CN210232729U - Clamp for pre-embedding installation of underground pipeline - Google Patents

Clamp for pre-embedding installation of underground pipeline Download PDF

Info

Publication number
CN210232729U
CN210232729U CN201921127649.4U CN201921127649U CN210232729U CN 210232729 U CN210232729 U CN 210232729U CN 201921127649 U CN201921127649 U CN 201921127649U CN 210232729 U CN210232729 U CN 210232729U
Authority
CN
China
Prior art keywords
clamp
clamping
fixedly connected
plate
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921127649.4U
Other languages
Chinese (zh)
Inventor
Zhiyong Yang
杨智勇
Guoping Yao
姚国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taicang Huahao Information Technology Co ltd
Original Assignee
Taicang Huahao Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taicang Huahao Information Technology Co ltd filed Critical Taicang Huahao Information Technology Co ltd
Priority to CN201921127649.4U priority Critical patent/CN210232729U/en
Application granted granted Critical
Publication of CN210232729U publication Critical patent/CN210232729U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a clamp for pre-buried installation of underground pipelines, which belongs to the clamp field, and comprises a clamp main body, wherein the clamp main body comprises two clamping parts and two handle parts, a movable rod is respectively connected on the two clamping parts in a penetrating way, one end of the movable rod is fixedly connected with a clamping block, one side of the two clamping parts is respectively provided with an arc plate, the middle part of the arc plate is connected with a threaded rod in a penetrating way, one end of the threaded rod is in threaded connection with the side wall of the clamping part, the other end of the threaded rod is fixedly connected with a pressing plate, the clamp can flexibly and rapidly clamp pipelines with different sizes, the clamping diameter is convenient to adjust, simultaneously, the stability of clamping is greatly improved, the installation work of the pipelines is convenient, the installation efficiency is improved, the first fixing plate and the second fixing plate are matched, the fixation after clamping can be realized, the hand of an operator is, greatly reducing the labor intensity of pipeline installation.

Description

Clamp for pre-embedding installation of underground pipeline
Technical Field
The utility model relates to a clamp field, more specifically say, relate to a clamp is used in pre-buried installation of pipeline.
Background
The urban underground pipeline refers to pipelines for water supply, drainage, gas, heating power, electric power, communication, radio and television, industry and the like in an urban range and auxiliary facilities thereof, is an important infrastructure and a 'lifeline' for guaranteeing urban operation, is planned to take about 10 years in China, and is built into a relatively perfect urban underground pipeline system, so that the construction management level of the underground pipeline can meet the requirements of economic and social development, and the emergency disaster prevention capability is greatly improved.
When installing at present, the underground pipeline adopts pre-buried mode mostly, need be with the help of the use of clamp at the in-process of pre-buried installation, and traditional clamp is when the centre gripping pipeline, because the size of pipeline differs, and the clamp presss from both sides tight dynamics inadequately when the centre gripping, leads to the pipeline not convenient to install to pipeline in the clamping process needs the operator hand to continuously press from both sides tightly hard, and pipeline installation intensity of labour is great.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a clamp is used in pre-buried installation of pipeline, it can realize nimble carrying out the high-speed grip to not unidimensional pipeline, be convenient for adjust the centre gripping diameter, the stability of centre gripping has been improved simultaneously greatly, the installation work of the pipeline of being convenient for improves the installation effectiveness, cooperation first fixed plate and second fixed plate can realize pressing from both sides the fixed after tight, prevent that operator's hand from needing to exert oneself always in the installation, greatly reduced pipeline installation's intensity of labour.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
A clamp for pre-buried installation of underground pipelines comprises a clamp main body, wherein the clamp main body comprises two clamping parts and two handle parts, a movable rod is respectively connected on the two clamping parts in a penetrating manner, one end of the movable rod is fixedly connected with a clamping block, an arc-shaped plate is respectively arranged on one side of each of the two clamping parts, a threaded rod is respectively connected in the middle of each arc-shaped plate in a penetrating manner, one end of each threaded rod is in threaded connection with the side wall of each clamping part, a pressing plate is fixedly connected with the other end of each threaded rod, a first fixing plate is hinged to the middle of one side wall of one handle part, first clamping teeth are uniformly arranged at the bottom end of each first fixing plate, an installation plate is fixedly connected at the top of one side wall of one handle part, a second fixing plate is fixedly connected to one side wall of the other handle part, and second, can realize nimble carrying out the quick clamp to not unidimensional pipeline tightly, be convenient for adjust the centre gripping diameter, improved the stability of centre gripping simultaneously greatly, the installation work of the pipeline of being convenient for improves the installation effectiveness, cooperates first fixed plate and second fixed plate, can realize pressing from both sides the fixed after tight, prevents that the operator hand from needing to exert oneself always in the installation, greatly reduced pipeline installation's intensity of labour.
Further, the bottom fixedly connected with compression spring of mounting panel, compression spring's bottom and the top fixed connection of first fixed plate, in the use, compression spring's elasticity promotes first fixed plate and the laminating of second fixed plate is fixed, and when needs centre gripping again, extrusion compression spring is light with first fixed plate and the separation of second fixed plate.
Further, the grip block is made for the elasticity material, the one end of grip block is equipped with anti-skidding texture, protects the surface of pipeline, increases frictional force simultaneously, improves the stability of centre gripping in-process.
Furthermore, the other end of the movable rod is fixedly connected with an anti-falling block to prevent the movable rod from falling off from the clamping part.
Furthermore, the center of one end of the pressing plate is fixedly connected with an adjusting handle, the outer wall of the adjusting handle is provided with anti-skidding textures, the adjusting handle can be held to rotate the threaded rod, and friction force is increased to facilitate force application.
Furthermore, the both sides wall of second fixed plate all fixedly connected with anticreep curb plate prevents that first fixed plate from droing.
Further, first latch matches with the second latch, and first latch can be in the second latch of removal in-process card, realizes the quick fixed to two handle portions.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) this scheme can realize nimble carrying out the quick clamp to not unidimensional pipeline and tightly, is convenient for adjust the centre gripping diameter, has improved the stability of centre gripping simultaneously greatly, and the installation work of the pipeline of being convenient for improves the installation effectiveness, and the first fixed plate of cooperation and second fixed plate can realize pressing from both sides the fixed after tight, prevent that operator's hand from needing to exert oneself always in the installation, greatly reduced pipeline installation's intensity of labour.
(2) The bottom fixedly connected with compression spring of mounting panel, compression spring's bottom and the top fixed connection of first fixed plate, in the use, compression spring's elasticity promotes first fixed plate and the laminating of second fixed plate is fixed, when needs centre gripping again, extrudees compression spring, easily separates first fixed plate and second fixed plate.
(3) The grip block is made for the elasticity material, and the one end of grip block is equipped with anti-skidding texture, protects the surface of pipeline, increases frictional force simultaneously, improves the stability of centre gripping in-process.
(4) The other end of the movable rod is fixedly connected with an anti-drop block to prevent the movable rod from dropping off from the clamping part.
(5) The center department fixedly connected with adjustment handle of clamp plate one end, the outer wall of adjustment handle is equipped with anti-skidding texture, can hold the rotatory threaded rod of adjustment handle, increases frictional force and is convenient for the application of force.
(6) The equal fixedly connected with anticreep curb plate of both sides wall of second fixed plate prevents that first fixed plate from droing.
(7) First latch and second latch match, and first latch can be in the second latch of removal in-process card income, realizes the quick fixed to two handle portions.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure at A in FIG. 1;
FIG. 3 is a schematic structural view of a second fixing plate portion of the present invention;
fig. 4 is a schematic structural view of a second latch portion of the present invention.
The reference numbers in the figures illustrate:
the clamp comprises a clamp body 1, an adjusting handle 2, a clamping block 3, a movable rod 4, an anti-falling block 5, an arc-shaped plate 6, a threaded rod 7, a pressing plate 8, an anti-falling side plate 9, a first fixing plate 10, a mounting plate 11, a compression spring 12, a first latch 13, a second fixing plate 14 and a second latch 15.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1:
referring to fig. 1-4, a clamp for pre-burying installation of underground pipelines comprises a clamp main body 1, the clamp main body 1 comprises two clamping parts and two handle parts, a movable rod 4 is connected on each of the two clamping parts in a penetrating manner, a clamping block 3 is fixedly connected at one end of the movable rod 4, an arc-shaped plate 6 is arranged at one side of each of the two clamping parts, a threaded rod 7 is connected in the middle of each arc-shaped plate 6 in a penetrating manner, one end of each threaded rod 7 is in threaded connection with the side wall of each clamping part, a pressing plate 8 is fixedly connected at the other end of each threaded rod 7, a first fixing plate 10 is hinged at the middle of one side wall of one handle part, first clamping teeth 13 are uniformly arranged at the bottom end of each first fixing plate 10, an installation plate 11 is fixedly connected at the top of one side wall of one handle part, a second fixing plate 14 is fixedly connected at one side, can realize nimble carrying out the quick clamp to the pipeline of unidimensional not tightly, be convenient for adjust the centre gripping diameter, improved the stability of centre gripping simultaneously greatly, the installation work of the pipeline of being convenient for improves the installation effectiveness, cooperates first fixed plate 10 and second fixed plate 14, can realize pressing from both sides the fixed after tight, prevents that the operator hand from needing to exert oneself always in the installation, greatly reduced pipeline installation's intensity of labour.
The bottom fixedly connected with compression spring 12 of mounting panel 11, the top fixed connection of the bottom of compression spring 12 and first fixed plate 10, in the use, compression spring 12's elasticity promotes first fixed plate 10 and the laminating of second fixed plate 14 is fixed, when needs centre gripping again, extrudees compression spring 12, easily separates first fixed plate 10 and second fixed plate 14.
Grip block 3 is made for the elasticity material, and the one end of grip block 3 is equipped with anti-skidding texture, protects the surface of pipeline, increases frictional force simultaneously, improves the stability of centre gripping in-process.
The other end of the movable rod 4 is fixedly connected with an anti-drop block 5 for preventing the movable rod 4 from dropping off from the clamping part.
The center department fixedly connected with adjustment handle 2 of clamp plate 8 one end, the outer wall of adjustment handle 2 is equipped with anti-skidding texture, can hold adjustment handle 2 rotation threaded rod 7, increases frictional force and is convenient for the application of force.
Two side walls of the second fixing plate 14 are fixedly connected with anti-drop side plates 9 for preventing the first fixing plate 10 from dropping.
The first latch 13 is matched with the second latch 15, and the first latch 13 can be clamped into the second latch 15 in the moving process, so that the two handle parts can be quickly fixed.
When the utility model is used, an operator can respectively hold the two adjusting handles 2 and rotate the adjusting handles 2 according to the size of the underground pipeline, so as to drive the threaded rod 7 to rotate, the arc-shaped plate 6 can be adjusted to a proper position, then the pipeline is clamped by the two clamping parts, the clamping block 3 can support the surface of the pipeline, the friction force is increased, in the clamping process, the operator can push the two handle parts, at the moment, the first fixing plate 10 moves relative to the second fixing plate 14, the first latch 13 can be clamped at a proper position of the second latch 15, so as to fix the positions of the two handle parts, the fixation after the pipeline is clamped is realized, the continuous force of the hand of the operator is prevented, when the pipeline needs to be re-clamped, the first fixing plate 10 can be upwards pushed, the compression spring 12 is compressed, so that the first fixing plate 10 can be easily separated from the second fixing plate 14, realize fixing again, can realize nimble carrying out the quick clamp to not unidimensional pipeline tightly, be convenient for adjust the centre gripping diameter, improved the stability of centre gripping simultaneously greatly, the installation work of the pipeline of being convenient for improves the installation effectiveness, cooperates first fixed plate 10 and second fixed plate 14, can realize pressing from both sides the fixed after tight, prevents that the operator hand from need exerting oneself always in the installation, greatly reduced pipeline installation's intensity of labour.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (7)

1. The utility model provides a pre-buried installation of underground pipeline is with clamp, includes clamp main part (1), its characterized in that: the clamp comprises a clamp body (1) and is characterized in that the clamp body comprises two clamping parts and two handle parts, a movable rod (4) is connected to each of the two clamping parts in a penetrating manner, one end of each movable rod (4) is fixedly connected with a clamping block (3), an arc-shaped plate (6) is arranged on one side of each clamping part, a threaded rod (7) is connected to the middle of each arc-shaped plate (6) in a penetrating manner, one end of each threaded rod (7) is in threaded connection with the side wall of each clamping part, a pressing plate (8) is fixedly connected to the other end of each threaded rod (7), a first fixing plate (10) is hinged to the middle of one side wall of one handle part, first clamping teeth (13) are uniformly arranged at the bottom end of each first fixing plate (10), a mounting plate (11) is fixedly connected to the top of one side wall of one handle part, and, the top end of the second fixing plate (14) is uniformly provided with second clamping teeth (15).
2. The clamp for pre-buried installation of the underground pipeline according to claim 1, characterized in that: the bottom fixedly connected with compression spring (12) of mounting panel (11), the top fixed connection of the bottom of compression spring (12) and first fixed plate (10).
3. The clamp for pre-buried installation of the underground pipeline according to claim 1, characterized in that: the clamping block (3) is made of elastic materials, and anti-skidding textures are arranged at one end of the clamping block (3).
4. The clamp for pre-buried installation of the underground pipeline according to claim 1, characterized in that: the other end of the movable rod (4) is fixedly connected with an anti-drop block (5).
5. The clamp for pre-buried installation of the underground pipeline according to claim 1, characterized in that: the center department fixedly connected with regulation handle (2) of clamp plate (8) one end, the outer wall of regulation handle (2) is equipped with anti-skidding texture.
6. The clamp for pre-buried installation of the underground pipeline according to claim 1, characterized in that: two side walls of the second fixing plate (14) are fixedly connected with anti-drop side plates (9).
7. The clamp for pre-buried installation of the underground pipeline according to claim 1, characterized in that: the first latch (13) is matched with the second latch (15).
CN201921127649.4U 2019-07-18 2019-07-18 Clamp for pre-embedding installation of underground pipeline Expired - Fee Related CN210232729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921127649.4U CN210232729U (en) 2019-07-18 2019-07-18 Clamp for pre-embedding installation of underground pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921127649.4U CN210232729U (en) 2019-07-18 2019-07-18 Clamp for pre-embedding installation of underground pipeline

Publications (1)

Publication Number Publication Date
CN210232729U true CN210232729U (en) 2020-04-03

Family

ID=69991791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921127649.4U Expired - Fee Related CN210232729U (en) 2019-07-18 2019-07-18 Clamp for pre-embedding installation of underground pipeline

Country Status (1)

Country Link
CN (1) CN210232729U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111793881A (en) * 2020-06-29 2020-10-20 苏州优百纺织有限公司 Weaving machine inlet wire clamping device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111793881A (en) * 2020-06-29 2020-10-20 苏州优百纺织有限公司 Weaving machine inlet wire clamping device
CN111793881B (en) * 2020-06-29 2021-12-21 苏州优众纳米科技有限公司 Weaving machine inlet wire clamping device

Similar Documents

Publication Publication Date Title
CN210232729U (en) Clamp for pre-embedding installation of underground pipeline
CN205200441U (en) Double -end simplex position riveting equipment
CN211073740U (en) Cutting knife angle adjusting structure for pipe fitting inclined plane cutting
CN208575880U (en) A kind of automatic mechanical hand front end clamp system
CN104235577A (en) Tablet computer portable bracket
CN218284611U (en) Tubular product fixing device for civil engineering
CN106786294B (en) Anisotropic clip lead fixator
CN212500567U (en) Digital printing equipment moves material device
CN108436958A (en) A kind of automatic mechanical hand front end clamp system
CN213801439U (en) Remove appurtenance for brick
CN110253461A (en) A kind of pre-buried install of underground utilities uses clamp
CN213134600U (en) Iron tower production is with quick bending device
CN204524495U (en) Multifunctional magnifier welding stage assembly
CN211016711U (en) Fixing clamp for replacing transformer respirator
CN110860322B (en) Clamping rod for combustor support frame
CN207139625U (en) A kind of aid for repairing electric wrench
CN208575451U (en) Clamping device is used in a kind of welding of rotary metal component
CN210475277U (en) Fixing device for clamp ring stamping
CN218484677U (en) Root canal file
CN204248834U (en) A kind of novel hardware screw driver
CN211941205U (en) Special perforating device of business administration
CN218301457U (en) Portable electric power law enforcement record appearance
CN209050623U (en) A kind of modified tweezers
CN2348968Y (en) Clamp
CN219918360U (en) Power transmission line mounting clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403

Termination date: 20210718