CN217782773U - Construction frame - Google Patents

Construction frame Download PDF

Info

Publication number
CN217782773U
CN217782773U CN202221337404.6U CN202221337404U CN217782773U CN 217782773 U CN217782773 U CN 217782773U CN 202221337404 U CN202221337404 U CN 202221337404U CN 217782773 U CN217782773 U CN 217782773U
Authority
CN
China
Prior art keywords
support column
workstation
link
mounting panel
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221337404.6U
Other languages
Chinese (zh)
Inventor
杨凤英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weipai Construction Technology Shanghai Co ltd
Original Assignee
Weipai Construction Technology Shanghai Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weipai Construction Technology Shanghai Co ltd filed Critical Weipai Construction Technology Shanghai Co ltd
Priority to CN202221337404.6U priority Critical patent/CN217782773U/en
Application granted granted Critical
Publication of CN217782773U publication Critical patent/CN217782773U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to the technical field of construction equipment, a construction frame is disclosed, including the support column, the side of support column is provided with the workstation, the outside of support column is provided with the second mounting panel, one side welding that the support column was kept away from to the second mounting panel has the second link, the side of second link articulates there is the connecting rod, the bottom of connecting rod articulates there is first link, the bottom welding of first link has first mounting panel, can play prevents empting, this construction frame's stability has been improved greatly, the top fixed mounting of support column has the rotation motor, the output shaft welding of rotation motor has the dwang, dwang and workstation threaded connection, be applicable to the not co-altitude construction site and use, the inside fixed mounting of support column has electric putter, electric putter's flexible fixed mounting has the fly leaf, one side welding that the fly leaf is close to the workstation has the fixture block, the draw-in groove has been seted up to one side that the workstation is close to the fly leaf, fixture block and draw-in groove looks adaptation, avoid the workstation to take place to rock.

Description

Construction frame
Technical Field
This application belongs to construction equipment technical field, specifically is construction scaffold.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object in a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
The scaffold is a device widely applied to the field of building construction, and particularly, the scaffold is frequently required to be built or constructed because the scaffold needs to be moved and ascended for indoor decoration and electromechanical installation.
The existing construction frame has poor stability, and in the working process, a support column needs to be manually supported, otherwise, the support column is easy to topple.
SUMMERY OF THE UTILITY MODEL
The purpose of this application lies in: in order to solve the problem of poor stability, a construction scaffold is provided.
The technical scheme adopted by the application is as follows: construction frame, including the support column, the side of support column is provided with the workstation, the side welding of workstation has the guardrail, the outside of support column is provided with the second mounting panel, the second mounting panel is kept away from one side welding of support column has the second link, the side of second link articulates there is the connecting rod, the bottom of connecting rod articulates there is first link, the bottom welding of first link has first mounting panel, the bottom welding of first mounting panel has ground stake.
Through adopting above-mentioned technical scheme, use through the cooperation of mounting panel, link and connecting rod, can play and prevent empting the effect, in staff's working process, avoid appearing the possibility that the scaffold emptys, improved this building scaffold's stability greatly.
In a preferred embodiment, a first magnetic block is embedded in the side surface of the supporting column, a second magnetic block is embedded in one side, close to the supporting column, of the second mounting plate, and the first magnetic block is magnetically connected with the second magnetic block.
Through adopting above-mentioned technical scheme, use through the cooperation of two kinds of magnetic paths, make things convenient for the staff to assemble.
In a preferred embodiment, threaded holes are formed in the side surface of the supporting column and the inside of the second mounting plate, and fixing bolts are connected to the inner threads of the threaded holes in a threaded manner.
Through adopting above-mentioned technical scheme, fixing bolt fixes in the threaded hole, can be the outside of second mounting panel fixed mounting at the support column.
In a preferred embodiment, the top fixed mounting of support column has the rotation motor, the output shaft welding of rotation motor has the dwang, the dwang with workstation threaded connection.
Through adopting above-mentioned technical scheme, the drive rotates the motor and drives the dwang and rotate for the workstation can the up-and-down motion, thereby height that can the quick adjustment workstation is applicable to the not construction site of co-altitude and uses.
In a preferred embodiment, a bearing seat is fixedly installed at the bottom of the inner wall of the supporting column, and the bearing seat is rotatably connected with the rotating rod.
Through adopting above-mentioned technical scheme, avoid the dwang to shift at the rotation in-process.
In a preferred embodiment, an electric push rod is fixedly mounted inside the supporting column, a movable plate is fixedly mounted at the telescopic end of the electric push rod, a clamping block is welded on one side of the movable plate close to the workbench, a clamping groove is formed in one side of the workbench close to the movable plate, and the clamping block is matched with the clamping groove.
Through adopting above-mentioned technical scheme, drive electric putter drives fly leaf and fixture block side-to-side movement, in the draw-in groove of fixture block joint at the workstation, just can fix the workstation in the support column, avoids the workstation to take place to rock, and this construction frame's security improves greatly.
In conclusion, due to the adoption of the technical scheme, the beneficial effects of the application are as follows:
1. in this application, use through the cooperation of mounting panel, link and connecting rod, can play and prevent empting the effect, in staff's working process, avoid appearing the possibility that the scaffold emptys, improved this construction frame's stability greatly.
2. In this application, the drive rotates the motor and drives the dwang and rotate for the workstation can the up-and-down motion, thereby can the height of rapid adjustment workstation, be applicable to not the construction site of co-altitude and use, drive electric putter drives fly leaf and fixture block side-to-side movement, and when the fixture block joint in the draw-in groove of workstation, just can fix the workstation in the support column, avoid the workstation to take place to rock.
Drawings
FIG. 1 is a schematic block diagram of the overall structure of the present application;
FIG. 2 is a schematic cross-sectional view of a second mounting plate of the present application;
fig. 3 is a schematic diagram of a cross-sectional structure of a support column of the present application.
The mark in the figure is: 1. a support column; 2. a work table; 3. a guardrail; 4. a first mounting plate; 5. piling; 6. a first link frame; 7. a connecting rod; 8. a second link frame; 9. a second mounting plate; 10. a first magnetic block; 11. a second magnetic block; 12. a threaded hole; 13. fixing the bolt; 14. rotating the motor; 15. rotating the rod; 16. a bearing seat; 17. an electric push rod; 18. a movable plate; 19. a clamping block; 20. a clamping groove.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The construction frame according to the embodiment of the present application will be described in detail with reference to fig. 1 to 3.
The embodiment of the application discloses construction frame. Referring to fig. 1, the construction frame includes support column 1, the side that two support columns 1 are close to each other is provided with workstation 2, the side welding of workstation 2 has guardrail 3, play the guard action, the outside of support column 1 is provided with second mounting panel 9, one side welding that support column 1 was kept away from to second mounting panel 9 has second link 8, the side of second link 8 articulates there is connecting rod 7, the bottom of connecting rod 7 articulates there is first link 6, the bottom welding of first link 6 has first mounting panel 4, the bottom welding of first mounting panel 4 has ground stake 5, through ground stake 5, can fix first mounting panel 4 subaerial, through the mounting panel, the cooperation of link and connecting rod 7 is used, can play the effect of preventing toppling.
Referring to fig. 1 and 2, the side of support column 1 is embedded to have first magnetic path 10, one side that second mounting panel 9 is close to support column 1 is embedded to have second magnetic path 11, first magnetic path 10 is connected with 11 magnetism of second magnetic path, use through the cooperation of two kinds of magnetic paths, make things convenient for the staff to assemble, threaded hole 12 has been seted up to the side of support column 1 and the inside of second mounting panel 9, the internal thread of threaded hole 12 is connected with fixing bolt 13, fixing bolt 13 is fixed in threaded hole 12, can be in the outside of support column 1 second mounting panel 9 fixed mounting.
Referring to fig. 1 and 3, top fixed mounting of support column 1 has rotation motor 14, the output shaft welding of rotation motor 14 has dwang 15, the drive rotates motor 14 and drives dwang 15 and rotate, the bottom fixed mounting of support column 1 inner wall has bearing frame 16, bearing frame 16 rotates with dwang 15 and is connected, avoid dwang 15 to shift at the rotation in-process, dwang 15 and workstation 2 threaded connection, dwang 15 rotates, make workstation 2 can the up-and-down motion, thereby can the height of quick adjustment workstation 2, be applicable to not the construction site use of co-altitude, the inside fixed mounting of support column 1 has electric putter 17, electric putter 17's flexible end fixed mounting has fly leaf 18, one side welding that fly leaf 18 is close to workstation 2 has fixture block 19, fixture block 19 is provided with a plurality ofly, a plurality of fixture blocks 19 are vertical and equidistant distribution on fly leaf 18. The driving electric push rod 17 drives the movable plate 18 and the clamping block 19 to move left and right, the clamping groove 20 is formed in one side, close to the movable plate 18, of the workbench 2, the clamping block 19 is matched with the clamping groove 20, when the clamping block 19 is clamped in the clamping groove 20 of the workbench 2, the workbench 2 can be fixed in the supporting column 1, and the workbench 2 is prevented from shaking.
The implementation principle of the construction frame of the embodiment of the application is as follows:
support column 1 is placed in suitable position, through ground stake 5, fix first mounting panel 4 subaerial, the first magnetic path 10 magnetism that second magnetic path 11 of second mounting panel 9 is aimed at support column 1 is connected, fix fixing bolt 13 in screw hole 12 again, just can be second mounting panel 9 fixed mounting in the outside of support column 1, through the mounting panel, link and connecting rod 7's cooperation is used, can play the effect of preventing empting, in staff's work process, the possibility of avoiding appearing the scaffold and toppling over, this building scaffold's stability has greatly been improved, when needs adjustment workstation 2 height, drive electric putter 17 drives fly leaf 18 and fixture block 19 rearward movement, fixture block 19 breaks away from workstation 2's draw-in groove 20, redrive rotation motor 14 drives dwang 15 and rotates, make workstation 2 can the up-and-down motion, thereby can adjust workstation 2's height fast, be applicable to the construction place use of different heights, when workstation 2 adjusts to suitable height, drive electric putter 17 drives draw-in groove 18 and fixture block 19 forward motion, fixture block 19 joint is in workstation 2's 20, just can be fixed at workstation 2, avoid workstation 2 to take place the emergence workstation 2 to rock.
The above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present application.

Claims (6)

1. Construction frame, including support column (1), its characterized in that: the side of support column (1) is provided with workstation (2), the side welding of workstation (2) has guardrail (3), the outside of support column (1) is provided with second mounting panel (9), keep away from second mounting panel (9) one side welding of support column (1) has second link (8), the side of second link (8) articulates there is connecting rod (7), the bottom of connecting rod (7) articulates there is first link (6), the bottom welding of first link (6) has first mounting panel (4), the bottom welding of first mounting panel (4) has ground stake (5).
2. A construction frame as claimed in claim 1, wherein: the side of support column (1) is embedded with first magnetic path (10), second mounting panel (9) are close to one side of support column (1) is embedded with second magnetic path (11), first magnetic path (10) with second magnetic path (11) magnetic connection.
3. A construction frame as claimed in claim 1, wherein: threaded holes (12) are formed in the side face of the supporting column (1) and the inside of the second mounting plate (9), and fixing bolts (13) are connected to the inner threads of the threaded holes (12) in a threaded mode.
4. A construction frame as claimed in claim 1, wherein: the top fixed mounting of support column (1) has rotation motor (14), the output shaft welding of rotation motor (14) has dwang (15), dwang (15) with workstation (2) threaded connection.
5. A construction frame as claimed in claim 4, wherein: the bottom fixed mounting of support column (1) inner wall has bearing frame (16), bearing frame (16) with dwang (15) rotate to be connected.
6. A construction frame as claimed in claim 1, wherein: the inside fixed mounting of support column (1) has electric putter (17), the flexible end fixed mounting of electric putter (17) has fly leaf (18), fly leaf (18) are close to one side welding of workstation (2) has fixture block (19), workstation (2) are close to draw-in groove (20) have been seted up to one side of fly leaf (18), fixture block (19) with draw-in groove (20) looks adaptation.
CN202221337404.6U 2022-05-31 2022-05-31 Construction frame Active CN217782773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221337404.6U CN217782773U (en) 2022-05-31 2022-05-31 Construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221337404.6U CN217782773U (en) 2022-05-31 2022-05-31 Construction frame

Publications (1)

Publication Number Publication Date
CN217782773U true CN217782773U (en) 2022-11-11

Family

ID=83928127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221337404.6U Active CN217782773U (en) 2022-05-31 2022-05-31 Construction frame

Country Status (1)

Country Link
CN (1) CN217782773U (en)

Similar Documents

Publication Publication Date Title
CN205309390U (en) Water bores tapping machine trompil angle adjusting mechanism
CN217782773U (en) Construction frame
CN215906792U (en) Lattice column guiding, positioning and verticality adjusting installation equipment
CN112405891A (en) Adjustable multifunctional wall drilling device for building
CN216992582U (en) Cutting device is used in building stone processing
CN215106444U (en) Prefabricated building house roof support
CN215631887U (en) Building structure design roof beam reinforced structure
CN212742537U (en) Piling fixing device for building
CN114182938A (en) Section steel inclined column installation device and construction method thereof
CN214940045U (en) Anti-seismic building pile for construction engineering
CN111716562A (en) Concrete wall drilling equipment for building engineering
CN217379895U (en) High strength antidetonation energy-saving building with external photovoltaic curtain
CN218324291U (en) Safety device is used in construction in room
CN221276343U (en) Elevated mounting structure
CN221526017U (en) Support frame for construction machinery
CN218844253U (en) Foundation pit slope surface drilling device
CN220667011U (en) Correction frame for lattice column construction
CN220133551U (en) Wall body strutting arrangement
CN220394568U (en) Reinforcing apparatus for building municipal works
CN219100070U (en) Pit wall anti-loosening reinforcing mechanism for constructional engineering
CN211773729U (en) Foundation ditch steel sheet pile supporting construction
CN217129073U (en) Support frame for building engineering convenient to adjust horizontal angle
CN213774468U (en) Building templates link for civil engineering
CN220414767U (en) Automatic screeding device of shear force wall
CN219952828U (en) Support for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant