CN100340722C - Concrete core cement soil stirring pile machine and its construction technological method - Google Patents

Concrete core cement soil stirring pile machine and its construction technological method Download PDF

Info

Publication number
CN100340722C
CN100340722C CNB2005100410064A CN200510041006A CN100340722C CN 100340722 C CN100340722 C CN 100340722C CN B2005100410064 A CNB2005100410064 A CN B2005100410064A CN 200510041006 A CN200510041006 A CN 200510041006A CN 100340722 C CN100340722 C CN 100340722C
Authority
CN
China
Prior art keywords
pile
stake
frame
machine
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100410064A
Other languages
Chinese (zh)
Other versions
CN1718938A (en
Inventor
董平
胡安兵
张健康
易敏
陈景雅
高建新
曹建
周明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University
Jiangsu Provincial Communication Planning and Design Institute Co Ltd
Original Assignee
Jiangsu Traffic Planning And Design Institute
Nanjing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Traffic Planning And Design Institute, Nanjing University filed Critical Jiangsu Traffic Planning And Design Institute
Priority to CNB2005100410064A priority Critical patent/CN100340722C/en
Publication of CN1718938A publication Critical patent/CN1718938A/en
Application granted granted Critical
Publication of CN100340722C publication Critical patent/CN100340722C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention discloses a concrete core cement earth stirring pile machine and a construction process thereof. The bottom of the pile machine is provided with a hydraulic pressure walking system which comprises a hydraulic power unit (11), a base (1), a longitudinal moving beam and a traverse moving beam (3 and 2), and a longitudinal roller bracket and a traverse roller bracket (7 and 8). A machine frame (5) is fixed on a guide rail of the center of the base (1), and the guide rail can slide along a guide slot, a deep stirring machine head (6) is respectively connected with a drill rod, a drill head (4) and a mud pipe (15), a hydraulic system (10) for pressing a pile is arranged in the center of the machine frame (5), and an electrical distribution box (9) is respectively connected with the deep stirring machine head (6) and the hydraulic system (10) for pressing the pile and provides dynamic force. Positioning centering and leveling are carried out to the pile machine by the hydraulic pressure walking system, and thus, the limitation of the smoothness of the ground is small. A small static hydraulic square pile is used, and the construction noise is low. The construction method not only can simultaneously construct for cement earth stirring and small square piles prefabrication, but also can ensure that when the small square pile is inserted into a cement mud stirring pile, verticality and coaxiality can be effectively controlled.

Description

Concrete core cement soil stirring pile machine and construction technique thereof
One, technical field
The present invention relates to the building foundation engineering construction machinery---stake machine and construction technology thereof specifically relate to the specific stub machine and the construction technique thereof of concrete core cement soil stirring pile.
Two, background technology
Concrete core cement soil stirring pile is in time to insert the composite pile that forms in the cement mixing method with the little side's stake of prefabricated reinforced concrete.The mid-90, along with the application of concrete core cement soil stirring pile has produced the cement-soil mixing pile machine that installs diesel hammer additional, it is the concrete core cement soil stirring pile machine of the first generation, in fact this machine has just been carried additionally a diesel hammer on the basis of original ripe mixing pile machine, as can be seen from Figure 1, this machine frame is shelved on two mobile transverse tubes, and the displacement of stake machine relies on the main winch pulling of switchbox control, realizes on mobile transverse tube in length and breadth to moving.Drilling cramp is arranged on frame one end, stirs the drill bit vertical ground deeply for guaranteeing that drilling cramp reaches, necessary leveling pile machine frame, and this can only rely on the mobile transverse tube of filling to adjust, and difficulty is bigger.The cycloidal-pin wheel reducer is the power set that stir drilling rod and drill bit deeply, the hammering pile frame is parallel with stake machine frame, be arranged on the drilling cramp outside, diesel hammer is tapped the head by secondary hoist engine pulling injection side's stake, stable for guaranteeing drilling cramp and hammering pile frame, strut is installed on this machine separately, adjusting screw(rod) can be regulated strut length, so that the drilling cramp adjustable height is to be fit to the construction of different depth cement mixing method.
Construction technology: 1. rely on mobile transverse tube, main winch to carry out the pile-forming machine perching centering leveling; 2. stir drilling rod and drill bit deeply and stir sinking in advance; 3. prepare mortar; 4. whitewashing is stirred; 5. stir multiple spray again; 6. along mobile transverse tube sidesway stake machine frame and hammering pile frame, and make the hammering pile frame after moving be positioned at the top of finishing agitation pile; 7. lift by crane prefabricated little side's stake and make little side's stake point aim at the center of agitation pile with secondary hoist engine, the side's of setting upright stake, pile crown puts pile cover, and starting hammering system uses hammering hammering side's stake to desired depth; 8. with sulphide mastic or welding pile extension; 9. repeating step 7., until the construction of finishing whole pile.
This machine can be finished the construction of concrete core cement soil stirring pile substantially, but still exists obviously not enough: 1. because the mobile and smoothing of frame only depends on two mobile transverse tubes, therefore, the verticality on drilling rod and drill bit and ground is subjected to the restriction of ground flat degree bigger; 2. adopt hammering mode injection small bore side's stake, very easily cause the pile crown breakage; 3. owing to lack guiding and stopping means, inserts little side stake verticality and with the very difficult assurance of the axiality of cement mixing method; 4. the noise of hammering generation is unallowed in many occasions.
Three, summary of the invention
1. goal of the invention
The objective of the invention is to overcome the problem that existing concrete core cement soil stirring pile machine exists, and a kind of specific stub machine and construction technique thereof of the concrete core cement soil stirring pile of constructing are provided.This machine not only want to construct simultaneously cement mixing method and prefabricated little side stake, and can guarantee that verticality and axiality can be controlled effectively when prefabricated little side insertion cement mixing method.
2. technical scheme
This machine comprises base and supporting leg crossbeam (1), frame (5), stirs head (6), drilling rod and drill bit (4), switchbox (9), strut (12), stake hook (14) and mud tube (15) deeply; Frame (5) is fixed on base and the supporting leg crossbeam (1), stirring head (6) deeply is connected with switchbox (9), its top is connected with assembly pulley by wire rope, the side is connected in the guide groove of frame (5), the bottom is connected with mud tube (15) with drilling rod and drill bit (4) respectively, strut (12) and windproof wirerope (13) are connected the both sides of frame (5), stake hook (14) is installed in the side of frame (5), it is characterized in that being provided with the hydraulic moving mechanism system in the bottom of stake machine, this system comprises hydraulic power unit (11), base and supporting leg crossbeam (1), traversing beam (2), vertical shift beam (3), vertical rolling wheel support (7) and horizontal rolling wheel support (8), frame (5) welding or anchor are on the slidably guide rail of base and supporting leg crossbeam (1) central authorities, and this guide rail can slide along the guide groove on base and the supporting leg crossbeam (1); Piling hydraulic system (10) places the center of frame (5).
Base and supporting leg crossbeam (1) are shelved on the vertical, horizontal rolling wheel support (7,8) in the above-mentioned hydraulic moving mechanism system, this rolling wheel support (7,8) places respectively on vertical shift beam (3) and the traversing beam (2), hydraulic power unit (11) is fixed on base and the supporting leg crossbeam (1), and the vertical, horizontal of control base (1) moves.Above-mentioned piling hydraulic system (10) is provided with upper and lower spacing device, and it is placed the center of frame (5), and top is connected with assembly pulley by wire rope, and both sides are connected in the guide groove of frame (5).Above-mentioned stake hook (14) top is connected with assembly pulley on being fixed on frame (5) with wire rope, and above-mentioned assembly pulley all is connected with switchbox (9) and controls.
Construction technique, its construction sequence is as follows: 1. by vertical rolling wheel support (7), horizontal rolling wheel support (8), vertical shift beam (2) and traversing beam (3), use hydraulic power unit (11) to the pile-forming machine perching centering leveling; 2. open the switch activated motor in the switchbox (9), treat that stirring head (6) rotating speed is normal after, drilling rod and drill bit (4) are cut soil along the guide edge rotation, and sink down into the design reinforcement degree of depth with the speed of 0.4~0.75m/min; 3. compare the preparation cement paste by pre-determined cement, and before slip casting, cement paste is passed through in the filtering net plate impouring aggregate bin; 4. after drill bit sinks down into projected depth, drilling rod and drill bit (4) are promoted (about 200mm) slightly, start mortar pump, cement paste is pressed in the weak soil layer through mud tube (15) feeding drilling rod and drill bit (4), and with the even speed of 0.3~0.5m/min, stir on the whitewashing limit while promoting, and the cement and the soil body are fully mixed, until design stake top mark height; 5. need carry out multiple spray by designing requirement and stir again, carry out secondary with above-mentioned steps method 4. and sink, whitewash, stir, promote; 6. by hydraulic power unit (11) moving frame (5), the distance that moves equals to stir deeply the distance between head (6) axis to piling hydraulic system (10) axis, and the axis of moving back piling hydraulic system (10) is consistent with the agitation pile axis; 7. by stake hook (14) the prefabricated little side stake of slinging, and its embedding is had in the piling hydraulic system (10) of stopping means up and down, prefabricated little side stake stake point is aimed at an agitation pile center just and also is pressed into slowly, until the predetermined design absolute altitude; 8. if the more piece stake then repeating step 7., glued joint with sulphide mastic or welding at little side's pile joint place.
3. beneficial effect
Because concrete core cement soil stirring pile machine adopts the silent piling hydraulic system, not only avoided the weakness of small bore side's stake anti-strike ability difference effectively, construction noise also declines to a great extent simultaneously; In addition,, longitudinal and transversely move beam sidesway and lifting freely, be subjected to the restriction of ground flat degree less because concrete core cement soil stirring pile machine adopts the hydraulic moving mechanism system; At last, also the most important thing is, construct with concrete core cement soil stirring pile machine, because this machine is provided with guide groove, sidesway screens and vertically-guided and device such as spacing, in construction, pass through hydraulic power unit (11) moving frame (5), the distance that moves equals to stir deeply the distance between drill bit (6) axis to piling hydraulic system (10) axis, the axis of moving back piling hydraulic system (10) is consistent with the agitation pile axis, guaranteed that little side stake stake point aims at the agitation pile center, thus controlled effectively the verticality of inserting little side and with the axiality of agitation pile.
Four, description of drawings
Fig. 1 is the lateral view that installs the deep-mixed pile machine of diesel hammer additional,
Fig. 2 A is the schematic side view of concrete core cement soil stirring pile machine,
Fig. 2-B is the front elevational schematic of concrete core cement soil stirring pile machine,
Each component names mark is as follows among the figure:
1-base and supporting leg crossbeam, the traversing beam of 2-, 3-vertical shift beam, 4-drilling rod and drill bit, 5-frame, 6-stirs head deeply, the vertical rolling wheel support of 7-, the horizontal rolling wheel support of 8-, 9-switchbox, 10-piling hydraulic system, the 11-hydraulic power unit, 12-strut, the windproof wirerope of 13-, 14-stake hook.The 15-mud tube.
Five, the specific embodiment
Can see the present invention---the overall picture of concrete core cement soil stirring pile machine basically clearly with reference to Fig. 2-A and Fig. 2-B.The bottom of this machine is the hydraulic moving mechanism system, comprise that hydraulic power unit (11), base and supporting leg crossbeam (1), traversing beam (2), vertical shift beam (3), vertical rolling wheel support (7) and horizontal rolling wheel support (8), base and supporting leg crossbeam (1) are shelved on the longitudinal and transverse support (7,8), this rolling wheel support (7,8) places vertical shift beam (3) to congratulate on the traversing beam (2) respectively, and hydraulic power unit (11) is fixed on base and rack beam (1) and goes up and control the vertical, horizontal of base and move; Frame (5) is welded on the slidably guide rail of base (1) central authorities, and this guide rail can slide along guide groove, so that after deep water earth mixing pile construction finishes, the axis of piling hydraulic system (10) is accurately overlapped with the axis of agitation pile.Stir head (6) top deeply and be connected with assembly pulley by steel wire, the side is connected in the guide groove of frame (5), and bottom jointed rod and drill bit (4) and mud tube (15) when stirring pile driving construction deeply, stir head (6) deeply and can move up and down smoothly together with drilling rod and drill bit (4).Switchbox (9) respectively with stir head (6) deeply and be connected with piling hydraulic system (10) and power is provided.Piling hydraulic system (10) is provided with stopping means up and down, and it is placed the center of frame (5), and top is connected with assembly pulley by wire rope, and both sides are connected in the guide groove of frame (5).Strut (12) and windproof wirerope (13) are connected to the both sides on frame (5) top, all are provided with in order to guarantee that frame is stable, and stake hook (14) is connected with assembly pulley on being fixed on frame (5) with wire rope, can be used to lift by crane little side; Assembly pulley is connected with switchbox (9) and controls.
Construction technique, its construction sequence is as follows:
1. by vertical rolling wheel support (7), horizontal rolling wheel support (8), vertical shift beam (3) and traversing beam (2), use hydraulic power unit (11) to the pile-forming machine perching centering leveling;
2. open the switch activated motor in the switchbox (9), treat that stirring head (6) rotating speed is normal after, drilling rod and drill bit (4) are cut soil along the guide edge rotation, and sink down into 15 meters degree of depth of design with the speed of 0.6m/min;
3. prepare cement paste by 1: 2 cement weight proportioning, and before slip casting with cement paste through in the filtering net plate impouring aggregate bin;
4. after drill bit sinks down into projected depth, drilling rod and drill bit (4) are promoted (about 200mm) slightly, start mortar pump, cement paste is pressed in the weak soil layer through mud tube (15) feeding drilling rod and drill bit (4), and with the even speed of 0.5m/min, stir on the whitewashing limit while promoting, and the cement and the soil body are fully mixed, high 15 meters until design stake top mark;
5. need carry out multiple spray by designing requirement and stir again, carry out secondary with above-mentioned steps method 4. and sink, whitewash, stir, promote;
6. by hydraulic power unit (11) moving frame (5), move 1.2 meters distances that equal to stir deeply between head (6) axis to piling hydraulic system (10) axis, the axis of moving back piling hydraulic system (10) is consistent with the agitation pile axis;
7. by stake hook (14) the prefabricated little side stake of slinging, and its embedding is had in the piling hydraulic system (10) of stopping means up and down, prefabricated little side stake stake point is aimed at an agitation pile center and also is pressed into slowly, until 15 meters of predetermined design absolute altitudes;
8. if 7. the more piece stake then needs repeating step, glued joint with sulphide mastic at little side's pile joint place.

Claims (4)

1. concrete core cement soil stirring pile machine comprises base and supporting leg crossbeam (1), frame (5), stirs head (6), drilling rod and drill bit (4), switchbox (9), strut (12), stake hook (14) and mud tube (15) deeply; Its mid frame (5) is fixed on base and the supporting leg crossbeam (1), stirring head (6) deeply is connected with switchbox (9), its top is connected with assembly pulley by wire rope, the side is connected in the guide groove of frame (5), the bottom is connected with mud tube (15) with drilling rod and drill bit (4) respectively, strut (12) and windproof wirerope (13) are connected the both sides of frame (5), stake hook (14) is installed in the side of frame (5), it is characterized in that being provided with the hydraulic moving mechanism system in the bottom of stake machine, this system comprises hydraulic power unit (11), base and supporting leg crossbeam (1), traversing beam (2), vertical shift beam (3), vertical rolling wheel support (7) and horizontal rolling wheel support (8), wherein base and supporting leg crossbeam (1) are shelved on vertical, horizontal rolling wheel support (7,8) on, vertical, horizontal rolling wheel support (7,8) place respectively on vertical shift beam (3) and the traversing beam (2), hydraulic power unit (11) is fixed on base and the supporting leg crossbeam (1), and control base and supporting leg crossbeam (1) is vertical, laterally move; Frame (5) welding or anchor are on the slidably guide rail of base and supporting leg crossbeam (1) central authorities, and this guide rail can slide along the guide groove on base and the supporting leg crossbeam (1); Piling hydraulic system (10) places the center of frame (5).
2. concrete core cement soil stirring pile machine according to claim 1 is characterized in that described piling hydraulic system (10) is provided with upper and lower spacing device, and top is connected with assembly pulley by wire rope, and both sides are connected in the guide groove of frame (5).
3. concrete core cement soil stirring pile machine according to claim 1 is characterized in that described stake hook (14) top is connected with assembly pulley on being fixed on frame (5) with wire rope, and assembly pulley is connected with switchbox (9) and controls.
4. construction technique that uses the described concrete core cement soil stirring pile machine of claim 1 to form agitation pile is characterized in that construction sequence is as follows:
1. use the vertical, horizontal of hydraulic power unit (11) control base and supporting leg crossbeam (1) to move to the pile-forming machine perching centering leveling;
2. open the switch activated motor in the switchbox (9), drive stirring head (6) rotation, treat that rotating speed is normal after, drilling rod and drill bit (4) are cut soil along the guide edge rotation, and sink down into the design reinforcement degree of depth with the speed of 0.4~0.75m/min;
3. prepare cement paste by 1: 2 cement weight proportioning, and before slip casting with cement paste through in the filtering net plate impouring aggregate bin;
4. after drill bit sinks down into projected depth, drilling rod and drill bit (4) are promoted 200mm slightly, start mortar pump, cement paste is pressed in the weak soil layer through mud tube (15) feeding drilling rod and drill bit (4), and with the even speed of 0.3~0.5m/min, stir on the whitewashing limit while promoting, and the cement and the soil body are fully mixed, until design stake top mark height;
5. in the time of need carrying out multiple spray and stir again by designing requirement, carry out that secondary sinks, whitewashing, stir, promote with above-mentioned steps method 4.;
6. by hydraulic power unit (11) moving frame (5), the distance that moves equals to stir deeply the distance between head (6) axis to piling hydraulic system (10) axis, and the axis of moving back piling hydraulic system (10) is consistent with the agitation pile axis;
7. by stake hook (14) the prefabricated little side stake of slinging, and its embedding is had in the piling hydraulic system (10) of stopping means up and down, prefabricated little side stake stake point is aimed at an agitation pile center and also is pressed into slowly, until the predetermined design absolute altitude;
8. if the more piece stake then repeating step 7., glued joint with sulphide mastic or welding at little side's pile joint place.
CNB2005100410064A 2005-07-13 2005-07-13 Concrete core cement soil stirring pile machine and its construction technological method Expired - Fee Related CN100340722C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100410064A CN100340722C (en) 2005-07-13 2005-07-13 Concrete core cement soil stirring pile machine and its construction technological method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100410064A CN100340722C (en) 2005-07-13 2005-07-13 Concrete core cement soil stirring pile machine and its construction technological method

Publications (2)

Publication Number Publication Date
CN1718938A CN1718938A (en) 2006-01-11
CN100340722C true CN100340722C (en) 2007-10-03

Family

ID=35930873

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100410064A Expired - Fee Related CN100340722C (en) 2005-07-13 2005-07-13 Concrete core cement soil stirring pile machine and its construction technological method

Country Status (1)

Country Link
CN (1) CN100340722C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942830A (en) * 2010-08-19 2011-01-12 上海强劲基础工程有限公司 Combined concrete soil pile with core pile and construction method as well as construction device thereof

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102373705A (en) * 2011-07-11 2012-03-14 上海城地建设发展有限公司 Pile sinking device and method for outer digging pre-stressed centrifugal pipe pile and square pile
CN102926382B (en) * 2012-11-08 2016-01-20 东莞市华科建筑科技有限公司 A kind of construction method of SMW engineering method
CN102926383B (en) * 2012-11-08 2016-04-27 东莞市华科建筑科技有限公司 A kind of single shaft SMW engineering method stake machine
CN103015413B (en) * 2012-12-26 2015-05-27 杭州南联土木工程科技有限公司 Construction method of composite pile with implanting-in rigid-body embedded into hard bearing stratum
CN103204451A (en) * 2013-04-03 2013-07-17 同济大学 Continuous-walking type hydraulic pushing device
CN103603347A (en) * 2013-10-31 2014-02-26 周兆弟 Anti-soil-accumulation cement mixing precast pile foundation and forming method
CN103669377A (en) * 2013-11-26 2014-03-26 山西四建集团有限公司 Waterproof curtain construction method
CN104213558B (en) * 2014-08-26 2016-01-27 浙江冶民园林工程有限公司 Mechanical punching stake
CN105735313A (en) * 2016-04-19 2016-07-06 黑龙江龙华岩土工程有限公司 Jacking type pile machine mixing and jet grouting device and pile forming method thereof
CN106638583A (en) * 2016-10-24 2017-05-10 中国民航机场建设集团公司 CFG pile driver quality monitoring system
CN108265708B (en) * 2018-03-28 2024-03-15 周兆弟 Piling equipment
CN108316294A (en) * 2018-03-30 2018-07-24 上海建工二建集团有限公司 The pile frame system and its application method of stake drilling machine are planted for ultra-deep

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1043181A (en) * 1988-12-06 1990-06-20 北京市机械施工公司 Long spiral auger pressurized slurry constructin method and device thereof
EP0504506A1 (en) * 1991-03-18 1992-09-23 Fang, Harvard Hydraulic pressure pile driver
CN2156212Y (en) * 1993-04-09 1994-02-16 建设部长沙建设机械研究院 Foldable pile frame
CN2296899Y (en) * 1997-05-28 1998-11-11 周本祥 Gantry cylinder top pressure type hydraulic static pile press
CN1260425A (en) * 1998-12-18 2000-07-19 邹宗煊 Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment
CN1632237A (en) * 2004-12-29 2005-06-29 天津市华达商贸有限公司 Construction machinery for long spiral press pouring concrete lock pin combination piles
CN1632232A (en) * 2004-12-23 2005-06-29 东南大学 Bi-directional cement soil mixing pile machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1043181A (en) * 1988-12-06 1990-06-20 北京市机械施工公司 Long spiral auger pressurized slurry constructin method and device thereof
EP0504506A1 (en) * 1991-03-18 1992-09-23 Fang, Harvard Hydraulic pressure pile driver
CN2156212Y (en) * 1993-04-09 1994-02-16 建设部长沙建设机械研究院 Foldable pile frame
CN2296899Y (en) * 1997-05-28 1998-11-11 周本祥 Gantry cylinder top pressure type hydraulic static pile press
CN1260425A (en) * 1998-12-18 2000-07-19 邹宗煊 Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment
CN1632232A (en) * 2004-12-23 2005-06-29 东南大学 Bi-directional cement soil mixing pile machine
CN1632237A (en) * 2004-12-29 2005-06-29 天津市华达商贸有限公司 Construction machinery for long spiral press pouring concrete lock pin combination piles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942830A (en) * 2010-08-19 2011-01-12 上海强劲基础工程有限公司 Combined concrete soil pile with core pile and construction method as well as construction device thereof

Also Published As

Publication number Publication date
CN1718938A (en) 2006-01-11

Similar Documents

Publication Publication Date Title
CN100340722C (en) Concrete core cement soil stirring pile machine and its construction technological method
CN110387879B (en) Concrete cast-in-place pile construction method for hydraulically vibrating and hammering immersed tube
CN110374500B (en) Grouped drilling and pile planting construction method
CN1793525A (en) Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN104711975B (en) Construction technology for long spiral cast-in-situ bored pile
CN107326898B (en) I-shaped precast pile supporting structure with adjustable inserted rigidity in cement-soil wall and construction method thereof
CN109098176A (en) The concrete-cored stake machine of the concrete-cored pile driving construction integral type of cement concrete and construction method
CN106545020A (en) A kind of construction method of deep foundation pit support
CN1900466A (en) Isolation pile construction method for important building protection
CN201321614Y (en) Retaining structure of precast reinforced concrete beam cement-soil piling wall
CN1676762A (en) Boring-tamping lime-soil compacting pile construction process
CN111519612B (en) Construction method of full-casing follow-up long spiral drilling pressure-grouting secant pile
CN110331936B (en) Combined drilling bottom-expanding pile-planting construction method
CN2890172Y (en) Concrete-cored soil cement mixing pile machine
CN1260425A (en) Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment
CN209053091U (en) The concrete-cored stake machine of the concrete-cored pile driving construction integral type of cement concrete
CN105804067A (en) Construction method for structural steel cemented soil stirring pile stand column used for deep foundation pit support
CN114592517B (en) Pile body dead weight hammering construction process with enlarged pile shoe
CN115233668A (en) Post-grouting construction method for precast tubular pile by internally hammering pile tip into rock
CN1117906C (en) Construction method of concrete pile and its construction equipment
CN1112486C (en) Construction equipment for in-site pouring concrete pile
CN1804230A (en) Construction method employing threaded stirring shaft to decrease ambient foundation deformation
KR100819379B1 (en) Concrete construction using hydraulic system and anti-noise non-vibration manufacturing method of concrete construction
CN112144519B (en) Drilling tool, cement-soil mixing pile sinking all-in-one machine and construction method of composite pile
CN113026801A (en) Construction method for reinforcing steel pipe pile of construction elevator foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 210093 Hankou Road, Jiangsu, China, No. 22, No.

Co-patentee after: Jiangsu Provincial Communications Planning and Design Institute Co.,Ltd.

Patentee after: NANJING University

Address before: 210093 Hankou Road, Jiangsu, China, No. 22, No.

Co-patentee before: Jiangsu Provincial Communication Planning and Design Institute Co.,Ltd.

Patentee before: Nanjing University

Address after: 210093 Hankou Road, Jiangsu, China, No. 22, No.

Co-patentee after: Jiangsu Provincial Communication Planning and Design Institute Co.,Ltd.

Patentee after: NANJING University

Address before: 210093 Hankou Road, Jiangsu, China, No. 22, No.

Co-patentee before: Communications Planning and Design Institute of Jiangsu Province

Patentee before: Nanjing University

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071003

Termination date: 20140713