column, and the purlines are vertically arranged on one side of the steel pipe column; the second gasket is clamped on the purline.
Further, the first gasket is a flat gasket.
Further, four support columns are arranged on each plate body, and the four support columns are distributed in a rectangular mode.
Further, the front side and the rear side of the steel pipe column are further provided with a plurality of second screws in a penetrating mode, the front end and the rear end of each second screw are respectively provided with a third gasket, the third gaskets are screwed up through nuts, the third gaskets are tightly attached to the side wall of the steel pipe column, and the second screws are arranged at intervals in the up-down direction.
Further, the two ends of the first screw rod and the second screw rod are respectively provided with double nuts.
The utility model has the beneficial effects that:
the utility model is implemented before pouring by arranging a plurality of groups of screw rod and gasket combined structures on the steel pipe column as reinforcing structures of the steel pipe column. Pouring is performed after reinforcement, the problem that the steel pipe column pouring construction possibly generates larger deformation is solved, and the construction quality and the qualification rate are improved.
Drawings
FIG. 1 is a schematic structural view of a reinforcing structure for steel pipe column casting construction of the present utility model;
FIG. 2 is a partial view at A in FIG. 1;
fig. 3 is a schematic structural view of a second gasket.
Name corresponding to each label in the figure:
1. a steel pipe column; 2. a third gasket; 3. a second screw; 4. a second gasket; 41. a plate body; 42. a support column; 5. a first screw; 6. purlin; 7. a pump pipe elbow; 8. and (3) a nut.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which are derived by a person skilled in the art based on the embodiments of the utility model, fall within the scope of protection of the utility model.
Embodiments of the utility model:
as shown in fig. 1 to 3, the reinforcing structure for steel pipe column pouring construction comprises a first screw 5 for penetrating the left and right sides of a steel pipe column 1, wherein a first gasket and a second gasket 4 are respectively arranged at the left and right ends of the first screw 5, and are screwed up by nuts 8. The first screw rods 5 are arranged at intervals in the up-down direction; the first gasket is a flat gasket, is made of steel plates, and is provided with a through hole in the middle.
As shown in fig. 3, the second gasket 4 includes a plate body 41 and a support column 42, the support column 42 is perpendicular to the plate body 41, the plate body 41 is used for being attached to the purline 6 on one side of the steel pipe column 1, and the purline 6 is vertically arranged on one side of the steel pipe column 1. Four support columns 42 are arranged on each plate 41, the four support columns 42 are distributed in a rectangular shape, and the second gaskets 4 are just clamped on the purlines 6. A circular through hole is formed in the middle of the plate 41 for the first screw 5 to pass through. The purline 6 in this embodiment is made of square steel, and is easily deformed under stress, so that the purline 6 is supported by the second gasket 4 formed by the support column 42 and the plate 41, and deformation of the purline is reduced.
The front side and the rear side of the steel pipe column 1 are also penetrated with a plurality of second screws 3, the front end and the rear end of each second screw 3 are respectively provided with a third gasket 2, and the third gaskets 2 are tightly screwed by nuts 8, so that the third gaskets 2 are tightly clung to the side wall of the steel pipe column 1, and the second screws 3 are arranged at intervals in the up-down direction.
The two ends of the first screw rod 5 and the second screw rod 3 are respectively provided with double nuts 8, so that the fastening effect is improved.
When the reinforced structure is applied to engineering, the concrete jacking method pouring construction steps are as follows:
(1) Welding a grouting port pump pipe elbow 7;
(2) Removing fireproof paint, removing local paint on the outer side of the steel pipe column, and preparing for perforating;
(3) A magnetic drill is adopted to drill holes, and holes are formed in positions of the steel pipe columns, which need to be penetrated by the screw rods;
(4) A column top opening hole is formed in the top of the steel pipe column by using plasma;
(5) Penetrating screw rods for reinforcement, penetrating each first screw rod and each first screw rod into the corresponding hole, and matching with corresponding gaskets, tightening by nuts, and reinforcing the steel pipe column and the purline;
(6) A gate valve, which is arranged on the pump pipe elbow 7 in the step (1);
(7) Installing a pump pipe, and then carrying out pipe jacking concrete pouring; pouring is completed, and inspection is performed;
(8) And (3) chiseling concrete on a pump pipe at a grouting port, cutting a screw rod, cutting the pump pipe at the grouting port, and cutting the screw rod Kong Jiahan. And through repeated concrete pouring construction, the pouring result meets the requirements of drawing design and related specifications.

Claims (5)

1. Reinforced structure for steel-pipe column pouring construction, its characterized in that: the device comprises a first screw rod which is used for penetrating the left side and the right side of a steel pipe column, wherein the left end and the right end of the first screw rod are respectively provided with a first gasket and a second gasket, and the first gasket and the second gasket are screwed up through nuts; the first screw rods are arranged at intervals in the up-down direction; the second gasket comprises a plate body and a support column, the support column is perpendicular to the plate body, the plate body is used for being attached to purlines on one side of the steel pipe column, and the purlines are vertically arranged on one side of the steel pipe column; the second gasket is clamped on the purline.
2. The reinforcing structure for steel pipe column casting construction according to claim 1, wherein: the first gasket is a flat gasket.
3. The reinforcing structure for steel pipe column casting construction according to claim 1, wherein: four support columns are arranged on each plate body, and the four support columns are distributed in a rectangular shape.
4. A reinforcing structure for steel pipe column casting according to any one of claims 1 to 3, wherein: the front side and the rear side of the steel pipe column are also penetrated with a plurality of second screws, the front end and the rear end of each second screw are respectively provided with a third gasket, and the third gaskets are tightly screwed by nuts, so that the third gaskets are tightly clung to the side wall of the steel pipe column, and the second screws are arranged at intervals in the up-down direction.
5. The reinforcing structure for steel pipe column casting according to claim 4, wherein: the two ends of the first screw rod and the second screw rod are respectively provided with an assembling double nut.
CN202321754303.3U 2023-07-05 2023-07-05 Reinforced structure for pouring construction of steel pipe column Active CN220203463U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321754303.3U CN220203463U (en) 2023-07-05 2023-07-05 Reinforced structure for pouring construction of steel pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321754303.3U CN220203463U (en) 2023-07-05 2023-07-05 Reinforced structure for pouring construction of steel pipe column

Publications (1)

Publication Number Publication Date
CN220203463U true CN220203463U (en) 2023-12-19

Family

ID=89156728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321754303.3U Active CN220203463U (en) 2023-07-05 2023-07-05 Reinforced structure for pouring construction of steel pipe column

Country Status (1)

Country Link
CN (1) CN220203463U (en)

Similar Documents

Publication Publication Date Title
CN110344340B (en) Reinforcing device for reinforcing pier by cofferdam-free underwater cross section increasing method and construction method thereof
CN110670601A (en) Axial force compensation device acting on steel support and using method thereof
CN220203463U (en) Reinforced structure for pouring construction of steel pipe column
CN106836559A (en) Reinforced concrete wall structure capable of preventing cracking and construction method thereof
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN215055279U (en) Thickness control device for steel plate concrete shear wall symmetrical wall body
CN214784019U (en) Elevator shaft support replacing device
CN115807508A (en) Construction method and node for building steel structure column base installation foundation
CN214940390U (en) Template for pouring full-package concrete of pipeline
CN215366786U (en) UHPC and concrete combined pier
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN212641764U (en) Curtain wall embedded part placed after beam side mold is closed
CN211472958U (en) Integral concrete structure of steel frame shear wall structure
CN210263921U (en) Clamp for reinforcing beam side mold
CN109877945B (en) Hole-forming positioning construction method for reserved hole channel of concrete beam
CN203755269U (en) Surge shaft cast-in-situ concrete assembling type formwork support
CN218375202U (en) Brickwork constructional column reentrant corner reinforcing tool
CN211499888U (en) Quick-release quick-assembly template applied to reinforcement engineering
CN218149804U (en) Article font template reinforcing apparatus
CN217602161U (en) Prefabricated post-cast section temporary supporting tool for mechanical connection of bottom steel bars
CN220953830U (en) Prestressed concrete frame beam column structure
CN220450787U (en) Non-dismantling modularized lining board
CN220927931U (en) Tubular prefabricated bolt hole die
CN215150150U (en) Prefabricated case roof beam hole for hoist positioner
CN217480808U (en) Truss type square steel tube concrete column restraint bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant