CN219952718U - Supporting steel platform for SOG terrace concrete pouring - Google Patents

Supporting steel platform for SOG terrace concrete pouring Download PDF

Info

Publication number
CN219952718U
CN219952718U CN202223216488.0U CN202223216488U CN219952718U CN 219952718 U CN219952718 U CN 219952718U CN 202223216488 U CN202223216488 U CN 202223216488U CN 219952718 U CN219952718 U CN 219952718U
Authority
CN
China
Prior art keywords
steel
sog
platform
plate
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223216488.0U
Other languages
Chinese (zh)
Inventor
许志强
赵波
王伟
欧宁
闫勇先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202223216488.0U priority Critical patent/CN219952718U/en
Application granted granted Critical
Publication of CN219952718U publication Critical patent/CN219952718U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a supporting steel platform for SOG terrace concrete pouring, which comprises a steel column base, wherein a first I-shaped steel is arranged at the top of the steel column base, an I-shaped steel is arranged at the top of the first I-shaped steel, a connecting rod is arranged at one side, close to the first I-shaped steel, of the bottom of the I-shaped steel, and a steel plate is arranged at the top of the I-shaped steel. Compared with a ground pump pouring mode, the concrete conveying pump truck is erected indoors through the supporting platform, construction operators and construction machinery are reduced, good economic benefits are achieved, concrete pouring is efficiently and highly-finished, and the construction quality of a terrace is improved.

Description

Supporting steel platform for SOG terrace concrete pouring
Technical Field
The utility model relates to the technical field of building construction, in particular to a supporting steel platform for SOG terrace concrete pouring.
Background
Along with the development of the building industry, the single building area of the industrial building is larger and larger in span, and the SOG prestress integral seamless terrace is more and more applied to the industrial building, and has the characteristics of large single-cabin area and high quality requirement. Therefore, the selection of the concrete pouring machine is particularly important, and two basic points of saving cost and improving the concrete pouring quality are needed. If the concrete delivery pump truck is directly driven into a room, the concrete delivery pump truck can not influence the pouring quality of the terrace, and even damages the terrace which is poured. It is therefore desirable to provide a supporting steel platform for parking concrete delivery pump trucks.
Disclosure of Invention
In view of the foregoing problems of the prior art, a primary object of the present utility model is to provide a support steel platform for SOG floor concreting.
The technical scheme of the utility model is as follows: the support steel platform comprises at least two I-steels, wherein the at least two I-steels are arranged in parallel at intervals; and is connected through a connecting rod; at least two steel column feet are arranged at the lower part of each I-steel;
the steel column foot comprises a connecting plate and two horizontal plates, the two horizontal plates are horizontally arranged at intervals, the connecting plate is vertically arranged, and two ends of the connecting plate are respectively connected with the two horizontal plates; the horizontal plate at the upper part is connected with the I-steel, and the horizontal plate at the lower part is used for being connected with a foundation.
The steel plate is arranged on the I-steel and is connected with the I-steel through bolts.
Further, the steel column foot comprises two connecting plates, and the two connecting plates are arranged in parallel at intervals.
Further, a plurality of steel bars are arranged on the steel plate at intervals in parallel, and the steel bars vertically extend along the length direction of the connecting rod.
Further, the steel bars are pattern steel bars.
Further, the connecting rod is angle steel or round steel.
Further, the specification of the steel column base is 200mm×200mm×10mm.
Further, the steel plate has a specification of 3000mm×1000mm×20mm.
Compared with the prior art, the utility model has the advantages and positive effects that:
after the steel platform is adopted, the concrete conveying pump truck can be directly driven to the steel plate of the steel platform for direct pouring. Compared with the ground pump pouring mode, the support steel platform for SOG terrace concrete pouring is used for erecting the overhead pump indoors, so that construction operators and construction machinery are reduced, good economic benefits are achieved, concrete pouring is efficiently and highly-finished, and terrace construction quality is improved.
Drawings
Fig. 1 is a perspective view of a steel platform (omitting a steel plate);
FIG. 2 is a top view of a steel platform;
fig. 3 is a side view of a steel platform.
Legend description: 1. steel column feet; 2. a connecting plate; 3. i-steel; 4. a connecting rod; 5. and (3) a steel plate.
Detailed Description
Examples
As shown in fig. 1 to 3, the utility model provides a supporting steel platform for SOG terrace concrete pouring, which comprises two parallel and spaced-apart i-beams 3, wherein the two i-beams 3 are horizontally arranged and fixedly connected through a connecting rod 4. The lower parts of the two ends of each I-steel 3 are provided with steel column feet 1 for supporting the I-steel 3. The upper part of the I-steel 3 is provided with a steel plate 5 for parking the concrete pump truck.
Specifically, steel column foot 1 includes two connecting plates 2 and two horizontal plates, and wherein, the horizontal plate level sets up, and two connecting plates 2 vertical interval sets up to, the upper and lower both ends of connecting plate 2 respectively with two horizontal plates welded fastening. The horizontal plate of steel column foot is provided with the bolt hole, and wherein, upper portion's horizontal plate is used for with steel sheet bolted connection, and lower part's horizontal plate passes through rag bolt and is connected with the ground.
In this embodiment, when steel column foot 1 installs, the lower part adopts the wood backing plate to pad down, keeps the top elevation on same level, lays I-steel 3 on the steel column foot again to adopt connecting rod 4 to carry out welded fastening from I-steel 3 bottom, I-steel 3 can be adjusted according to the wheel interval, can level then lay steel sheet 4 from outside to inside, when laying steel sheet 4, the mechanical wheel should fall on the both sides I-steel 3, makes the platform atress even, avoids eccentric atress, and steel sheet thickness can carry out reasonable choice according to mechanical weight.
Further, the steel column feet 1 are two groups, and one group is arranged at the end part of each I-steel. One side of each group of steel column feet is provided with a connecting rod 4, the transverse distance of each two groups of first I-steel 2 is 3000mm, the longitudinal distance of each two groups of steel column feet is 2200mm, the I-steel adopts No. 18I-steel, the specification of the steel column feet 1 is 200mm multiplied by 10mm, and the specification of the steel plate 5 is 3000mm multiplied by 1000mm multiplied by 20mm.
In addition, the steel plate is provided with a plurality of pattern steel bars (not shown in the figure), and the pattern steel bars are arranged in parallel at intervals, so that the strength of the steel plate can be increased on one hand, and the steel plate is prevented from being deformed; on the other hand, the friction force of the wheels can be increased, and the wheels are prevented from skidding.
Finally, it should be noted that: the embodiments described above are only for illustrating the technical solution of the present utility model, and are not limiting; although the utility model has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some or all of the technical features thereof can be replaced with equivalents; such modifications and substitutions do not depart from the spirit of the utility model.

Claims (7)

1. A support steel platform for SOG terrace concrete placement, its characterized in that:
the steel comprises at least two I-beams, wherein the at least two I-beams are arranged in parallel at intervals; and is connected through a connecting rod; at least two steel column feet are arranged at the lower part of each I-steel;
the steel column foot comprises a connecting plate and two horizontal plates, the two horizontal plates are horizontally arranged at intervals, the connecting plate is vertically arranged, and two ends of the connecting plate are respectively connected with the two horizontal plates; the horizontal plate at the upper part is connected with the I-steel, and the horizontal plate at the lower part is used for being connected with a foundation;
the steel plate is arranged on the I-steel and is connected with the I-steel through bolts.
2. A support steel platform for SOG floor concreting according to claim 1, characterized in that:
the steel column foot includes two the connecting plate, two connecting plates parallel interval sets up.
3. A support steel platform for SOG floor concreting according to claim 1, characterized in that: the steel plate is provided with a plurality of steel bars which are arranged at intervals in parallel, and the steel bars vertically extend along the length direction of the connecting rod.
4. A support steel platform for SOG floor concreting according to claim 3, characterized in that: the steel bars are pattern steel bars.
5. A support steel platform for SOG floor concreting according to claim 1, characterized in that: the connecting rod is angle steel or round steel.
6. A support steel platform for SOG floor concreting according to claim 1, characterized in that: the specification of the steel column foot (1) is 200mm multiplied by 10mm.
7. A support steel platform for SOG floor concreting according to claim 1, characterized in that: the specification of the steel plate (5) is 3000mm multiplied by 1000mm multiplied by 20mm.
CN202223216488.0U 2022-11-30 2022-11-30 Supporting steel platform for SOG terrace concrete pouring Active CN219952718U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223216488.0U CN219952718U (en) 2022-11-30 2022-11-30 Supporting steel platform for SOG terrace concrete pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223216488.0U CN219952718U (en) 2022-11-30 2022-11-30 Supporting steel platform for SOG terrace concrete pouring

Publications (1)

Publication Number Publication Date
CN219952718U true CN219952718U (en) 2023-11-03

Family

ID=88545916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223216488.0U Active CN219952718U (en) 2022-11-30 2022-11-30 Supporting steel platform for SOG terrace concrete pouring

Country Status (1)

Country Link
CN (1) CN219952718U (en)

Similar Documents

Publication Publication Date Title
CN101839070B (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN216109770U (en) A cloth machine construction structures for aluminum alloy template system
CN112663501A (en) Upper-span existing line steel box girder structure and construction method
CN106930315B (en) A kind of moving tower crane foundation structure and construction method
CN113279582A (en) Hanging construction method for overhanging and hanging type cast-in-place plate
CN102322134B (en) Method for determining difference in bearing capacities of fastener-type full space support frame and full space scaffold
CN219952718U (en) Supporting steel platform for SOG terrace concrete pouring
CN107165056B (en) Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof
KR100529517B1 (en) Method for pulling up equally the upper structure of a bridge using a raising bracket supporting load dispersedly, having a displacement measuring instrument
CN216690350U (en) Concrete circular silo slip form construction equipment
CN213356779U (en) Overweight steel column translation transportation installation device
CN213477191U (en) Large-span strength beam and welding tool
KR100293687B1 (en) Concrete delivery device and its installation method
CN111927070A (en) Diaphragm plate construction platform and installation method thereof
CN111827090A (en) Large-size quick assembling steel pipe support
CN219195663U (en) C-beam cantilever bracket device
CN218292479U (en) Construction elevator does not need to do basic shore structure based on two limb shaped steel post
CN220503785U (en) Construction structure of steel column concrete pier wharf
CN212535066U (en) Basement lane die carrier basis reservation passageway construction equipment
CN215252993U (en) Construction elevator foundation back-jacking device
CN213741569U (en) Prefabricated concrete assembled high support
CN211713706U (en) Large cantilever prefabricated bent cap installation lattice support device
CN216074809U (en) Bridge rail guard template installation platform truck
CN220203366U (en) Rail electric hanging basket device
CN219137748U (en) Shaped steel reinforced structure of basement roof temporary construction road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant