CN219710590U - Quick connecting device for building structural design wall post base - Google Patents

Quick connecting device for building structural design wall post base Download PDF

Info

Publication number
CN219710590U
CN219710590U CN202320441902.3U CN202320441902U CN219710590U CN 219710590 U CN219710590 U CN 219710590U CN 202320441902 U CN202320441902 U CN 202320441902U CN 219710590 U CN219710590 U CN 219710590U
Authority
CN
China
Prior art keywords
fixedly connected
mounting
plate
sides
connecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320441902.3U
Other languages
Chinese (zh)
Inventor
王超
余明
甘辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320441902.3U priority Critical patent/CN219710590U/en
Application granted granted Critical
Publication of CN219710590U publication Critical patent/CN219710590U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a quick connecting device for a building structural design wall post base, which comprises a quick connecting device body arranged between a concrete foundation and the wall post base, wherein the quick connecting device body comprises a mounting plate movably contacted with the top of the concrete foundation, two sides of the mounting plate are fixedly connected with vertical adjusting mechanisms, and the mounting plate is used for supporting the two vertical adjusting mechanisms. According to the utility model, through the arrangement of the vertical adjusting mechanism and the mounting piece, when the vertical deviation occurs between the second threaded hole and the corresponding first T-shaped fixing bolt, the vertical position of the first T-shaped fixing bolt can be adjusted, re-drilling is not needed, the operation of personnel is convenient, the effect of quick mounting is realized, the buffer mechanism is arranged, the shock impact force received can be buffered and unloaded, the damage risk caused by the larger shock impact force to the column foot and the concrete foundation can be effectively reduced, and the purpose of buffering and unloading protection is achieved.

Description

Quick connecting device for building structural design wall post base
Technical Field
The utility model relates to the technical field of quick connection equipment for wall bases, in particular to a quick connection device for wall bases in building structural design.
Background
The advantages of building the steel structure factory building are summarized, the steel structure factory building is high in construction speed, convenient to build and high in convenience, the wall column base mainly comprises an inserting type column base, an embedded type column base and other mounting modes, when the existing inserting type wall column base is mounted, the wall column base and a concrete foundation are required to be fixed through T-shaped anchor rods, and before mounting, holes are required to be drilled in the concrete foundation;
in the prior art, a T-shaped anchor rod hard connection mode is adopted, when the T-shaped anchor rod is deviated from a hole on a concrete foundation up and down, re-punching adjustment is needed, and the adjustment mode is time-consuming and time-consuming; and the mode of hard connection can not cushion the power of unloading to outside vibrations, when the earthquake takes place, can cause great damage risk to building structure, can not satisfy the user demand, combines the above-mentioned circumstances, consequently we have provided a building structure design wall post foot quick connecting device.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a quick connecting device for a building structural design wall post.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a building structure design heel quick connect device, includes installs the quick connect device body between concrete foundation and heel, the quick connect device body includes the mounting panel with concrete foundation top movable contact, the equal fixedly connected with vertical adjustment mechanism in both sides of mounting panel, the mounting panel is used for installing two vertical adjustment mechanism, vertical adjustment mechanism's bottom fixedly connected with mounting plate, concrete foundation's both sides all are equipped with two first T shape fixing bolt, the mounting plate thread bush is established on two first T shape fixing bolt that correspond, concrete foundation thread bush is established on four first T shape fixing bolt, cooperate with the mounting plate through first T shape fixing bolt, can realize fixed connection between concrete foundation and the mounting panel, wall heel's bottom thread tightening has the fixed plate, two vertical adjustment mechanisms slidable mounting respectively in the both sides of fixed plate, buffer gear is installed between the bottom of fixed plate and the top of mounting panel, buffer gear's setting can cushion the shock impact force that receives.
Preferably, the vertical adjustment mechanism includes the rectangular pipe, one side that two rectangular pipes are close to each other is equipped with the rectangular pole with the both sides fixed connection of mounting panel respectively, sliding sleeve in the rectangular pipe, the top fixedly connected with installation piece of rectangular pipe, two installation pieces slidable mounting are in the both sides of fixed plate respectively, the screw rod is installed in the bottom rotation of installation piece, the top of screw rod extends to the top and the fixedly connected with knob of corresponding installation piece, the rectangular pole thread bush is established on the screw rod that corresponds, the screw rod is with the mode of the rectangular pole threaded connection that corresponds, can drive the vertical removal of rectangular pole that corresponds when the screw rod rotates, the top of installation piece and the bottom fixed connection of the rectangular pole that corresponds.
Preferably, the buffer gear includes the arc buffer board of fixed connection in the fixed plate bottom, two recesses have been seted up at the top of mounting panel, slidable mounting has the slider on the bottom inner wall of recess, the bottom both sides of arc buffer board rotate the installation with the top of two sliders respectively, one side that two sliders kept away from each other respectively with the one side inner wall that two recesses kept away from each other fixedly connected with first buffer spring, the setting of slider and first buffer spring, can take place the deformation at the arc buffer board, provide the space distance that removes for the both ends of arc buffer board, the top fixedly connected with two locating plates of mounting panel, first groove has all been seted up to the bottom both sides of fixed plate, locating plate slidable mounting is in the first inslot that corresponds, the effect of vertical direction is played to the fixed plate to the locating plate, fixedly connected with spring damper between the top inner wall of the top of locating plate and the first groove that corresponds, the vibration amplitude of shaking that can effectually reduce the decline, fixedly connected with second buffer spring between the top inner wall of the top of locating plate and the first groove that corresponds, second buffer spring movable sleeve is established on the spring that corresponds, the second buffer spring is set up on the corresponding spring, the second buffer spring can receive the shock damping force of shock damping, the shock damping device is unloaded.
Preferably, the top fixedly connected with two stationary blades of fixed plate, two first screw holes have been seted up on the right side of wall post base, and first screw hole screw thread cover is equipped with two first T shape fixing bolt, and the stationary blade screw thread cover is established on two first T shape fixing bolt that correspond, and stationary blade and first T shape fixing bolt cooperate, can realize the fixed connection between fixed plate and the wall post base.
Preferably, two second screw holes have been seted up on the right side of concrete foundation, and first T shape fixing bolt thread bush is established at the second screw hole that corresponds, and the setting of two first T shape fixing bolts can realize the fixed connection between mounting plate and the concrete foundation.
Preferably, the mounting groove has been seted up to the bottom of fixed plate, and the top inner wall of mounting groove and the top fixed connection of arc buffer board.
Preferably, the second recess has all been seted up to the both sides of fixed plate, and the second recess is kept away from its open-ended one side inner wall on fixedly connected with first T shape slide rail, and one side that two installation pieces are close to each other is equal fixedly connected with rectangular piece, and top and bottom have been seted up to the one side that the rectangular piece kept away from corresponding installation piece and are the opening setting first T shape spout, first T shape spout and the first T shape slide rail sliding connection of correspondence.
Compared with the prior art, the utility model has the beneficial effects that:
1. the vertical adjusting mechanism is matched with the mounting piece, so that the vertical position of the first T-shaped fixing bolt can be adjusted, and when the first T-shaped fixing bolt and the corresponding second threaded hole have vertical deviation, re-drilling is not needed, the operation of personnel is convenient, and the effect of quick mounting can be realized in an adjusting mode;
2. through buffer gear's setting, can cushion the impact force that receives and unload the power, can effectually reduce because of the great damage risk that causes wall post base and concrete foundation of impact force of vibrations, reach the effect of buffering and unloading the power protection.
According to the utility model, through the arrangement of the vertical adjusting mechanism and the mounting piece, when the vertical deviation occurs between the second threaded hole and the corresponding first T-shaped fixing bolt, the vertical position of the first T-shaped fixing bolt can be adjusted, re-drilling is not needed, the operation of personnel is convenient, the effect of quick mounting is realized, the buffer mechanism is arranged, the shock impact force received can be buffered and unloaded, the damage risk caused by the larger shock impact force to the column foot and the concrete foundation can be effectively reduced, and the purpose of buffering and unloading protection is achieved.
Drawings
Fig. 1 is a schematic perspective view of a quick connection device for a foundation of a building structure design according to the present utility model;
FIG. 2 is a schematic diagram of a quick connector for a foundation of a building structure according to the present utility model;
fig. 3 is an enlarged schematic view of the portion a in fig. 2.
In the figure: 100. a concrete foundation; 101. a wall post base; 1. a fixing plate; 2. a mounting plate; 3. a mounting piece; 4. an arc-shaped buffer plate; 5. a first T-shaped fixing bolt; 6. a groove; 7. a slide block; 8. a first buffer spring; 9. a positioning plate; 10. a first groove; 11. a second buffer spring; 12. a mounting block; 13. a rectangular tube; 14. a rectangular bar; 15. a screw; 16. and a fixing piece.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-3, a quick connection device for a building structural design wall post base comprises a quick connection device body installed between a concrete foundation 100 and a wall post base 101, wherein the quick connection device body comprises a mounting plate 2 movably contacted with the top of the concrete foundation 100, two sides of the mounting plate 2 are fixedly connected with a vertical adjusting mechanism, the vertical adjusting mechanism comprises rectangular pipes 13, one sides of the two rectangular pipes 13, which are close to each other, are respectively fixedly connected with two sides of the mounting plate 2, rectangular rods 14 are sleeved in the rectangular pipes 13 in a sliding manner, the top ends of the rectangular pipes 13 are fixedly connected with mounting blocks 12, the two mounting blocks 12 are respectively and slidably installed on two sides of a fixing plate 1, second grooves are respectively formed in two sides of the fixing plate 1, first T-shaped sliding rails are fixedly connected on the inner walls of one side, which are far away from an opening, of the second grooves are respectively fixedly connected with rectangular blocks on one sides, which the two mounting blocks 12 are close to each other, the rectangular block is far away from one side of the corresponding installation block 12, the top and the bottom of the rectangular block are provided with openings, the first T-shaped sliding grooves are in sliding connection with the corresponding first T-shaped sliding rails, the arrangement of the first T-shaped sliding rails plays a vertical guiding effect on the installation block 12, the bottom of the installation block 12 is rotationally provided with a screw rod 15, the top of the installation block 12 is provided with a circular hole, two bearings are fixedly sleeved in the circular hole, the inner side of an inner ring of each bearing is fixedly connected with the outer side of the corresponding screw rod 15, the bearings play a role in rotationally installing the corresponding screw rod 15, the top end of each screw rod 15 extends to the upper side of the corresponding installation block 12 and is fixedly connected with a knob, the knob can drive the corresponding screw rod 15 to rotate, the rectangular rod 14 is in threaded sleeve on the corresponding screw rod 15, the top end of each rectangular rod 14 is provided with a third threaded hole, the third threaded hole is in threaded connection with the corresponding screw rod 15, and in a mode that the third threaded hole is in threaded connection with the corresponding screw rod 15, the corresponding rectangular rod 14 can be driven to vertically move while the screw rod 15 rotates, and the bottom end of the rectangular rod 14 is fixedly connected with the mounting plate 3;
two first T-shaped fixing bolts 5 are arranged on two sides of the concrete foundation 100, a mounting plate 3 is sleeved on the two corresponding first T-shaped fixing bolts 5 in a threaded manner, two fourth threaded holes are formed in the right side of the mounting plate 3, the fourth threaded holes are connected with the corresponding first T-shaped fixing bolts 5 in a threaded manner, the concrete foundation 100 is sleeved on the four first T-shaped fixing bolts 5 in a threaded manner, two second threaded holes are formed in the right side of the concrete foundation 100, the first T-shaped fixing bolts 5 are sleeved in the corresponding second threaded holes in a threaded manner, a fixing plate 1 is fixedly arranged at the bottom of a wall column base 101 in a threaded manner, two fixing plates 16 are fixedly connected to the top of the fixing plate 1, two first threaded holes are formed in the right side of the wall column base 101 in a threaded manner, two first T-shaped fixing bolts are sleeved on the corresponding first T-shaped fixing bolts in a threaded manner, two fifth threaded holes are formed in the right side of the fixing plates 16 in a threaded manner, and the fifth threaded holes are connected with the corresponding first T-shaped fixing bolts in a threaded manner;
a buffer mechanism is arranged between the bottom of the fixed plate 1 and the top of the mounting plate 2, the buffer mechanism comprises an arc buffer plate 4 fixedly connected to the bottom of the fixed plate 1, wherein the bottom of the fixed plate 1 is provided with a mounting groove, the top inner wall of the mounting groove is fixedly connected with the top of the arc buffer plate 4, the top of the mounting plate 2 is provided with two grooves 6, the bottom inner wall of each groove 6 is slidably provided with a sliding block 7, the bottom inner wall of each groove 6 is fixedly connected with a second T-shaped sliding rail, the bottom of each sliding block 7 is provided with a second T-shaped sliding groove, the second T-shaped sliding rail is slidably connected with the corresponding second T-shaped sliding groove, the two sides of the bottom of the arc buffer plate 4 are respectively rotatably mounted with the tops of the two sliding blocks 7, one side, away from each other, of the two sliding blocks 7 are respectively fixedly connected with a first buffer spring 8 between the inner walls of one side, away from each other, of the two grooves 6, the top of the mounting plate 2 is fixedly connected with two positioning plates 9, the two sides of the bottom of the fixing plate 1 are provided with first grooves 10, the positioning plates 9 are slidably arranged in the corresponding first grooves 10, a spring damper is fixedly connected between the top of the positioning plates 9 and the inner wall of the top of the corresponding first grooves 10, the arrangement of the spring damper can reduce the shaking amplitude in the shaking process, a second buffer spring 11 is fixedly connected between the top of the positioning plates 9 and the inner wall of the top of the corresponding first grooves 10, the second buffer spring 11 is movably sleeved on the corresponding spring damper, the first buffer spring 8, the second buffer spring 11 and the arc buffer plate 4 are arranged, the impact force in the shaking process can be effectively relieved, can be when vertical deviation appears in second screw hole and corresponding first T shape fixing bolt 5, adjust the vertical position of first T shape fixing bolt 5, do not need to drill again, make things convenient for personnel's operation, realize quick installation's effect, through buffer gear's setting, can cushion the impact force that receives and unload the power, can effectually reduce because of the great damage risk that causes wall column foot 101 and concrete foundation 100 of impact force, reach the purpose of buffering and unloading the power protection.
Working principle: when the concrete foundation 100 and the wall column base 101 are not installed, the first T-shaped fixing bolt 5 and the corresponding second threaded hole are in a separated state, the fixing plate 1 and the wall column base 101 are in a fixed state, when the concrete foundation 100 and the wall column base 101 are installed, when the first T-shaped fixing bolt 5 and the corresponding second threaded hole deviate from each other up and down, the corresponding screw rod 15 is driven to rotate by the forward rotation knob, the corresponding rectangular rod 14 is driven to vertically move by the rotation of the screw rod 15 under the action of the third threaded hole formed in the rectangular rod 14, the corresponding mounting plate 3 is driven to vertically move by the rectangular rod 14, the corresponding first T-shaped fixing bolt 5 is driven to vertically move by the mounting plate 3, the rotation knob is stopped when the first T-shaped fixing bolt 5 is downwards moved to be aligned with the corresponding second threaded hole, the first T-shaped fixing bolt 5 can be rotated at the moment under the action of the locking force of the threads of the third threaded hole and the corresponding screw rod 15, the corresponding screw rod 15 is simultaneously moved to the corresponding second threaded hole, the concrete foundation 100 and the wall column base 101 are in a connected state, the first T-shaped fixing bolt 5 can be installed independently, the first T-shaped fixing bolt 5 can be quickly and conveniently and quickly installed by people can not be in the corresponding position when the corresponding T-shaped fixing bolt is required to be installed;
when receiving outside vibration force, the power of vibrations can drive the wall column foot 101 and move downwards, wall column foot 101 drives two first grooves 10 and slides downwards on locating plate 9 that corresponds respectively, wall column foot 101 compresses second buffer spring 11 and spring damper when moving downwards, wall column foot 101 extrudees arc buffer plate 4 simultaneously, extruded power makes arc buffer plate 4 take place deformation, make the both ends of arc buffer plate 4 drive the slider 7 that corresponds respectively and remove, first buffer spring 8 that corresponds compresses when slider 7 removes, under the elasticity effect of second buffer spring 11, arc buffer plate 4 and first buffer spring 8, can carry out effective buffering to the shock impact force that receives and unload the power, can effectually reduce the damage risk to wall column foot 101 and concrete foundation 100 that causes because of the shock impact force is great, reach the effect of buffering and unloading force protection.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (7)

1. The utility model provides a building structure designs quick connecting device of wall column foot, including installing the quick connecting device body between concrete foundation (100) and wall column foot (101), a serial communication port, quick connecting device body includes mounting panel (2) with concrete foundation (100) top movable contact, the equal fixedly connected with vertical adjustment mechanism in both sides of mounting panel (2), the bottom fixedly connected with mounting plate (3) of two vertical adjustment mechanisms, the both sides of concrete foundation (100) all are equipped with two first T shape fixing bolt (5), mounting plate (3) thread bush is established on two corresponding first T shape fixing bolt (5), concrete foundation (100) thread bush is established on four first T shape fixing bolt (5), the bottom thread tightening of wall column foot (101) has fixed plate (1), two vertical adjustment mechanisms slidable mounting are in the both sides of fixed plate (1) respectively, install buffer gear between the bottom of fixed plate (1) and the top of mounting panel (2).
2. The quick connecting device for the building structural design wall post base according to claim 1, wherein the vertical adjusting mechanism comprises rectangular pipes (13), one sides of the two rectangular pipes (13) close to each other are fixedly connected with two sides of the mounting plate (2) respectively, rectangular rods (14) are sleeved in the rectangular pipes (13) in a sliding mode, the top ends of the rectangular pipes (13) are fixedly connected with mounting blocks (12), the two mounting blocks (12) are respectively and slidably mounted on two sides of the fixing plate (1), screw rods (15) are rotatably mounted at the bottoms of the mounting blocks (12), the top ends of the screw rods (15) extend to the positions above the corresponding mounting blocks (12) and are fixedly connected with knobs, the rectangular rods (14) are sleeved on the corresponding screw rods (15) in a threaded mode, and the tops of the mounting pieces (3) are fixedly connected with the bottom ends of the corresponding rectangular rods (14).
3. The quick connecting device for the building structural design wall post base according to claim 1, wherein the buffer mechanism comprises an arc buffer plate (4) fixedly connected to the bottom of a fixed plate (1), two grooves (6) are formed in the top of a mounting plate (2), sliding blocks (7) are slidably mounted on the inner walls of the bottoms of the grooves (6), two sides of the bottom of the arc buffer plate (4) are rotatably mounted on the tops of the two sliding blocks (7) respectively, a first buffer spring (8) is fixedly connected between one side, away from each other, of the two sliding blocks (7) and the inner wall of one side, away from each other, of the two grooves (6), two positioning plates (9) are fixedly connected to the top of the mounting plate (2), first grooves (10) are formed in the two sides of the bottom of the fixed plate (1), spring dampers are fixedly connected between the tops of the positioning plates (9) and the inner walls of the tops of the corresponding first grooves (10), and a second buffer spring damper (11) is fixedly connected between the tops of the positioning plates (9) and the inner walls of the tops of the corresponding first grooves (10), and the second buffer springs (11) are correspondingly arranged on the movable spring sleeves.
4. The quick connecting device for the building structural design wall post base according to claim 1, wherein the top of the fixing plate (1) is fixedly connected with two fixing plates (16), two first threaded holes are formed in the right side of the wall post base (101), two second T-shaped fixing bolts are sleeved in the first threaded holes, and the fixing plates (16) are sleeved on the corresponding two second T-shaped fixing bolts in a threaded mode.
5. The quick connection device for the foundation of the building structural design according to claim 1, wherein two second threaded holes are formed in the right side of the concrete foundation (100), and the first T-shaped fixing bolts (5) are sleeved in the corresponding second threaded holes in a threaded manner.
6. A quick connection device for a building structural design wall post according to claim 3, wherein the bottom of the fixing plate (1) is provided with a mounting groove, and the top inner wall of the mounting groove is fixedly connected with the top of the arc-shaped buffer plate (4).
7. The quick connecting device for the building structural design wall post base according to claim 2, wherein the two sides of the fixing plate (1) are provided with second grooves, the inner wall of one side of the second grooves away from the opening is fixedly connected with first T-shaped sliding rails, one sides of the two mounting blocks (12) close to each other are fixedly connected with rectangular blocks, the top and the bottom of one side of the rectangular blocks away from the corresponding mounting blocks (12) are provided with first T-shaped sliding grooves, and the first T-shaped sliding grooves are in sliding connection with the corresponding first T-shaped sliding rails.
CN202320441902.3U 2023-03-10 2023-03-10 Quick connecting device for building structural design wall post base Active CN219710590U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320441902.3U CN219710590U (en) 2023-03-10 2023-03-10 Quick connecting device for building structural design wall post base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320441902.3U CN219710590U (en) 2023-03-10 2023-03-10 Quick connecting device for building structural design wall post base

Publications (1)

Publication Number Publication Date
CN219710590U true CN219710590U (en) 2023-09-19

Family

ID=88005458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320441902.3U Active CN219710590U (en) 2023-03-10 2023-03-10 Quick connecting device for building structural design wall post base

Country Status (1)

Country Link
CN (1) CN219710590U (en)

Similar Documents

Publication Publication Date Title
CN219710590U (en) Quick connecting device for building structural design wall post base
CN213174191U (en) Large-span steel structure anti-seismic support
CN111749614A (en) Multifunctional rotary drilling rig
CN112064819B (en) Building main body structure with auxiliary assembly installing support
CN219793705U (en) High-speed railway sound barrier metal composite high-efficiency sound absorption and insulation plate
CN210128213U (en) Mounting bracket of industrial equipment
CN114961321A (en) Porous steel-clad transmission tower main material uninterrupted power reinforcing device
CN215928648U (en) Cooling water pipeline supporting device for coal-fired power plant
CN216138143U (en) Perforating device convenient to piston rod is fixed
CN113417578A (en) High-efficient oil drilling device
CN106825675B (en) A kind of three hole once balance drilling equipments for solar energy mirror holder
CN219261354U (en) Anti-seismic buffer base for constructional engineering
CN219451053U (en) Adjustable damping support framework of steel structure assembly plant
CN220687247U (en) Foundation drilling device
CN219909606U (en) Steel structure beam with anti-offset alignment device
CN114525807B (en) Large steel structure embedded part
CN217782773U (en) Construction frame
CN216240463U (en) Fixing frame convenient to install for geological exploration drilling machine
CN115538603A (en) Building steel structure support, connecting member and mounting method
CN220807311U (en) Auxiliary positioning device for mechanical safety
CN113669251B (en) Damping device for water pump with multiple buffering angle adjustment function
CN220248262U (en) Energy-saving power generation equipment for ship
CN117328592B (en) Curtain wall and construction method thereof
CN216553761U (en) Drilling machine supporting device for coal mine
CN219100304U (en) Assembled building supporting seat

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant