CN219860079U - Prefabricated part hoisting round head hanging nail structure - Google Patents
Prefabricated part hoisting round head hanging nail structure Download PDFInfo
- Publication number
- CN219860079U CN219860079U CN202321231532.7U CN202321231532U CN219860079U CN 219860079 U CN219860079 U CN 219860079U CN 202321231532 U CN202321231532 U CN 202321231532U CN 219860079 U CN219860079 U CN 219860079U
- Authority
- CN
- China
- Prior art keywords
- wall
- fixed
- prefabricated
- fixed ring
- round head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003292 glue Substances 0.000 claims abstract description 30
- 239000007787 solid Substances 0.000 claims description 17
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 206010058109 Hangnail Diseases 0.000 claims description 9
- 241000405070 Percophidae Species 0.000 abstract description 10
- 238000005266 casting Methods 0.000 abstract description 7
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract description 5
- 238000009415 formwork Methods 0.000 description 12
- 238000010276 construction Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a prefabricated part lifting round head hanging nail structure, which relates to the field of round head hanging nail structures and comprises a prefabricated template, a reinforcing steel bar support, a glue, a duckbill hanging tool and a casting wall, wherein the inner wall of the prefabricated template is connected with a fixed column in a sliding manner, the outer wall of the fixed column is fixedly connected with a first fixed ring and a second fixed ring, the inner wall of the prefabricated template is provided with a first fixed groove for clamping the first fixed ring, the inner wall of the glue is provided with a second fixed groove for clamping the second fixed ring, the inner wall of the glue is connected with the round head hanging nail in a sliding manner, one end of the round head hanging nail is fixedly connected with the reinforcing steel bar support, the other end of the round head hanging nail is clamped with the duckbill hanging tool, the first fixed ring and the second fixed ring are arranged in a semicircular ring manner, the first fixed ring is mutually perpendicular to the second fixed ring, one end of the fixed column, which is far away from the glue, is fixedly connected with a limiting plate, one end of the limiting plate is attached to the outer wall of the prefabricated template, and the lifting efficiency can be improved through the cooperation between the devices.
Description
Technical Field
The utility model relates to the technical field of round head hanging nail structures, in particular to a prefabricated part hanging round head hanging nail structure.
Background
The building parts with a plurality of assembly building forms are produced and processed by workshops, and the component varieties mainly comprise: the prefabricated building comprises an external wall board, an internal wall board, a superimposed sheet, a balcony, an air-conditioning board, stairs, prefabricated beams, prefabricated columns and the like, wherein most of assembled buildings use concrete prefabricated components in the building process to achieve the effect of quick construction, the concrete prefabricated components are usually concrete prefabricated components for the building, which are cast in a reusable mould, are generally cured and formed in a controllable environment in advance, are transported to a building site in advance and are hoisted to a designated position, and for convenience in hoisting, round head hanging nails are needed to be embedded in the prefabricated concrete components to serve as hoisting points for hoisting according to the shape, size and quality of the prefabricated concrete components, the round head hanging nails are matched with the hoisting tools to be used, the component production process can be simplified, the hoisting construction is facilitated, and the operation time of workers is shortest, so that the safety coefficient of the concrete prefabricated components in the production and transportation processes is ensured.
Traditional hoist and mount mode needs to place U shaped steel muscle rings in concrete wall, and the rethread is hoisted U shaped steel muscle, and is relatively poor through this structure shock resistance to the reinforcing bar use amount is higher, and the construction difficulty degree is higher, and for this reason, we have proposed prefabricated component and lifted by crane the button head and hang nail structure.
Disclosure of Invention
In order to achieve the above purpose, the present utility model provides the following technical solutions: including prefabricated template, reinforcing bar support, ripples are glued, duckbilled hoist and water the wall of building, the inner wall sliding connection of prefabricated template has the fixed column, the first solid fixed ring of outer wall fixedly connected with of fixed column and second solid fixed ring, the first fixed slot that supplies first solid fixed ring block is seted up to the inner wall of prefabricated template, the second fixed slot that supplies the second solid fixed ring block is seted up to the inner wall of ripples glue, the inner wall sliding connection of ripples glue has the button head to hang the nail, the one end and the reinforcing bar support fixed connection of button head to hang the nail, the other end and the duckbilled hoist joint of button head to hang the nail.
Preferably, the first fixing ring and the second fixing ring are arranged in a semicircular shape, and the first fixing ring and the second fixing ring are mutually perpendicular.
Preferably, the fixed column is kept away from the one end fixedly connected with limiting plate of ripples glue, and the one end and the outer wall laminating of prefabricated template of limiting plate.
Preferably, a first sliding groove for sliding the first fixing ring is formed in the inner wall of the prefabricated formwork.
Preferably, the inner wall of the wave glue is provided with a second sliding groove for the second fixing ring to slide.
Preferably, the outer wall of the prefabricated template is provided with a grouting opening.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the glue is fixed on the outer wall of the prefabricated formwork through the fixing column, the concrete is poured on the reinforced bar bracket through the grouting opening, when the concrete is solidified, the prefabricated formwork and the glue are taken down, a groove is formed at the top end of the poured wall at the moment, one end of the circular hanging nail is positioned in the center of the groove, and the poured wall can be hoisted through clamping the duckbill lifting appliance and the circular hanging nail.
Drawings
Fig. 1 is a schematic structural view of a reinforcing bar bracket according to the present utility model;
FIG. 2 is a cross-sectional view of a wave glue according to the present utility model;
fig. 3 is a schematic structural view of the duckbill hanger according to the present utility model.
In the figure: 1. prefabricating a template; 2. a reinforcing steel bar bracket; 3. a limiting plate; 4. fixing the column; 5. a grouting port; 6. a first fixing ring; 7. a second fixing ring; 8. wave glue; 9. round head hanging nails; 10. casting a wall; 11. duckbill hanger.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are only some, but not all embodiments of the utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
Referring to fig. 1-3, in the drawings, a prefabricated component lifting round head hanging nail structure comprises a prefabricated formwork 1, a reinforcing steel bar support 2, a glue 8, a duckbill hanger 11 and a casting wall 10, concrete to be poured can be planned through the arrangement of the prefabricated formwork 1, the casting wall 10 can be formed after the concrete is poured, the strength of the casting wall 10 can be improved through erecting the reinforcing steel bar support 2 in the prefabricated formwork 1, the glue 8 is fixed on the outer wall of the prefabricated formwork 1 during pouring, and the glue 8 is removed after the concrete is solidified, so that the shape of the glue 8 can be left on the outer wall of the casting wall 10.
The inner wall sliding connection of prefabricated template 1 has fixed column 4, the fixed column 4 can bear the force and follow the inner wall slip of prefabricated template 1, the outer wall fixedly connected with first solid fixed ring 6 and the solid fixed ring 7 of second of fixed column 4, the first fixed slot that supplies the solid fixed ring 6 block of first is offered to the inner wall of prefabricated template 1, the second fixed slot that supplies the solid fixed ring 7 block of second is offered to the inner wall of ripples gum 8, when first solid fixed ring 6 and first fixed slot block, fixed column 4 just can carry out the block with prefabricated template 1 this moment, fixed column 4 just can not follow the inner wall slip of prefabricated template 1 this moment, when the solid fixed ring 7 of second and the solid fixed slot block of the second of the inner wall of ripples gum 8, ripples gum 8 can accomplish this moment and be connected with fixed column 4.
Wherein first fixed slot and second fixed slot are the annular setting, only need run through the inner wall of prefabricated template 1 with the one end of fixed column 4 and extend to the inner wall of ripples gum 8 simultaneously, need grasp ripples gum 8 and rotate fixed column 4 this moment, can make the first solid fixed ring 6 of fixed column 4 outer wall rotate to the inner wall of first fixed slot, the second solid fixed ring 7 rotates the inner wall of second fixed slot, ripples gum 8 alright be connected with prefabricated template 1 through the setting of fixed column 4 this moment, compare in the past through the bolt with ripples gum 8 fix the outer wall speed at prefabricated template 1 faster efficiency higher.
The inner wall sliding connection of ripples glue 8 has button head to hang nail 9, button head to hang nail 9 slidable mounting is at the other end of ripples glue 8, the one end and the reinforcing bar support 2 fixed connection of button head to hang nail 9, the other end and the reinforcing bar support 2 that lays of button head to hang nail 9 are connected, the accessible is with reinforcing bar support 2 welded mode, also the mode that the accessible uses the lantern ring to cup joint, the other end and the duckbill hoist 11 joint of button head to hang nail 9, the effect of ripples glue 8 is that the protection is lifted up button head and is hung the nail 9 and hang the end and not sheltered from by the concrete, reserve suitable space for the lifting by crane of duckbill hoist 11, and ripples glue 8 still circulated use.
During hoisting, the duckbill hoist 11 is used for supporting the casting wall 10, and the load in the horizontal direction can be directly transmitted into the concrete, so that the hoisting efficiency and the quality safety are ensured.
Referring to fig. 1-3, this embodiment further describes example 1, in which the first fixing ring 6 and the second fixing ring 7 are disposed in a semicircular shape, and the first fixing ring 6 and the second fixing ring 7 are perpendicular to each other.
In this embodiment: the second fixed ring 7 is arranged under the first fixed ring 6, and when the first fixed ring 6 is positioned on the inner wall of the prefabricated formwork 1, the second fixed ring 7 is positioned on the outer wall of the prefabricated formwork 1, so that the second fixed ring is convenient to be connected with the glue 8.
Referring to fig. 1-3, in the drawings, one end of a fixing column 4 far away from a glue 8 is fixedly connected with a limiting plate 3, and one end of the limiting plate 3 is attached to the outer wall of a prefabricated formwork 1.
In this embodiment: the diameter of limiting plate 3 is greater than the diameter of fixed column 4, can restrict the slip orbit of fixed column 4 through the setting of limiting plate 3 to limiting plate 3 that sets up can be convenient for exert effort to it, makes prefabricated template 1 and pouring wall 10 break away from.
Referring to fig. 1-3, a first sliding groove for sliding the first fixing ring 6 is formed on the inner wall of the prefabricated form 1.
In this embodiment: the first sliding groove is consistent with the first fixed ring 6 in size, meanwhile, the first sliding groove can limit the rotation of the first fixed ring 6, the fixed column 4 can drive the first fixed ring 6 and the second fixed ring 7 to slide along the inner wall of the first sliding groove, the first fixed groove is formed in the inner wall of the first sliding groove, when the fixed column 4 drives the first fixed ring 6 to slide to the position of the first fixed groove, the second fixed ring 7 is located on the outer wall of the prefabricated formwork 1, the first fixed ring 6 and the second fixed ring 7 can be driven to rotate through rotating the fixed column 4, at the moment, the first fixed ring 6 can rotate to the inner cavity of the first fixed groove, and the sliding of the fixed column 4 is limited.
Referring to fig. 1-3, a second sliding groove is formed on the inner wall of the glue 8 for sliding the second fixing ring 7.
In this embodiment: the second fixed slot is formed in the inner wall of the second sliding slot, when the second fixed ring 7 slides out of the inner wall of the prefabricated formwork 1, the second sliding slot formed by the glue 8 is spliced with the second fixed ring 7, the second fixed ring 7 can be rotated to the inner cavity of the second fixed slot through rotation of the fixed column 4, and the glue 8 is fixed on the outer wall of the fixed column 4.
Referring to fig. 1-3, a grouting opening 5 is formed in the outer wall of the prefabricated form 1.
In this embodiment: when the glue 8 is installed, pouring can be completed by inputting concrete into the grouting openings 5.
Working principle: through fixing the fixed column 4 with ripples glue 8 at the outer wall of prefabricated form 1, the concrete pours reinforcing bar support 2 through grout mouth 5, when the concrete solidifies, takes off prefabricated form 1 together with ripples glue 8, just can appear the recess on the top of watering the wall 10 this moment to the one end of circular peg 9 is located recess central authorities, carries out the joint through lifting device 11 with the button head peg 9 with the duckbill this moment, alright hoist and mount to watering the wall 10.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process-method-article or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process-method-article or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes-modifications-substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. Prefabricated component lifts by crane button head and hangs nail structure, its characterized in that: including prefabricated template (1), reinforcing bar support (2), ripples are glued (8), duckbilled hoist (11) and are watered wall (10), the inner wall sliding connection of prefabricated template (1) has fixed column (4), the outer wall fixedly connected with first solid fixed ring (6) and second solid fixed ring (7) of fixed column (4), the first fixed slot that supplies first solid fixed ring (6) block has been seted up to the inner wall of prefabricated template (1), the second fixed slot that supplies second solid fixed ring (7) block has been seted up to the inner wall of ripples glued (8), the inner wall sliding connection of ripples glued (8) has button head to hang nail (9), the one end and the reinforcing bar support (2) fixed connection of button head to hang nail (9), the other end and duckbilled hoist (11) block of button head to hang nail (9).
2. The precast element lifting round head hanging nail structure according to claim 1, wherein: the first fixing ring (6) and the second fixing ring (7) are arranged in a semicircular mode, and the first fixing ring (6) and the second fixing ring (7) are perpendicular to each other.
3. The precast element lifting round head hanging nail structure according to claim 2, wherein: one end of the fixed column (4) far away from the glue (8) is fixedly connected with a limiting plate (3), and one end of the limiting plate (3) is attached to the outer wall of the prefabricated template (1).
4. The precast element lifting round head hanging nail structure according to claim 1, wherein: the inner wall of the prefabricated template (1) is provided with a first sliding groove for the first fixing ring (6) to slide.
5. The precast element lifting round head hanging nail structure according to claim 1, wherein: the inner wall of the wave glue (8) is provided with a second sliding groove for the second fixing ring (7) to slide.
6. The precast element lifting round head hanging nail structure according to claim 1, wherein: the outer wall of the prefabricated template (1) is provided with a grouting opening (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321231532.7U CN219860079U (en) | 2023-05-22 | 2023-05-22 | Prefabricated part hoisting round head hanging nail structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321231532.7U CN219860079U (en) | 2023-05-22 | 2023-05-22 | Prefabricated part hoisting round head hanging nail structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219860079U true CN219860079U (en) | 2023-10-20 |
Family
ID=88337098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321231532.7U Active CN219860079U (en) | 2023-05-22 | 2023-05-22 | Prefabricated part hoisting round head hanging nail structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219860079U (en) |
-
2023
- 2023-05-22 CN CN202321231532.7U patent/CN219860079U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204609154U (en) | The hollow stair system of a kind of prefabricated assembling type reinforced concrete | |
CN105133755B (en) | A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall | |
CN102777030A (en) | Method for building up formwork construction platform of lift shaft | |
CN114150766A (en) | Prefabricated reinforced concrete column connecting joint and construction method thereof | |
CN102444310A (en) | Method for constructing concrete chimney cylinder body through formwork lifting process | |
CN109252656B (en) | High-rise building climbing template and assembling, pouring and lifting method | |
CN219860079U (en) | Prefabricated part hoisting round head hanging nail structure | |
CN101748893B (en) | Method for manufacturing high-rise building balcony boards | |
CN109732773B (en) | Mounting node and mounting method of support hinged concrete prefabricated part | |
CN110344553A (en) | A kind of formwork erecting structure and formwork support process of stair lifting construction piece post-cast strip | |
CN113802562B (en) | Steel reinforcement cage circulating hanging bar device and use method thereof | |
CN205400094U (en) | Pothook formula ligature device of glomeration mode hoist and mount building block brickwork wall piece | |
CN102116084B (en) | Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building | |
JP2002030615A (en) | Construction method of tower structure | |
SU1441038A1 (en) | Method of erecting high ferroconcrete flues | |
CN212295585U (en) | Construction operation platform arranged on aluminum formwork outside shear wall | |
KR20170106869A (en) | Rope fixing device for building cleaning | |
CN207582978U (en) | A kind of floorslab thickness control device | |
CN217780474U (en) | Large-scale prefabricated case roof beam hoist and mount crack control device | |
CN218659707U (en) | Plaster mold box mold facilitating taking of parts | |
CN216276184U (en) | Prefabricated component connection structure | |
CN215671046U (en) | Square chimney urceolus rollover construction device | |
CN114562022B (en) | Prefabricated balcony slab of assembled and hoisting structure | |
CN212799252U (en) | Pre-buried wire rope cover hoisting ring structure | |
CN215561941U (en) | Hydraulic jacking platform rollover structure for high pier construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |