CN219691104U - Bridge concrete form fixing device - Google Patents

Bridge concrete form fixing device Download PDF

Info

Publication number
CN219691104U
CN219691104U CN202321263681.1U CN202321263681U CN219691104U CN 219691104 U CN219691104 U CN 219691104U CN 202321263681 U CN202321263681 U CN 202321263681U CN 219691104 U CN219691104 U CN 219691104U
Authority
CN
China
Prior art keywords
pressing seat
fixing device
bridge concrete
template
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321263681.1U
Other languages
Chinese (zh)
Inventor
秦勇
韩铁刚
冯刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Stecol Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stecol Corp filed Critical Stecol Corp
Priority to CN202321263681.1U priority Critical patent/CN219691104U/en
Application granted granted Critical
Publication of CN219691104U publication Critical patent/CN219691104U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge concrete template fixing device, which belongs to the technical field of bridge construction and comprises a pressing seat, wherein two template clamping plates are arranged in the pressing seat, and a bridge concrete template is arranged between the two template clamping plates; screw rods are rotatably connected to the side walls of the two template clamping plates, screw holes matched with the screw rods are formed in the two sides of the pressing seat, and rocking handles are fixed to the end portions of the two screw rods, which are opposite to each other; the screw rod is characterized in that threaded sleeves are arranged on the screw rods, the threaded sleeves are connected with a pressing seat, and a supporting piece is arranged on one side of the pressing seat. The bridge concrete template fixing device is convenient to install and favorable for subsequent disassembly.

Description

Bridge concrete form fixing device
Technical Field
The utility model belongs to the technical field of bridge construction, and particularly relates to a bridge concrete template fixing device.
Background
Bridge construction: building a bridge according to the design content; mainly refers to the contents of bridge construction technology, construction organization, construction management, construction quality and the like. When bridge guardrail is pour, need use fixing device to fix the template that guardrail concrete placement used, when traditional fixing device installs or dismantles, need use tools such as spanner to twist the bolt or the nut on the fixing device one by one, not only inconvenient, the bolt or the nut drops easily moreover and loses.
Disclosure of Invention
The utility model aims to provide a bridge concrete template fixing device which is used for solving the problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the bridge concrete template fixing device comprises a pressing seat, wherein two template clamping plates are arranged in the pressing seat, and a bridge concrete template is arranged between the two template clamping plates;
screw rods are rotatably connected to the side walls of the two template clamping plates, screw holes matched with the screw rods are formed in the two sides of the pressing seat, and rocking handles are fixed to the end portions of the two screw rods, which are opposite to each other;
the screw rod is characterized in that threaded sleeves are arranged on the screw rods, the threaded sleeves are connected with a pressing seat, and a supporting piece is arranged on one side of the pressing seat.
In a further embodiment, the support comprises a stop and a support plate, wherein the stop is fixed on both sides of the support plate;
the two stop blocks are connected with the pressing seat, and two inserting rods are fixed at the bottom end of the support plate.
In a further embodiment, two side walls of the two template clamping plates, which are opposite to each other, are respectively fixed with two cross bars, and two through holes matched with the cross bars are respectively formed in two sides of the pressing seat.
In a further embodiment, two clamping seats are fixed on two sides of the pressing seat, connecting rods are arranged on two sides of the pressing seat, and slots matched with the connecting rods are formed in the four clamping seats;
two sides of the pressing seat are provided with two bolts, the four clamping seats are provided with through holes matched with the bottom ends of the bolts, and the top ends of the two connecting rods are provided with a plurality of clamping grooves matched with the bolts.
In a further embodiment, the pressing seat is provided with a scraping plate, and the pressing seat is provided with a through groove.
In a further embodiment, guide rods are fixed on two sides of the pressing seat, and two sliding grooves matched with the guide rods are formed in the scraping plate.
The utility model has the technical effects and advantages that: this bridge concrete template fixing device through setting up seat, template grip block, lead screw, rocking handle and screw sleeve, holds the rocking handle and can make the lead screw rotatory, and the rotatory in-process of lead screw promotes the template grip block and removes to bridge concrete template, realizes bridge concrete template's centre gripping fixed, and screw sleeve has improved the stability of lead screw, and reverse rocking the rocking handle can be released the fixed to bridge concrete template, need not to use tools such as spanner, has solved traditional fixing device's bolt or nut and has dropped the problem that loses easily.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged view of the structure of FIG. 1A in accordance with the present utility model;
fig. 3 is an enlarged view of the structure at B in fig. 1 according to the present utility model.
In the figure: 1. pressing a base; 2. a template clamping plate; 3. bridge concrete templates; 4. a connecting rod; 5. a stop block; 6. a support; 7. a support plate; 8. a rod; 9. a threaded sleeve; 10. a screw rod; 11. a rocking handle; 12. a cross bar; 13. a clamping seat; 14. a plug pin; 15. a scraper; 16. and a guide rod.
Detailed Description
In the following description, numerous specific details are set forth in order to provide a more thorough understanding of the present utility model. It will be apparent, however, to one skilled in the art that the utility model may be practiced without one or more of these details. In other instances, well-known features have not been described in detail in order to avoid obscuring the utility model.
Referring to fig. 1 to 3, the present utility model provides a bridge concrete form fixing device, and the bridge concrete form fixing device will be described in detail with reference to the accompanying drawings.
Example 1
The bridge concrete template fixing device comprises a pressing seat 1, wherein two template clamping plates 2 are arranged in the pressing seat 1, and a bridge concrete template 3 is arranged between the two template clamping plates 2; screw rods 10 are rotatably connected to the opposite side walls of the two template clamping plates 2, screw holes matched with the screw rods 10 are formed in the two sides of the pressing seat 1, and rocking handles 11 are welded to the opposite end parts of the two screw rods 10; the two screw rods 10 are respectively provided with a threaded sleeve 9, the two threaded sleeves 9 are welded with the pressing seat 1, and one side of the pressing seat 1 is provided with a supporting piece 6.
In this embodiment, the specific usage flow is as follows: the pressing seat 1 is arranged at the top end of the bridge concrete template 3, the bridge concrete template 3 is positioned between the two template clamping plates 2, the screw rod 10 can be rotated by holding the rocking handle 11 by hand, the template clamping plates 2 are pushed to move towards the bridge concrete template 3 in the rotating process of the screw rod 10, the clamping fixation of the bridge concrete template 3 is realized, the stability of the screw rod 10 is improved by the threaded sleeve 9, and the fixation of the bridge concrete template 3 can be relieved by reversely rocking the rocking handle 11 when the bridge concrete template is disassembled, tools such as a spanner are not needed, so that the problem that a bolt or a nut of a traditional fixing device is easy to drop and lose is solved.
Example 2
On the basis of embodiment 1, the supporting piece 6 comprises a stop block 5 and a support plate 7, wherein the stop block 5 is welded on two sides of the support plate 7;
two dog 5 all with press seat 1 welding, the bottom welding of extension board 7 has two inserted bars 8, inserts the bottom of two inserted bars 8 in the soil, can improve the stability of pressing seat 1.
Two lateral walls of template grip block 2 are all welded two horizontal poles 12 on the back of the body, press the both sides of seat 1 all offered two with the through-hole of horizontal pole 12 adaptation, horizontal pole 12 with press the setting of the through-hole on the seat 1, improved the stability of template grip block 2.
Two clamping seats 13 are welded on two sides of the pressing seat 1, connecting rods 4 are arranged on two sides of the pressing seat 1, and slots matched with the connecting rods 4 are formed in the four clamping seats 13;
two bolts 14 are arranged on two sides of the pressing seat 1, through holes matched with the bottom ends of the bolts 14 are formed in the four clamping seats 13, a plurality of clamping grooves matched with the bolts 14 are formed in the top ends of the two connecting rods 4, the clamping seats 13 and the bolts 14 are arranged, connection of two adjacent pressing seats 1 is facilitated, and overall stability of the pressing seat 1 is further improved.
The pressing seat 1 is provided with a scraping plate 15, the pressing seat 1 is provided with a through groove for passing through concrete and a concrete vibrating rod, and when the pressing seat 1 is provided with concrete, the scraping plate 15 is manually pushed to move so as to scrape the concrete on the pressing seat 1.
Guide rods 16 are welded on two sides of the pressing seat 1, and two sliding grooves matched with the guide rods 16 are formed in the scraping plates 15.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the above-described embodiments, and that the above-described embodiments and descriptions are only preferred embodiments of the present utility model, and are not intended to limit the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. Bridge concrete form fixing device, including pressing seat (1), its characterized in that: two template clamping plates (2) are arranged in the pressing seat (1), and a bridge concrete template (3) is arranged between the two template clamping plates (2);
screw rods (10) are rotationally connected to the opposite side walls of the two template clamping plates (2), screw holes matched with the screw rods (10) are formed in the two sides of the pressing seat (1), and rocking handles (11) are fixed to the opposite end parts of the two screw rods (10);
the screw rod (10) is provided with threaded sleeves (9), the threaded sleeves (9) are connected with the pressing seat (1), and one side of the pressing seat (1) is provided with a supporting piece (6).
2. The bridge concrete form fixing device of claim 1, wherein: the support piece (6) comprises a stop block (5) and a support plate (7), wherein the stop block (5) is fixed on two sides of the support plate (7); the two stop blocks (5) are connected with the pressing seat (1), and two inserting rods (8) are fixed at the bottom end of the support plate (7).
3. The bridge concrete form fixing device of claim 1, wherein: two side walls of the template clamping plates (2) which are opposite are respectively fixed with two cross bars (12), and two through holes matched with the cross bars (12) are respectively formed in two sides of the pressing seat (1).
4. The bridge concrete form fixing device of claim 1, wherein: two clamping seats (13) are fixed on two sides of the pressing seat (1), connecting rods (4) are arranged on two sides of the pressing seat (1), and slots matched with the connecting rods (4) are formed in the four clamping seats (13);
two sides of the pressing seat (1) are provided with two bolts (14), the four clamping seats (13) are provided with through holes matched with the bottoms of the bolts (14), and the tops of the two connecting rods (4) are provided with a plurality of clamping grooves matched with the bolts (14).
5. The bridge concrete form fixing device of claim 1, wherein: the pressing seat (1) is provided with a scraping plate (15), and the pressing seat (1) is provided with a through groove.
6. The bridge concrete form fixing device of claim 5, wherein: guide rods (16) are fixed on two sides of the pressing seat (1), and two sliding grooves matched with the guide rods (16) are formed in the scraping plates (15).
CN202321263681.1U 2023-05-23 2023-05-23 Bridge concrete form fixing device Active CN219691104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321263681.1U CN219691104U (en) 2023-05-23 2023-05-23 Bridge concrete form fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321263681.1U CN219691104U (en) 2023-05-23 2023-05-23 Bridge concrete form fixing device

Publications (1)

Publication Number Publication Date
CN219691104U true CN219691104U (en) 2023-09-15

Family

ID=87971322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321263681.1U Active CN219691104U (en) 2023-05-23 2023-05-23 Bridge concrete form fixing device

Country Status (1)

Country Link
CN (1) CN219691104U (en)

Similar Documents

Publication Publication Date Title
CN219691104U (en) Bridge concrete form fixing device
CN110217032A (en) A kind of Cabinetmaker decorative pattern engraving uses machine table
CN208051948U (en) A kind of special coring folder of Quality of Water Conservancy Projects detection
CN209780238U (en) Structure for fixing templates on two sides of expansion joint
CN207469730U (en) A kind of construction of hydro project template
CN206903223U (en) A kind of building construction formwork Multifunctional pull rod device
CN213927498U (en) I-steel wall-through isolation sleeve box
CN213869083U (en) Support frame for preventing toppling over during building construction
CN201079937Y (en) Multipurpose spanner
CN112049416B (en) Clamp for building mould
CN212831368U (en) Building construction template anchor clamps
CN213153115U (en) Steel pipe ground inserting device for vegetable greenhouse
CN213449505U (en) Engineering construction template fixing device
CN208930064U (en) A kind of outline border jig
CN213087431U (en) Template fixing device for construction
CN206722383U (en) Field of civil engineering gang form
CN208237217U (en) A kind of clamping device for the construction of municipal natural gas line
CN217463576U (en) Detachable pipeline connector
CN208950304U (en) A kind of adjustable frame column die clamper
CN208220221U (en) Fixed tie bar fastening tool of template
CN220613722U (en) Finished product clamp for autoclaved aerated concrete block production
CN217412298U (en) Thread rolling mechanism for bolt processing
CN220928701U (en) Frame post template reinforcing apparatus is built in room
CN220598071U (en) Supporting device for highway engineering concrete pouring
CN212224619U (en) Building engineering construction is with hanging mould device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant