CN219692739U - Suspension device for special-shaped high-rise building window installation measuring instrument - Google Patents

Suspension device for special-shaped high-rise building window installation measuring instrument Download PDF

Info

Publication number
CN219692739U
CN219692739U CN202320985316.5U CN202320985316U CN219692739U CN 219692739 U CN219692739 U CN 219692739U CN 202320985316 U CN202320985316 U CN 202320985316U CN 219692739 U CN219692739 U CN 219692739U
Authority
CN
China
Prior art keywords
pipe section
outer pipe
positioning
fixed
measuring instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320985316.5U
Other languages
Chinese (zh)
Inventor
范丽君
赵宇
王旭
石俊兰
刘恩泽
于晨晨
黄白
张德华
吴佩芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Fifth Construction Group Co Ltd
Original Assignee
Shanxi Fifth Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Fifth Construction Group Co Ltd filed Critical Shanxi Fifth Construction Group Co Ltd
Priority to CN202320985316.5U priority Critical patent/CN219692739U/en
Application granted granted Critical
Publication of CN219692739U publication Critical patent/CN219692739U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a special-shaped high-rise building window installation measuring instrument suspension device, which comprises an outer pipe section and an inner pipe section which are mutually sleeved, wherein first positioning nuts are fixed on two sides of the outer pipe section, and first positioning bolts are connected with the first positioning nuts through internal threads; a second positioning nut is fixed at the center position of the front side of the outer pipe section, a second positioning bolt is connected with the second positioning nut through internal threads, and the end part of a screw rod of the second positioning bolt penetrates through the pipe wall of the outer pipe section and then is propped against the pipe wall of the inner pipe section; an L-shaped clamping plate is fixed at the middle position of the top of the rear side of the outer pipe section. The device has scientific design, simple structure and convenient operation, the assembled parts can be seen at the construction site, and can be manufactured by waste steel pipes, bolts, nuts, steel sheets and the like, any worker can quickly manufacture qualified finished products when drawing is taken, the applicability is extremely strong, the labor is saved, the construction progress is accelerated, the construction efficiency is improved, and the device is safe, reliable, green, efficient and environment-friendly.

Description

Suspension device for special-shaped high-rise building window installation measuring instrument
Technical Field
The utility model belongs to the technical field of building construction, in particular to construction of a curtain wall framework, and particularly relates to a suspension device for a special-shaped high-rise building window installation measuring instrument.
Background
At present, most of high-rise building designs are frame shear wall structures, so that the building can have enough strength to resist horizontal loads such as earthquake loads and wind loads, the safety of the building is guaranteed, and the shear walls are arranged on the outer side of the building, particularly at corners. In addition, in order to be attractive and reduce stress concentration at corners, most of modern building corners are arc-shaped, and construction difficulty of arc-shaped shear walls at the corners is caused due to position specificity and irregular structure. During the construction of the structure, the arc wall needs to customize the template according to the characteristics by oneself, the template after secondary processing is slightly worse than the common template in strength, and in construction, the main beam and the secondary beam for reinforcement cannot use steel pipes, and most of the arc wall uses bent steel bars. The method can lead to unavoidable expansion of the mould, so that the construction quality of the arc wall is difficult to control, unavoidable quality defects such as unevenness and the like appear, the outer side of the shear wall belongs to a place with difficult quality inspection, the part is often easy to ignore in main construction, and the inconvenience of subsequent construction is caused.
The modern exterior design uses a large amount of curtain wall elements, whether metal curtain wall or glass curtain wall, floor window parts and whole layer of strip window also become the first choice in design. It is notable that the largest difference between a strip window and a windowpane curtain wall is that: the window type glass curtain wall is a frame supporting glass curtain wall with a self structure and transverse continuity, the strip window is a single window with a self structure and no continuity, and the window type glass curtain wall is a transverse combined window formed by connecting the single window with the self structure through assembling. Compared with the belt window, the belt window saves more cost; the construction of the outer window can be seen with the floor in the part of the general straight section, the installation quality of the window control frame can be controlled by means of the building five zero line and placing a level meter on a windowsill, and the two ends of the shear wall of the straight section can be pulled or leveled by an instrument. However, since no windowsill is arranged at the arc-shaped shear wall, the two sides of the shear wall cannot be pulled, the shear wall cannot be in communication with floors, and the construction of the position is difficult due to the unevenness of the outer wall. That is, if the shear wall is a pull-through line, the shear wall is clung to the building outer wall in a straight state due to the corner part, the straight line cannot be ensured, no place is arranged by using a level meter, the construction part cannot be adjusted by an external worker during construction, and the construction quality is difficult to see and control.
Disclosure of Invention
The utility model aims to solve the problems in the prior art and provides a suspension device for installing a measuring instrument on a special-shaped high-rise building window. The device can install the level gauge on the outer curtain wall keel to realize the purpose that the level gauge is stably arranged outside the building outer wall, thereby realizing the horizontal and vertical measurement of the outer wall.
The utility model is realized by the following technical scheme:
the utility model provides a dysmorphism high-rise building window installs measuring instrument linkage, includes outer pipe section and inner tube section, and outer pipe section slip-on is outside the inner tube section, and the length of outer pipe section is less than the length of inner tube section; the upper part and the lower part of the outer pipe section are respectively fixed with first positioning nuts, and the first positioning nuts are internally and respectively connected with first positioning bolts in a threaded manner; a second positioning nut is fixed at the center position of the front side of the outer pipe section, a second positioning bolt is connected with the second positioning nut through internal threads, and the end part of a screw rod of the second positioning bolt penetrates through the pipe wall of the outer pipe section and then is propped against the pipe wall of the inner pipe section; an L-shaped clamping plate is fixed at the middle position of the top of the rear side of the outer pipe section, the end part of a short plate of the L-shaped clamping plate is fixed with the pipe wall of the outer pipe section, and a long plate of the L-shaped clamping plate is positioned right behind the outer pipe section and is provided with a gap between the long plate and the long plate to form a clamping groove.
Further, a backing plate is arranged between the second positioning nut and the pipe wall of the outer pipe section, the second positioning nut is fixedly connected with the backing plate, and the backing plate is fixedly connected with the pipe wall of the outer pipe section.
Further, a handle rod is fixed on the bolt head of the second positioning bolt, and the handle rod and the second positioning bolt are arranged in a T shape.
Further, the outer pipe section is made of DN255 galvanized steel pipes, and the inner pipe section is made of DN15 galvanized steel pipes.
The device is an instrument suspension bracket designed based on the horizontal keel at the outer side of the outer wall and the base reserved at the bottom of the level, so that the instrument suspension bracket can be conveniently used at the position without a windowsill at the outer side of the outer wall of the building. The problem that the quality of the construction process of levelness and perpendicularity is difficult to control because the arc-shaped outer wall outer window installation level cannot be used is solved, and the times of unqualified reworking maintenance of the outer window quality are greatly reduced. The construction time is saved, and the construction efficiency and the engineering quality are greatly improved.
The device has scientific design, simple structure and convenient operation, the assembled parts can be seen at the construction site, and can be manufactured by waste steel pipes, bolts, nuts, steel sheets and the like, any worker can quickly manufacture qualified finished products when drawing is taken, the applicability is extremely strong, the labor is saved, the construction progress is accelerated, the construction efficiency is improved, and the device is safe, reliable, green, efficient and environment-friendly.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the utility model.
Fig. 1 is a front view of the structure of the device of the present utility model.
Fig. 2 is a right side view of the structure of the device of the present utility model.
In the figure: 1-outer pipe section, 2-inner pipe section, 3-first positioning nut, 4-first positioning bolt, 5-backing plate, 6-second positioning nut, 7-second positioning bolt, 8-handle bar, 9-L-shaped clamping plate and 10-clamping groove.
Detailed Description
For a better understanding of the present utility model, reference will be made to the following description of the utility model taken in conjunction with the accompanying drawings and examples. The features of the embodiments and examples of the present utility model may be combined with each other without any conflict.
In the description of the present utility model, it should be understood that the directions or positional relationships indicated by the terms "upper", "lower", "front", "rear", "inner", "outer", etc. are based on the directions or positional relationships shown in fig. 1, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "fixed" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art in a specific case.
The utility model provides a special-shaped high-rise building window installs measuring instrument linkage, as shown in fig. 1 and 2, includes outer pipe section 1 and inner tube section 2, and outer pipe section 1 sliding sleeve is outside inner tube section 2, and the length of outer pipe section 1 is less than the length of inner tube section 2; the outer pipe section 1 is made of DN255 galvanized steel pipes, and the inner pipe section 2 is made of DN15 galvanized steel pipes.
The upper part both sides position department and the lower part both sides position department of outer pipe section 1 are fixed with first positioning nut 3 respectively, and equal threaded connection has first positioning bolt 4 in the first positioning nut 3.
A backing plate 5 and a second positioning nut 6 are fixed at the center of the front side of the outer pipe section 1, and specifically: the center of the front side of the outer pipe section 1 is provided with a perforation, the backing plate 5 is welded and fixed on the pipe wall of the outer pipe section 1, the second positioning nut 6 is fixed on the backing plate 5, and the perforation on the outer pipe section 1, the perforation on the backing plate 5 and the screw hole on the second positioning nut 6 are aligned; the second positioning nut 6 is internally and threadedly connected with a second positioning bolt 7, and the screw end of the second positioning bolt 7 sequentially passes through a screw hole of the second positioning nut 6, the perforation of the backing plate 5 and the perforation of the outer pipe section 1 and then is propped against the pipe wall of the inner pipe section 2; a handle rod 8 is fixed on the bolt head of the second positioning bolt 7, the handle rod 8 and the second positioning bolt 7 are arranged in a T shape, and the handle rod 8 is used for rotating the second positioning bolt 7.
An L-shaped clamping plate 9 is fixed at the middle position of the top of the rear side of the outer pipe section 1, the end part of a short plate of the L-shaped clamping plate 9 is welded and fixed with the pipe wall of the outer pipe section 1, a long plate of the L-shaped clamping plate 9 is positioned right behind the outer pipe section 1, a gap is reserved between the long plate and is arranged in parallel, and the gap forms a clamping groove 10.
When the device is used, the device is clamped on a curtain wall keel through the clamping groove 10 between the L-shaped clamping plate 9 and the outer pipe section 1, then the device is firmly fixed on the curtain wall keel through rotating the four first positioning bolts 4, then the height of the inner pipe section 2 is adjusted through adjusting the relative positions of the inner pipe section 2 and the outer pipe section 1, and finally the level gauge is installed at the top of the inner pipe section 2.
The foregoing examples illustrate only a few embodiments of the utility model and are described in detail herein without thereby limiting the scope of the utility model. It should be noted that it will be apparent to those skilled in the art that several variations and modifications can be made without departing from the spirit of the utility model, which are all within the scope of the utility model.

Claims (5)

1. A special-shaped high-rise building window installation measuring instrument linkage, its characterized in that: the pipe comprises an outer pipe section and an inner pipe section, wherein the outer pipe section is sleeved outside the inner pipe section in a sliding manner, and the length of the outer pipe section is smaller than that of the inner pipe section; the upper part and the lower part of the outer pipe section are respectively fixed with first positioning nuts, and the first positioning nuts are internally and respectively connected with first positioning bolts in a threaded manner; a second positioning nut is fixed at the center position of the front side of the outer pipe section, a second positioning bolt is connected with the second positioning nut through internal threads, and the end part of a screw rod of the second positioning bolt penetrates through the pipe wall of the outer pipe section and then is propped against the pipe wall of the inner pipe section; an L-shaped clamping plate is fixed at the middle position of the top of the rear side of the outer pipe section, the end part of a short plate of the L-shaped clamping plate is fixed with the pipe wall of the outer pipe section, and a long plate of the L-shaped clamping plate is positioned right behind the outer pipe section and is provided with a gap between the long plate and the long plate to form a clamping groove.
2. The shaped high rise building window mounted measuring instrument suspension device of claim 1 wherein: a backing plate is arranged between the second positioning nut and the pipe wall of the outer pipe section, the second positioning nut is fixedly connected with the backing plate, and the backing plate is fixedly connected with the pipe wall of the outer pipe section.
3. The shaped high-rise building window installation measuring instrument suspension device according to claim 1 or 2, characterized in that: a handle rod is fixed on the bolt head of the second positioning bolt, and the handle rod and the second positioning bolt are arranged in a T shape.
4. The shaped high-rise building window installation measuring instrument suspension device according to claim 1 or 2, characterized in that: the outer pipe section is made of DN255 galvanized steel pipe, and the inner pipe section is made of DN15 galvanized steel pipe.
5. A shaped high rise building window mounted measuring instrument suspension device as defined in claim 3 wherein: the outer pipe section is made of DN255 galvanized steel pipe, and the inner pipe section is made of DN15 galvanized steel pipe.
CN202320985316.5U 2023-04-27 2023-04-27 Suspension device for special-shaped high-rise building window installation measuring instrument Active CN219692739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320985316.5U CN219692739U (en) 2023-04-27 2023-04-27 Suspension device for special-shaped high-rise building window installation measuring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320985316.5U CN219692739U (en) 2023-04-27 2023-04-27 Suspension device for special-shaped high-rise building window installation measuring instrument

Publications (1)

Publication Number Publication Date
CN219692739U true CN219692739U (en) 2023-09-15

Family

ID=87964510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320985316.5U Active CN219692739U (en) 2023-04-27 2023-04-27 Suspension device for special-shaped high-rise building window installation measuring instrument

Country Status (1)

Country Link
CN (1) CN219692739U (en)

Similar Documents

Publication Publication Date Title
CN111395641A (en) Precast concrete external wallboard and construction method thereof
CN211172572U (en) GRC curtain wall board
CN219692739U (en) Suspension device for special-shaped high-rise building window installation measuring instrument
CN219491722U (en) Reinforcing device for K plate of aluminum alloy template
CN217924354U (en) A super large metal furred ceiling structure for steel construction cornice
CN110714607A (en) Climb adjustable adaptor for frame
CN211850034U (en) Mounting and connecting structure of prefabricated external wall panel
CN215330448U (en) Simple to operate's building steel structure
CN210867045U (en) Support frame for cable bridge
CN216475738U (en) Assembled exterior wall cladding
CN209907886U (en) Adjustable assembled stair construction platform
CN109470579B (en) Mechanism and method for measuring physical properties of curtain wall
CN219011972U (en) Stay cable auxiliary tensioning tool
CN215829991U (en) Support joint for climbing frame at hollow position
CN220747514U (en) Wallboard combination pendant convenient to quick construction
CN216380102U (en) Green energy-saving assembled building wall
CN214833509U (en) Assembly type wall board leveling and straightening installation structure
CN214834668U (en) Ultra-long support device of all-steel climbing frame
CN219569402U (en) Prefabricated staircase location mounting structure
CN216641406U (en) Aluminum alloy template bathroom rabbet beam four-side internal corner section bar for building
CN219100685U (en) Simple wall connecting piece for steel frame structure building scaffold
CN219080582U (en) Steel structure supporting member
CN219219805U (en) Novel large-die back edge
CN216766779U (en) Integrated formwork support for double-layer cantilever plate structure
CN210622277U (en) Hanging flower basket high support fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant