CN220014402U - Temporary auxiliary support device for frame body - Google Patents

Temporary auxiliary support device for frame body Download PDF

Info

Publication number
CN220014402U
CN220014402U CN202321451055.5U CN202321451055U CN220014402U CN 220014402 U CN220014402 U CN 220014402U CN 202321451055 U CN202321451055 U CN 202321451055U CN 220014402 U CN220014402 U CN 220014402U
Authority
CN
China
Prior art keywords
frame
frame body
support device
auxiliary support
clamping piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321451055.5U
Other languages
Chinese (zh)
Inventor
许博玮
薛恒岩
李明科
曹凤新
房世鹏
杜焕宇
赵华颖
陈浩
李阳
吴浩
朱晓冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202321451055.5U priority Critical patent/CN220014402U/en
Application granted granted Critical
Publication of CN220014402U publication Critical patent/CN220014402U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a temporary auxiliary support device for a frame body, and relates to the field of constructional engineering. The device comprises an inclined strut assembly arranged between a building wall body and a frame body, wherein the frame body comprises a bottom plate arranged at the top of the right side of the building wall body, a plurality of vertical rods are fixedly arranged at the top of the bottom plate, a plurality of passage plates are fixedly arranged between one row of vertical rods on the left side and one row of vertical rods on the right side, and a protection net is fixedly arranged between two adjacent vertical rods on the right side. According to the utility model, the climbing frame is installed through the arrangement of the lower bearing frame, the frame body is driven to climb up and down on the right side of the building wall body through the arrangement of the climbing frame, the protection effect on the frame body is achieved through the arrangement of the protection net, the auxiliary supporting effect on the frame body is achieved through the cooperation of the wall penetrating pipe, the embedded steel bar, the first clamping piece, the sliding sleeve and the second clamping piece, and the stability of the frame body in dismantling only one rest support can be achieved.

Description

Temporary auxiliary support device for frame body
Technical Field
The utility model relates to the field of constructional engineering, in particular to a temporary auxiliary support device for a frame body.
Background
The building engineering is the engineering entity for planning, surveying, designing and constructing, completing and installing the building and its matched line, pipeline and equipment.
The scaffold is likely to be used in high-rise buildings, the scaffold can ascend or descend along the building, multiple disassembly and assembly procedures of the scaffold are avoided, when the scaffold is no longer needed to be used in the building, the scaffold needs to be disassembled, the scaffold only remains one support when the scaffold is disassembled to the lowest floor, the scaffold transversely has certain instability to influence the disassembly safety, stability is guaranteed when the bottommost scaffold is disassembled, and therefore the temporary auxiliary support device of the scaffold needs to be designed, and the stability when the bottommost scaffold is disassembled is effectively guaranteed by adopting a mode of adding one lateral support at the bottom of the scaffold.
Disclosure of Invention
In order to solve the problems in the prior art, the utility model provides a temporary auxiliary support device for a frame body.
The utility model provides a temporary auxiliary support device for a frame body, which adopts the following technical scheme: the utility model provides a temporary auxiliary support device of support body, including setting up the bracing subassembly between building wall and support body, the support body is including setting up the bottom plate at building wall right side top, the top fixed mounting of bottom plate has a plurality of pole setting, fixed mounting has a plurality of passageway boards between left side one row of pole setting and the right side one row of pole setting, fixed mounting has the protection network between two adjacent pole settings on right side, the top fixed mounting of bottom plate has lower bearing frame, the left side fixed mounting of lower bearing frame inner chamber has climbs the frame, it includes the guide rail to climb the frame, the left side of guide rail is provided with the connecting plate that passes through bolt one and nut with building wall to be connected, all run through around building wall inner chamber bottom has the wall pipe, all be provided with the pre-buried bar around the bottom of building wall inner chamber, one side rotation of pre-buried bar is connected with fastener one, the left end block of wall pipe is in the inner chamber of fastener one, left side one row foremost and the equal cover of last pole setting are equipped with the sliding sleeve, one side rotation of sliding sleeve is connected with fastener two.
Through the technical scheme, the climbing frame is installed through the arrangement of the lower bearing frame, the frame body is driven to climb up and down on the right side of the building wall body through the arrangement of the climbing frame, the protection effect on the frame body is achieved through the arrangement of the protection net, the auxiliary supporting effect on the frame body is achieved through the cooperation of the wall penetrating pipe, the embedded steel bars, the clamping piece I, the sliding sleeve and the clamping piece II, and the stability of the frame body when only one rest support is removed can be achieved.
Preferably, a diagonal bracing I is fixedly arranged between the left upright rod and the right upright rod which correspond to each other.
Through adopting above-mentioned technical scheme, through the setting of bracing one, play the effect of connecting support to controlling two adjacent pole settings, then make the installation of pole setting more stable to the stability of support body when using has been improved.
Preferably, a diagonal bracing II is fixedly arranged between the front upright post and the rear upright post which correspond to each other.
Preferably, a falling protection device is movably arranged between the guide rail and the connecting plate.
Through adopting above-mentioned technical scheme, through the setting of anti-falling device, played a protection spacing effect to the support body, avoided climbing the support and drove the support body and take place to drop the emergence accident suddenly, improved the support body and climb the security of frame.
Preferably, two sides of the sliding sleeve are connected with bolts II in a threaded manner, and one opposite ends of the bolts II are tightly attached to the surface of the vertical rod.
Preferably, the inner cavity of the second bolt is adhered with an anti-slip elastic pad.
Through adopting above-mentioned technical scheme, through the setting of anti-skidding elastic pad for clamping piece two are inseparabler to the block of wall pipe, thereby make the wall pipe more firm to the support of support body, improved the stability of support body.
Preferably, the left end fixedly connected with of fastener one is with the limiting plate that laminates mutually with the wall pipe left end.
In summary, the present utility model includes at least one of the following beneficial technical effects:
1. according to the utility model, the climbing frame is installed through the arrangement of the lower bearing frame, the frame body is driven to climb up and down on the right side of the building wall body through the arrangement of the climbing frame, the protection effect on the frame body is achieved through the arrangement of the protection net, the auxiliary supporting effect on the frame body is achieved through the cooperation of the wall penetrating pipe, the embedded steel bar, the first clamping piece, the sliding sleeve and the second clamping piece, and the stability of the frame body in dismantling only one rest support can be achieved.
2. According to the utility model, through the arrangement of the first diagonal bracing, the function of connecting and supporting the left and right adjacent vertical rods is achieved, so that the installation of the vertical rods is more stable, and the stability of the frame body in use is improved.
3. According to the utility model, through the arrangement of the anti-falling device, a protection and limit function is realized on the frame body, the phenomenon that the climbing frame drives the frame body to suddenly fall down is avoided, and the safety of the frame body and the climbing frame is improved.
4. According to the utility model, through the arrangement of the anti-slip elastic pad, the clamping of the second pair of wall penetrating pipes is tighter, so that the wall penetrating pipes support the frame body more firmly, and the stability of the frame body is improved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model, are incorporated in and constitute a part of this specification. The drawings and their description are illustrative of the utility model and are not to be construed as unduly limiting the utility model. In the drawings:
fig. 1 is a schematic perspective view of the present utility model.
Fig. 2 is a schematic rear perspective view of the present utility model.
Fig. 3 is a schematic front view of the structure of the support only after the frame body is removed.
Fig. 4 is a schematic perspective view of a rear view of a wall and a frame of the present utility model.
Fig. 5 is a schematic view of a right-hand view of a portion of a wall and a frame of the present utility model.
Fig. 6 is a schematic top view of the construction wall, frame and climbing frame of the present utility model.
Fig. 7 is a schematic front perspective view of a second embodiment of the present utility model.
Reference numerals illustrate: 1. building a wall; 2. a frame body; 21. a bottom plate; 22. a vertical rod; 23. a first diagonal brace; 24. a second diagonal brace; 25. a aisle plate; 26. a protective net; 3. a lower bearing frame; 4. a climbing frame; 41. a guide rail; 42. a connecting plate; 43. an anti-falling device; 5. a wall pipe; 6. embedding reinforcing steel bars; 7. the clamping piece I; 8. a sliding sleeve; 9. the second clamping piece is provided with a second clamping piece; 10. a second bolt; 11. an anti-slip elastic pad; 12. and a limiting plate.
Detailed Description
In order that those skilled in the art will better understand the present utility model, a technical solution in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in which it is apparent that the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the present utility model without making any inventive effort, shall fall within the scope of the present utility model.
It should be noted that the terms "first," "second," and the like in the description and the claims of the present utility model and the above figures are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged where appropriate in order to describe the embodiments of the utility model herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In the present utility model, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate an azimuth or a positional relationship based on that shown in the drawings. These terms are only used to better describe the present utility model and its embodiments and are not intended to limit the scope of the indicated devices, elements or components to the particular orientations or to configure and operate in the particular orientations.
Also, some of the terms described above may be used to indicate other meanings in addition to orientation or positional relationships, for example, the term "upper" may also be used to indicate some sort of attachment or connection in some cases. The specific meaning of these terms in the present utility model will be understood by those of ordinary skill in the art according to the specific circumstances.
In addition, the term "plurality" shall mean two as well as more than two.
It should be noted that, without conflict, the embodiments of the present utility model and features of the embodiments may be combined with each other. The utility model will be described in detail below with reference to the drawings in connection with embodiments.
Embodiment one:
referring to fig. 1 and 7, the embodiment of the utility model discloses a temporary auxiliary support device for a frame body, which comprises an inclined strut assembly arranged between a building wall body 1 and a frame body 2, wherein the frame body 2 comprises a bottom plate 21 arranged at the top of the right side of the building wall body 1, a plurality of upright posts 22 are fixedly arranged at the top of the bottom plate 21, inclined struts two 24 are fixedly arranged between the front upright posts 22 and the rear upright posts 22, a plurality of passage plates 25 are fixedly arranged between the left upright posts 22 and the right upright posts 22, a protective net 26 is fixedly arranged between the right upright posts 22, a lower bearing frame 3 is fixedly arranged at the top of the bottom plate 21, a climbing frame 4 is fixedly arranged at the left side of an inner cavity of the lower bearing frame 3, the climbing frame 4 comprises a guide rail 41, a connecting plate 42 connected with the building wall body 1 through a bolt one and a nut is arranged at the left side of the guide rail 41, a falling preventing device 43 is movably arranged between the guide rail 41 and the connecting plate 42, through the arrangement of the anti-falling device 43, the anti-falling device plays a role in protecting and limiting the frame body 2, the situation that the climbing frame 4 drives the frame body 2 to suddenly fall down to cause accidents is avoided, the safety of the frame body 2 and the climbing frame 4 is improved, the front and the rear of the left side bottom of the building wall body 1 are respectively penetrated with a wall penetrating pipe 5, the front and the rear of the bottom of the inner cavity of the building wall body 1 are respectively provided with an embedded steel bar 6, one side of each embedded steel bar 6 is rotationally connected with a clamping piece 7, the left end of each wall penetrating pipe 5 is clamped in the inner cavity of the corresponding clamping piece 7, the surfaces of a row of upright rods 22 at the forefront side and the rearmost side of the left side are respectively sleeved with a sliding sleeve 8, one side of each sliding sleeve 8 is rotationally connected with a clamping piece 9, two sides of each sliding sleeve 8 are respectively and spirally connected with a bolt two 10, one end opposite to each bolt two bolts 10 are tightly adhered with the surfaces of the upright rods 22, the inner cavities of each bolt two 10 are adhered with an anti-skid elastic pad 11, the arrangement of the anti-skid elastic pad 11 is adopted, make fastener two 9 inseparabler to the block of wall pipe 5 to make wall pipe 5 more firm to the support of support body 2, improved the stability of support body 2, fastener one 7's left end fixedly connected with and wall pipe 5 left end limiting plate 12 that laminating mutually.
Embodiment two:
referring to fig. 1 and 2, a diagonal bracing one 23 is fixedly installed between the left and right corresponding upright posts 22, and the left and right adjacent upright posts 22 are connected and supported through the diagonal bracing one 23, so that the upright posts 22 are more stably installed, and the stability of the frame body 2 in use is improved.
Working principle: when the wall penetrating pipe is used, a user firstly rotates the clamping piece I7 at the front side of the embedded bar 6 to clamp the left end of the wall penetrating pipe 5 into the inner cavity of the clamping piece I7, then moves the climbing frame 4 to convey the frame body 2 to the ground, then upwards slides the sliding sleeve 8 on the surface of the vertical rod 22, simultaneously rotates the clamping piece II to clamp the right end of the wall penetrating pipe 5 into the inner cavity of the clamping piece II 9, then rotates the bolt II 10 to enable one end of the bolt II 10 to be tightly attached to the surface of the vertical rod 22, at the moment, the installation of the wall penetrating pipe 5 is completed, then the top of the frame body 2 is removed, under the action of the wall penetrating pipe 5, the frame body 2 is timely removed until the rest part is still stable in structure under the support of the wall penetrating pipe 5, and the stability of the frame body 2 when only the rest support is removed can be achieved, and the stability of the removal is effectively ensured.
To sum up: this temporary auxiliary support device of support body, through the setting of lower bearing frame 3, make climb frame 4 and install, through the setting of climbing frame 4, make and drive support body 2 and climb from top to bottom in building wall 1's right side, through the setting of protection network 26, make to support body 2 play a guard action when using, through wall pipe 5, embedded bar 6, fastener one 7, sliding sleeve 8 and fastener two 9's cooperation use, make to support body 2 play auxiliary support's effect, can reach support body 2 when demolishing only remaining one support, effectively guaranteed the stability of demolishing.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (7)

1. The utility model provides a temporary auxiliary support device of support body which characterized in that: including setting up the bracing subassembly between building wall (1) and support body (2), support body (2) are including setting up bottom plate (21) at building wall (1) right side top, the top fixed mounting of bottom plate (21) has a plurality of pole settings (22), and fixed mounting has a plurality of passageway boards (25) between left side one row of pole settings (22) and right side one row of pole settings (22), and fixed mounting has protection network (26) between two adjacent pole settings (22) on right side, the top fixed mounting of bottom plate (21) has lower bearing frame (3), the left side fixed mounting of lower bearing frame (3) inner chamber has climbing frame (4), climbing frame (4) include guide rail (41), the left side of guide rail (41) be provided with building wall (1) through bolt one and nut connection connecting plate (42), all run through in front and back of building wall (1) inner chamber bottom has through wall pipe (5), all be provided with pre-buried wall (6) around pre-buried wall (1) inner chamber bottom, one side clamping piece (7) are equipped with at the front and back of a left side clamping piece (7) and one side (8) of all side clamping piece (7) are equipped with at the side of the side sleeve (8), one side of the sliding sleeve (8) is rotatably connected with a clamping piece II (9).
2. The temporary auxiliary support device for a rack according to claim 1, wherein: a diagonal bracing I (23) is fixedly arranged between the left upright rod (22) and the right upright rod (22).
3. The temporary auxiliary support device for a rack according to claim 2, wherein: two diagonal braces (24) are fixedly arranged between the front upright posts (22) and the rear upright posts (22).
4. A temporary auxiliary support device for a frame according to claim 3, wherein: and a falling prevention device (43) is movably arranged between the guide rail (41) and the connecting plate (42).
5. The temporary auxiliary support device for a frame according to claim 4, wherein: two sides of the sliding sleeve (8) are connected with two bolts (10) in a threaded mode, and one ends, opposite to the two bolts (10), of the two bolts are tightly attached to the surface of the vertical rod (22).
6. The temporary auxiliary support device for a frame according to claim 5, wherein: an inner cavity of the second bolt (10) is adhered with an anti-slip elastic pad (11).
7. The temporary auxiliary support device for a frame according to claim 6, wherein: the left end of the first clamping piece (7) is fixedly connected with a limiting plate (12) attached to the left end of the wall penetrating pipe (5).
CN202321451055.5U 2023-06-08 2023-06-08 Temporary auxiliary support device for frame body Active CN220014402U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321451055.5U CN220014402U (en) 2023-06-08 2023-06-08 Temporary auxiliary support device for frame body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321451055.5U CN220014402U (en) 2023-06-08 2023-06-08 Temporary auxiliary support device for frame body

Publications (1)

Publication Number Publication Date
CN220014402U true CN220014402U (en) 2023-11-14

Family

ID=88687203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321451055.5U Active CN220014402U (en) 2023-06-08 2023-06-08 Temporary auxiliary support device for frame body

Country Status (1)

Country Link
CN (1) CN220014402U (en)

Similar Documents

Publication Publication Date Title
CN206233531U (en) Door-type scaffold and the attachment means for the door-type scaffold
CN205822747U (en) Architectural engineering scaffold
CN220014402U (en) Temporary auxiliary support device for frame body
EP2140082B1 (en) Scaffold with handrail frames provided with post sections
CN111927071A (en) Movable operating platform
CN210217747U (en) Vault construction auxiliary device for tunnel construction
CN207048357U (en) A kind of civil engineering building guardrail
CN215670909U (en) High security scaffold frame
CN210315249U (en) Bridge welding protector
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN205296792U (en) Raise scaffold
CN212406044U (en) Anti-falling climbing frame device for high-rise building construction
CN209780174U (en) Scaffold for building construction
CN207003972U (en) A kind of portable construction operation platform
KR200400391Y1 (en) Structure of scaffold frame installed with fall-down preventive rail
CN210152410U (en) Stereotyping protective barrier suitable for soft foundation rapid construction
CN214463234U (en) Safety protective guard is used in building engineering construction
CN213710261U (en) Scaffold with safety protection structure for building construction
CN217631146U (en) Scaffold for housing construction engineering
CN214402638U (en) Safe cat ladder of being under construction
CN217680702U (en) Construction is with facing limit guardrail convenient to transportation and dismouting
CN209817383U (en) Portable scaffold frame for fitment
CN219569665U (en) Protective hoistway guardrail for elevator construction
CN217711659U (en) Anti-tilting device attached to lifting scaffold
CN212773370U (en) Scaffold

Legal Events

Date Code Title Description
GR01 Patent grant