CN207046633U - It is a kind of can fast positioning installation steel structure type elevator hoistways - Google Patents
It is a kind of can fast positioning installation steel structure type elevator hoistways Download PDFInfo
- Publication number
- CN207046633U CN207046633U CN201720882215.XU CN201720882215U CN207046633U CN 207046633 U CN207046633 U CN 207046633U CN 201720882215 U CN201720882215 U CN 201720882215U CN 207046633 U CN207046633 U CN 207046633U
- Authority
- CN
- China
- Prior art keywords
- assembly parts
- connection
- subplate
- mainboard
- interlude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to it is a kind of can fast positioning installation steel structure type elevator hoistways, top assembly parts, interlude assembly parts and bottom assembly parts including passing sequentially through connector connection from top to bottom, also include the time ladder portion assembly parts installed by connector, it is characterised in that:Described connector is mainly made up of connection mainboard and connection subplate, positioning convex is formed with the middle part of described connection mainboard, connection main aperture is formed with the surrounding of positioning convex, positioning hole is formed with the middle part of described connection subplate, connection secondary orifices is formed with the surrounding of positioning hole, connection mainboard realizes connection by bolt with being connected subplate with being connected main aperture and connecting the assembling of secondary orifices.The utility model scientific structure design is reasonable, has convenient installation, the space improved efficiency of construction, do not influence hoistway, ensures the advantages of elevator normal mounting operation.
Description
Technical field
The utility model belongs to elevators field, particularly it is a kind of can fast positioning installation steel structure type elevator hoistways.
Background technology
With rapid development of economy, people are increasing to the demand of elevator, and elevator installation is firstly the need of there is elevator
Road, in general elevator hoistways constructional difficulties, the cycle, length was, it is necessary to which the workload of site operation is big.
Existing hoistway with steel structure uses the method assembled again in hoistway after sectional making, is generally divided into welded type
And pin-connected panel.The hoistway of welded type connection can cause construction pollution, influence resident's normal life;The hoistway of pin-connected panel passes through company
The structure that each section is attached by fitting, connector can protrude to the inside of hoistway when mounted, cause elevator hoistways to use empty
Between reduce, or even elevator can not normal mounting, operation the problem of.In addition, no matter the hoistway of which kind of form, existing structure all can
On-site hoisting location difficulty be present, the requirement of precise positioning, Fast Installation can not be met.
The content of the invention
The purpose of this utility model be to provide a kind of scientific structure design rationally, convenient installation, improve efficiency of construction, no
Influence the space of hoistway, ensure the operation of elevator normal mounting can fast positioning installation steel structure type elevator hoistways.
The utility model solves its technical problem and is achieved through the following technical solutions:
It is a kind of can fast positioning installation steel structure type elevator hoistways, including pass sequentially through from top to bottom connector connection
Top assembly parts, interlude assembly parts and bottom assembly parts, in addition to by connector uniformly be arranged on interlude assembly parts and
The time ladder portion assembly parts of bottom assembly parts sidepiece, it is characterised in that:Described connector is mainly by connection mainboard and connection subplate
Form, be formed with positioning convex in the middle part of described connection mainboard, connection main aperture be formed with the surrounding of positioning convex, in described company
Connect and be formed with the positioning hole being oppositely arranged with positioning convex in the middle part of subplate, be formed with the surrounding of positioning hole and be oppositely arranged with being connected main aperture
Connection secondary orifices, connection mainboard and be connected subplate by bolt and be connected main aperture and connection secondary orifices assembling realization connection, it is described
The connection mainboard or auxiliary connection of top assembly parts, interlude assembly parts and bottom assembly parts by being welded on respective vertical beam end
Plate is attached fixation, the connection mainboard or connection subplate waited terraced portion's assembly parts and welded by rear gangboard and supporting plate end
It is connected on the connection subplate or connection mainboard of the welding of vertical beam side.
Moreover, the top assembly parts, interlude assembly parts and bottom assembly parts each vertical beam in bottom on be welded with
The connection mainboard perpendicular with its end face, it is welded with each vertical beam in top of the interlude assembly parts and bottom assembly parts
The connection subplate perpendicular with its end face.
Moreover, the top assembly parts, interlude assembly parts and bottom assembly parts each vertical beam in bottom on be welded with
The connection subplate perpendicular with its end face, it is welded with each vertical beam in top of the interlude assembly parts and bottom assembly parts
The connection mainboard perpendicular with its end face.
Moreover, described connection mainboard and connection subplate is square plate body jaggy, the square plate at angle one by one
The intersection point of body diagonal coincides with cornerwise intersection point on vertical beam end face, and the outer rim of the breach exists with the inner edge of hoistway frame
In same plane.
The advantages of the utility model and have the beneficial effect that:
1. can fast positioning installation steel structure type elevator hoistways, by by traditional welded type well for being inconvenient to operate
The pin-connected panel hoistway that hoistway inner space is influenceed behind road or shaping is designed as the hoistway being attached using novel connector, solves
Noise present in welding procedure is big, constructional difficulties problem, and influence hoistway space present in existing splicing structure and
The problem of elevator normal operation.This novel elevator hoistway convenient construction, in construction, first by bottom assembly parts by connecting mainboard
Or connection subplate is fixed on the advance mounted connection subplate of foundation ditch civil engineering or connection mainboard, and it is bolted, then
Start to lift interlude assembly parts and top assembly parts successively, positioning is realized by the cooperation of positioning convex and positioning hole, then
Two parts are fixedly connected by bolt again, finally terraced portion's assembly parts, simple, side are waited in installation in the same way
Just, efficiency of construction is substantially increased.
2. can fast positioning installation steel structure type elevator hoistways, by connection mainboard and connecting at one jiao of subplate
Breach is set, the occupancy in connector space in elevator hoistways is avoided, facilitates normal mounting of the elevator in it.
3. the utility model scientific structure design is reasonable, there is convenient installation, the sky for improving efficiency of construction, not influenceing hoistway
Between, ensure the advantages of elevator normal mounting operation, be it is a kind of with higher innovation can fast positioning installation steel structure type
Elevator hoistways.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 A-A to schematic diagram;
Fig. 3 is Fig. 2 B portions enlarged drawing;
Fig. 4 is the structural representation of the utility model connector.
Description of reference numerals:
Assembly parts, 2- interludes assembly parts, 3- vertical beams, 4- connectors, 5- bottoms assembly parts, 6- supporting plates, 7- at the top of 1-
Afterwards gangboard, 8- hoistways frame, 9- breach, 10- wait terraced portion's assembly parts, 11- positioning holes, 12- connections secondary orifices, 13- connections mainboard,
14- connections subplate, 15- positioning convex.
Embodiment
Below by specific embodiment, the utility model is described in further detail, following examples be it is descriptive, no
It is limited, it is impossible to which the scope of protection of the utility model is limited with this.
It is a kind of can fast positioning installation steel structure type elevator hoistways, including pass sequentially through from top to bottom connector connection
Top assembly parts 1, interlude assembly parts 2 and bottom assembly parts 5, in addition to interlude is uniformly arranged on by connector 4 and assembled
The time ladder portion assembly parts 10 of part and bottom assembly parts sidepiece, its innovation is:Described connector is mainly by connection mainboard
13 and connection subplate 14 form, be formed with positioning convex 15 in the middle part of described connection mainboard, company be formed with the surrounding of positioning convex
Main aperture is connect, the positioning hole 11 being oppositely arranged with positioning convex is formed with the middle part of described connection subplate, in the surrounding system of positioning hole
There is the connection secondary orifices 12 being oppositely arranged with being connected main aperture, connection mainboard is with being connected subplate by bolt with being connected main aperture and auxiliary connection
Connection is realized in the assembling in hole, and the top assembly parts, interlude assembly parts and bottom assembly parts are by the respective end of vertical beam 3
The connection mainboard or connection subplate of welding are attached fixation, and the terraced portion's assembly parts of time pass through rear gangboard 7 and the end of supporting plate 6
The connection mainboard or connection subplate of welding are connected on the connection subplate or connection mainboard of the welding of vertical beam side.
The top assembly parts, interlude assembly parts and bottom assembly parts each vertical beam in bottom on be welded with and its end
The perpendicular connection mainboard in face, it is welded with and its end in each vertical beam in top of the interlude assembly parts and bottom assembly parts
The perpendicular connection subplate in face.
The top assembly parts, interlude assembly parts and bottom assembly parts each vertical beam in bottom on be welded with and its end
The perpendicular connection subplate in face, it is welded with and its end in each vertical beam in top of the interlude assembly parts and bottom assembly parts
The perpendicular connection mainboard in face.
Described connection mainboard and connect subplate for one by one at angle jagged 9 square plate body, the square plate body pair
The intersection point of linea angulata coincides with cornerwise intersection point on vertical beam end face, and the outer rim of the breach is with the inner edge of hoistway frame 8 same
In one plane.
The utility model after traditional welded type hoistway for being inconvenient to operate or shaping by will influence hoistway inner space
Pin-connected panel hoistway be designed as the hoistway being attached using novel connector, solve noise present in welding procedure it is big,
Constructional difficulties problem, and the problem of influence hoistway space and elevator normal operation present in existing splicing structure.This is new
Elevator hoistways convenient construction, in construction, bottom assembly parts are first fixed on foundation ditch civil engineering by connecting mainboard or connection subplate
It is mounted in advance to connect on subplate or connection mainboard, and be bolted, then start to lift interlude assembly parts successively
And top assembly parts, positioning is realized by the cooperation of positioning convex and positioning hole, then again consolidated two parts by bolt
Fixed connection, finally terraced portion's assembly parts are waited in installation in the same way, simply, conveniently, substantially increase efficiency of construction.
Although disclosing embodiment of the present utility model and accompanying drawing for the purpose of illustration, those skilled in the art can be with
Understand:Do not departing from the utility model and spirit and scope of the appended claims, it is various replace, change and modifications all be can
Can, therefore, the scope of the utility model is not limited to embodiment and accompanying drawing disclosure of that.
Claims (4)
1. it is a kind of can fast positioning installation steel structure type elevator hoistways, including pass sequentially through from top to bottom connector connection top
Portion's assembly parts, interlude assembly parts and bottom assembly parts, in addition to interlude assembly parts and bottom are uniformly arranged on by connector
The time ladder portion assembly parts of portion's assembly parts sidepiece, it is characterised in that:Described connector is mainly by connection mainboard and connection subplate structure
Into being formed with positioning convex in the middle part of described connection mainboard, connection main aperture be formed with the surrounding of positioning convex, in described connection
The positioning hole being oppositely arranged with positioning convex is formed with the middle part of subplate, is formed with what is be oppositely arranged with being connected main aperture in the surrounding of positioning hole
Secondary orifices is connected, connection mainboard realizes connection, the top by bolt with being connected subplate with being connected main aperture and connecting the assembling of secondary orifices
The connection mainboard or connection subplate of portion's assembly parts, interlude assembly parts and bottom assembly parts by being welded on respective vertical beam end
Fixation is attached, it is described to wait connection mainboard or the connection subplate company that terraced portion's assembly parts are welded by rear gangboard and supporting plate end
It is connected on the connection subplate or connection mainboard of the welding of vertical beam side.
2. it is according to claim 1 it is a kind of can fast positioning installation steel structure type elevator hoistways, it is characterised in that:Institute
State top assembly parts, be welded with the company perpendicular with its end face in each vertical beam in the bottom of interlude assembly parts and bottom assembly parts
Mainboard is connect, the company perpendicular with its end face is welded with each vertical beam in top of the interlude assembly parts and bottom assembly parts
Connect subplate.
3. it is according to claim 1 it is a kind of can fast positioning installation steel structure type elevator hoistways, it is characterised in that:Institute
State top assembly parts, be welded with the company perpendicular with its end face in each vertical beam in the bottom of interlude assembly parts and bottom assembly parts
Subplate is connect, the company perpendicular with its end face is welded with each vertical beam in top of the interlude assembly parts and bottom assembly parts
Connect mainboard.
4. it is according to claim 1 it is a kind of can fast positioning installation steel structure type elevator hoistways, it is characterised in that:It is described
Connection mainboard and connection subplate be square plate body jaggy at angle one by one, the intersection point of the square plate body diagonal with it is vertical
Cornerwise intersection point coincides on beam-ends face, and the outer rim of the breach and the inner edge of hoistway frame are in the same plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720882215.XU CN207046633U (en) | 2017-07-20 | 2017-07-20 | It is a kind of can fast positioning installation steel structure type elevator hoistways |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720882215.XU CN207046633U (en) | 2017-07-20 | 2017-07-20 | It is a kind of can fast positioning installation steel structure type elevator hoistways |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207046633U true CN207046633U (en) | 2018-02-27 |
Family
ID=61497337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720882215.XU Active CN207046633U (en) | 2017-07-20 | 2017-07-20 | It is a kind of can fast positioning installation steel structure type elevator hoistways |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207046633U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138364A (en) * | 2018-09-20 | 2019-01-04 | 上海三菱电梯有限公司 | A kind of installation elevator shaft structure and its building method |
-
2017
- 2017-07-20 CN CN201720882215.XU patent/CN207046633U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138364A (en) * | 2018-09-20 | 2019-01-04 | 上海三菱电梯有限公司 | A kind of installation elevator shaft structure and its building method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101824905B (en) | Assembly type variable steel girder platform, distribution method and assembly method thereof | |
CN102975818B (en) | A kind of aluminum alloy superstructure block hanging method | |
CN206053121U (en) | A kind of new steel structure beam | |
CN207046633U (en) | It is a kind of can fast positioning installation steel structure type elevator hoistways | |
CN214696793U (en) | Climb and shelve superelevation and spring layer extension and adhere to support | |
CN103061514A (en) | Long-span steel structure corridor construction method | |
CN209066598U (en) | Double replaceable active beam links of channel cross-section-steel skirt beam connection structure | |
CN204418654U (en) | For the aluminum alloy pattern plate between body of wall | |
CN208310204U (en) | A kind of pedestal for elevator coupling beam formwork erection | |
CN103590621B (en) | Tower crane integral type steel frame aisle and preparation method thereof | |
CN202321919U (en) | Metallic framework structure of escalator | |
CN210150559U (en) | Hoisting assembly in groups for reinforcing steel bar formwork integrated component | |
CN211257292U (en) | T-shaped corner joint of assembled wall | |
CN103255719B (en) | Installing method for large-section special-shaped pier cap formwork | |
CN206634888U (en) | A kind of special-shaped upright steel structure elevator hoistways | |
CN207244453U (en) | A kind of suspension bridge light anchorage mast apparatus | |
CN202164729U (en) | Knee brace structure between beams of different heights | |
CN207436484U (en) | A kind of building aluminum alloy mould plate combined system | |
CN201367671Y (en) | Prestressed reinforced concrete double-T plate | |
CN204980791U (en) | Shrouding about door of detachable elevator glass layer | |
CN102398840A (en) | Metal framework structure for escalator | |
CN109956395A (en) | A kind of steel vestibule integrally promotes shackle structure | |
CN211596366U (en) | Mortise and tenon socket joint formula steel trestle crossbeam and steel-pipe pile connected node | |
CN211257444U (en) | Assembled wall frame unit with reinforced structure | |
CN212897184U (en) | Reinforcement component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |