CN220036182U - Pre-buried equipment of civil engineering construction - Google Patents
Pre-buried equipment of civil engineering construction Download PDFInfo
- Publication number
- CN220036182U CN220036182U CN202321475181.4U CN202321475181U CN220036182U CN 220036182 U CN220036182 U CN 220036182U CN 202321475181 U CN202321475181 U CN 202321475181U CN 220036182 U CN220036182 U CN 220036182U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- buried
- civil engineering
- equipment
- bracing piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title abstract description 12
- 230000007246 mechanism Effects 0.000 claims abstract description 10
- 238000009434 installation Methods 0.000 claims description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to the technical field of civil engineering and discloses civil engineering pre-buried equipment, which comprises pre-buried plates, wherein the bottoms of the pre-buried plates are fixedly connected with supporting legs, the number of the supporting legs is two, folding mechanisms are arranged at the bottoms of the supporting legs and comprise first supporting rods, the first supporting rods are connected to the inner walls of the supporting legs in a sliding mode, and bottom plates are fixedly connected to the bottoms of the first supporting rods. This pre-buried equipment of civil engineering construction through setting up folding mechanism, can expand the fixed plate when using this equipment, and then increase the area with concrete contact, improves the stability of this equipment, when not using this equipment, can fold the fixed plate through the cooperation use to fixed plate and dead lever, contracts first bracing piece through controlling electric telescopic handle, carries out spacingly through limiting plate folding back fixed plate, reduces the volume when this equipment carries, makes this equipment portable.
Description
Technical Field
The utility model relates to the technical field of civil engineering, in particular to pre-buried equipment for civil engineering.
Background
The civil construction refers to the construction of wood constructional engineering, and covers the construction of buildings, structures and engineering objects in the construction fields of houses, roads, railways, airports, bridges, water conservancy, ports, tunnels, water supply and drainage, protection and the like in various fields of land, underground, land, water, underwater and the like, and the civil construction comprises the technical activities of survey, design, construction, maintenance, management and the like in the engineering construction process.
In the civil engineering construction process, need use pre-buried equipment generally, but current pre-buried equipment is mostly only simple bracing piece and concrete contact, and area of contact is little, and stability is relatively poor, and the equipment of installation large tracts of land bottom plate and concrete contact is inconvenient for folding the bottom plate, and then makes pre-buried equipment volume great easily, inconvenient carry.
Disclosure of Invention
The utility model aims to provide civil engineering construction pre-buried equipment so as to solve the problems in the background technology.
In order to solve the technical problems, the utility model provides the following technical scheme: the civil engineering pre-buried equipment comprises a pre-buried plate, wherein the bottom of the pre-buried plate is fixedly connected with two supporting legs, and the bottom of the supporting legs is provided with a folding mechanism;
the folding mechanism comprises a first supporting rod, the first supporting rod is connected to the inner wall of the supporting leg in a sliding mode, a bottom plate is fixedly connected to the bottom of the first supporting rod, fixing rods are fixedly connected to two sides of the bottom plate, and a fixing plate is connected to the surface of the fixing rods in a rotating mode.
Preferably, the top sliding connection of pre-buried board has the installation shell, the quantity of installation shell is two, one side fixedly connected with bearing of installation shell.
Preferably, the top fixedly connected with fixed block of pre-buried board, the inner wall threaded connection of fixed block has the threaded rod, the one end of threaded rod and the inner wall fixed connection of bearing inner race.
Preferably, the bottom fixedly connected with guide block of installation shell, the guide way that uses with the guide block cooperation is seted up at the top of pre-buried board.
Preferably, the both sides of supporting leg all fixedly connected with locating lever, the fixed surface of locating lever is connected with the limiting plate.
Preferably, the inner wall fixedly connected with electric telescopic handle of supporting leg, electric telescopic handle's output and the top fixed connection of first bracing piece, the equal fixedly connected with second bracing piece in both sides of supporting leg, the one end of second bracing piece and the bottom fixed connection of pre-buried board.
Preferably, the two sides of the first support rod are fixedly connected with sliding blocks, and the inner wall of the support leg is provided with sliding grooves matched with the sliding blocks.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the folding mechanism is arranged, so that the fixing plate can be unfolded when the equipment is used, the contact area between the fixing plate and concrete is increased, the stability of the equipment is improved, when the equipment is not used, the fixing plate can be folded through the cooperation of the fixing plate and the fixing rod, the first supporting rod is contracted through the control of the electric telescopic rod, the limiting plate is used for limiting the folded fixing plate, the volume of the equipment is reduced, and the equipment is convenient to carry.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is an enlarged view of the utility model at A in FIG. 1;
FIG. 3 is a cross-sectional view of a partial structure of the present utility model;
fig. 4 is an exploded view of a partial structure of the present utility model.
Wherein: 1. embedding a plate; 2. support legs; 3. a folding mechanism; 301. a first support bar; 302. a bottom plate; 303. a fixed rod; 304. a fixing plate; 4. a mounting shell; 5. a bearing; 6. a fixed block; 7. a threaded rod; 8. a guide block; 9. a guide groove; 10. a positioning rod; 11. a limiting plate; 12. an electric telescopic rod; 13. a slide block; 14. a chute; 15. and a second support bar.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, a pre-buried device for civil engineering comprises a pre-buried plate 1, wherein the bottom of the pre-buried plate 1 is fixedly connected with two supporting legs 2, and a folding mechanism 3 is arranged at the bottom of the supporting legs 2;
the folding mechanism 3 comprises a first supporting rod 301, the first supporting rod 301 is connected to the inner wall of the supporting leg 2 in a sliding mode, the bottom of the first supporting rod 301 is fixedly connected with a bottom plate 302, two sides of the bottom plate 302 are fixedly connected with fixing rods 303, and the surface of the fixing rods 303 is rotatably connected with fixing plates 304.
Specifically, the top sliding connection of pre-buried board 1 has installation shell 4, and the quantity of installation shell 4 is two, and one side fixedly connected with bearing 5 of installation shell 4.
Through above-mentioned technical scheme, through setting up bearing 5, be convenient for fix a position threaded rod 7 to make threaded rod 7 rotate more stably, make threaded rod 7 can promote installation shell 4 and remove.
Specifically, the top fixedly connected with fixed block 6 of pre-buried board 1, the inner wall threaded connection of fixed block 6 has threaded rod 7, the inner wall fixed connection of one end and the bearing 5 inner race of threaded rod 7.
Through above-mentioned technical scheme, through setting up fixed block 6, can support threaded rod 7 to carry out threaded connection to threaded rod 7, be convenient for threaded rod 7 rotates.
Specifically, the bottom fixedly connected with guide block 8 of installation shell 4, guide slot 9 that uses with guide block 8 cooperation has been seted up at the top of pre-buried board 1.
Through above-mentioned technical scheme, through the cooperation use of guide block 8 and guide slot 9, can lead the removal of installation shell 4 to make the removal of installation shell 4 more stable.
Specifically, the two sides of the supporting leg 2 are fixedly connected with a positioning rod 10, and the surface of the positioning rod 10 is fixedly connected with a limiting plate 11.
Through above-mentioned technical scheme, through setting up limiting plate 11, can carry out spacingly to folding back fixed plate 304, reduce the volume when this equipment carries, make this equipment portable.
Specifically, the inner wall fixedly connected with electric telescopic handle 12 of supporting leg 2, electric telescopic handle 12's output and the top fixed connection of first bracing piece 301, the equal fixedly connected with second bracing piece 15 of both sides of supporting leg 2, the one end of second bracing piece 15 and the bottom fixed connection of pre-buried board 1.
Through above-mentioned technical scheme, through setting up electric telescopic handle 12, can adjust the position of first bracing piece 301, and then be convenient for adjust the height of this equipment.
Specifically, the two sides of the first supporting rod 301 are fixedly connected with a sliding block 13, and the inner wall of the supporting leg 2 is provided with a sliding groove 14 matched with the sliding block 13.
Through above-mentioned technical scheme, through the cooperation use of slider 13 and spout 14, can lead the removal of first bracing piece 301, make the removal of first bracing piece 301 more stable to can carry out spacing to first bracing piece 301, make first bracing piece 301 can not break away from the inner chamber of supporting leg 2.
When using, when not using this equipment, can use through the cooperation to fixed plate 304 and dead lever 303, fold fixed plate 304, shrink first bracing piece 301 through control electric telescopic handle 12, carry out spacingly to folding back fixed plate 304 through limiting plate 11, reduce the volume when this equipment carries, make this equipment portable, when using this equipment, expand fixed plate 304, and then increase the area of contact with the concrete, improve the stability of this equipment, but the height of this equipment is adjusted through control electric telescopic handle 12, bury the bottom of pre-buried board 1 in the concrete after, through rotating threaded rod 7 and then can adjust the position of installation shell 4, be convenient for connect outside connecting piece through installation shell 4.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present utility model, and the present utility model is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present utility model has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (7)
1. The utility model provides a pre-buried equipment of civil engineering, includes pre-buried board (1), its characterized in that: the bottom of the embedded plate (1) is fixedly connected with two supporting legs (2), and a folding mechanism (3) is arranged at the bottom of the supporting legs (2);
folding mechanism (3) are including first bracing piece (301), first bracing piece (301) sliding connection is in the inner wall of supporting leg (2), the bottom fixedly connected with bottom plate (302) of first bracing piece (301), both sides of bottom plate (302) are all fixedly connected with dead lever (303), the surface rotation of dead lever (303) is connected with fixed plate (304).
2. The civil engineering pre-buried device according to claim 1, characterized in that: the top sliding connection of pre-buried board (1) has installation shell (4), the quantity of installation shell (4) is two, one side fixedly connected with bearing (5) of installation shell (4).
3. The civil engineering pre-buried device according to claim 1, characterized in that: the top fixedly connected with fixed block (6) of pre-buried board (1), the inner wall threaded connection of fixed block (6) has threaded rod (7), the inner wall fixed connection of one end and bearing (5) inner race of threaded rod (7).
4. The civil engineering pre-buried device according to claim 2, characterized in that: the bottom of installation shell (4) fixedly connected with guide block (8), guide slot (9) that use with guide block (8) cooperation has been seted up at the top of pre-buried board (1).
5. The civil engineering pre-buried device according to claim 1, characterized in that: the two sides of the supporting leg (2) are fixedly connected with positioning rods (10), and the surfaces of the positioning rods (10) are fixedly connected with limiting plates (11).
6. The civil engineering pre-buried device according to claim 1, characterized in that: the inner wall fixedly connected with electric telescopic handle (12) of supporting leg (2), the output of electric telescopic handle (12) and the top fixed connection of first bracing piece (301), the both sides of supporting leg (2) are all fixedly connected with second bracing piece (15), the one end of second bracing piece (15) and the bottom fixed connection of pre-buried board (1).
7. The civil engineering pre-buried device according to claim 1, characterized in that: both sides of first bracing piece (301) are all fixedly connected with slider (13), spout (14) that use with slider (13) cooperation are seted up to the inner wall of supporting leg (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321475181.4U CN220036182U (en) | 2023-06-08 | 2023-06-08 | Pre-buried equipment of civil engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321475181.4U CN220036182U (en) | 2023-06-08 | 2023-06-08 | Pre-buried equipment of civil engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220036182U true CN220036182U (en) | 2023-11-17 |
Family
ID=88727101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321475181.4U Active CN220036182U (en) | 2023-06-08 | 2023-06-08 | Pre-buried equipment of civil engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220036182U (en) |
-
2023
- 2023-06-08 CN CN202321475181.4U patent/CN220036182U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN220036182U (en) | Pre-buried equipment of civil engineering construction | |
CN212986627U (en) | Tripod is used in civil engineering survey and drawing | |
CN220082540U (en) | Water conservancy and hydropower engineering foundation leakage detection positioning device | |
CN210482316U (en) | Assembled foundation pit supporting structure device | |
CN216641339U (en) | Civil engineering construction support | |
CN216406362U (en) | Supporting and reinforcing device for telegraph pole | |
CN213271714U (en) | Civil engineering equipment strutting arrangement | |
CN212583440U (en) | Warning guardrail for building electric power engineering | |
CN213265530U (en) | Multifunctional jack for civil engineering construction | |
CN214365159U (en) | Civil engineering construction is with die carrier of convenient dismouting | |
CN219138369U (en) | Novel concrete building structure for civil engineering | |
CN212105265U (en) | Support is used in civil engineering construction | |
CN211173220U (en) | Strutting arrangement for civil engineering | |
CN216076270U (en) | Civil engineering main part construction quick assembly disassembly template equipment | |
CN217268778U (en) | Strutting arrangement for civil engineering | |
CN212537282U (en) | Functional foot rest for building engineering management | |
CN212412895U (en) | Motor for civil engineering convenient to height-adjusting | |
CN214618841U (en) | Foldable support is used in survey and drawing | |
CN218375766U (en) | Deep foundation pit enclosure guardrail | |
CN219113981U (en) | Detachable operation table | |
CN220150327U (en) | Foundation pit supporting structure | |
CN214500653U (en) | Distance measuring device for civil engineering convenient to equipment | |
CN217048698U (en) | Deep basal pit side slope mound transfer device | |
CN214835058U (en) | Strutting arrangement that civil engineering used | |
CN218479595U (en) | Building structure reinforcing and connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |