CN111827090A - Large-size quick assembling steel pipe support - Google Patents

Large-size quick assembling steel pipe support Download PDF

Info

Publication number
CN111827090A
CN111827090A CN201910296421.6A CN201910296421A CN111827090A CN 111827090 A CN111827090 A CN 111827090A CN 201910296421 A CN201910296421 A CN 201910296421A CN 111827090 A CN111827090 A CN 111827090A
Authority
CN
China
Prior art keywords
steel
steel pipe
pipes
transverse
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910296421.6A
Other languages
Chinese (zh)
Inventor
沈燕飞
祝新顺
程海欧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB First Engineering Co Ltd
Original Assignee
CCCC SHB First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB First Engineering Co Ltd filed Critical CCCC SHB First Engineering Co Ltd
Priority to CN201910296421.6A priority Critical patent/CN111827090A/en
Publication of CN111827090A publication Critical patent/CN111827090A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the technical field of road and bridge construction, and particularly relates to a large-size quick-assembly steel pipe support which comprises two groups of main frames arranged on two sides of a pier, a connecting flower frame for connecting the two groups of main frames and a limiting frame arranged between the two groups of main frames, wherein each main frame comprises a steel pipe pile, a steel pipe supporting leg, a vertical connecting steel pipe and a transverse connecting steel pipe; has the advantages that: the main frame is formed by connecting the steel pipe piles, the steel pipe supporting legs, the vertical connecting steel pipes and the transverse connecting steel pipes through end flanges; and large-size quick assembly is realized by connecting the flower stand and the limiting frame, the steel pipe support is quick in connection, simple in structure, convenient to operate, safe and reliable, and can be used repeatedly, and the cost is saved.

Description

Large-size quick assembling steel pipe support
Technical Field
The invention belongs to the technical field of road and bridge construction, and particularly relates to a large-size quickly-assembled steel pipe support.
Background
With the increase of the investment of the country to the field of infrastructure, more and more expressways are under large-scale construction. The capping beam is a cross beam arranged at the top of the framed bent pier for supporting, distributing and transferring the load of the upper structure. Its main function is to support the bridge superstructure and transfer all loads to the substructure, so the capping beams are an important component in bridges.
In order to get rid of the potential safety hazard, carry out the pre-compaction to the bent cap support, prevent toppling and handle, and the bent cap support that is established according to certain size by many violently erects the steel pipe at present, builds and wastes time and energy, and the bearing effect is unstable, and the support recycles inefficiency, causes destruction to finished product concrete structure easily when demolising, has the potential safety hazard.
Based on the technical scheme, the invention provides the bent cap steel pipe support which greatly reduces the labor amount, improves the repeated utilization rate and improves the safety and the high efficiency of construction compared with the prior art.
Disclosure of Invention
The invention aims to provide a large-size quick-assembly steel pipe support, which aims to solve the problems that in the background art, in order to eliminate potential safety hazards, a capping beam support needs to be pre-pressed and overturn-proof, and the capping beam support constructed by a plurality of transverse and vertical steel pipes according to a certain size at present wastes time and labor for construction, is unstable in bearing effect, low in recycling efficiency of the support, easy to damage a finished concrete structure during dismantling, and has potential safety hazards.
In order to achieve the above objects and achieve the above technical effects, the present invention is implemented by the following technical solutions:
a large-size rapid assembling steel pipe support comprises two groups of main frames arranged on two sides of a pier, a connecting flower frame for connecting the two groups of main frames, and a limiting frame arranged between the two groups of main frames;
the main frame comprises steel pipe piles, steel pipe supporting legs, vertical connecting steel pipes and transverse connecting steel pipes;
a concrete support foundation is arranged on the side surface of the pier bearing platform, the steel pipe pile is arranged above the support foundation, and the steel pipe pile, the steel pipe supporting leg and the vertical connecting steel pipe are sequentially vertically connected upwards and are perpendicular to the support foundation;
the vertical connecting steel pipes comprise vertical steel pipes, inclined steel pipes, transverse pipe connecting pipes, transverse pull steel plates and bearing platforms; the horizontal tube connecting tubes are arranged at the other side of the vertical steel tube in a vertically fixed mode, the horizontal pulling steel plates are fixedly connected to the vertical steel tube and the inclined steel tube, and the bearing platforms are horizontally arranged at the upper ends of the vertical steel tube and the inclined steel tube and are level in height;
the transverse connecting steel pipe comprises an upper transverse pipe group, a lower transverse pipe group and a diagonal draw pipe fixedly connected between the two transverse pipes groups;
the steel pipe piles, the steel pipe supporting legs and the vertical connecting steel pipes of each group of main frames are in two groups and are symmetrically distributed through the connection of the transverse pipe connecting pipes and the transverse pipes; the steel pipe piles, the steel pipe supporting legs, the vertical connecting steel pipes and the transverse connecting steel pipes are connected through flanges arranged at the end heads to form a group of main frames, so that large-size quick assembly is realized;
the connecting flower stand comprises a flower stand cross bar, angle steel and shaping steel; the flower shelf cross bars are arranged between the two groups of vertical steel pipes through angle steels and are arranged into an upper group and a lower group, and the shaping steels are crosswise arranged on the angle steels;
the limiting frame is arranged between the two groups of transverse pipes and comprises limiting vertical steel, limiting angle iron, limiting transverse steel and limiting screws;
spacing perpendicular steel is the channel-section steel, connects between two sets of violently pipes through spacing angle bar, and sets up in the left and right sides near every pier shaft, the every spacing perpendicular steel of spacing horizontal steel fixed connection, and set up both sides around the pier respectively, stop screw passes the channel-section steel pterygoid lamina of spacing perpendicular steel, sets up in the left and right sides of spacing perpendicular steel relatively, carries on spacingly to the pier shaft.
Preferably, the inclined pull pipes are two groups, and the upper parts of the inclined pull pipes are inclined inwards to form a supporting force.
Preferably, the nut is welded on the limiting vertical steel at the mounting position of the limiting screw.
Preferably, the channel steel wing plate of the limiting vertical steel is removed at the position where the limiting transverse steel is connected, and the limiting vertical steel is connected to the bottom plate of the limiting vertical steel through a preset screw.
Preferably, the bridge pier limited by the limiting screw is provided with a base plate, so that damage to the bridge pier caused by the base plate is avoided.
Preferably, the steel pipe supporting legs of each group of supports, the two groups of steel pipe supporting legs of the two groups of main frames and the two groups of vertical steel pipes of the two groups of main frames are respectively connected with a transverse pulling plate through angle irons.
Preferably, the transverse connection steel pipe further comprises a middle bearing platform arranged at the top of the middle of the transverse connection steel pipe, and the middle bearing platform is flush with the bearing platform.
Preferably, the transverse duplex steel distribution beam is installed on the support foundation at the lower end of each group of main frames, and then the steel pipe piles are installed through the flanges.
The invention has the beneficial effects that: the main frame is formed by connecting the steel pipe piles, the steel pipe supporting legs, the vertical connecting steel pipes and the transverse connecting steel pipes through end flanges; and large-size quick assembly is realized by connecting the flower stand and the limiting frame, the steel pipe support is quick in connection, simple in structure, convenient to operate, safe and reliable, and can be used repeatedly, and the cost is saved.
Drawings
Fig. 1 is a front view structural schematic diagram of the steel pipe support.
FIG. 2 is a schematic side view of the steel pipe support.
Fig. 3 is a schematic top view of the steel pipe support.
Fig. 4 is a schematic structural view of a steel pipe bracket according to a second embodiment.
FIG. 5 is a schematic diagram of the third structure of the embodiment of the steel pipe support.
Description of reference numerals: 1. steel pipe piles; 2. steel pipe supporting legs; 3. vertically connecting the steel pipes; 301. a vertical steel pipe; 302. an inclined steel pipe; 303. a horizontal pipe connecting pipe; 304. transversely pulling a steel plate; 305. a load-bearing platform; 4. transversely connecting the steel pipes; 401. a transverse tube; 402. obliquely pulling the pipe; 5. connecting the flower stand; 501. angle steel; 502. a flower stand cross bar; 503. shaping steel; 6. a limiting frame; 601. limiting vertical steel; 602. limiting angle iron; 603. limiting transverse steel; 604. a limit screw; 7. transversely pulling the plate; 8. a middle load-bearing platform; 9. a distribution beam; 10. a steel pipe pile foundation.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "central, lateral, longitudinal, up, down, front, back, left, right, vertical, horizontal, top, bottom, inner, outer" and the like refer to orientations or positional relationships based on those shown in fig. 1, which are used only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Example one
Referring to fig. 1, fig. 2 and fig. 3 are schematic structural diagrams of a large-sized rapid-assembly steel pipe support, in which two sets of main frames are arranged on both sides of a pier, a connecting flower shelf 5 connecting the two sets of main frames, and a limit frame 6 arranged between the two sets of main frames.
The main frame comprises a steel pipe pile 1, steel pipe supporting legs 2, a vertical connecting steel pipe 3 and a transverse connecting steel pipe 4; 369# pier support foundation is arranged on plain concrete on the side face of a bearing platform, steel bars are planted after the surface roughening is removed, horizontal steel bar meshes are paved, a pouring support foundation is arranged on the plain concrete on the side face of the bearing platform, the steel bars are planted and the horizontal steel bar meshes are paved after the surface roughening is removed, C40 concrete with the thickness of 1m multiplied by 1m and 30cm is poured to serve as a cushion layer, 4 foundation bolts and steel plates are pre-buried in the top face, after the support foundation concrete reaches the design strength, the pre-buried 4 foundation bolts are used for installing a steel pipe pile 1, the steel pipe pile 1 is arranged above the support foundation, the length of the steel pipe pile 1 is 0.3m, 0.5m, 1m, 2m and 3m, and the steel pipe pile 1 is unequal, and; the steel pipe pile 1, the steel pipe support legs 2 and the vertical connecting steel pipes 3 are sequentially vertically connected upwards and are perpendicular to the support foundation; the vertical connecting steel pipe 3 comprises a vertical steel pipe 301, an inclined steel pipe 302, a horizontal pipe connecting pipe 303, a horizontal pulling steel plate 304 and a bearing platform 305; the inclined steel pipes 302 are fixedly arranged on one side of the vertical steel pipe 301 in an inclined upward manner, the number of the transverse pipe connecting pipes 303 is two, the transverse pipe connecting pipes are fixedly arranged on the other side of the vertical steel pipe 301 in an up-and-down manner, the transverse pull steel plate 304 is fixedly connected to the vertical steel pipe 301 and the inclined steel pipes 302, the bearing platform 305 is horizontally arranged at the upper ends of the vertical steel pipe 301 and the inclined steel pipes 302 and is level with each other in height, and after the bearing platform 305 is a support, a jack is installed to install a platform at the top of; the transverse connection steel pipe 4 comprises an upper transverse pipe 401, a lower transverse pipe 401 and a diagonal pulling pipe 402 fixedly connected between the two transverse pipes 401, and the diagonal pulling pipes 402 are two groups and are inclined inwards to form supporting force.
The steel pipe piles 1, the steel pipe support legs 2 and the vertical connecting steel pipes 3 of each group of main frames are two groups and are symmetrically distributed through the connection of the transverse pipe connecting pipes 303 and the transverse pipes 401; the steel pipe pile 1, the steel pipe supporting legs 2, the vertical connecting steel pipes 3 and the transverse connecting steel pipes 4 are connected through flanges arranged at the ends to form a group of main frames, and large-size quick assembly is achieved.
The connecting flower stand 5 comprises angle steel 501, a flower stand cross bar 502 and shaping steel 503; the flower stand cross bars 502 are arranged between the two groups of vertical steel pipes 301 through angle steels 501, and are arranged into an upper group and a lower group, and the shaping steels 503 are arranged on the angle steels in a crossed manner; the shape of the connecting flower shelf 5 is various, the connecting effect and the firm connection of the two groups of main frames are realized, and mutual dislocation is prevented.
The limiting frame 6 is arranged between the two groups of transverse pipes 401, and the limiting frame 6 comprises limiting vertical steel 601, limiting angle iron 602, limiting transverse steel 603 and limiting screws 604;
the limiting vertical steel 601 is a channel steel and is connected between the two groups of transverse tubes 401 through limiting angle iron 602, and are arranged at the left and right sides close to each pier body, the limiting transverse steel 603 is fixedly connected with each limiting vertical steel 601, and are respectively arranged at the front side and the rear side of the pier, the channel steel wing plates are removed from the position where the limiting vertical steel 601 is connected with the limiting horizontal steel 603, the limiting screws 604 are connected on the bottom plate of the limiting vertical steel 601 through preset screws, penetrate through channel steel wing plates of the limiting vertical steel 601 and are oppositely arranged on the left side and the right side of the limiting vertical steel 601, the pier body is limited, a nut is welded at the installation position of the limiting screw 604 by the limiting vertical steel 601, be equipped with the backing plate on the pier with stop screw 604 contact, avoid consequently leading to the damage to the pier, be connected with horizontal arm-tie 7 through the angle bar respectively on the steel pipe landing leg 2 of every group support, between two sets of steel pipe landing legs 2 of two sets of body framves and between two sets of vertical steel pipe 301 of two sets of body framves.
Example two
Referring to fig. 4, a schematic structural diagram of the second embodiment of the support, the transverse connection steel pipe 4 further includes a middle bearing platform 8 disposed at the middle top, and the middle bearing platform 8 is flush with the bearing platform 305, and in the second embodiment, in order to adapt to installation of different platforms at the top of the support, the number of the bearing platforms 305 is increased, the number of jacks is increased, and installation for different platforms is achieved.
EXAMPLE III
Referring to fig. 5, a schematic structural diagram of the third embodiment of the present invention, a bracket foundation of the 368# and 388# piers is adjusted to 1.6m × 1.2m, pouring is started from a bearing platform top, 2 phi 32 finish-rolled deformed steels are pre-embedded, after the bracket foundation concrete reaches strength, a transverse duplex 56-type steel distribution beam is firstly installed on the 368# and 388# supports, the distribution beam and the foundation are anchored by the phi 32 finish-rolled deformed steels, a transverse duplex steel distribution beam 9 is firstly installed on the bracket foundation at the lower end of each main frame, a steel pipe pile foundation 10 is arranged on the distribution beam 9, a flange is arranged on the steel pipe pile foundation 10, and then the steel pipe pile 1 is installed through the flange; aiming at different piers, the support foundation is adjusted, a transverse duplex steel distribution beam 9 is added below the steel pipe pile 1, and the steel pipe pile 1 is installed through a flange, so that the steel pipe structure is applied to different piers.
After the construction of a pier body of the No. 369 pier is finished, pouring a support foundation on plain concrete on the side surface of a pier body bearing platform, removing burrs on the surface, planting ribs, paving a horizontal reinforcing mesh, pouring C40 concrete with the thickness of 1m multiplied by 1m and 30cm as a cushion layer, and embedding 4 foundation bolts and steel plates on the top surface; after the support foundation concrete reaches the design strength; adjusting the bracket foundation of the 368# and 388# piers to be 1.6m multiplied by 1.2m, pouring from the top of a bearing platform, embedding 2 phi 32 finish-rolled deformed steels, installing a transverse duplex 56-type steel distribution beam 9 firstly in the 368# and 388# piers, anchoring the distribution beam 9 and the foundation by the phi 32 finish-rolled deformed steels, and connecting the distribution beam with a flange of a steel pipe pile 1 through a steel pipe pile foundation 10 arranged on the distribution beam by a screw;
the method comprises the following steps that a unilateral steel pipe main frame is assembled on the ground, the steel pipe pile 1 selects proper length (0.3 m, 0.5m, 1m, 2m, 3m and unequal) of the steel pipe pile 1 according to elevation, a large-size quick assembly support is realized among the steel pipe pile 1, steel pipe supporting legs 2, a vertical connecting steel pipe 3 and a transverse connecting steel pipe 4 through flanges, the whole body is lifted by a crane after connection is finished, and the 369# pier is directly installed on the steel pipe pile 1 through 4 foundation screws pre-embedded in a support foundation; the 368# pier and the 388# pier are directly connected with the steel pipe pile 1 through the steel pipe foundation 10 by flange screws; after the main frames on the two sides are installed in place, the flower shelf 5 and the limiting frame 6 are installed and connected in time through the preset installation holes on the main frames;
firstly, installing angle steel 501 through a preset installation hole, or installing the angle steel 501 before the main frame is lifted, then installing a flower stand cross bar 502 and a lateral transverse pull plate 7 through the angle steel 501, and then fixing and shaping steel 503 in a crossed manner through the angle steel 501; then, installing a limiting frame, installing limiting vertical steels 601 on the left and right of the pier body correspondingly through preset limiting angle steels 602, then installing limiting horizontal steels 603, enabling the limiting horizontal steels to be installed on each limiting vertical steel 601 through screws, enabling limiting screws 604 to penetrate through channel steel wing plates of the limiting vertical steels 601 and a base plate preset on the pier body, avoiding damage to the pier caused by the damage, and limiting at the same time; the installation of the large-size quick assembling steel pipe support is completed.
In summary, the problems that in the prior art, the conventional bent cap support constructed by a plurality of transverse and vertical steel pipes according to a certain size wastes time and labor in building, is unstable in bearing effect, low in recycling efficiency of the support, and easy to damage a finished concrete structure and even cause potential safety hazards in dismantling are solved; the main frame is formed by connecting the steel pipe piles, the steel pipe supporting legs, the vertical connecting steel pipes and the transverse connecting steel pipes through end flanges; and large-size quick assembly is realized by connecting the flower stand and the limiting frame, the steel pipe support is quick in connection, simple in structure, convenient to operate, safe and reliable, and can be used repeatedly, and the cost is saved.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (8)

1. A large-size rapid assembling steel pipe support is characterized by comprising two groups of main frames arranged at two sides of a pier, a connecting flower frame (5) for connecting the two groups of main frames and a limiting frame (6) arranged between the two groups of main frames;
the main frame comprises steel pipe piles (1), steel pipe supporting legs (2), vertical connecting steel pipes (3) and transverse connecting steel pipes (4);
a concrete support foundation is arranged on the side face of the pier bearing platform, the steel pipe pile (1) is arranged above the support foundation, and the steel pipe pile (1), the steel pipe supporting legs (2) and the vertical connecting steel pipes (3) are sequentially vertically connected upwards and are perpendicular to the support foundation;
the vertical connecting steel pipe (3) comprises a vertical steel pipe (301), an inclined steel pipe (302), a horizontal pipe connecting pipe (303), a horizontal pull steel plate (304) and a bearing platform (305); the inclined steel pipes (302) are fixedly arranged on one side of the vertical steel pipe (301) in an inclined upward direction, the number of the transverse pipe connecting pipes (303) is two, the transverse pipe connecting pipes are fixedly arranged on the other side of the vertical steel pipe (301) in an up-down direction, the transverse pull steel plate (304) is fixedly connected to the vertical steel pipe (301) and the inclined steel pipes (302), and the bearing platform (305) is horizontally arranged at the upper ends of the vertical steel pipe (301) and the inclined steel pipes (302) and is level to the height;
the transverse connecting steel pipe (4) comprises an upper transverse pipe (401) and a lower transverse pipe (401) and an inclined pull pipe (402) fixedly connected between the two transverse pipes (401);
the steel pipe piles (1), the steel pipe support legs (2) and the vertical connecting steel pipes (3) of each group of main frames are two groups, and are connected with the transverse pipes (401) through transverse pipe connecting pipes (303) and distributed symmetrically; the steel pipe piles (1), the steel pipe supporting legs (2), the vertical connecting steel pipes (3) and the transverse connecting steel pipes (4) are connected with one another through end flanges, a group of main frames are formed, and large-size rapid assembly is achieved;
the connecting flower stand (5) comprises angle steel (501), a flower stand cross bar (502) and shaping steel (503); the flower stand cross rods (502) are arranged between the two groups of vertical steel pipes (301) through angle steels (501) and are arranged into an upper group and a lower group, and the shaping steels (503) are arranged on the angle steels in a crossed manner;
the limiting frame (6) is arranged between the two groups of transverse pipes (401), and the limiting frame (6) comprises limiting vertical steel (601), limiting angle iron (602), limiting transverse steel (603) and limiting screws (604);
spacing perpendicular steel (601) are the channel-section steel, connect between two sets of violently pipes (401) through spacing angle bar (602), and set up in the left and right sides near every pier shaft, spacing horizontal steel (603) every spacing perpendicular steel (601) of fixed connection, and set up both sides around the pier respectively, spacing screw (604) pass the channel-section steel pterygoid lamina of spacing perpendicular steel (601), set up in the left and right sides of spacing perpendicular steel (601) relatively, carry on spacingly to the pier shaft.
2. A large-sized rapid assembling steel pipe support as claimed in claim 1, wherein the inclined pulling pipes (402) on the transverse connecting steel pipe (4) are divided into two groups, and the upper parts of the inclined pulling pipes are inclined inwards to form a supporting force.
3. The large-size rapid assembling steel pipe support as claimed in claim 1, wherein the limiting vertical steel (601) is welded with a nut at the mounting position of the limiting screw (604).
4. The large-size rapid assembling steel pipe bracket as claimed in claim 1, wherein the limiting vertical steel (601) is connected to the bottom plate of the limiting vertical steel (601) by a preset screw after removing a channel steel wing plate at the position of connecting the limiting horizontal steel (603).
5. A large-sized rapid assembling steel pipe support as claimed in claim 1 or 3, wherein a pad is provided on the pier in contact with the limit screw (604) to prevent damage to the pier caused thereby.
6. The large-size rapid assembling steel pipe support as claimed in claim 1, wherein cross-pull plates (7) are connected between the steel pipe legs (2) of each group of supports, between the two groups of steel pipe legs (2) of the two groups of main frames, and between the two groups of vertical steel pipes (301) of the two groups of main frames through angle irons, respectively.
7. A large-size rapid assembling steel pipe support as claimed in claims 1 to 6, wherein said transverse connecting steel pipe (4) further comprises a middle bearing platform (8) arranged at the middle top, and the middle bearing platform (8) is flush with the bearing platform (305).
8. The large-size rapid assembling steel pipe support as claimed in claims 1 to 6, wherein a transverse double-I-shaped steel distribution beam (9) is firstly installed on the support foundation at the lower end of each group of main frames, a steel pipe pile foundation (10) is arranged on the distribution beam (9), a flange is arranged on the steel pipe pile foundation (10), and then the steel pipe pile (1) is installed through the flange.
CN201910296421.6A 2019-04-13 2019-04-13 Large-size quick assembling steel pipe support Pending CN111827090A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910296421.6A CN111827090A (en) 2019-04-13 2019-04-13 Large-size quick assembling steel pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910296421.6A CN111827090A (en) 2019-04-13 2019-04-13 Large-size quick assembling steel pipe support

Publications (1)

Publication Number Publication Date
CN111827090A true CN111827090A (en) 2020-10-27

Family

ID=72915353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910296421.6A Pending CN111827090A (en) 2019-04-13 2019-04-13 Large-size quick assembling steel pipe support

Country Status (1)

Country Link
CN (1) CN111827090A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112520206A (en) * 2020-11-12 2021-03-19 安徽江淮福臻车体装备有限公司 Die support
CN113550235A (en) * 2021-08-31 2021-10-26 中交二航局第二工程有限公司 Cast-in-place bent cap support and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112520206A (en) * 2020-11-12 2021-03-19 安徽江淮福臻车体装备有限公司 Die support
CN113550235A (en) * 2021-08-31 2021-10-26 中交二航局第二工程有限公司 Cast-in-place bent cap support and construction method thereof

Similar Documents

Publication Publication Date Title
CN109403456B (en) Steel corbel embedded structure and construction method thereof
CN112411391A (en) Single-column capping beam steel pipe column Bailey beam construction supporting system and construction method thereof
CN211849246U (en) Reverse hoisting system suitable for high-pile wharf
CN111827090A (en) Large-size quick assembling steel pipe support
CN211848965U (en) A cast-in-place box girder bracket
CN216109354U (en) A transfer layer steel column installation structure
KR100529517B1 (en) Method for pulling up equally the upper structure of a bridge using a raising bracket supporting load dispersedly, having a displacement measuring instrument
CN113958112A (en) Comprehensive scaffold construction method
CN210104547U (en) Large-size quick assembling steel pipe support
CN204753412U (en) Integral movable formwork for arch culvert construction
CN219118536U (en) Assembled concrete prefabricated plate
CN217353562U (en) High altitude structure braced system that encorbelments
CN217378583U (en) Crossbeam support structure with main tower column stull function
CN110924415A (en) Steel bar support frame structure for 4.5m thick large raft foundation and construction method thereof
CN212656460U (en) Beam-slab shared shelving beam
CN215593723U (en) Big bent cap cantilever braced system of public road bridge roof beam
CN220202735U (en) Be used for goaf anchor mound formula transmission line shaft tower basis
CN220266621U (en) Combined foundation piles
CN218346228U (en) Steel-pipe pile prefabricated extension basis
CN216109887U (en) Broken line-shaped temporary enclosure for edge of foundation pit
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN223317512U (en) Integral attaching device of attached lifting scaffold
CN211713706U (en) Large cantilever prefabricated bent cap installation lattice support device
CN218521625U (en) Cast-in-place box girder construction bearing structure of pier department
CN215369949U (en) Middle plate and frame body reserved door type channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201027

WD01 Invention patent application deemed withdrawn after publication