CN216076270U - Civil engineering main part construction quick assembly disassembly template equipment - Google Patents
Civil engineering main part construction quick assembly disassembly template equipment Download PDFInfo
- Publication number
- CN216076270U CN216076270U CN202122470195.4U CN202122470195U CN216076270U CN 216076270 U CN216076270 U CN 216076270U CN 202122470195 U CN202122470195 U CN 202122470195U CN 216076270 U CN216076270 U CN 216076270U
- Authority
- CN
- China
- Prior art keywords
- template
- civil engineering
- kelly
- quick assembly
- assembly disassembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a rapid template dismounting and mounting device for civil engineering main body construction, and relates to the technical field of civil engineering construction. Including template, No. two templates and No. three templates, the one end activity of template is provided with the template No. two, the fixed plugboard that is provided with in one side of template No. one, the inslot activity of plugboard inner wall is provided with the kelly, the fixed crooked pole that is provided with of one end of kelly, the fixed sliding sleeve that is provided with in one end of crooked pole, the one end activity of template No. two is provided with the template No. three, the inslot activity of template No. three is provided with the second kelly, the fixed pole of buckling that is provided with of one end of second kelly, the fixed nut seat that is provided with in one end of the pole of buckling. Through setting up plugboard and kelly, just can utilize the joint between plugboard and the kelly, realize quick assembly disassembly between a template and No. two templates, the speed of dismouting is very fast, reduces the time that the dismouting consumes to improve the efficiency of construction.
Description
Technical Field
The utility model relates to the technical field of civil engineering construction, in particular to a quick template dismounting and mounting device for civil engineering main body construction.
Background
Civil engineering construction, i.e. the construction of civil construction engineering, covers the construction of buildings, structures and engineering works in facilities and places in engineering ranges such as buildings, roads, railways, airports, bridges, water conservancy projects, ports, tunnels, water supply and drainage projects, protection projects and the like in all categories such as ground, underground, land, above water and under water, and not only includes various technical activities such as surveying, designing, constructing, maintaining and managing in the engineering construction process.
The connecting structure of the existing template equipment for civil engineering is complex, auxiliary parts such as screws and nuts are more on the equipment, the operation is more complicated in the dismounting process, the time consumption is long during mounting and dismounting, and the dismounting efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model provides a quick template dismounting and mounting device for civil engineering main body construction, which has the advantage of high mounting and dismounting efficiency and solves the problem of complicated dismounting and mounting steps.
In order to realize the purpose of high efficiency of installation and disassembly, the utility model provides the following technical scheme: the utility model provides a civil engineering main part construction quick assembly disassembly template equipment, includes template, No. two templates and No. three templates, the one end activity of template is provided with the template No. two, the fixed plugboard that is provided with in one side of template, the inslot activity of plugboard inner wall is provided with the kelly, the fixed crooked pole that is provided with of one end of kelly, the fixed sliding sleeve that is provided with in one end of crooked pole, the one end activity of template No. two is provided with No. three templates, the activity of the inslot of template wall inslot No. three is provided with the second kelly, the fixed pole of buckling that is provided with in one end of second kelly, the fixed nut seat that is provided with in one end of the pole of buckling.
As a preferred technical scheme of the utility model, the first template is provided with an inserting groove matched with the inserting plate.
As a preferable technical scheme of the utility model, the connection relation between the clamping groove on the inner wall of the plugboard and the clamping rod is clamping.
As a preferred technical scheme of the utility model, a support rod is movably arranged on the inner wall of the sliding sleeve, a spring is sleeved on the surface of the support rod, and an adjusting plate is fixedly arranged on one side of the sliding sleeve.
As a preferable technical scheme of the utility model, the third template is provided with an inserting groove matched with the second inserting plate.
As a preferred technical scheme of the present invention, the second plugboard is provided with a slot, and an inner wall of the slot is clamped with a second clamping rod.
As a preferable technical scheme of the utility model, the inner wall of the nut seat is movably provided with a positive and negative screw rod.
As a preferred technical scheme of the utility model, a bottom plate is arranged at the bottom of the first template, wheels are arranged at four corners of the bottom, and a fork is fixedly arranged on one side of the bottom plate.
Compared with the prior art, the utility model provides a quick template dismounting and mounting device for civil engineering main body construction, which has the following beneficial effects:
1. this civil engineering main part construction quick assembly disassembly template equipment through setting up plugboard and kelly, just can utilize the joint between plugboard and the kelly, realizes the quick assembly disassembly between a template and No. two templates, and the speed of dismouting is very fast, reduces the time that the dismouting consumes to improve the efficiency of construction.
2. This civil engineering main part construction quick assembly disassembly template equipment through setting up second plugboard and second kelly, just can utilize the joint of second plugboard and second kelly, realizes the quick assembly disassembly between No. two templates and No. three templates, and dismouting easy operation is convenient, helps improving the efficiency of construction.
3. This civil engineering main part construction quick assembly disassembly template equipment through setting up wheel and fork, and the wheel makes things convenient for the staff to remove template equipment, has brought the convenience for the civil engineering construction, and the fork can carry work, improves the efficiency of construction.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic top view of a first form of the present invention;
FIG. 3 is a schematic diagram of a plug board structure according to the present invention;
fig. 4 is a schematic diagram of a second plug board structure according to the present invention.
In the figure: 1. a first template; 2. a second template; 201. a plugboard; 202. a clamping rod; 203. a curved rod; 204. a sliding sleeve; 205. a support bar; 206. a spring; 207. an adjusting plate; 3. template III; 301. a second patch panel; 302. a second clamping rod; 303. a bending rod; 304. a nut seat; 305. a positive and negative screw rod; 4. a base plate; 401. a wheel; 402. a fork.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the utility model discloses a civil engineering main body construction quick assembly and disassembly template device, which comprises a first template 1, a second template 2 and a third template 3, wherein one end of the first template 1 is movably provided with the second template 2, one side of the first template 1 is fixedly provided with an insertion plate 201, a clamping rod 202 is movably arranged in a groove on the inner wall of the insertion plate 201, one end of the clamping rod 202 is fixedly provided with a bending rod 203, one end of the bending rod 203 is fixedly provided with a sliding sleeve 204, one end of the second template 2 is movably provided with the third template 3, a second clamping rod 302 is movably arranged in a groove on the inner wall of the third template 3, one end of the second clamping rod 302 is fixedly provided with a bending rod 303, and one end of the bending rod 303 is fixedly provided with a nut seat 304.
Specifically, the first template 1 is provided with an insertion groove matched with the insertion plate 201.
In this embodiment, the first template 1 and the second template 2 can be assembled by arranging the plug-in connector on the first template 1.
Specifically, the connection relationship between the locking groove on the inner wall of the insertion board 201 and the locking rod 202 is locking.
In this embodiment, through setting up plugboard 201 and kelly 202, just can utilize the joint between plugboard 201 and the kelly 202, realize quick assembly disassembly between template 1 and No. two templates 2, the speed of dismouting is very fast, reduces the time that the dismouting consumes to improve the efficiency of construction.
Specifically, the inner wall activity of sliding sleeve 204 is provided with bracing piece 205, spring 206 has been cup jointed on the surface of bracing piece 205, sliding sleeve 204's one side is fixed and is provided with regulating plate 207.
In this embodiment, by arranging the sliding sleeve 204, the supporting rod 205, the spring 206 and the adjusting plate 207, the hand-end adjusting plate 207 can enable the clamping rod 202 at one end of the bending rod 203 to enter or separate from the clamping groove on the plug board 201, and the user can install and detach the hand-end adjusting plate 207 only by moving the adjusting plate 207.
Specifically, the third template 3 is provided with an insertion groove adapted to the second insertion plate 301.
In this embodiment, the assembly between the third template 3 and the second template 2 can be realized by arranging the insertion groove on the third template 3.
Specifically, a clamping groove is formed in the second plug board 301, and a second clamping rod 302 is clamped to the inner wall of the clamping groove.
In this embodiment, through setting up second plugboard 301 and second kelly 302, just can utilize the joint of second plugboard 301 and second kelly 302, realize the quick assembly disassembly between No. 2 templates and No. 3 templates, dismouting easy operation is convenient, helps improving the efficiency of construction.
Specifically, the inner wall of the nut seat 304 is movably provided with a positive and negative lead screw 305.
In this embodiment, by arranging the nut seat 304 and the positive and negative lead screws 305, the two second clamping rods 302 can be driven to move in a reverse direction and synchronously by using the positive and negative threads of the positive and negative lead screws 305 and the movable connection of the nut seat 304, so that one ends of the second clamping rods 302 enter or are separated from the clamping grooves on the second plug board 301, and the user can install and detach the two clamping rods by simply rotating the hand.
Specifically, the bottom of template 1 is provided with bottom plate 4, the four corners of bottom 4 bottom all is provided with wheel 401, one side of bottom plate 4 is fixed and is provided with fork 402.
In this embodiment, through setting up wheel 401 and fork 402, wheel 401 makes things convenient for the staff to remove form equipment, has brought the convenience for the civil engineering construction, and fork 402 can carry work, improves the efficiency of construction.
The working principle and the using process of the utility model are as follows: when in use, the inserting plate 201 on the second template 2 is inserted into the inserting groove on the first template 1, the adjusting plate 207 is moved by hand, the clamping rod 202 at one end of the bending rod 203 enters the clamping groove on the inserting plate 201, thereby realizing the installation between the first template 1 and the second template 2, when in disassembly, the hand moves the adjusting plate 207 to ensure that the clamping rod 202 at one end of the bending rod 203 is separated from the clamping groove on the inserting plate 201, the second inserting plate 301 on the first template 1 is inserted into the third template 3, the positive and negative screw rod 305 is rotated, the movable connection between the positive and negative screw threads of the positive and negative screw rod 305 and the nut seat 304 is utilized to drive the two second clamping rods 302 to carry out reverse synchronous movement, so that one end of the second clamping rod 302 enters the clamping groove on the second inserting plate 301, therefore, the first template 1 and the third template 3 are installed, and when the first template and the third template are detached, the positive and negative screw rods 305 are rotated, so that one end of the second clamping rod 302 is separated from the clamping groove in the second plug board 301.
In summary, the construction quick assembly and disassembly formwork device for the civil engineering main body can realize the assembly between the first formwork 1 and the second formwork 2 by arranging the insertion connector on the first formwork 1, can realize the quick assembly and disassembly between the first formwork 1 and the second formwork 2 by arranging the insertion plate 201 and the clamping rod 202 and utilizing the clamping connection between the insertion plate 201 and the clamping rod 202, has higher assembly and disassembly speed, reduces the time consumed by assembly and disassembly, thereby improving the construction efficiency, can enable the clamping rod 202 at one end of the bending rod 203 to enter or separate into the clamping groove on the insertion plate 201 by arranging the sliding sleeve 204, the supporting rod 205, the spring 206 and the adjusting plate 207 at one end of the hand, can realize the assembly and disassembly by only moving the adjusting plate 207 and can realize the assembly between the third formwork 3 and the second formwork 2 by arranging the insertion groove on the third formwork 3, through setting up second plugboard 301 and second kelly 302, just can utilize the joint of second plugboard 301 and second kelly 302, realize quick assembly disassembly between No. two templates 2 and No. three templates 3, the dismouting easy operation is convenient, help improving the efficiency of construction, through setting up nut seat 304, and positive and negative lead screw 305, just can utilize positive and negative lead screw 305 positive and negative screw and the swing joint of nut seat 304 to drive two second kellies 302 and carry out reverse synchronous motion, make in the one end of second kelly 302 gets into or breaks away from the draw-in groove on second plugboard 301, the user only needs simple hand to rotate can realize installation and dismantlement.
It should be noted that, in this document, terms such as "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a civil engineering main part construction quick assembly disassembly template equipment, includes template (1), No. two templates (2) and No. three template (3), its characterized in that: the one end activity of a template (1) is provided with template (2) No. two, one side of template (1) is fixed and is provided with plugboard (201), the inslot activity of plugboard (201) inner wall is provided with kelly (202), the fixed crooked pole (203) that is provided with of one end of kelly (202), the fixed sliding sleeve (204) that is provided with of one end of crooked pole (203), the one end activity of template (2) is provided with template (3) No. three, the activity of the inner wall inslot of template (3) is provided with second kelly (302), the fixed pole (303) of buckling that is provided with of one end of second kelly (302), the fixed nut seat (304) that is provided with of one end of pole (303) of buckling.
2. The civil engineering main body construction quick assembly disassembly template equipment of claim 1, characterized in that: the first template (1) is provided with a plug-in groove matched with the plug-in board (201).
3. The civil engineering main body construction quick assembly disassembly template equipment of claim 1, characterized in that: the connection relationship between the clamping groove on the inner wall of the insertion plate (201) and the clamping rod (202) is clamping.
4. The civil engineering main body construction quick assembly disassembly template equipment of claim 1, characterized in that: the inner wall activity of sliding sleeve (204) is provided with bracing piece (205), spring (206) has been cup jointed on the surface of bracing piece (205), one side of sliding sleeve (204) is fixed and is provided with regulating plate (207).
5. The civil engineering main body construction quick assembly disassembly template equipment of claim 1, characterized in that: and the third template (3) is provided with an inserting groove matched with the second inserting plate (301).
6. The civil engineering main body construction quick assembly disassembly template equipment of claim 5, characterized in that: the second plug board (301) is provided with a clamping groove, and the inner wall of the clamping groove is clamped with a second clamping rod (302).
7. The civil engineering main body construction quick assembly disassembly template equipment of claim 1, characterized in that: the inner wall of the nut seat (304) is movably provided with a positive and negative screw rod (305).
8. The civil engineering main body construction quick assembly disassembly template equipment of claim 1, characterized in that: the bottom of a template (1) is provided with a bottom plate (4), the four corners of the bottom plate (4) are provided with wheels (401), and one side of the bottom plate (4) is fixedly provided with a fork (402).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122470195.4U CN216076270U (en) | 2021-10-13 | 2021-10-13 | Civil engineering main part construction quick assembly disassembly template equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122470195.4U CN216076270U (en) | 2021-10-13 | 2021-10-13 | Civil engineering main part construction quick assembly disassembly template equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216076270U true CN216076270U (en) | 2022-03-18 |
Family
ID=80638945
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122470195.4U Active CN216076270U (en) | 2021-10-13 | 2021-10-13 | Civil engineering main part construction quick assembly disassembly template equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216076270U (en) |
-
2021
- 2021-10-13 CN CN202122470195.4U patent/CN216076270U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201650319U (en) | Angle installer for anchor bolt | |
CN216076270U (en) | Civil engineering main part construction quick assembly disassembly template equipment | |
CN213547996U (en) | But remote control earth leakage protection equipment | |
CN111411640B (en) | Construction device for complex soil non-drainage sinking open caisson | |
CN204225455U (en) | Patch block graticule chi | |
CN218175698U (en) | Fence for city planning | |
CN113738127A (en) | Building engineering is with energy-concerving and environment-protective steel construction stabilising arrangement | |
CN210134433U (en) | Construction management is with consolidating bearing structure | |
CN208651217U (en) | A kind of building energy conservation blowing device | |
CN220036182U (en) | Pre-buried equipment of civil engineering construction | |
CN220890110U (en) | Device for controlling drilling angle of side slope | |
CN215489176U (en) | Lighting device for geological exploration | |
CN211776062U (en) | Civil engineering construction support bracket of easy dismouting | |
CN220540757U (en) | Total powerstation that hydraulic engineering detected | |
CN217097753U (en) | A marking device for water and electricity installation engineering | |
CN221778398U (en) | Height-adjustable hydraulic engineering retaining wall | |
CN212927346U (en) | Municipal works are with construction warning baffle | |
CN213844589U (en) | Electronic intelligent guiding mark | |
CN216766966U (en) | Civil engineering is with stake strutting arrangement of being convenient for adjust size | |
CN212105265U (en) | Support is used in civil engineering construction | |
CN221119018U (en) | Connecting piece for dry-hanging wallboard | |
CN219548293U (en) | Brick wall ash groove leveling tool | |
CN217054349U (en) | Concrete forming template convenient to build | |
CN216212186U (en) | Progress display board for civil engineering construction management | |
CN214006033U (en) | Steel construction connecting device for civil engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |