CN219859992U - Wall-attached rod heightening device of construction lifter - Google Patents

Wall-attached rod heightening device of construction lifter Download PDF

Info

Publication number
CN219859992U
CN219859992U CN202320925904.XU CN202320925904U CN219859992U CN 219859992 U CN219859992 U CN 219859992U CN 202320925904 U CN202320925904 U CN 202320925904U CN 219859992 U CN219859992 U CN 219859992U
Authority
CN
China
Prior art keywords
wall
channel
heightening
attached
construction elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320925904.XU
Other languages
Chinese (zh)
Inventor
吴旭
保松林
李玄叶
朱景
祝成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202320925904.XU priority Critical patent/CN219859992U/en
Application granted granted Critical
Publication of CN219859992U publication Critical patent/CN219859992U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides a wall-attached rod heightening device of a construction lifter, which comprises a channel steel component, heightening pieces and bolts, wherein the channel steel component comprises two channel steels which are symmetrically arranged front and back, the channel steels are transversely arranged, the two channel steels are welded and fixed through a plurality of steel plates which are uniformly distributed, the heightening pieces are arranged at the bottom of the channel steel component in a bilateral symmetry manner, the heightening pieces are of cuboid box-packed structures, two reserved holes which are symmetrically arranged in the upper surface and the lower surface of the heightening pieces are respectively arranged in the middle of the heightening pieces, the positions of the reserved holes in the upper surface and the lower surface of the heightening pieces are corresponding, and the lower ends of the bolts penetrate through the end parts of the wall-attached rod pieces, the middle gaps of the channel steel component, the reserved holes of the heightening pieces and beam plates of each floor structure and then fix the two heightening pieces. The utility model enables the construction lifter to be attached to the floor, the distance between the construction lifter and the floor is shortened, a special passage is not required to be additionally erected, and when the construction lifter is attached to the floor, the wall attaching rod piece can be ensured to meet the angle of +/-8 DEG of the wall attaching horizontal angle when being attached to the floor.

Description

Wall-attached rod heightening device of construction lifter
Technical Field
The utility model relates to the technical field of wall attaching rod heightening of elevators, in particular to a wall attaching rod heightening device of a construction elevator.
Background
The fixed distance between the wall attaching rods of the existing building site construction lifter on the standard joint of the lifter is 750mm, the wall attaching rods can only be fixed on the main joint of the standard joint, the other side of the wall attaching rods is fixed on the structure to meet the requirement of the horizontal attaching angle within +/-8 degrees, the wall attaching rods are generally attached to the beam sides of floors, but the wall attaching rods are longer, and the beams are positioned at the outermost sides of the floors, so that the position of the construction lifter is generally far away from the floors, and a special channel side is built between the construction lifter and the floors by adopting a steel pipe scaffold.
Disclosure of Invention
In order to solve the problems, the utility model discloses a wall attaching rod heightening device of a construction lifter.
The specific scheme is as follows:
the utility model provides a construction elevator attaches wall pole bed hedgehopping device, installs on each floor structure beam slab for fixed wall pole tip that attaches, its characterized in that: including channel-section steel subassembly, rim charge spare and bolt, the channel-section steel subassembly includes the channel-section steel that two bilateral symmetry set up, the channel-section steel transversely sets up, and the steel sheet welded fastening through a plurality of even subdivisions between two channel-section steels, rim charge spare has two and bilateral symmetry to set up in the bottom of channel-section steel subassembly, rim charge spare is cuboid box-packed structure, and the middle part all is equipped with the preformed hole that two bilateral symmetry set up about it, and the preformed hole position is corresponding about, the bolt lower extreme passes behind preformed hole and each floor structure beam slab of attaching wall member tip, channel-section steel subassembly, rim charge spare and fix four.
As a further improvement of the utility model, the top of the channel steel component is provided with a bolt fixing angle steel for fixing a bolt.
As a further improvement of the utility model, a ribbed steel plate is arranged in the middle of the inner cavity of the heightening piece along the longitudinal direction.
As a further improvement of the utility model, the steel plate is a 5mm thick steel plate, and the raised piece is a 3mm thick steel plate iron box.
As a further improvement of the utility model, one side of each floor structure beam plate is provided with a construction elevator standard joint, the wall-attached rod piece is arranged between the construction elevator standard joint and the elevating device, one end of the wall-attached rod piece is fixedly connected with the construction elevator standard joint through a U-shaped bolt, and the other end of the wall-attached rod piece is fixedly connected with the elevating device through a bolt.
The utility model has the beneficial effects that: the construction lifter can be attached to the floor, the distance between the construction lifter and the floor is shortened, a special passage is not required to be additionally erected, and when the construction lifter is attached to the floor, the condition that the horizontal angle of the attached wall is +/-8 DEG can be met when the attached wall rod piece is attached to the floor can be ensured; the utility model has the advantages of convenient material processing, convenient turnover use, customized size according to actual conditions, simple and understandable operation, convenient installation for workers, simple and effective installation problem of the construction lifter, and great reduction of potential safety hazard of large machinery.
Drawings
Fig. 1 is a top view of the present utility model.
Fig. 2 is a cross-sectional view A-A' of fig. 1.
FIG. 3 is a top view of the spacer of the present utility model.
Fig. 4 is a cross-sectional view of a spacer according to the present utility model.
FIG. 5 is a schematic representation of the use of the present utility model.
List of reference numerals:
the steel plate comprises a beam plate of each floor structure, a 2-wall-attached rod piece, a 3-channel steel component, a 31-channel steel, a 32-steel plate, a 4-heightening piece, a 41-reserved hole, a 42-rib steel plate, 5-bolts, 6-bolt fixed angle steel, 7-construction elevator standard section and 8-U-shaped bolts.
Description of the embodiments
The present utility model is further illustrated in the following drawings and detailed description, which are to be understood as being merely illustrative of the utility model and not limiting the scope of the utility model.
As shown in the figure, a construction elevator attaches wall pole bed hedgehopping device installs on each floor structure beam slab 1 for fixed wall pole piece 2 tip that attaches, including channel-section steel subassembly 3, bed hedgehopping piece 4 and bolt 5, channel-section steel subassembly 3 includes the channel-section steel 31 that two front and back symmetries set up, channel-section steel 31 transversely set up, steel sheet 32 welded fastening through a plurality of even subdivisions between two channel-section steel 31, bed hedgehopping piece 4 has two and bilateral symmetry to set up in the bottom of channel-section steel subassembly 3, bed hedgehopping piece 4 is cuboid box structure, the middle part all is equipped with the preformed hole 41 that two bilateral symmetry set up about it, and the preformed hole 41 position of upper and lower face is corresponding, bolt 5 lower extreme passes and attaches wall pole piece 2 tip, the middle part clearance of channel-section steel subassembly 3, preformed hole 41 and each floor structure beam slab 1 after with four fixed.
In this embodiment, the top of the channel steel assembly 3 is provided with a bolt-fixing angle 6 for fixing the bolt 5.
In this embodiment, the middle part of the inner cavity of the elevation 4 is provided with a ribbed steel plate 42 in the longitudinal direction.
In the present embodiment, the steel plate 32 is a 5mm thick steel plate, and the spacer 4 is a 3mm thick steel plate iron box.
In this embodiment, one side of each floor structure beam plate 1 is provided with a construction elevator standard section 7, a wall-attached rod 2 is arranged between the construction elevator standard section 7 and a lifting device, one end of the wall-attached rod is fixedly connected with the construction elevator standard section 7 through a U-shaped bolt 8, and the other end of the wall-attached rod is fixedly connected with the lifting device through a bolt 5.
The installation steps of the utility model are as follows:
1. customizing a heightening piece and a wall-attached horizontal angle according to the arrangement sizes of the site standard section and the floor elevation;
2. the size of the heightening piece and the reserved hole site keep the position of the heightening piece and the length of the channel steel according to the bolt spacing of the wall attached to the construction lifter;
3. and the bolts of the wall-attached rod pieces of the lifter penetrate through the channel steel and the heightening piece to be fixed at the bottom of the floor together.
The technical means disclosed by the scheme of the utility model is not limited to the technical means disclosed by the embodiment, and also comprises the technical scheme formed by any combination of the technical features. It should be noted that modifications and adaptations to the utility model may occur to one skilled in the art without departing from the principles of the present utility model and are intended to be within the scope of the present utility model.

Claims (5)

1. The utility model provides a construction elevator attaches wall pole bed hedgehopping device installs on each floor structure beam slab (1) for fixed wall pole piece (2) tip, its characterized in that: including channel-section steel subassembly (3), rim (4) and bolt (5), channel-section steel subassembly (3) are including two around channel-section steel (31) that the symmetry set up, channel-section steel (31) transversely set up, steel sheet (32) welded fastening through a plurality of even subdivisions between two channel-section steel (31), rim (4) have two and bilateral symmetry set up in the bottom of channel-section steel subassembly (3), rim (4) are cuboid box-packed structure, and the middle part all is equipped with preformed hole (41) that two bilateral symmetry set up about it, and preformed hole (41) position from top to bottom is corresponding, bolt (5) lower extreme passes behind preformed hole (41) and each floor structure beam slab (1) of wall attaching member (2) tip, channel-section steel subassembly (3) middle part clearance, rim (4) and four are fixed.
2. The construction elevator wall-attached pole heightening device according to claim 1, wherein: the top of the channel steel component (3) is provided with a bolt fixing angle steel (6) for fixing the bolt (5).
3. The construction elevator wall-attached pole heightening device according to claim 1, wherein: the middle part of the inner cavity of the heightening piece (4) is longitudinally provided with a ribbed steel plate (42).
4. The construction elevator wall-attached pole heightening device according to claim 1, wherein: the steel plate (32) is a 5mm thick steel plate, and the heightening piece (4) is a 3mm thick steel plate iron box.
5. The construction elevator wall-attached pole heightening device according to claim 1, wherein: one side of each floor structure beam plate (1) is provided with a construction elevator standard section (7), the wall-attached rod piece (2) is arranged between the construction elevator standard section (7) and the heightening device, one end of the wall-attached rod piece is fixedly connected with the construction elevator standard section (7) through a U-shaped bolt (8), and the other end of the wall-attached rod piece is fixedly connected with the heightening device through a bolt (5).
CN202320925904.XU 2023-04-23 2023-04-23 Wall-attached rod heightening device of construction lifter Active CN219859992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320925904.XU CN219859992U (en) 2023-04-23 2023-04-23 Wall-attached rod heightening device of construction lifter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320925904.XU CN219859992U (en) 2023-04-23 2023-04-23 Wall-attached rod heightening device of construction lifter

Publications (1)

Publication Number Publication Date
CN219859992U true CN219859992U (en) 2023-10-20

Family

ID=88345374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320925904.XU Active CN219859992U (en) 2023-04-23 2023-04-23 Wall-attached rod heightening device of construction lifter

Country Status (1)

Country Link
CN (1) CN219859992U (en)

Similar Documents

Publication Publication Date Title
CN103485530B (en) A kind of steel form of the modular stairway that is exclusively used in skyscraper and assemble method thereof
CN103470018B (en) Detachable converter tooling platform
CN219859992U (en) Wall-attached rod heightening device of construction lifter
KR20170049719A (en) Pre-assembled re-bar column
CN109235235B (en) Longitudinal connection method for main beams at continuous part of steel-concrete composite bridge deck
CN208965581U (en) A kind of non-console mode tower crane platform
CN210084736U (en) A portable lifting hook for installation of people's air defense door
CN109778702A (en) Across existing city intersection steel box-girder pushing tow model and its application method
CN109812009A (en) A kind of construction of lift well elevator steel structure base and construction method
CN109811650A (en) The structure that steel column is connect with concrete bearing platform
CN203531347U (en) Detachable converter tooling platform
CN210001379U (en) single bearing beam of elevator without machine room
CN210164121U (en) Roof slab structure for preventing large airplane from impacting
CN207046633U (en) It is a kind of can fast positioning installation steel structure type elevator hoistways
CN206467669U (en) Prestressed anchor bearing structure
CN206052961U (en) A kind of corrugated sheet steel makees the groove type plate of skeleton
CN218479556U (en) Can have enough to meet need cloth machine operation platform device
CN207078863U (en) Large-tonnage large span machine-roomless lift spandrel girder
CN218932204U (en) Slag guiding device under converter
CN216764077U (en) Connecting structure for crane beam
CN216040704U (en) Shaped steel bearing structure
CN212893471U (en) Lifting appliance for T-shaped beam template
CN220704553U (en) Profile steel combined supporting structure with axial force servo system
CN210103237U (en) Construction elevator system independent of outside building
CN219910047U (en) Unloading platform suitable for reconstruction and expansion building engineering project