CN219808677U CN202320350396.7U CN202320350396U CN219808677U CN 219808677 U CN219808677 U CN 219808677U CN 202320350396 U CN202320350396 U CN 202320350396U CN 219808677 U CN219808677 U CN 219808677U
Authority
CN
China
Prior art keywords
fixedly connected
movable frame
scaffold
frame
tunnel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320350396.7U
Other languages
Chinese (zh)
Inventor
王建强
李涛
焦鹏翼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luzhong Highway Construction Co ltd
Original Assignee
Shandong Luzhong Highway Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luzhong Highway Construction Co ltd filed Critical Shandong Luzhong Highway Construction Co ltd
Priority to CN202320350396.7U priority Critical patent/CN219808677U/en
Application granted granted Critical
Publication of CN219808677U publication Critical patent/CN219808677U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model is applicable to the technical field of tunnel construction, and provides a scaffold for tunnel construction, which comprises: the movable frame is fixedly connected with a ladder; the number of the interference components is several, the interference components are fixedly connected with the movable frame and the ladder respectively, the interference components are communicated with a communicating pipe, the communicating pipe is communicated with an air pump, and the air pump is fixedly connected with the movable frame; remove the frame and remove to predetermineeing the position, the air pump is through filling gas and then drive corresponding conflict subassembly conflict tunnel's lateral wall and bottom in a plurality of conflict subassemblies in communicating pipe, and then support spacing removal frame, effectively provide safety protection for constructor through safety barrier and emergency exit, through the setting of arc slope and friction area, is favorable to constructor's construction, has to remove the frame and supports stably, easy dismounting, the advantage that construction and security are high of being convenient for.

Description

Scaffold for tunnel construction
Technical Field
The utility model belongs to the technical field of tunnel construction, and particularly relates to a scaffold for tunnel construction.
Background
Scaffold refers to various supports erected at construction sites for workers to operate and to address vertical and horizontal transport. The general term of the building world refers to places on the building site where external walls, interior decorations or high floors cannot be directly constructed. The scaffold is mainly made of bamboo, wood, steel pipes or synthetic materials for constructors to move up and down or surrounding safety nets to enclose high-altitude installation components and the like. Some projects also use scaffolds as templates, and are widely used in advertising industry, municipal administration, traffic roads and bridges, mines and other departments; the tunnel construction is a short term of a new Austrian tunnel construction method, which is a reasonable construction method provided by Austrian scholars in the long-term practice of the tunnel construction from the viewpoint of rock mechanics, and is a new engineering construction method formed by adopting a system which is formed by anchor spraying technology, monitoring measurement and the like and rock mechanics theory.
Traditional scaffold frame for tunnel construction often adopts a plurality of steel pipes to build, and rethread fastener interconnect between the steel pipe, the dismouting is inconvenient, and efficiency is lower, because through manual assembly, the human factor of influence is great, for example the carelessness of assembly personnel etc. the scaffold frame often has the problem that stability is not enough, has the potential safety hazard.
Disclosure of Invention
The embodiment of the utility model aims to provide a scaffold for tunnel construction, which aims to solve the problems in the background technology.
The embodiment of the utility model is realized in such a way that the scaffold for tunnel construction comprises:
the movable frame is fixedly connected with a ladder;
the device comprises a plurality of interference components, wherein the interference components are respectively fixedly connected with the movable frame and the ladder, communicating pipes are communicated with the interference components, air pumps are communicated with the communicating pipes, and the air pumps are fixedly connected with the movable frame.
As a further scheme of the utility model, the collision assembly comprises a pressure cylinder, a piston, a movable rod and a collision plate, wherein the pressure cylinder is fixedly connected with the movable frame and the ladder respectively, the pressure cylinder is communicated with the communicating pipe, the pressure cylinder is fixedly connected with the piston, the piston is fixedly connected with the movable rod, and the movable rod is fixedly connected with the collision plate.
As a further scheme of the utility model, one side of the abutting plate is provided with friction lines.
As a further scheme of the utility model, a plug rod is processed on one side of the abutting plate.
As a further scheme of the utility model, the movable frame is fixedly connected with an arch slope, and the arch slope is fixedly connected with a plurality of friction belts.
As a further scheme of the utility model, the movable frame is fixedly connected with a guardrail, and the guardrail is movably connected with a safety door.
As a further scheme of the utility model, the safety door comprises a door body, a connecting seat and a bolt, wherein the connecting seat is rotationally connected with the guardrail, the connecting seat is fixedly connected with the door body, the door body is in sliding connection with the bolt, a slot is formed in the movable frame and is used for being matched with the bolt, and a handle is fixedly connected with the bolt.
Compared with the prior art, the utility model has the beneficial effects that: remove the frame and remove to predetermineeing the position, the air pump is through filling gas and then drive corresponding conflict subassembly conflict tunnel's lateral wall and bottom in a plurality of conflict subassemblies in communicating pipe, and then support spacing removal frame, effectively provide safety protection for constructor through safety barrier and emergency exit, through the setting of arc slope and friction area, is favorable to constructor's construction, has to remove the frame and supports stably, easy dismounting, the advantage that construction and security are high of being convenient for.
Drawings
Fig. 1 is a schematic structural diagram of a scaffold for tunnel construction according to an embodiment of the present utility model;
fig. 2 is a schematic partial structure diagram of a scaffold for tunnel construction according to an embodiment of the present utility model;
fig. 3 is a schematic structural diagram of a safety door according to an embodiment of the present utility model.
In the accompanying drawings: 1-movable frame, 11-slot, 2-ladder, 3-guardrail, 4-arch slope, 5-friction belt, 6-emergency exit, 61-door body, 62-connecting seat, 63-bolt, 64-handle, 7-air pump, 8-communicating pipe, 9-conflict subassembly, 91-pressure cylinder, 92-piston, 93-movable rod, 94-conflict board.
Detailed Description
The present utility model will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present utility model more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the utility model.
Specific implementations of the utility model are described in detail below in connection with specific embodiments.
As shown in fig. 1 to 3, according to an embodiment of the present utility model, a scaffold for tunnel construction includes:
the movable frame 1 is fixedly connected with a ladder 2;
the conflict subassembly 9, conflict subassembly 9 quantity is a plurality of, conflict subassembly 9 respectively with remove frame 1 and ladder 2 fixed connection, conflict subassembly 9 intercommunication has communicating pipe 8, communicating pipe 8 intercommunication has air pump 7, air pump 7 with remove frame 1 fixed connection.
In this embodiment, the abutting component 9 includes a pressure cylinder 91, a piston 92, a movable rod 93 and an abutting plate 94, where the pressure cylinder 91 is fixedly connected with the movable frame 1 and the ladder 2, the pressure cylinder 91 is communicated with the communicating pipe 8, the pressure cylinder 91 is fixedly connected with the piston 92, the piston 92 is fixedly connected with the movable rod 93, and the movable rod 93 is fixedly connected with the abutting plate 94; the air pump 7 sends air into the pressure cylinders 91 through the communicating pipe 8, the pressure in the pressure cylinders 91 increases to drive the piston 92 to move, the piston 92 drives the abutting plates 94 to move through the movable rod 93, the abutting plates 94 respectively abut against the side wall and the bottom of the tunnel so as to support the stable moving frame 1, and after construction is completed, the air pump 7 pumps air in the pressure cylinders 91 through the communicating pipe 8, so that each structure is reset, and the air pump has the advantages of stable support of the moving frame 1 and convenience in disassembly and assembly;
further, friction lines are formed on one side of the abutting plate 94, and friction force between the friction lines and the side wall or the bottom of the tunnel is increased, so that stability of the movable frame 1 is further improved;
furthermore, the inserted bars are processed on one side of the abutting plate 94, and the number of the inserted bars is a plurality of, so that the stability of the movable frame 1 is improved by arranging the inserted bars on the surface of the abutting plate 94 abutting against the bottom of the tunnel;
further, be equipped with pressure sensor on communicating pipe 8, monitor the pressure in the pressure cylinder 91 through pressure sensor, and then control conflict board 94 is to tunnel lateral wall and bottom's pressure, prevent that the too big damage tunnel lateral wall of pressure or pressure from being too little to lead to removing frame 1 stability poor.
Referring to fig. 1 to 3, in an embodiment of the present utility model, the movable frame 1 is fixedly connected with a guard rail 3, and the guard rail 3 is movably connected with a safety door 6.
In this embodiment, the safety door 6 includes a door body 61, a connection seat 62 and a latch 63, where the connection seat 62 is rotationally connected with the guardrail 3, the connection seat 62 is fixedly connected with the door body 61, the door body 61 is slidably connected with the latch 63, the moving frame 1 is provided with a slot 11 for matching with the latch 63, and the latch 63 is fixedly connected with a handle 64; the movable frame 1 is climbed through the ladder 2, the bolt 63 is lifted through the handle 64, the door body 61 is rotated, the movable frame 1 can be climbed, the door body 61 can be fixed through the cooperation of the bolt 63 and the slot 11, the constructor is protected through the cooperation of the door body 61 and the guardrail 3, the constructor is prevented from falling, and the movable frame has the advantage of good safety.
Referring to fig. 1 to 3, in an embodiment of the present utility model, the movable frame 1 is fixedly connected with an arch slope 4, and a plurality of friction belts 5 are fixedly connected to the arch slope 4.
In this embodiment, because tunnel top generally sets up to the arch, through the setting of arch slope 4 for constructor is basically unanimous with the direct distance in tunnel top, is favorable to constructor's construction, and traditional removal frame 1 upper surface is generally the plane, sets up the arcwall face at cooperation tunnel top like this, leads to the distance between the different positions different, leads to constructor often to need bow humpback or stand on the spot to stand on the foot the point, is unfavorable for constructor normal construction, through the setting of friction belt 5, can make constructor stably stand on arch slope 4, has the advantage of being convenient for construction.
Working principle:
remove frame 1 and remove to predetermineeing the position, air pump 7 is through filling gas and then drive corresponding conflict subassembly 9 conflict tunnel's lateral wall and bottom in a plurality of conflict subassemblies 9 in communicating pipe 8, and then support spacing removal frame 1, effectively provide safety protection for constructor through safety barrier 3 and emergency exit 6, through the setting of arc slope and friction belt 5, be favorable to constructor's construction, have to remove frame 1 support stability, easy dismounting, be convenient for construction and the high advantage of security.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the utility model.

Claims (6)

1. Scaffold for tunnel construction, characterized by comprising:
the movable frame is fixedly connected with a ladder;
the number of the interference components is several, the interference components are fixedly connected with the movable frame and the ladder respectively, the interference components are communicated with a communicating pipe, the communicating pipe is communicated with an air pump, and the air pump is fixedly connected with the movable frame;
the interference assembly comprises a pressure cylinder, a piston, a movable rod and an interference plate, wherein the pressure cylinder is respectively fixedly connected with the movable frame and the ladder, the pressure cylinder is communicated with the communicating pipe, the pressure cylinder is fixedly connected with the piston, the piston is fixedly connected with the movable rod, and the movable rod is fixedly connected with the interference plate.
2. The scaffold for tunnel construction according to claim 1, wherein one side of the abutting plate is processed with friction lines.
3. The scaffold for tunnel construction according to claim 1, wherein the interference plate is formed with a rod on one side thereof.
4. The scaffold for tunnel construction according to claim 1, wherein the movable frame is fixedly connected with an arch slope, and the arch slope is fixedly connected with a plurality of friction belts.
5. The scaffold for tunnel construction according to claim 1, wherein the movable frame is fixedly connected with a guard rail, and the guard rail is movably connected with a safety door.
6. The scaffold for tunnel construction according to claim 5, wherein the safety door comprises a door body, a connecting seat and a bolt, the connecting seat is rotatably connected with the guard rail, the connecting seat is fixedly connected with the door body, the door body is slidably connected with the bolt, a slot is formed in the movable frame and is used for being matched with the bolt, and the bolt is fixedly connected with a handle.
CN202320350396.7U 2023-03-01 2023-03-01 Scaffold for tunnel construction Active CN219808677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320350396.7U CN219808677U (en) 2023-03-01 2023-03-01 Scaffold for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320350396.7U CN219808677U (en) 2023-03-01 2023-03-01 Scaffold for tunnel construction

Publications (1)

Publication Number Publication Date
CN219808677U true CN219808677U (en) 2023-10-10

Family

ID=88210837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320350396.7U Active CN219808677U (en) 2023-03-01 2023-03-01 Scaffold for tunnel construction

Country Status (1)

Country Link
CN (1) CN219808677U (en)

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN201826516U (en) Novel attached lifting scaffold
CN210236926U (en) Folding type tower crane pedestrian safety passage
CN103174283B (en) Mobile operation platform
CN219808677U (en) Scaffold for tunnel construction
CN213359473U (en) Novel instrument formula faces frontier defense and protects
CN110847589A (en) Scaffold with safety protection mechanism and building method
CN102733586A (en) Scaffold cart
CN205976725U (en) A face limit safety barrier for standardizing construction
CN211873922U (en) Construction is with preventing guardrail bar
CN211775606U (en) Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN203555689U (en) Electric hanging basket for vertical shaft
CN203583906U (en) Disassembling-free floor edge guardrail in decoration stage
CN208056519U (en) A kind of detachable edge protection column
CN206205475U (en) A kind of vertical opening protective device of shear wall structure
CN111636667A (en) High-altitude operation platform construction method and operation platform applied to large-span plant
CN219118917U (en) Safe anti-climbing fence platform device of tower crane
CN112647756A (en) Warning protective railing for elevator shaft
CN215331316U (en) High combined scaffold for building construction
CN217631128U (en) Building scaffold
CN218714986U (en) Totally-enclosed climbing frame pocket net structure of super high-rise building
CN214785857U (en) Scaffold frame that factor of safety is high
CN212053692U (en) Scaffold for building engineering