CN219729264U - Special rubbish recovery unit of building - Google Patents

Special rubbish recovery unit of building Download PDF

Info

Publication number
CN219729264U
CN219729264U CN202320912498.3U CN202320912498U CN219729264U CN 219729264 U CN219729264 U CN 219729264U CN 202320912498 U CN202320912498 U CN 202320912498U CN 219729264 U CN219729264 U CN 219729264U
Authority
CN
China
Prior art keywords
connecting rod
rod
group
construction
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320912498.3U
Other languages
Chinese (zh)
Inventor
郑响升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hesheng Construction Engineering Co ltd
Original Assignee
Guangdong Hesheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hesheng Construction Engineering Co ltd filed Critical Guangdong Hesheng Construction Engineering Co ltd
Priority to CN202320912498.3U priority Critical patent/CN219729264U/en
Application granted granted Critical
Publication of CN219729264U publication Critical patent/CN219729264U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Receptacles (AREA)

Abstract

The utility model discloses a special garbage recycling device for a building, which relates to the field of building garbage disposal and aims at solving the problems of manpower waste and inconvenient operation caused by the fact that a plurality of persons are required to cooperatively operate an existing building garbage recycling woven bag. The utility model has novel structure, and the device effectively solves the problems of manpower waste and inconvenient operation caused by the cooperative operation of a plurality of people in the prior construction waste recovery woven bags.

Description

Special rubbish recovery unit of building
Technical Field
The utility model relates to the field of construction waste treatment, in particular to a special construction waste recovery device.
Background
The construction waste is mainly solid brick slag, the construction waste is generally crushed and reused after being recycled, the special woven bags for filling and packaging the construction waste are produced in a matched mode in the market at present, the construction waste is packaged by bags, so that the construction waste is very convenient to transport and process, but in the actual operation process, the woven bags at least need two persons to cooperatively operate, one person is filled with the construction waste, the other person keeps the open state of the woven bags, manpower is wasted, and the construction waste is very inconvenient, and therefore, in order to solve the problem, the special construction waste recycling device is provided.
Disclosure of Invention
The utility model provides a special garbage recycling device for a building, which solves the problems of waste of manpower and inconvenient operation caused by the need of cooperative operation of multiple persons in the existing woven bags for recycling the building garbage.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a special rubbish recovery unit of building, includes first go-between, second go-between and bracing piece, first go-between and second go-between all are parallel hexagon, just first go-between comprises six first connecting rods of group and six first curved bars of group, the second go-between comprises six second connecting rods of group and six second curved bars of group, the second go-between is located the bottom of first go-between, every group all be connected with the bracing piece between first connecting rod and the second connecting rod, and every group first connecting rod joint has the clip, the sack edge of braided bag turn-over with first go-between cup joints, just clip centre gripping braided bag sack edge in first connecting rod.
Preferably, the first connecting ring and the second connecting ring are both horizontally arranged, the supporting rods are both vertically arranged, and each group of the first connecting rods and the second connecting rods connected with the supporting rods are parallel to each other.
Preferably, the bottom of the supporting rod is horizontally bent towards the outer side of the device, an anti-slip sleeve is fixedly sleeved at the tail end of the bottom of the supporting rod, and the contact surface of the anti-slip sleeve and the ground is a plane.
Preferably, the support rod is fixedly connected with the first connecting rod and the second connecting rod through the adapter sleeve.
Preferably, the first connecting rod is matched and sleeved with the adapter sleeve, one side of the adapter sleeve is fixedly connected with the cover plate, and the side surfaces between the adapter sleeve and the cover plate are all vertically provided with arc-shaped groove fixing clamp connection supporting rods.
Preferably, the circular arc outer wall of the adapter sleeve is radially connected with a screw, and the screw tightly pushes against the corresponding first connecting rod and second connecting rod.
Preferably, the first connecting rod and the second connecting rod are positioned at the screw and are provided with flat bottom grooves, the screw is tightly propped against the flat bottom grooves, and the side wall of the first connecting rod is parallel to the axial direction of the side wall of the first connecting rod and is provided with anti-skid patterns.
Preferably, the clip is arranged in a C shape, and the arc-shaped outer wall of the clip is symmetrically provided with clamping handles.
Preferably, anti-skid patterns are transversely formed on two sides, far away from each other, of the clamping handles, and clamps are arranged at two ends of each group of the first connecting rods.
Preferably, screw heads are arranged at two ends of the first bent rod and the second bent rod along the tangential direction of the first bent rod and the second bent rod, and the screw heads are in threaded connection with the corresponding first connecting rod and second connecting rod.
The beneficial effects of the utility model are as follows:
1. the device is a detachable and portable woven bag auxiliary opening bracket device, the connecting rods and the bent rods of the first connecting ring and the second connecting ring of the device are all in a parallel hexagonal structure through threaded splicing, and the supporting rods are fixedly connected with the first connecting ring and the second connecting ring through adapter sleeves to be built, so that the device is very convenient to carry and use;
2. the device is characterized in that one end of the short elbow of the supporting rod is downwards placed on the ground, the woven bag pocket is placed between the connecting ring and the supporting rod, the edge of the bag mouth of the woven bag is outwards turned to be sleeved with the first connecting ring, the clamp clamps the edge of the bag mouth of the woven bag to be used in the first connecting rod, and at the moment, building rubbish is filled into the woven bag by a single person, so that the device is simple and practical to operate.
In conclusion, the device effectively solves the problems that the existing construction waste recycling woven bags are wasted in manpower and inconvenient to operate due to the fact that a plurality of persons are required to operate cooperatively.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
Fig. 2 is a partial structural exploded view of the present utility model.
Fig. 3 is a schematic view of a first link structure according to the present utility model.
Fig. 4 is an enlarged view of the structure of fig. 1 a according to the present utility model.
Fig. 5 is an enlarged view of the structure of B in fig. 2 according to the present utility model.
Reference numerals in the drawings: 1. a first connection ring; 101. a first link; 102. a first bent rod; 103. a screw head; 104. a flat bottom groove; 2. a second connecting ring; 201. a second link; 202. a second bent rod; 3. a support rod; 301. an anti-skid sleeve; 4. an adapter sleeve; 401. an arc groove; 402. a cover plate; 5. a clip; 501. a clamping handle.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1 to 5, a special garbage recycling device for construction comprises a first connecting ring 1, a second connecting ring 2 and supporting rods 3, wherein the first connecting ring 1 and the second connecting ring 2 are horizontally arranged, the supporting rods 3 are vertically arranged, a first connecting rod 101 and a second connecting rod 201 connected with each group of supporting rods 3 are parallel to each other, screw heads 103 are arranged at two ends of a first bent rod 102 and a second bent rod 202 along the tangential direction of the first connecting rod 101 and the second connecting rod 201, and the screw heads 103 are in threaded connection with the corresponding first connecting rod 101 and second connecting rod 201.
Referring to fig. 1 and 2, the bottom end of the support rod 3 is horizontally bent to the outside of the device, and the end of the bottom of the support rod 3 is fixedly sleeved with an anti-slip sleeve 301, and the contact surface between the anti-slip sleeve 301 and the ground is a plane, so that the device is prevented from shifting in the process of filling construction waste.
Referring to fig. 1, fig. 2, fig. 4 and fig. 5, the supporting rod 3 is fixedly connected with the first connecting rod 101 and the second connecting rod 201 through the adapter sleeve 4, the first connecting rod 101 is matched and sleeved with the adapter sleeve 4, one side of the adapter sleeve 4 is fixedly connected with the cover plate 402, the side surface between the adapter sleeve 4 and the cover plate 402 is vertically provided with the arc groove 401 to fixedly clamp the supporting rod 3, the arc outer wall of the adapter sleeve 4 is radially connected with a screw, the screw abuts against the corresponding first connecting rod 101 and second connecting rod 201, and the round hole of the adapter sleeve 4 and the arc groove 401 are mutually perpendicular.
Referring to fig. 3, the first connecting rod 101 and the second connecting rod 201 are located at the screw positions and are provided with flat bottom grooves 104, the screw tightly pushes against the flat bottom grooves 104, the side wall of the first connecting rod 101 is parallel to the axial direction of the side wall of the first connecting rod, the screw tightly pushes against the flat bottom grooves 104 can effectively avoid the rotation of the supporting rod 3 and the adapter sleeve 4 relative to the first connecting rod 101, and meanwhile, the angle positioning of the device during assembly is also facilitated.
Referring to fig. 4 and 5, the clip 5 is in a C-shaped configuration, the arc-shaped outer walls of the clip 5 are symmetrically provided with the clamping handles 501, two sides of the clamping handles 501 away from each other are transversely provided with anti-slip patterns, two ends of each group of first connecting rods 101 are respectively provided with the clip 5, and the clamping handles 501 are pinched in the middle to enable the clip 5 to elastically deform and open to loosen the first connecting rods 101.
The device solves the work principle that current building rubbish retrieves braided bag and leads to extravagant manpower and inconvenient problem of operation because of needs many people collaborative operation: the device is a detachable and portable woven bag auxiliary opening bracket device, connecting rods and bent rods of a first connecting ring 1 and a second connecting ring 2 of the device are all in a parallel hexagon structure through threaded splicing, a supporting rod 3 can be built through fixedly connecting an adapter sleeve 4 with the first connecting ring 1 and the second connecting ring 2, one end of a short elbow of the supporting rod 3 of the device is placed on the ground downwards, a woven bag pocket is placed between the connecting ring and the supporting rod 3, the edge of a bag opening of the woven bag is turned outwards to be sleeved with the first connecting ring 1, the edge of the bag opening of the woven bag is clamped by a clamp 5 to be used in a first connecting rod 101, and at the moment, construction waste is filled into the woven bag through single person operation;
the concrete structure is that the first connecting ring 1 and the second connecting ring 2 are all parallel hexagons, and the first connecting ring 1 comprises six groups of first connecting rods 101 and six groups of first bent rods 102, the second connecting ring 2 comprises six groups of second connecting rods 201 and six groups of second bent rods 202, the second connecting ring 2 is located at the bottom of the first connecting ring 1, support rods 3 are connected between each group of first connecting rods 101 and each group of second connecting rods 201, and clamps 5 are clamped on each group of first connecting rods 101.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (10)

1. The utility model provides a special rubbish recovery unit of building, includes first go-between (1), second go-between (2) and bracing piece (3), its characterized in that, first go-between (1) and second go-between (2) all are parallel hexagon, just first go-between (1) are by six first connecting rods (101) of group and six first curved bars (102) of group are constituteed, second go-between (2) are constituteed by six second connecting rods (201) of group and six second curved bars (202), second go-between (2) are located the bottom of first go-between (1), every group all be connected with bracing piece (3) between first connecting rod (101) and second connecting rod (201), and every group first connecting rod (101) joint has clip (5), the bag mouth edge of braided bag eversion with first connecting ring (1) cup joints, just clip (5) centre gripping braided bag mouth edge in first connecting rod (101).
2. The construction-specific garbage collection device according to claim 1, wherein the first connecting ring (1) and the second connecting ring (2) are horizontally arranged, the supporting rods (3) are vertically arranged, and the first connecting rod (101) and the second connecting rod (201) connected with each group of the supporting rods (3) are parallel to each other.
3. The garbage recycling device special for buildings according to claim 1, wherein the bottom end of the supporting rod (3) is horizontally bent towards the outer side of the device, an anti-slip sleeve (301) is fixedly sleeved at the tail end of the bottom of the supporting rod (3), and the contact surface of the anti-slip sleeve (301) and the ground is a plane.
4. The garbage collection device special for construction according to claim 1, wherein the support rod (3) is fixedly connected with the first connecting rod (101) and the second connecting rod (201) through the adapter sleeve (4).
5. The special garbage recycling device for buildings according to claim 4, wherein the first connecting rod (101) is matched and sleeved with the adapter sleeve (4), one side of the adapter sleeve (4) is fixedly connected with the cover plate (402), and the side surfaces between the adapter sleeve (4) and the cover plate (402) are all vertically provided with arc grooves (401) for fixing and clamping the supporting rods (3).
6. The construction-specific garbage collection device according to claim 5, wherein the circular arc outer wall of the adapter sleeve (4) is radially connected with screws, and the screws are tightly abutted against the corresponding first connecting rod (101) and second connecting rod (201).
7. The construction-specific garbage collection device according to claim 6, wherein the first connecting rod (101) and the second connecting rod (201) are provided with flat bottom grooves (104) at the screw positions, the screw tightly abuts against the flat bottom grooves (104), and the side wall of the first connecting rod (101) is provided with anti-skid patterns parallel to the axial direction of the side wall.
8. The construction waste recycling device according to claim 1, wherein the clip (5) is arranged in a C-shape, and the arc-shaped outer wall of the clip (5) is symmetrically provided with clip handles (501).
9. The construction waste recycling device according to claim 8, wherein anti-slip patterns are transversely formed on two sides of the clamping handles (501) which are far away from each other, and clamps (5) are arranged at two ends of each group of the first connecting rods (101).
10. The construction-specific garbage collection device according to claim 1, wherein screw heads (103) are provided at both ends of the first bent rod (102) and the second bent rod (202) in tangential directions thereof, and the screw heads (103) are in threaded connection with the corresponding first connecting rod (101) and second connecting rod (201).
CN202320912498.3U 2023-04-21 2023-04-21 Special rubbish recovery unit of building Active CN219729264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320912498.3U CN219729264U (en) 2023-04-21 2023-04-21 Special rubbish recovery unit of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320912498.3U CN219729264U (en) 2023-04-21 2023-04-21 Special rubbish recovery unit of building

Publications (1)

Publication Number Publication Date
CN219729264U true CN219729264U (en) 2023-09-22

Family

ID=88029547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320912498.3U Active CN219729264U (en) 2023-04-21 2023-04-21 Special rubbish recovery unit of building

Country Status (1)

Country Link
CN (1) CN219729264U (en)

Similar Documents

Publication Publication Date Title
CN219729264U (en) Special rubbish recovery unit of building
CN207956768U (en) A kind of brick clamping device for building
CN109515498A (en) A kind of transfer device for pipeline in the construction of Urban Underground pipe gallery
CN209954681U (en) Mechanical arm clamping device
CN213436298U (en) Soil prosthetic devices loosens soil convenient to carry
CN216613050U (en) Washing machine flush joint pipe fitting grabbing device
CN213318690U (en) Clamp with locking effect for repairing blade
CN213801439U (en) Remove appurtenance for brick
CN213732026U (en) Pipeline cutting support for hydraulic engineering construction
CN213745217U (en) Pipeline socket installation tool
CN213134600U (en) Iron tower production is with quick bending device
CN213787930U (en) Complete denture holder
CN215967001U (en) Welding device for dust bag cage support
CN216576327U (en) Clamping device for welding construction steel bars
CN110253461A (en) A kind of pre-buried install of underground utilities uses clamp
CN214882791U (en) Be used for town road side flat stone construction anchor clamps
CN216667282U (en) Protection explosion-proof equipment is used in test of concrete feeding rubber tube water pressure
CN215556287U (en) Transport cable pit bears down on one device
CN217255932U (en) A handheld electric drill for assisting installation photovoltaic board
CN212105082U (en) Detachable steel pipe scaffold even wall spare
CN216780842U (en) Adjustable flange positioner
CN214575814U (en) Straight thread sleeve mechanical installation device of easy operation
CN215967489U (en) Clamping device is used in back splint processing
CN2933741Y (en) Multifunctional mechanical arm
CN214489462U (en) Welding device for steel processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant