CN220151309U - Drill rod trash removal structure for construction of long spiral bored concrete pile - Google Patents
Drill rod trash removal structure for construction of long spiral bored concrete pile Download PDFInfo
- Publication number
- CN220151309U CN220151309U CN202321018095.0U CN202321018095U CN220151309U CN 220151309 U CN220151309 U CN 220151309U CN 202321018095 U CN202321018095 U CN 202321018095U CN 220151309 U CN220151309 U CN 220151309U
- Authority
- CN
- China
- Prior art keywords
- guide plate
- baffle ring
- long spiral
- drill rod
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 11
- 239000010813 municipal solid waste Substances 0.000 title description 2
- 238000007790 scraping Methods 0.000 claims abstract description 34
- 238000004140 cleaning Methods 0.000 claims abstract description 14
- 238000005553 drilling Methods 0.000 claims abstract description 8
- 230000000149 penetrating effect Effects 0.000 claims abstract description 3
- 239000002689 soil Substances 0.000 description 20
- 238000000034 method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000003670 easy-to-clean Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a drill rod dirt cleaning structure for construction of a long spiral filling pile; the dirt cleaning structure comprises a baffle ring arranged on a long spiral drilling machine, a guide plate detachably arranged on the outer circumference of the baffle ring, and a mud scraping device arranged on the guide plate. The mud scraping device comprises a scraping rod penetrating through the guide plate and hinged to the guide plate through a support, and a balancing weight arranged at the lower end of the scraping rod; the top end of the scraping rod is processed into a bent hook shape. The utility model can conveniently realize the cleaning operation of the drill rod and avoid the occurrence of potential safety hazards.
Description
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a drill rod dirt cleaning structure for construction of a long spiral filling pile.
Background
When the construction of the long spiral filling pile is carried out, a long spiral drilling machine is adopted to drill holes in advance to a preset depth; when the spiral drill rod is lifted out of the soil, a large amount of soil is clamped in the gaps of the spiral blades, the soil is not easy to separate when the screw rod is lifted, cleaning is realized by subsequent hammering or shoveling and cutting by staff, cleaning is time-consuming and labor-consuming, and the soil blocks which are separated individually often occur at high positions and easily damage ground staff.
Disclosure of Invention
The utility model aims to provide a drill rod dirt-removing structure for construction of a long spiral filling pile; the spiral drill rod is used for solving the problem that soil is not easy to clean when the spiral drill rod is carried.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a long spiral bored concrete pile construction is with drilling rod structure of decontaminating, includes the fender ring of establishing on long spiral drilling machine, its characterized in that still includes detachable baffle that sets up on the fender ring outer circumference, establishes the mud scraping device on the baffle.
Further, the mud scraping device comprises a scraping rod penetrating through the guide plate and hinged to the guide plate through a support, and a balancing weight arranged at the lower end of the scraping rod; the top end of the scraping rod is processed into a bent hook shape.
Further, two sleeves are arranged on the outer circumference of the baffle ring at intervals, inserting rods corresponding to the sleeves are arranged on the lower side of the guide plate, and the inserting rods are matched with the sleeves to realize detachable connection of the guide plate and the baffle ring.
Further, the deflector is semi-annular in top view, and is inclined obliquely downwards relative to the baffle ring.
The beneficial effects of the utility model are as follows:
the scraping rod acts on the space between the blades of the spiral drill rod, and the screw rod reversely rotates when being lifted, so that the scraping rod is promoted to destroy the inherent stability of soil, the soil is further quickly dropped off and scattered to the periphery of the spiral drill rod through the guide plate, the follow-up manual cleaning is not needed, and the safety risk caused by the drop of the soil at high positions is avoided; the detachable connection structure of the guide plate and the baffle ring increases the convenience of application.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a schematic diagram of another embodiment of the present utility model;
fig. 3 is a schematic top view of the deflector and the scraper bar according to the present utility model.
Wherein, 1-baffle ring; 2-a deflector; 3-scraping rod; 4-balancing weight; 5-sleeve; and 6-inserting the rod.
Detailed Description
The preferred embodiments of the present utility model will be described below with reference to the accompanying drawings.
As shown in fig. 1 to 3, a drill rod dirt cleaning structure for construction of a long spiral bored pile; the dirt cleaning structure comprises a baffle ring 1 arranged on a long spiral drilling machine, wherein the baffle ring 1 is sleeved on the outer side of a spiral drill rod which is vertically arranged. The dirt cleaning structure further comprises a guide plate 2 detachably arranged on the outer circumference of the baffle ring 1 and a mud scraping device arranged on the guide plate 2.
The deflector 2 is used for realizing the dispersion of earth, and the condition of backfilling appears in the earth accumulation in drilling position too near. The deflector 2 is semi-annular in plan view, and the deflector 2 is inclined obliquely downwards relative to the baffle ring 1, so that soil blocks can be promoted to slide down.
The mud scraping device comprises a scraping rod 3 and a balancing weight 4. The top end of the scraping rod 3 is processed into a hook shape, so that the scraping rod is beneficial to being inserted into a soil layer, the soil blocks are disturbed, and the soil blocks are promoted to fall off rapidly; the scraping rod 3 is in a bending shape; the scraping rod 3 penetrates through the guide plate 2, a support is arranged on the guide plate 2, a pin shaft is inserted in the middle of the scraping rod 3, the scraping rod 3 is hinged to the support through cooperation of the pin shaft and the support, and the balancing weight 4 is connected to the bottom of the scraping rod 3. The scraper bar 3 has a moving swing space when acting on the soil blocks, which can further promote the disturbance of the soil blocks.
The baffle ring 1 is provided with two sleeves 5 at intervals on the outer circumference, the lower side of the guide plate 2 is provided with a inserted link 6 corresponding to the sleeves 5, the inserted link 6 is inserted into the sleeves 5 to realize the connection and fixation of the guide plate 2 and the baffle ring 1, and the structure also has the characteristics of detachability and convenient maintenance.
The application method and the working principle of the utility model are as follows:
when the spiral drill rod on the long spiral drilling machine is lifted, the spiral drill rod is lifted in a rotating state; the scraping rod 3 and the end part of the bent hook shape are inserted into the soil layer clamped by the blades in the lifting process, and the soil layer is scraped or pulled, so that the soil layer is disturbed to change the inherent consolidation state, and then automatically falls off and slides down through the guide plate 2. In the soil scraping process, due to the hinged connection of the scraping rod 3 and the matching action of the balancing weight 4, the end part of the scraping rod 3 is enabled to have a certain swinging function when scraping soil, the actual action position of the scraping rod 3 can be changed, and the soil falling is further promoted. The spiral drill rod cleaning device is simple in overall structural design, convenient to process and manufacture and capable of achieving an automatic cleaning function of the spiral drill rod.
Claims (3)
1. The drill rod dirt removing structure for the construction of the long spiral bored concrete pile comprises a baffle ring arranged on a long spiral drilling machine and is characterized by further comprising a guide plate detachably arranged on the outer circumference of the baffle ring and a mud scraping device arranged on the guide plate; the mud scraping device comprises a scraping rod penetrating through the guide plate and hinged to the guide plate through a support, and a balancing weight arranged at the lower end of the scraping rod; the top end of the scraping rod is processed into a bent hook shape.
2. The drill rod dirt cleaning structure for construction of long spiral bored concrete pile according to claim 1, wherein two sleeves are arranged on the outer circumference of the baffle ring at intervals, inserted bars corresponding to the sleeves are arranged on the lower side of the guide plate, and the inserted bars are matched with the sleeves to realize detachable connection of the guide plate and the baffle ring.
3. The drill rod dirt cleaning structure for construction of long spiral bored concrete pile as set forth in claim 2, wherein the deflector is semi-annular in plan view projection, and the deflector is inclined obliquely downward relative to the baffle ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321018095.0U CN220151309U (en) | 2023-04-29 | 2023-04-29 | Drill rod trash removal structure for construction of long spiral bored concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321018095.0U CN220151309U (en) | 2023-04-29 | 2023-04-29 | Drill rod trash removal structure for construction of long spiral bored concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220151309U true CN220151309U (en) | 2023-12-08 |
Family
ID=89019590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321018095.0U Active CN220151309U (en) | 2023-04-29 | 2023-04-29 | Drill rod trash removal structure for construction of long spiral bored concrete pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220151309U (en) |
-
2023
- 2023-04-29 CN CN202321018095.0U patent/CN220151309U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101766081A (en) | Pull-type combined harvester for deep-root Chinese medicinal plants | |
CN202882773U (en) | Long spiral drilling machine and automatic soil cleaning device thereof | |
CN108966795B (en) | Double-row four-shovel vibration type cassava excavator | |
CN220151309U (en) | Drill rod trash removal structure for construction of long spiral bored concrete pile | |
CN111886946B (en) | Device that loosens soil breaks ground in planting | |
CN105089512A (en) | Under-slung auger stem desilting machine | |
CN212463968U (en) | Agricultural production is with equipment for improvement soil | |
CN107347580B (en) | Suspension type seedling lifter | |
CN113498653A (en) | Melon and fruit is planted with automatic squaring equipment | |
CN214592797U (en) | Difficult vertical afforestation working head of digging a pit | |
CN210782019U (en) | Tobacco planting dibbler | |
CN2396609Y (en) | Residual mulching film removing recovery implement for farm field | |
CN211702945U (en) | Spiral soil digging device | |
CN202565705U (en) | Suspension type digging mechanism | |
CN111305298A (en) | Construction machinery and construction method for building foundation pit | |
CN210694950U (en) | Chinese yam excavating gear | |
CN220935574U (en) | Fruit tree hole digger equipment for fruit tree planting | |
CN211527868U (en) | Soil sample retreating device for geotechnical density test | |
CN217481200U (en) | Bottom expanding drill bit for cast-in-situ bored pile | |
CN220645907U (en) | Hole cleaning device | |
CN219386313U (en) | High-efficient desilting device in bored concrete pile hole | |
CN217428659U (en) | Digging device for landscaping | |
CN220630101U (en) | Bupleurum digger | |
CN113445560B (en) | Ditching device for land comprehensive remediation, irrigation and drainage engineering and application | |
CN216207735U (en) | Geotechnical sampling device for geotechnical engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |