CN220184032U - Construction platform for port engineering pouring - Google Patents

Construction platform for port engineering pouring Download PDF

Info

Publication number
CN220184032U
CN220184032U CN202321520261.7U CN202321520261U CN220184032U CN 220184032 U CN220184032 U CN 220184032U CN 202321520261 U CN202321520261 U CN 202321520261U CN 220184032 U CN220184032 U CN 220184032U
Authority
CN
China
Prior art keywords
bracket
support
construction platform
plate
port engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321520261.7U
Other languages
Chinese (zh)
Inventor
宋振榜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Port And Shipping Development Center
Original Assignee
Jining Port And Shipping Development Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Port And Shipping Development Center filed Critical Jining Port And Shipping Development Center
Priority to CN202321520261.7U priority Critical patent/CN220184032U/en
Application granted granted Critical
Publication of CN220184032U publication Critical patent/CN220184032U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a port engineering pouring construction platform, which belongs to the technical field of port engineering and comprises a first bracket, wherein a second bracket is arranged on one side opposite to the first bracket, a bearing plate is arranged between the first bracket and the second bracket, a groove is formed in the middle of one side of the bearing plate, a guide plate is fixed on one side in the groove, the guide plate is of an inclined structure, a support frame is arranged above the groove, the support frame is of an inverted U-shaped structure, and an adjusting rod is arranged in the middle of the top end of the support frame. Through setting up recess, deflector, support frame, regulation pole and clamp plate, can place the pump line in the recess, make the pump line slope through the deflector, then the staff rotates the regulation pole, makes the regulation pole drive clamp plate pump line one end down, and then adjusts the inclination of pump line and fix it, in the concrete of being convenient for spray directly enters into the hole stake to the convenient mounted position who confirms construction platform.

Description

Construction platform for port engineering pouring
Technical Field
The utility model relates to the technical field of port engineering, in particular to a port engineering pouring construction platform.
Background
With the continuous development of the building industry, deep foundation pits, super high-rise buildings, large public buildings and the like are endless, and the projects comprise hole-forming cast-in-place piles, including supporting piles, anti-compression piles, anti-pulling piles and the like, and the construction process of the cast-in-place piles is as follows: the hole is formed firstly, then the reinforcement cage is placed, and then concrete pouring is carried out, wherein the pile diameter can reach 1m, the pile length can reach 20-30 m, and in general, the concrete pouring is started from the pile bottom, the fixing of the pump pipe used, the requirement of dismantling the pump pipe along with pouring and the like and the safety protection problem of the deep hole opening are particularly important.
The prior patent number is CN202222120795.2, discloses a construction platform based on a port engineering filling pile, which comprises construction lifting plates, support columns and driving components, wherein the number of the support columns is two, and the construction lifting plates are positioned in the middle between the two support columns; the driving component is positioned at the left side of the left support column; the driving assembly comprises a driving motor, a driving motor fixing frame, a transmission rod, a second bevel gear and a first bevel gear, wherein the right side of the driving motor fixing frame is fixed with the left side of a left side supporting column, the driving motor is fixedly arranged in the driving motor fixing frame, the direction of the output end of the driving motor is the right side, and the output end of the driving motor is fixed with the left side of the transmission rod. This construction platform based on harbour engineering bored concrete pile wholly has realized the purpose that can go up and down to adjust, has fine practicality.
The pump pipe is horizontally fixed on the lifting plate, and the pump pipe in the horizontal direction is sprayed forward to be sprayed forward for a certain distance to fall down, so that the installation position of the construction platform is difficult to determine and inconvenient to use.
Disclosure of Invention
The utility model mainly aims to provide a port engineering pouring construction platform.
The aim of the utility model can be achieved by adopting the following technical scheme:
the utility model provides a construction platform that port engineering was filled, includes first support, first support is provided with the second support on one side relatively, first support with be provided with the loading board between the second support, loading board one side middle part is provided with the recess, one side is fixed with the deflector in the recess, the deflector is slope column structure, the recess top is provided with the support frame, the support frame is the type of falling U structure, support frame top mid-mounting has the regulation pole, it has the clamp plate to adjust the pole bottom through the bearing connection, the clamp plate is the arc structure.
Preferably, the bottom of the bearing plate is connected with two supporting plates through bolts.
Preferably, a sliding block is connected to one side, far away from the bearing plate, of the supporting plate, and the supporting plate is respectively connected with the first bracket and the second bracket in a sliding manner through the sliding block.
Preferably, the first support and the second support are provided with empty slots on opposite side walls, and the empty slots are formed on the first support and the second support.
Preferably, a guide rod is fixed at the middle part in the second bracket, and the supporting plate is in sliding connection with the guide rod.
Preferably, a sliding sleeve is arranged in the middle of the supporting plate in the first bracket, and the sliding sleeve penetrates through the supporting plate.
Preferably, a ball screw is connected to the sliding sleeve, and a motor is installed at the top end of the ball screw penetrating through the top wall of the first bracket.
The beneficial technical effects of the utility model are as follows:
according to the utility model, the pump pipe can be placed in the groove by arranging the groove, the guide plate, the support frame, the adjusting rod and the pressing plate, the pump pipe is inclined by the guide plate, then the staff rotates the adjusting rod, the adjusting rod drives one end of the pressing plate to drive the pressing plate to press the pump pipe, the inclination angle of the pump pipe is adjusted and fixed, and the sprayed concrete is convenient to directly enter the hole pile, so that the installation position of the construction platform is convenient to determine.
Drawings
FIG. 1 is a schematic view of a construction platform for port engineering pouring according to a preferred embodiment of the present utility model;
FIG. 2 is a front cross-sectional view of a preferred embodiment of a port engineering poured construction platform according to the present utility model;
fig. 3 is a cross-sectional view of a support frame in a preferred embodiment of a port engineering filling construction platform according to the present utility model.
The reference numerals are explained as follows:
1. a first bracket; 2. a second bracket; 3. a carrying plate; 4. a groove; 5. a guide plate; 6. a support frame; 7. an adjusting rod; 8. a pressing plate; 9. a supporting plate; 10. a slide block; 11. a hollow groove; 12. a guide rod; 13. a sliding sleeve; 14. a ball screw; 15. and a motor.
Description of the embodiments
In order to make the technical solution of the present utility model more clear and obvious to those skilled in the art, the present utility model will be described in further detail with reference to examples and drawings, but the embodiments of the present utility model are not limited thereto.
As shown in fig. 1-3, the construction platform for port engineering pouring provided by the embodiment comprises a first bracket 1, a second bracket 2 is arranged on the opposite side of the first bracket 1, a bearing plate 3 is arranged between the first bracket 1 and the second bracket 2, a groove 4 is arranged in the middle of one side of the bearing plate 3, a guide plate 5 is fixed on one side of the groove 4, the guide plate 5 is of an inclined structure, a support frame 6 is arranged above the groove 4, the support frame 6 is of an inverted U-shaped structure, an adjusting rod 7 is arranged at the middle part of the top end of the support frame 6, a pressing plate 8 is connected to the bottom of the adjusting rod 7 through a bearing, the pressing plate 8 is of an arc-shaped structure, a pump pipe can be placed in the groove 4, the pump pipe is inclined through the guide plate 5, then a worker rotates the adjusting rod 7, the adjusting rod 7 drives one end of the pressing plate 8 to further adjust the inclination angle of the pump pipe and fix the pump pipe, and concrete which is convenient to spray directly enters a hole pile, so that the installation position of the construction platform can be conveniently determined.
The bottom of the bearing plate 3 is connected with two supporting plates 9 through bolts, and the bearing plate 3 is conveniently supported by the supporting plates 9.
The support plate 9 is connected with a slide block 10 on one side far away from the bearing plate 3, and the support plate 9 is respectively connected with the first support 1 and the second support 2 in a sliding manner through the slide block 10, so that the support plate 9 can move along the first support 1 and the second support 2 through the slide block 10 in the lifting process.
The first bracket 1 and the second bracket 2 are provided with the empty slot 11 on the opposite side wall, the empty slot 11 is formed on the first bracket 1, and the supporting plate 9 is conveniently lifted along the first bracket 1 and the second bracket 2 through the empty slot 11 on the second bracket 2.
A guide rod 12 is fixed in the middle part in the second bracket 2, the supporting plate 9 is in sliding connection with the guide rod 12, and the supporting plate 9 can be guided through the guide rod 12.
The middle part of the supporting plate 9 in the first bracket 1 is provided with a sliding sleeve 13, and the sliding sleeve 13 penetrates through the supporting plate 9, so that the sliding sleeve 13 drives the supporting plate 9 to lift.
The sliding sleeve 13 is internally connected with a ball screw 14, and a motor 15 is arranged at the top end of the ball screw 14 penetrating through the top wall of the first bracket 1, so that the motor 15 can drive the ball screw 14 to rotate.
The working principle of the device is as follows: when the device is specifically used, a worker installs and fixes the first support 1 and the second support 2 on the outer side of a hole pile respectively, then places a pump pipe on the bearing plate 3, and inclines the pump pipe through the guide plate 5 in the groove 4, the worker can move the pump pipe according to the use requirement, the inclination angle of the pump pipe is continuously changed until the pump pipe is inclined to a proper position, after the adjustment is finished, the worker rotates the adjusting rod 7, the adjusting rod 7 drives the pressing plate 8 to press one end of the pump pipe, the inclination angle of the pump pipe is further adjusted, the pump pipe is fixed, the injected concrete is convenient to directly enter the hole pile, so that the installation position of a construction platform is convenient to determine, in the casting process, the motor 15 at the top of the first support 1 drives the ball screw 14 to rotate, the ball screw 14 drives the sliding sleeve 13 to move up and down, and then the two supporting plates 9 move along the empty grooves 11 on the first support 1 and the second support 2, and the height of the pump pipe is adjusted.
The above is merely a further embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto, and any person skilled in the art will be able to apply equivalents and modifications according to the technical solution and the concept of the present utility model within the scope of the present utility model disclosed in the present utility model.

Claims (7)

1. A construction platform that port engineering was filled, its characterized in that: including first support (1), first support (1) opposite one side is provided with second support (2), first support (1) with be provided with loading board (3) between second support (2), loading board (3) one side middle part is provided with recess (4), one side is fixed with deflector (5) in recess (4), deflector (5) are the slope column structure, recess (4) top is provided with support frame (6), support frame (6) are the type of falling U structure, support frame (6) top mid-mounting has regulation pole (7), regulation pole (7) bottom is connected with clamp plate (8) through the bearing, clamp plate (8) are the arc structure.
2. The port engineering perfusion construction platform of claim 1, wherein: the bottom of the bearing plate (3) is connected with supporting plates (9) through bolts, and the number of the supporting plates (9) is two.
3. The port engineering perfusion construction platform of claim 2, wherein: the support plate (9) is connected with a sliding block (10) on one side far away from the bearing plate (3), and the support plate (9) is respectively connected with the first support (1) and the second support (2) in a sliding manner through the sliding block (10).
4. A harbor engineering perfusion construction platform according to claim 3, wherein: the novel bracket is characterized in that empty slots (11) are formed in one side wall of the first bracket (1) and one side wall of the second bracket (2) opposite to each other, and the empty slots (11) are formed in the first bracket (1) and the second bracket (2).
5. The port engineering perfusion construction platform of claim 4, wherein: a guide rod (12) is fixed in the middle of the second bracket (2), and the supporting plate (9) is in sliding connection with the guide rod (12).
6. The port engineering perfusion construction platform of claim 5, wherein: the sliding sleeve (13) is arranged in the middle of the supporting plate (9) in the first bracket (1), and the sliding sleeve (13) penetrates through the supporting plate (9).
7. The port engineering perfusion construction platform of claim 6, wherein: the sliding sleeve (13) is connected with a ball screw (14), and the top end of the ball screw (14) penetrates through the top wall of the first bracket (1) to be provided with a motor (15).
CN202321520261.7U 2023-06-15 2023-06-15 Construction platform for port engineering pouring Active CN220184032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321520261.7U CN220184032U (en) 2023-06-15 2023-06-15 Construction platform for port engineering pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321520261.7U CN220184032U (en) 2023-06-15 2023-06-15 Construction platform for port engineering pouring

Publications (1)

Publication Number Publication Date
CN220184032U true CN220184032U (en) 2023-12-15

Family

ID=89115414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321520261.7U Active CN220184032U (en) 2023-06-15 2023-06-15 Construction platform for port engineering pouring

Country Status (1)

Country Link
CN (1) CN220184032U (en)

Similar Documents

Publication Publication Date Title
CN100340722C (en) Concrete core cement soil stirring pile machine and its construction technological method
CN110284703A (en) A kind of light-duty climbing form system of screw rod promotion
CN220184032U (en) Construction platform for port engineering pouring
CN214615488U (en) Concrete pouring spreader for building
CN210315664U (en) Reverse construction method foundation pit rectangular lattice column positioning and verticality adjusting device
CN210342736U (en) Spread thick liquid auxiliary device and automatic thick liquid device of spreading
CN110606439A (en) Be suitable for transmission material between reverse construction method floor with small-size swing arm formula electric hoist
CN217299690U (en) Plastering machine for inner wall
CN215759019U (en) Deep hole bored concrete pile steel reinforcement cage correcting unit
CN216130135U (en) Inner supporting structure for foundation pit
CN205935643U (en) Outer wall is from climbing die carrier
CN210369893U (en) Light-duty creeping formwork system of lead screw promotion
CN214303019U (en) Assembled building truss supporting structure
CN110761284B (en) Slope anchor for building municipal works
CN2890172Y (en) Concrete-cored soil cement mixing pile machine
CN113404519A (en) Movable building construction device
CN212863911U (en) High-strength prestressed pipe pile anchoring crane
CN220953402U (en) Pile verticality adjusting structure
CN221167823U (en) Reinforced steel sheet pile foundation pit
CN219527655U (en) Quick pouring device for photovoltaic concrete filling pile
CN220704538U (en) Beam bottom formwork structure of limited space under construction is done in contrary
CN220468641U (en) Device for quickly positioning prefabricated spliced pier
CN213999369U (en) Liftable beam support structure
CN215761475U (en) Light high-pressure rotary jet drilling machine
CN220954805U (en) Building body bearing wall reinforcing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant