CN219840403U - Special appurtenance builds a wall - Google Patents

Special appurtenance builds a wall Download PDF

Info

Publication number
CN219840403U
CN219840403U CN202320870355.0U CN202320870355U CN219840403U CN 219840403 U CN219840403 U CN 219840403U CN 202320870355 U CN202320870355 U CN 202320870355U CN 219840403 U CN219840403 U CN 219840403U
Authority
CN
China
Prior art keywords
auxiliary tool
clamping plate
grip block
adjusting plate
special
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320870355.0U
Other languages
Chinese (zh)
Inventor
杨伟龙
杨振潮
刘小燕
芮观宝
张新峰
毛海龙
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scegc No8 Construction Engineering Group Co ltd
Original Assignee
Scegc No8 Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scegc No8 Construction Engineering Group Co ltd filed Critical Scegc No8 Construction Engineering Group Co ltd
Priority to CN202320870355.0U priority Critical patent/CN219840403U/en
Application granted granted Critical
Publication of CN219840403U publication Critical patent/CN219840403U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a special auxiliary tool for building walls, which relates to the technical field of building engineering, and comprises an auxiliary tool body, wherein the auxiliary tool body comprises a first clamping plate and a second clamping plate, one sides of the first clamping plate and one side of the second clamping plate are fixedly provided with a lapping plate, the top surfaces of the first clamping plate and the second clamping plate are symmetrically provided with adjusting buckles, a brick is built according to the requirements under the matching of a bidirectional threaded rod sleeved in the two adjusting buckles and two threaded pieces, the distance between the first clamping plate and the second clamping plate of the auxiliary tool body is adjusted, when a plurality of rollers arranged in one side of the first clamping plate and one side of the second clamping plate are attached to two sides of the brick to be built, the rotating threaded pieces are stopped, the adjustment of the device is completed, and the auxiliary tool body can be used for adjusting the brick according to the widths of the brick, so that the practicability of the device is greatly improved.

Description

Special appurtenance builds a wall
Technical Field
The utility model relates to the technical field of building engineering, in particular to an auxiliary tool special for wall building.
Background
The house building process comprises the following steps: the foundation and foundation parts, the main structure parts, the building decoration parts, the building roof parts, the building water supply, drainage and heating parts, the building electric parts changing parts, the intelligent building parts, the ventilation and air conditioning parts and the elevator parts are all nine parts, wherein in the building construction process, the wall building of the foundation and the foundation parts can be said to be of great importance, because the structural support of the house is the wall surface, if the wall is problematic, the immeasurable loss is likely to be caused.
When a worker builds a wall surface through bricks, according to the height of the wall surface to be built, cement is paved on each layer of bricks to be built, the bricks are continuously built, and the height of the wall surface is increased, however, when cement is paved, most workers lay cement on the top surface of the bricks through hand tools, redundant cement easily falls on the ground from two sides of the bricks when paving, the phenomenon that cement paving is uneven is easy to occur, and the quality of the wall surface is influenced, so that a special auxiliary tool for building the wall is needed to assist the worker in building the wall, the cement can be paved uniformly while material waste is reduced, and secondly, the existing part of auxiliary tool for building the wall is too single in structure and can only be used for certain types of bricks, so that the practicability is low, the requirement of the existing wall building workers cannot be met, and the inventor proposes a special auxiliary tool for building the wall to solve the problem.
Disclosure of Invention
In order to solve the problems that when workers lay cement on the top surface of a brick through a hand tool, redundant cement easily falls on the ground from two sides of the brick during laying, the phenomenon of uneven cement laying easily occurs, and the quality of a wall surface is affected; the utility model aims to provide an auxiliary tool special for wall building.
In order to solve the technical problems, the utility model adopts the following technical scheme: the utility model provides a special appurtenance builds a wall, including appurtenance body, appurtenance body includes first grip block and second grip block, equal fixed mounting in one side of first grip block and second grip block has the strap, the equal symmetry in top surface of first grip block and second grip block is installed and is adjusted and detained, two regulation are detained the inside callipers and are equipped with two threaded rods, two threaded rods surface screw thread cover is equipped with the screw thread piece, two screw thread pieces mutually support with adjusting and detaining, the mounting groove has all been seted up in one side of first grip block and second grip block, install evenly distributed's gyro wheel through the rotation piece rotation in the mounting groove, under the cooperation of two threaded rods and two screw thread pieces that the endotheca was established in two regulation, adjust the width of building the fragment of brick as required, when a plurality of gyro wheels of installing in one side of this appurtenance body and second grip block and the both sides subsides of needs are pasted, stop rotating the screw thread piece, this device adjusts and accomplishes, place this appurtenance body on cement fragment of brick, pour into two cement into two and scrape down the brick bodies through the cooperation, two and handle the middle of the cement is handled down.
Preferably, a first adjusting plate is fixedly arranged at one end of the top surface of the first clamping plate, a second adjusting plate is fixedly arranged at one end of the top surface of the second clamping plate, scraping plates are fixedly arranged at the bottom surfaces of the first adjusting plate and the second adjusting plate, the scraping plates are matched with the butt strap, cement needing to be laid is poured into the middle of the two butt straps of the auxiliary tool body, under the matching of the two scraping plates arranged at the bottom surfaces of the first adjusting plate and the second adjusting plate, cement is uniformly scraped, the cement is uniformly paved on the top surfaces of the bricks, and the like until the brick paving of each layer is completed, wherein the bottom ends of the scraping plates and the top surfaces of the butt straps are in a parallel state, the thickness of the cement paving is equal to that of the butt strap, the first adjusting plate in the device is positioned at the front side of the second adjusting plate, and the crossed area of the first adjusting plate and the second adjusting plate is larger than the maximum adjusting distance of the auxiliary tool body, and the problem that cement cannot be scraped is avoided.
Preferably, the middle fixed cover of two-way threaded rod is equipped with the spacer sleeve, two side cover that two-way threaded rod surface is located the spacer sleeve is equipped with the spring, the spring is mutually supported with the regulation knot, under two spring assistance at two side cover of spacer sleeve are established at two-way threaded rod surface, stability when increasing first grip block and second grip block and adjusting, the spout has been seted up to one side of first grip block, one side fixed mounting of second grip block has the draw runner, draw runner slidable mounting is in the spout, when first grip block and second grip block are adjusted, the draw runner of second grip block one side installation slides in the spout of first grip block one side seting up, through the cooperation of draw runner and spout, the stability of the scraper blade of first grip block and second grip block bottom surface installation in scraping the cement of getting the accessory tool body is increased.
Preferably, the fixed surface of two screw members installs evenly distributed's rotation knot, rotates and detains mutually supporting with the screw member, rotates two screw members that the convenience was established to two-way threaded rod surface cover through rotating knot to adjust the distance between first grip block and the second grip block, the fixed surface of position sleeve installs the handle, handle and appurtenance body mutually support, under the cooperation of handle and gyro wheel, the pulling appurtenance body will pour into cement in the middle of the two butt straps through two scraping plates and scrape even processing.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the auxiliary tool, under the cooperation of the two bidirectional threaded rods sleeved in the two adjusting buckles and the two threaded pieces, the width of the brick is built according to the requirement, the distance between the first clamping plate and the second clamping plate of the auxiliary tool body is adjusted, when a plurality of rollers arranged in one side of the first clamping plate and one side of the second clamping plate are attached to two sides of the brick to be built, the threaded pieces are stopped to rotate, the adjustment of the auxiliary tool is completed, the auxiliary tool body can be adjusted according to the width of the brick, and the practicability of the auxiliary tool is greatly improved;
2. in the utility model, cement needing to be laid is poured into the middle of two butt straps of an auxiliary tool body, the cement is scraped uniformly under the cooperation of two scraping plates arranged on the bottom surfaces of a first adjusting plate and a second adjusting plate, so that the cement is uniformly laid on the top surface of the brick, and the like until the brick on each layer is laid, the cement is not required to be laid on the top surface of the brick by workers through hand tools;
3. according to the auxiliary tool, the auxiliary tool body is placed on bricks for paving cement through the two butt straps, the cement is poured into the two butt straps, the auxiliary tool body is pulled under the cooperation of the handle and the roller, and the cement poured into the middle of the two butt straps is scraped evenly through the two scraping plates.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Figure 1 is a schematic diagram of the structure of the present utility model,
figure 2 is a schematic view of the auxiliary tool body structure of the utility model,
figure 3 is a schematic view of the structure of the bidirectional threaded rod matched adjusting buckle of the utility model,
figure 4 is a schematic view of the structure of the first adjusting plate and the second adjusting plate of the utility model,
figure 5 is an enlarged schematic view of the structure at a of the present utility model,
FIG. 6 is an enlarged schematic view of the structure of the present utility model at B.
In the figure: 1. an auxiliary tool body; 2. a first clamping plate; 21. a first adjustment plate; 211. a chute; 3. a second clamping plate; 31. a second adjusting plate; 311. a slide bar; 4. a two-way threaded rod; 41. a positioning sleeve; 411. a handle; 42. a screw; 421. a rotary buckle; 43. a spring; 5. a butt strap; 6. a roller; 7. a scraper; 8. a mounting groove; 9. and (5) adjusting the buckle.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Examples: as shown in fig. 1-6, the utility model provides a special auxiliary tool for wall building, which comprises an auxiliary tool body 1, wherein the auxiliary tool body 1 comprises a first clamping plate 2 and a second clamping plate 3, one sides of the first clamping plate 2 and the second clamping plate 3 are fixedly provided with a bonding plate 5, the top surfaces of the first clamping plate 2 and the second clamping plate 3 are symmetrically provided with adjusting buckles 9, two adjusting buckles 9 are internally clamped with a bidirectional threaded rod 4, threaded sleeves on the surfaces of the bidirectional threaded rod 4 are provided with threaded pieces 42, the two threaded pieces 42 are mutually matched with the adjusting buckles 9, one sides of the first clamping plate 2 and the second clamping plate 3 are respectively provided with a mounting groove 8, uniformly distributed idler wheels 6 are rotatably arranged in the mounting grooves 8 through rotating pieces, the distance between the bidirectional threaded rods 4 sleeved in the two adjusting buckles 9 and the two threaded pieces 42 is adjusted according to the requirements, when a plurality of bricks 6 arranged in one side of the first clamping plate 2 and the second clamping plate 3 are in contact with the two bricks 6, the cement bonding plates are required to be placed in the two sides of the cement bonding tool body 1, and the cement bonding tool body is uniformly laid in the cement bonding tool body 5 through the two matched with the two clamping plates 5, and the cement bonding tool is completely laid in the cement bonding tool body 5 by pulling the two side by the two clamping plates 5.
A first adjusting plate 21 is fixedly arranged at one end of the top surface of the first clamping plate 2, a second adjusting plate 31 is fixedly arranged at one end of the top surface of the second clamping plate 3, scraping plates 7 are fixedly arranged on the bottom surfaces of the first adjusting plate 21 and the second adjusting plate 31, and the scraping plates 7 are matched with the butt strap 5;
through adopting above-mentioned technical scheme, pour the cement that needs to build bricks into the middle of two butt straps 5 of appurtenance body 1, under the cooperation of two scrapers 7 of first regulating plate 21 and second regulating plate 31 bottom surface installation, scrape even processing to cement, make cement evenly lay at the fragment of brick top surface, and so on, until the fragment of brick of every layer is laid and is accomplished, wherein, the bottom of scraper 7 is in parallel state with the top surface of butt strap 5, the thickness that cement was laid is the thickness of butt strap 5, first regulating plate 21 in this device is located the front side of second regulating plate 31, first regulating plate 21 and the crossing region of second regulating plate 31 are greater than the biggest adjustment distance of this appurtenance body 1, can not have the problem that cement was scraped.
The middle of the bidirectional threaded rod 4 is fixedly sleeved with a positioning sleeve 41, springs 43 are sleeved on the surfaces of the bidirectional threaded rod 4 and positioned on two sides of the positioning sleeve 41, and the springs 43 are matched with the adjusting buckles 9;
by adopting the technical scheme, the stability of the first clamping plate 2 and the second clamping plate 3 during adjustment is increased under the assistance of the two springs 43 which are arranged on the surfaces of the two-way threaded rods 4 and sleeved on the two sides of the positioning sleeve 41.
A sliding groove 211 is formed in one side of the first adjusting plate 21, a sliding bar 311 is fixedly arranged on one side of the second adjusting plate 31, and the sliding bar 311 is slidably arranged in the sliding groove 211;
through adopting above-mentioned technical scheme, when first grip block 2 and second grip block 3 are adjusted, the draw runner 311 of second grip block 31 one side installation slides in the spout 211 of seting up of first grip block 21 one side, through the cooperation of draw runner 311 and spout 211, increases the stability of scraping plate 7 of first grip block 21 and second grip block 31 bottom surface installation in scraping appurtenance body 1 cement.
The surfaces of the two screw members 42 are fixedly provided with uniformly distributed rotating buckles 421, and the rotating buckles 421 are matched with the screw members 42;
through adopting above-mentioned technical scheme, conveniently rotate two screw 42 that two-way threaded rod 4 surface cover were established through rotating knot 421 to adjust the distance between first grip block 2 and the second grip block 3.
The surface of the positioning sleeve 41 is fixedly provided with a handle 411, and the handle 411 is matched with the auxiliary tool body 1;
through adopting above-mentioned technical scheme, under the cooperation of handle 411 and gyro wheel 6, pulling appurtenance body 1 will pour into two butt strap 5 middle cement through two scraper blades 7 and scrape even processing.
Working principle: under the cooperation of the two threaded rods 4 and the two threaded pieces 42 sleeved in the two adjusting buckles 9, the width of the brick is built according to the requirement, the distance between the first clamping plate 2 and the second clamping plate 3 of the auxiliary tool body 1 is adjusted, when a plurality of rollers 6 arranged in one side of the first clamping plate 2 and one side of the second clamping plate 3 are attached to two sides of the brick to be built, the threaded pieces 42 are stopped to rotate, the adjustment of the device is completed, and the auxiliary tool body 1 can be used for adjusting the brick according to the width of the brick, so that the practicability of the device is greatly improved;
the auxiliary tool body 1 after adjustment is erected on bricks through the two butt straps 5, cement is poured into the two butt straps 5, the auxiliary tool body 1 is pulled under the cooperation of the handle 411 and the roller 6, and cement poured into the middle of the two butt straps 5 is scraped evenly through the two scraping plates 7;
pouring the cement needing to be laid into the middle of the two butt straps 5 of the auxiliary tool body 1, under the cooperation of the two scraping plates 7 installed on the bottom surfaces of the first adjusting plate 21 and the second adjusting plate 31, uniformly scraping the cement, uniformly paving the cement on the top surfaces of the bricks, and so on until the bricks on each layer are paved, and paving the cement on the top surfaces of the bricks through the hand tool without workers.
It will be apparent to those skilled in the art that various modifications and variations can be made to the present utility model without departing from the spirit or scope of the utility model. Thus, it is intended that the present utility model also include such modifications and alterations insofar as they come within the scope of the appended claims or the equivalents thereof.

Claims (6)

1. The utility model provides a special appurtenance builds a wall, includes appurtenance body (1), its characterized in that: appurtenance body (1) are including first grip block (2) and second grip block (3), equal fixed mounting in one side of first grip block (2) and second grip block (3) has strap (5), equal symmetry in top surface of first grip block (2) and second grip block (3) is installed and is adjusted knot (9), two adjust knot (9) inside callipers and be equipped with two-way threaded rod (4), two-way threaded rod (4) surface screw thread cover is equipped with screw thread piece (42), two screw thread piece (42) and adjustment knot (9) mutually support, mounting groove (8) have all been seted up in one side of first grip block (2) and second grip block (3), install evenly distributed's gyro wheel (6) through rotating the piece rotation in mounting groove (8).
2. The special auxiliary tool for wall building according to claim 1, wherein a first adjusting plate (21) is fixedly arranged at one end of the top surface of the first clamping plate (2), a second adjusting plate (31) is fixedly arranged at one end of the top surface of the second clamping plate (3), scraping plates (7) are fixedly arranged on the bottom surfaces of the first adjusting plate (21) and the second adjusting plate (31), and the scraping plates (7) are mutually matched with the butt strap (5).
3. The auxiliary tool special for wall building according to claim 1, wherein a positioning sleeve (41) is fixedly sleeved in the middle of the bidirectional threaded rod (4), springs (43) are sleeved on two sides of the surface of the bidirectional threaded rod (4) positioned on the positioning sleeve (41), and the springs (43) are matched with the adjusting buckle (9).
4. The auxiliary tool special for wall building according to claim 2, wherein a sliding groove (211) is formed in one side of the first adjusting plate (21), a sliding strip (311) is fixedly arranged on one side of the second adjusting plate (31), and the sliding strip (311) is slidably arranged in the sliding groove (211).
5. A special auxiliary tool for wall building according to claim 1, wherein the surfaces of the two screw members (42) are fixedly provided with uniformly distributed rotating buckles (421), and the rotating buckles (421) are mutually matched with the screw members (42).
6. A special auxiliary tool for wall building according to claim 3, wherein a handle (411) is fixedly arranged on the surface of the positioning sleeve (41), and the handle (411) is matched with the auxiliary tool body (1).
CN202320870355.0U 2023-04-18 2023-04-18 Special appurtenance builds a wall Active CN219840403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320870355.0U CN219840403U (en) 2023-04-18 2023-04-18 Special appurtenance builds a wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320870355.0U CN219840403U (en) 2023-04-18 2023-04-18 Special appurtenance builds a wall

Publications (1)

Publication Number Publication Date
CN219840403U true CN219840403U (en) 2023-10-17

Family

ID=88303320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320870355.0U Active CN219840403U (en) 2023-04-18 2023-04-18 Special appurtenance builds a wall

Country Status (1)

Country Link
CN (1) CN219840403U (en)

Similar Documents

Publication Publication Date Title
US11220794B2 (en) Wide swath offset concrete screed
CN111764232B (en) Prefabricated waterproofing membrane mud flat machine
CN206448541U (en) One kind is built a wall multi-functional ash bucket
CN219840403U (en) Special appurtenance builds a wall
CN205036058U (en) Multi -way plastering trowel that adjusts
CN106958353B (en) Spread thick liquid device with reel
CN111677302A (en) Wall building auxiliary tool
CN216379029U (en) Highway is concrete device of pouring fast for engineering
CN206319547U (en) Solutioning machine
CN209924388U (en) Automatic ceramic tile adjusting system
CN211114690U (en) Tile work equipment for building decoration
CN206784969U (en) Construction paving slurry container
CN220790675U (en) Concrete slab surface covering construction device
CN211775931U (en) Mortar joint plastering device for brick masonry
CN213015040U (en) Slurry extrusion device in prefabricated waterproof coiled material beach machine
CN220579731U (en) Road paving device
CN219690268U (en) Highway engineering shop membrane device
CN211665494U (en) Concrete paving device
CN213417484U (en) Highway is concrete device of pouring fast for engineering
CN215055537U (en) Mortar smearing device for wall building
CN210827015U (en) Automatic water replenishing and press finishing device for road shoulder slip form construction
CN216765401U (en) Waterproofing membrane extrusion equipment
CN217580503U (en) Template is pour in escape canal with adjustable
CN220079664U (en) Pavement film laying aid
US20220243406A1 (en) Wide Swath Offset Concrete Screed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant