CN110253461A - A kind of pre-buried install of underground utilities uses clamp - Google Patents

A kind of pre-buried install of underground utilities uses clamp Download PDF

Info

Publication number
CN110253461A
CN110253461A CN201910648856.2A CN201910648856A CN110253461A CN 110253461 A CN110253461 A CN 110253461A CN 201910648856 A CN201910648856 A CN 201910648856A CN 110253461 A CN110253461 A CN 110253461A
Authority
CN
China
Prior art keywords
fixed plate
fixedly connected
clamping
underground utilities
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910648856.2A
Other languages
Chinese (zh)
Inventor
杨智勇
姚国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taicang Huahao Information Technology Co Ltd
Original Assignee
Taicang Huahao Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taicang Huahao Information Technology Co Ltd filed Critical Taicang Huahao Information Technology Co Ltd
Priority to CN201910648856.2A priority Critical patent/CN110253461A/en
Publication of CN110253461A publication Critical patent/CN110253461A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B5/00Clamps
    • B25B5/04Clamps with pivoted jaws
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B5/00Clamps
    • B25B5/16Details, e.g. jaws, jaw attachments

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention discloses a kind of pre-buried installation clamps of underground utilities, belong to clamp field, a kind of pre-buried installation clamp of underground utilities, including clamp body, clamp body includes two clamping parts and two shank parts, run through on two clamping parts and is connected with motion bar, one end of motion bar is fixedly connected with grip block, the side of two clamping parts is equipped with arc panel, the middle part of arc panel, which is run through, is connected with threaded rod, one end of threaded rod and the sidewall thread of clamping part connect, the other end of threaded rod is fixedly connected with pressing plate, it may be implemented flexibly to carry out Quick-clamped to various sizes of pipeline, diameter is clamped convenient for adjusting, the stability of clamping is substantially increased simultaneously, convenient for the installment work of pipeline, improve installation effectiveness, cooperate the first fixed plate and the second fixed plate, the fixation after clamping may be implemented, it prevents from operating in installation process Person's hand needs to exert oneself always, substantially reduces the labor intensity of pipeline installation.

Description

A kind of pre-buried install of underground utilities uses clamp
Technical field
The present invention relates to clamp fields, more specifically to a kind of pre-buried installation clamp of underground utilities.
Background technique
City Buried Pipeline refers to water supply, draining, combustion gas, heating power, electric power, communication, radio and television, industry in city scope Equal pipelines and its affiliated facility are the important infrastructure and " lifeline " for ensureing city operations, and China plans with 10 years or so Time builds up more perfect City Buried Pipeline system, and underground pipeline construction management level is made to can adapt to economic society hair Exhibition needs, and emergency and disaster prevention ability is substantially improved.
Underground utilities during installation, mostly use greatly pre-buried mode at present, need during pre-buried installation by folder The use of pincers, traditional clamp is when clamping pipeline, and since the size of pipeline is different, clamp clamping dynamics in clamping is inadequate, Cause pipeline to be not easy to install, and the pipeline in clamping process, operator's hand is needed to continue firmly to clamp, pipeline installs labor Fatigue resistance is larger.
Summary of the invention
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide a kind of underground utilities pre-buried installation folders Pincers, it may be implemented flexibly to carry out Quick-clamped to various sizes of pipeline, convenient for adjusting clamping diameter, substantially increase simultaneously The stability of clamping improves installation effectiveness convenient for the installment work of pipeline, cooperates the first fixed plate and the second fixed plate, can be with It realizes the fixation after clamping, prevents operator's hand in installation process from needing to exert oneself always, substantially reduce the labour of pipeline installation Intensity.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of underground utilities pre-buried installation clamp, including clamp body, the clamp body include two clamping parts and Two shank parts, through motion bar is connected on two clamping parts, one end of the motion bar is fixedly connected with clamping Block, the side of two clamping parts are equipped with arc panel, and the middle part of the arc panel, which is run through, is connected with threaded rod, the screw thread The sidewall thread of one end of bar and clamping part connects, and the other end of the threaded rod is fixedly connected with pressing plate, described in one of them The first fixed plate is hinged in the middle part of shank part one side wall, the bottom end of first fixed plate is uniformly provided with first latching tooth, wherein Mounting plate is fixedly connected at the top of one shank part one side wall, the one side wall of shank part described in another one is fixed to be connected It is connected to the second fixed plate, the top of second fixed plate is uniformly provided with the second latch, may be implemented flexibly to various sizes of Pipeline carries out Quick-clamped, convenient for adjusting clamping diameter, while the stability of clamping is substantially increased, convenient for the erector of pipeline Make, improve installation effectiveness, cooperate the first fixed plate and the second fixed plate, the fixation after clamping may be implemented, prevent installation process Middle operator's hand needs to exert oneself always, substantially reduces the labor intensity of pipeline installation.
Further, the bottom end of the mounting plate is fixedly connected with compressed spring, the bottom end of the compressed spring and first The top of fixed plate is fixedly connected, and in use, the elastic force of compressed spring pushes the first fixed plate and the second fixed plate to paste It closes and fixes, when needing to clamp again, squeeze compressed spring, easily separate the first fixed plate with the second fixed plate.
Further, the grip block is made of elastic material, and one end of the grip block is equipped with slip-resistant texture, to pipeline Surface protected, while increasing frictional force, improve the stability in clamping process.
Further, the other end of the motion bar is fixedly connected with anti-drop block, prevents motion bar from retained part from de- It falls.
Further, release handle is fixedly connected at the center of described pressing plate one end, the outer wall of the release handle is equipped with anti- Sliding texture, can hold release handle rotating threaded rod, increase frictional force convenient for force.
Further, the two sidewalls of second fixed plate are fixedly connected to anticreep side plate, prevent the first fixed plate de- It falls.
Further, the first latching tooth is matched with the second latch, and first latching tooth can be caught in second in moving process In latch, the quick fixation to two shank parts is realized.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) this programme may be implemented flexibly to carry out Quick-clamped to various sizes of pipeline, convenient for adjusting clamping diameter, together When substantially increase the stability of clamping, convenient for the installment work of pipeline, improve installation effectiveness, cooperate the first fixed plate and second Fixed plate may be implemented the fixation after clamping, prevent operator's hand in installation process from needing to exert oneself always, substantially reduce pipeline The labor intensity of installation.
(2) bottom end of mounting plate is fixedly connected with compressed spring, and the bottom end of compressed spring and the top of the first fixed plate are solid Fixed connection, in use, the elastic force of compressed spring push the first fixed plate to be bonded fixation with the second fixed plate, when needing again When new clamping, compressed spring is squeezed, easily separates the first fixed plate with the second fixed plate.
(3) grip block is made of elastic material, and one end of grip block is equipped with slip-resistant texture, protects to the surface of pipeline Shield, while increasing frictional force, improve the stability in clamping process.
(4) other end of motion bar is fixedly connected with anti-drop block, prevents motion bar from isolating and falling off from clamping part.
(5) release handle is fixedly connected at the center of pressing plate one end, the outer wall of release handle is equipped with slip-resistant texture, can hold Release handle rotating threaded rod increases frictional force convenient for force.
The two sidewalls of (6) second fixed plates are fixedly connected to anticreep side plate, prevent the first fixed plate from falling off.
(7) first latching tooth is matched with the second latch, and first latching tooth can be caught in the second latch in moving process, is realized Quick fixation to two shank parts.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of the second fixed plate part of the invention;
Fig. 4 is the structural schematic diagram of the second latch part of the invention.
Figure label explanation:
1 clamp body, 2 release handles, 3 grip blocks, 4 motion bars, 5 anti-drop blocks, 6 arc panels, 7 threaded rods, 8 pressing plates, 9 anticreeps Side plate, 10 first fixed plates, 11 mounting plates, 12 compressed springs, 13 first latching tooths, 14 second fixed plates, 15 second latches.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments, is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside", " top/bottom end " Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
Fig. 1-4 is please referred to, a kind of underground utilities pre-buried installation clamp, including clamp body 1, clamp body 1 includes two A clamping part and two shank parts, through motion bar 4 is connected on two clamping parts, one end of motion bar 4 is fixedly connected with Grip block 3, the side of two clamping parts are equipped with arc panel 6, and the middle part of arc panel 6, which is run through, is connected with threaded rod 7, threaded rod 7 One end and the sidewall thread of clamping part connect, the other end of threaded rod 7 is fixedly connected with pressing plate 8, one of shank part one The first fixed plate 10 is hinged in the middle part of side wall, the bottom end of the first fixed plate 10 is uniformly provided with first latching tooth 13, one of them is held Mounting plate 11 is fixedly connected at the top of shank one side wall, it is fixed that the one side wall of another one shank part is fixedly connected with second Plate 14, the top of the second fixed plate 14 are uniformly provided with the second latch 15, may be implemented flexibly to carry out various sizes of pipeline fast Speed clamps, and convenient for adjusting clamping diameter, while substantially increasing the stability of clamping, convenient for the installment work of pipeline, improves peace Efficiency is filled, the first fixed plate 10 and the second fixed plate 14 are cooperated, the fixation after clamping may be implemented, prevent from operating in installation process Person's hand needs to exert oneself always, substantially reduces the labor intensity of pipeline installation.
The bottom end of mounting plate 11 is fixedly connected with compressed spring 12, the top of the bottom end of compressed spring 12 and the first fixed plate 10 End is fixedly connected, and in use, it is solid that the elastic force of compressed spring 12 pushes the first fixed plate 10 to be bonded with the second fixed plate 14 It is fixed, when needing to clamp again, compressed spring 12 is squeezed, easily separates the first fixed plate 10 with the second fixed plate 14.
Grip block 3 is made of elastic material, and one end of grip block 3 is equipped with slip-resistant texture, protects to the surface of pipeline, Increase frictional force simultaneously, improves the stability in clamping process.
The other end of motion bar 4 is fixedly connected with anti-drop block 5, prevents motion bar 4 from isolating and falling off from clamping part.
Release handle 2 is fixedly connected at the center of 8 one end of pressing plate, the outer wall of release handle 2 is equipped with slip-resistant texture, can hold 2 rotating threaded rod 7 of release handle increases frictional force convenient for force.
The two sidewalls of second fixed plate 14 are fixedly connected to anticreep side plate 9, prevent the first fixed plate 10 from falling off.
First latching tooth 13 is matched with the second latch 15, and first latching tooth 13 can be caught in the second latch 15 in moving process In, realize the quick fixation to two shank parts.
In using the present invention, operator can hold two release handles 2 according to the size of underground utilities respectively, rotation Arc panel 6 can thus be adjusted to drive the rotation of threaded rod 7 and arrive suitable position, then by two by release handle 2 Clamping part clamps pipeline, and grip block 3 can resist the surface of pipeline, increases frictional force, during clamping, operator be will push Two shank parts, the first fixed plate 10 is mobile relative to the second fixed plate 14 at this time, and first latching tooth 13 can be fastened on the second latch 15 Proper site, so that the position of two shank parts be fixed, fixation after realizing pipeline clamping prevents operator's hand Continue to exert oneself, when needing to clamp again, the first fixed plate 10 can be pushed up, compress compressed spring 12, it in this way can be light Pine separates the first fixed plate 10 with the second fixed plate 14, and realization is retightened, and may be implemented flexibly to various sizes of pipeline Quick-clamped is carried out, convenient for adjusting clamping diameter, while substantially increasing the stability of clamping, convenient for the installment work of pipeline, Installation effectiveness is improved, the first fixed plate 10 and the second fixed plate 14 are cooperated, the fixation after clamping may be implemented, prevent installation process Middle operator's hand needs to exert oneself always, substantially reduces the labor intensity of pipeline installation.
The foregoing is intended to be a preferred embodiment of the present invention;But scope of protection of the present invention is not limited thereto. Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change, should be covered by the scope of protection of the present invention.

Claims (7)

1. a kind of underground utilities pre-buried installation clamp, including clamp body (1), it is characterised in that: clamp body (1) packet Two clamping parts and two shank parts are included, runs through on two clamping parts and is connected with motion bar (4), the motion bar (4) One end be fixedly connected with grip block (3), the side of two clamping parts is equipped with arc panel (6), the arc panel (6) Middle part is through being connected with threaded rod (7), and one end of the threaded rod (7) and the sidewall thread of clamping part connect, the threaded rod (7) the other end is fixedly connected with pressing plate (8), is hinged with the first fixed plate in the middle part of one of them described shank part one side wall (10), the bottom end of first fixed plate (10) is uniformly provided with first latching tooth (13), one of them shank part one side wall Top is fixedly connected with mounting plate (11), and the one side wall of shank part described in another one is fixedly connected with the second fixed plate (14), the top of second fixed plate (14) is uniformly provided with the second latch (15).
2. the pre-buried installation clamp of a kind of underground utilities according to claim 1, it is characterised in that: the mounting plate (11) Bottom end be fixedly connected with compressed spring (12), the bottom end of the compressed spring (12) and the top of the first fixed plate (10) are fixed Connection.
3. the pre-buried installation clamp of a kind of underground utilities according to claim 1, it is characterised in that: the grip block (3) It is made of elastic material, one end of the grip block (3) is equipped with slip-resistant texture.
4. the pre-buried installation clamp of a kind of underground utilities according to claim 1, it is characterised in that: the motion bar (4) The other end be fixedly connected with anti-drop block (5).
5. the pre-buried installation clamp of a kind of underground utilities according to claim 1, it is characterised in that: the pressing plate (8) one It is fixedly connected at the center at end release handle (2), the outer wall of the release handle (2) is equipped with slip-resistant texture.
6. the pre-buried installation clamp of a kind of underground utilities according to claim 1, it is characterised in that: second fixed plate (14) two sidewalls are fixedly connected to anticreep side plate (9).
7. the pre-buried installation clamp of a kind of underground utilities according to claim 1, it is characterised in that: the first latching tooth (13) it is matched with the second latch (15).
CN201910648856.2A 2019-07-18 2019-07-18 A kind of pre-buried install of underground utilities uses clamp Withdrawn CN110253461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910648856.2A CN110253461A (en) 2019-07-18 2019-07-18 A kind of pre-buried install of underground utilities uses clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910648856.2A CN110253461A (en) 2019-07-18 2019-07-18 A kind of pre-buried install of underground utilities uses clamp

Publications (1)

Publication Number Publication Date
CN110253461A true CN110253461A (en) 2019-09-20

Family

ID=67926821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910648856.2A Withdrawn CN110253461A (en) 2019-07-18 2019-07-18 A kind of pre-buried install of underground utilities uses clamp

Country Status (1)

Country Link
CN (1) CN110253461A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111912332A (en) * 2020-08-12 2020-11-10 河南飞舟管通工程有限公司 Clip type detachable underground pipeline monitoring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111912332A (en) * 2020-08-12 2020-11-10 河南飞舟管通工程有限公司 Clip type detachable underground pipeline monitoring device

Similar Documents

Publication Publication Date Title
CN110253461A (en) A kind of pre-buried install of underground utilities uses clamp
CN108023302A (en) A kind of more changing device of insulator
CN204868589U (en) Handheld anchor clamps
CN208575880U (en) A kind of automatic mechanical hand front end clamp system
CN210798458U (en) Semicircle cross arm staple bolt that electric power laid usefulness
CN108436958A (en) A kind of automatic mechanical hand front end clamp system
CN210232729U (en) Clamp for pre-embedding installation of underground pipeline
CN203703558U (en) Fixing support
CN204339645U (en) The medical fixture of a kind of fixture block formula
CN203278084U (en) Special tool for fixing mesophase drainage wire in 10KV live working
CN108682976A (en) Portable high-voltage grounding wire operating device
CN204344588U (en) A kind of fastening rope type medical clamp tool
CN107322816A (en) A kind of diamond saw blade
CN210121829U (en) Novel wall face inslot automatic installation pipe card equipment of building decoration construction
CN209061481U (en) A kind of quick point glue equipment of pipeline corrosion protection adhesive
CN208516715U (en) A kind of antifatigue fixed device of building hoist trailing cable
CN104690545B (en) A kind of assembling pipe joint
CN208862444U (en) A kind of 500KV transformer substation grounding wire high-altitude hanging device
CN207605266U (en) The mounting structure of wall-mounted fire extinguisher
CN207948077U (en) New Forestry engineering pit-picker attachment device
CN207415274U (en) A kind of bearing Mounting device
CN207977681U (en) It is a kind of to facilitate fixed power line clamp
CN212407971U (en) Quick clamping and positioning device for pipeline plugging piece
CN213922516U (en) Portable garbage collection device for environmental protection
CN212105082U (en) Detachable steel pipe scaffold even wall spare

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190920