CN220058089U - Combined prefabricated pipe gallery - Google Patents

Combined prefabricated pipe gallery Download PDF

Info

Publication number
CN220058089U
CN220058089U CN202321529765.5U CN202321529765U CN220058089U CN 220058089 U CN220058089 U CN 220058089U CN 202321529765 U CN202321529765 U CN 202321529765U CN 220058089 U CN220058089 U CN 220058089U
Authority
CN
China
Prior art keywords
pipe gallery
piece
fixed connection
support
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321529765.5U
Other languages
Chinese (zh)
Inventor
王靖博
刘险峰
李德奎
彭靖
邱政银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Uonue Utility Tunnel Technology Chongqing Co ltd
Original Assignee
Uonue Utility Tunnel Technology Chongqing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Uonue Utility Tunnel Technology Chongqing Co ltd filed Critical Uonue Utility Tunnel Technology Chongqing Co ltd
Priority to CN202321529765.5U priority Critical patent/CN220058089U/en
Application granted granted Critical
Publication of CN220058089U publication Critical patent/CN220058089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to the technical field of pipe galleries, in particular to a combined prefabricated pipe gallery, which comprises two pipe gallery main bodies and a mounting mechanism, wherein the two pipe gallery main bodies are in contact with each other, the mounting mechanism comprises a plurality of groups of mounting components, each mounting component comprises a support plate, a supporting block, two springs, two loop bars and two slide bars, the support plates are fixedly connected with the corresponding pipe gallery main bodies, one ends of the loop bars are fixedly connected with the corresponding pipe gallery main bodies, the other ends of the loop bars are sleeved with the corresponding slide bars, one ends of the slide bars, which are far away from the loop bars, are fixedly connected with the supporting blocks, the supporting blocks are provided with cambered surfaces, the support plates are provided with supporting grooves, one sides, which are far away from the slide bars, of the supporting blocks are inserted into the supporting grooves, one ends of the two springs are fixedly connected with the corresponding pipe gallery main bodies, and the other ends of the two springs are fixedly connected with the supporting blocks.

Description

Combined prefabricated pipe gallery
Technical Field
The utility model relates to the technical field of pipe galleries, in particular to a combined prefabricated pipe gallery.
Background
The pipe gallery, namely the corridor of pipeline, a lot of pipelines in chemical industry and related factories are concentrated together, arrange outside the device or factory building, generally in the sky, prop up with the support, form the appearance similar with the corridor, also have a few pipe galleries to be located the underground, the construction is with various circuits in the city being concentrated and being settled inside the pipe gallery in the below pipe gallery, and then the staff of being convenient for maintains, present prefabricated pipe gallery mainly divide into whole prefabricated pipe gallery and pieced prefabricated pipe gallery, wherein whole prefabricated pipe gallery divide into the nipple joint with the pipe gallery on the vertical axis and prefabricate, again assemble to the job site.
But current whole prefabricated piping lane is slower to efficiency when installing the equipment to two adjacent piping lane to influence whole efficiency of construction.
Disclosure of Invention
The utility model aims to provide a combined prefabricated pipe gallery, which aims to solve the technical problem that the efficiency of the existing integral prefabricated pipe gallery is low when two adjacent pipe galleries are assembled in the prior art, so that the integral construction efficiency is affected.
In order to achieve the above purpose, the combined prefabricated pipe gallery comprises two pipe gallery main bodies and a mounting mechanism, wherein the two pipe gallery main bodies are in contact with each other, the mounting mechanism comprises a plurality of groups of mounting assemblies, each mounting assembly comprises a support plate, a supporting block, two springs, two loop bars and two sliding bars, the support plates are fixedly connected with the corresponding pipe gallery main bodies, one ends of the loop bars are fixedly connected with the corresponding pipe gallery main bodies, the corresponding sliding bars are sleeved at the other ends of the loop bars, one ends of the sliding bars, far away from the loop bars, are fixedly connected with the supporting blocks, cambered surfaces are arranged on the supporting blocks, supporting grooves are formed in the support plates, one sides, far away from the sliding bars, of the supporting blocks are inserted into the supporting grooves, one ends of the two springs are fixedly connected with the corresponding pipe gallery main bodies, and the other ends of the two springs are fixedly connected with the supporting blocks.
The installation component still includes the slider, the piping lane main part still is provided with two spouts, the slider with extension board fixed connection, and be located the below of extension board, just the slider with corresponding spout sliding connection.
The installation assembly further comprises two connecting rods, and two ends of each connecting rod are fixedly connected with the corresponding support plates respectively.
The combined prefabricated pipe gallery comprises a pipe gallery body, a combined prefabricated pipe gallery body and a combined prefabricated pipe gallery body, wherein the combined prefabricated pipe gallery body comprises a plurality of groups of hanging components, each hanging component comprises two supporting blocks, a shaft body and hanging rings, the two supporting blocks are respectively fixedly connected with the corresponding pipe gallery body, two ends of the shaft body are respectively and rotatably connected with the corresponding supporting blocks, and the hanging rings are fixedly connected with the outer wall of the shaft body.
The lifting assembly further comprises a protection piece, wherein the protection piece is arranged on the lifting ring and located on the inner side wall of the lifting ring.
According to the combined prefabricated pipe gallery, the mounting mechanism is arranged, when the pipe gallery is specifically mounted, the two support plates on one pipe gallery main body are aligned to the other pipe gallery main body, the corresponding pipe gallery main bodies are pushed, the two support plates slide in the other pipe gallery main body, the two support plates support the two cambered surfaces on the corresponding two support blocks while sliding in the corresponding pipe gallery main body, the support plates support the corresponding cambered surfaces to drive the support blocks to move, the support blocks drive the corresponding slide rods to slide in the loop bars, the support blocks drive the corresponding two springs to shrink, the springs continue to push the corresponding pipe gallery main bodies, drive the corresponding two support plates to move to the designated positions, at the moment, the springs reset and stretch, the springs drive the support blocks to insert into the corresponding support grooves, and the two support blocks support the two support blocks to move in the loop bars, so that the pipe gallery can be mounted in a more convenient manner.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a schematic structural view of a first embodiment of the present utility model.
Fig. 2 is a cross-sectional view of the A-A line structure of fig. 1 in accordance with the present utility model.
Fig. 3 is a cross-sectional view of the B-B line structure of fig. 1 according to the present utility model.
Fig. 4 is a schematic structural view of a second embodiment of the present utility model.
101-pipe gallery main body, 102-connecting rod, 103-supporting plate, 104-supporting block, 105-spring, 106-loop bar, 107-slide bar, 108-slide block, 109-supporting groove, 110-cambered surface, 111-slide groove, 201-supporting block, 202-shaft body, 203-hanging ring and 204-protection piece.
Detailed Description
First embodiment:
referring to fig. 1 to 3, fig. 1 is a schematic structural view of a first embodiment of the present utility model, fig. 2 is a sectional view of the A-A line structure of fig. 1 of the present utility model, and fig. 3 is a sectional view of the B-B line structure of fig. 1 of the present utility model.
The utility model provides a combined prefabricated pipe gallery, which comprises: including two piping lane main part 101 and installation mechanism, installation mechanism includes multiunit installation component and two connecting rods 102, the installation component includes extension board 103, supports and holds piece 104, two springs 105, two loop bars 106, two slide bars 107 and slider 108, and the efficiency is slower when installing the equipment to two adjacent piping lane in current whole prefabricated piping lane among the prior art has been solved to the aforesaid scheme to influence the technical problem of whole efficiency of construction.
For this embodiment, two pipe gallery main bodies 101 contact each other, two pipe gallery main bodies 101 are all prefabricated pipe gallery of whole for build under, the effect is with various circuits in the city are concentrated and are settled pipe gallery main body 101 is inside.
Wherein the support plate 103 is fixedly connected with the corresponding pipe gallery main body 101, one end of the loop bar 106 is fixedly connected with the corresponding pipe gallery main body 101, the other end of the loop bar 106 is sleeved with the corresponding slide bar 107, one end of the slide bar 107, which is far away from the loop bar 106, is fixedly connected with the supporting block 104, the supporting block 104 is provided with a cambered surface 110, the support plate 103 is provided with a supporting groove 109, one side, which is far away from the slide bar 107, of the supporting block 104 is inserted into the supporting groove 109, one ends of the two springs 105 are fixedly connected with the corresponding pipe gallery main body 101, the other ends of the two springs 105 are fixedly connected with the supporting block 104, and by arranging the mounting mechanism, when in specific mounting, the two support plates 103 on one pipe gallery main body 101 are aligned with the other pipe gallery main body 101 and push the corresponding pipe gallery main body 101, so that the two support plates 103 slide in the other pipe rack main body 101, the two support plates 103 support the two cambered surfaces 110 on the corresponding two support blocks 104 while sliding in the corresponding pipe rack main body 101, when the support plates 103 support the corresponding cambered surfaces 110, the support blocks 104 drive the support blocks 104 to move, the corresponding slide bars 107 slide in the sleeve bars 106 by the support blocks 104, the corresponding two springs 105 are driven to shrink by the support blocks 104, the corresponding pipe rack main body 101 is continuously pushed, the corresponding two support plates 103 are driven to move to the designated position, at this time, the springs 105 are reset and elongated, the springs 105 drive the support blocks 104 to be inserted into the corresponding support grooves 109, the two support blocks 103 are matched to support, limit and fix the two support plates 103, thereby install two pipe gallery main part 101 is accomplished to this mode can be more convenient install two pipe gallery main part 101, promoted the efficiency of construction.
Secondly, the pipe rack main body 101 is further provided with two sliding grooves 111, the sliding blocks 108 are fixedly connected with the support plates 103 and are located below the support plates 103, the sliding blocks 108 are slidably connected with the corresponding sliding grooves 111, and when the support plates 103 move, the support plates 103 drive the sliding blocks 108 to slide in the corresponding sliding grooves 111 through the sliding blocks 108, so that the stability of the support plates 103 is improved, and quick positioning can be achieved.
Meanwhile, two ends of the connecting rod 102 are fixedly connected with the corresponding support plates 103 respectively, and the corresponding two support plates 103 can be connected through the connecting rod 102, so that the stability of the two support plates 103 is improved.
By means of the combined prefabricated pipe gallery provided by the embodiment, the installation mechanism is arranged, when the installation mechanism is specifically installed, one of the two support plates 103 is aligned to the other support plate 103 in the pipe gallery main body 101, the corresponding support plate 103 is pushed to slide in the other pipe gallery main body 101, the two support plates 103 slide in the corresponding pipe gallery main body 101 and simultaneously support the two corresponding support plates 104 on the two cambered surfaces 110, the support plates 103 support the corresponding cambered surfaces 110 and drive the support blocks 104 to move, the support blocks 104 drive the corresponding slide rods 107 to slide in the sleeve rods 106, the support blocks 104 drive the corresponding two springs 105 to shrink, the corresponding support plates 103 are driven to move to a specified position at the moment, the springs 105 are reset to drive the corresponding spring 105 to slide in the pipe gallery main body 101, and the two support blocks are driven to move into the corresponding support blocks, and the two support plates 103 can be installed in a fixed mode, and the two support plates 101 can be installed in a matched mode.
Second embodiment:
referring to fig. 4 on the basis of the first embodiment, fig. 4 is a schematic structural diagram of a second embodiment of the present utility model.
The utility model provides a combined prefabricated pipe gallery, which also comprises a plurality of groups of hanging components, wherein each hanging component comprises two supporting blocks 201, a shaft body 202, hanging rings 203 and a protective piece 204.
For this embodiment, two prop up piece 201 respectively with corresponding pipe gallery main part 101 fixed connection, the both ends of axis body 202 respectively with corresponding prop up piece 201 rotation connection, rings 203 with the outer wall fixed connection of axis body 202, when installing pipe gallery main part 101 needs hoist and mount, with the lifting hook on corresponding rings 203, can hoist pipe gallery main part 101 that corresponds, when hoist and mount, rings 203 drive along with gravity the both ends of axis body 202 rotate respectively on corresponding prop up piece 201, make rings 203 laminating in pipe gallery main part 101 can practice thrift the space.
The protection piece 204 is disposed on the hanging ring 203 and located on the inner side wall of the hanging ring 203, and an anti-slip effect can be achieved between the hanging ring 203 and the lifting hook through the arrangement of the protection piece 204.
Use a prefabricated piping lane of combination formula of this embodiment, when installing the piping lane main part 101 needs hoist and mount, with the lifting hook in the correspondence rings 203 can hoist and mount the piping lane main part 101 that corresponds, when hoist and mount, rings 203 drive along with gravity the both ends of axis body 202 are respectively in the correspondence prop up piece 201 and rotate, make rings 203 laminate in piping lane main part 101 can practice thrift the space, through setting up protector 204 can be right play anti-skidding effect between rings 203 and the lifting hook.
The above disclosure is only a preferred embodiment of the present utility model, and it should be understood that the scope of the utility model is not limited thereto, and those skilled in the art will appreciate that all or part of the procedures described above can be performed according to the equivalent changes of the claims, and still fall within the scope of the present utility model.

Claims (5)

1. A combined prefabricated pipe gallery comprises two pipe gallery main bodies, wherein the two pipe gallery main bodies are contacted with each other,
the device also comprises a mounting mechanism, wherein the mounting mechanism comprises a plurality of groups of mounting components;
the installation component includes the extension board, supports and hold piece, two springs, two loop bars and two slide bars, the extension board with correspond pipe gallery main part fixed connection, the one end of loop bar with correspond pipe gallery main part fixed connection, the other end cover of loop bar is established corresponding the slide bar, the slide bar keep away from the one end of loop bar with support and hold piece fixed connection, support and hold the piece and be provided with cambered surface department, the extension board is provided with and supports and hold the groove, support and hold the piece keep away from the one side of slide bar insert to support and hold the inslot, two the one end of spring all with correspond pipe gallery main part fixed connection, and two the other end of spring all with support and hold piece fixed connection.
2. The modular pre-fabricated piping lane of claim 1 wherein,
the installation component still includes the slider, the piping lane main part still is provided with two spouts, the slider with extension board fixed connection, and be located the below of extension board, just the slider with corresponding spout sliding connection.
3. The modular pre-fabricated tube lane of claim 2 wherein,
the installation component still includes two connecting rods, the both ends of connecting rod respectively with corresponding extension board fixed connection.
4. A modular prefabricated piping lane as claimed in claim 3 wherein,
the prefabricated piping lane of combination still includes the multiunit and hangs and get the subassembly, hang and get the subassembly and include two piece pieces, axis body and rings, two the piece respectively with corresponding piping lane main part fixed connection, the both ends of axis body respectively with the piece rotation is connected that corresponds, rings with the outer wall fixed connection of axis body.
5. The modular pre-fabricated tube lane of claim 4 wherein,
the lifting assembly further comprises a protection piece, wherein the protection piece is arranged on the lifting ring and is positioned on the inner side wall of the lifting ring.
CN202321529765.5U 2023-06-15 2023-06-15 Combined prefabricated pipe gallery Active CN220058089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321529765.5U CN220058089U (en) 2023-06-15 2023-06-15 Combined prefabricated pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321529765.5U CN220058089U (en) 2023-06-15 2023-06-15 Combined prefabricated pipe gallery

Publications (1)

Publication Number Publication Date
CN220058089U true CN220058089U (en) 2023-11-21

Family

ID=88754594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321529765.5U Active CN220058089U (en) 2023-06-15 2023-06-15 Combined prefabricated pipe gallery

Country Status (1)

Country Link
CN (1) CN220058089U (en)

Similar Documents

Publication Publication Date Title
CN211447718U (en) Well operation platform
CN209977447U (en) Antidetonation support convenient to installation
CN220058089U (en) Combined prefabricated pipe gallery
CN110436394B (en) Outer machine erection equipment of air conditioner
CN110259096A (en) The certainly mobile operation platform of civil engineering and its application method
CN216195505U (en) A novel fossil fragments for building engineering
CN215084433U (en) Smoke blocking vertical wall fire-resistant plate mounting structure
CN210423961U (en) Auxiliary mounting mechanism for large-diameter oil and gas pipeline
CN212584421U (en) Combined pipe gallery support with high shock strength
CN108265861A (en) A kind of aluminium-plastic panel mounting connection structure
CN210716187U (en) Hydraulic control valve convenient to maintain
CN211516608U (en) Flexible composite pipe joint pipe filling machine
CN210704448U (en) Butt joint supporting and adjusting device for water supply and drainage pipeline
CN209370591U (en) A kind of rectangle blower antidetonation suspension and support
CN216238646U (en) Small-size utility tunnel convenient to dismantle installation
CN217815420U (en) Piping lane pipeline branch mouth crowd's sleeve pipe wall watertight fittings
CN219554515U (en) Bridge structure
CN216078958U (en) Concatenation formula LED screen support
CN215817346U (en) Just, dismantlement formula cable erection crane span structure of electromechanical engineering installation usefulness
CN219196446U (en) Suspended type building suspended ceiling structure
CN216948629U (en) Flood prevention pump truck
CN212198357U (en) Piping lane water supply pipeline erects mechanism
CN209905470U (en) Energy-concerving and environment-protective building pipe fitting rack for civil engineering
CN220622989U (en) Civil engineering construction pipeline strutting arrangement
CN212407807U (en) Pipeline supporting and hanging frame for building electromechanical installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant