CN219638402U - Novel construction of reserved hole of piping shaft device - Google Patents
Novel construction of reserved hole of piping shaft device Download PDFInfo
- Publication number
- CN219638402U CN219638402U CN202320765300.3U CN202320765300U CN219638402U CN 219638402 U CN219638402 U CN 219638402U CN 202320765300 U CN202320765300 U CN 202320765300U CN 219638402 U CN219638402 U CN 219638402U
- Authority
- CN
- China
- Prior art keywords
- positions
- reserved hole
- fixing
- threaded rod
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 3
- 230000000149 penetrating effect Effects 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 description 14
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a novel construction device for a reserved hole of a pipeline well, which comprises a fixed plate, wherein top plates are arranged at the top positions of concrete layers, PVC sleeves are arranged at the middle positions of the tops of the fixed plates, connecting plates are fixedly connected to the top positions of the outer diameters of the PVC sleeves, fixed rods are penetrated and slidingly connected to the left side and the right side of the connecting plates, leveling templates are penetrated and slidingly connected to the tops of the outer diameters of threaded rods close to the middle positions, and nut pairs are penetrated and threadedly connected to the top positions of the outer diameters of the threaded rods. In the utility model, firstly, a sleeve is processed, a leveling fixing bracket is manufactured and assembled, a PVC sleeve is placed in a hole reserved by a first steel bar and a second steel bar, a leveling template slides into a threaded rod, then a nut pair is screwed into the threaded rod, the nut pair is driven to move downwards by rotating a turntable, and the leveling template corrects the PVC sleeve by the downward movement of the nut pair.
Description
Technical Field
The utility model relates to the technical field of piping wells, in particular to a novel construction device for a reserved hole of a piping well.
Background
The pipeline well is a vertical well for arranging vertical equipment pipelines in a building, the more complex and advanced functional building is provided with more support systems, and besides basic water supply, power supply and drain pipelines, the pipeline well has the functions of telephone, cable television, monitoring, ventilation and the like, and as the name implies, the pipeline well walks the space of various pipelines, has vertical and horizontal directions, has a through structure and is also divided, the clean and tidy of the building is influenced when various pipelines are obviously installed, and the pipeline well is arranged to occupy only a small space and can be completely hidden.
The traditional method of reserving holes for the pipeline wells adopts prefabricated steel sleeves for reserving holes on site, the construction quality deviation of the reserved holes is large, the construction quality deviation is mainly represented as structural damage of holes, quality problems in the subsequent pipeline installation process are easy to occur, for example, the deviation of the verticality of the pipeline installation is large, the reserved holes of the pipeline wells need to be re-chiseled, the construction quality is not in place, secondary reworking is likely to be caused, and the construction cost of manpower and material resources and the like is greatly input.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a novel reserved hole construction device for a pipeline well.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a novel piping shaft reserved hole construction device, includes the fixed plate, fixed plate top intermediate position runs through and is provided with the threaded rod, the equal fixedly connected with second reinforcing bar of even gathering in fixed plate top left and right sides position, second reinforcing bar external diameter top bottom and intermediate position all are provided with evenly distributed's fixed block, the equal fixedly connected with first reinforcing bar in fixed block left and right sides position, fixed plate top left and right sides position all is provided with the concrete layer, concrete layer top position all is provided with the roof, fixed plate top intermediate position is provided with the PVC sleeve pipe, PVC sleeve pipe external diameter top position fixedly connected with connecting plate, connecting plate left and right sides position all runs through and sliding connection has the dead lever, threaded rod external diameter top is close to intermediate position and runs through and sliding connection has the leveling template, threaded rod external diameter top position runs through and threaded connection has the nut pair.
As a further description of the above technical solution:
and a clamp is arranged at the bottom of the threaded rod.
As a further description of the above technical solution:
the first steel bars and the second steel bars are positioned inside the concrete layer.
As a further description of the above technical solution:
the two fixing rods penetrate through the top plate and are fixedly connected with the top plate.
As a further description of the above technical solution:
and the top of the nut pair is fixedly connected with a turntable.
As a further description of the above technical solution:
the top positions of the outer diameters of the two fixing rods penetrate through and are in threaded connection with fixing nuts.
As a further description of the above technical solution:
the PVC sleeve is positioned inside the concrete layer.
The utility model has the following beneficial effects:
in the utility model, firstly, a sleeve is processed, a leveling fixing bracket is manufactured and assembled, a PVC sleeve is placed in a hole reserved by a first steel bar and a second steel bar, a leveling template slides into a threaded rod, then a nut pair is screwed into the threaded rod, the nut pair is driven to move downwards by rotating a turntable, and the leveling template corrects the PVC sleeve by the downward movement of the nut pair.
Drawings
Fig. 1 is a plan view of a novel construction device for a reserved hole of a pipe well.
Legend description:
1. a fixing plate; 2. a threaded rod; 3. a nut pair; 4. a clamp; 5. a PVC sleeve; 6. a connecting plate; 7. a fixed rod; 8. a fixing nut; 9. leveling the template; 10. a top plate; 11. a first reinforcing bar; 12. a second reinforcing bar; 13. a fixed block; 14. a concrete layer; 15. a turntable.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that, directions or positional relationships indicated by terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., are based on directions or positional relationships shown in the drawings, are merely for convenience of description and simplification of description, and do not indicate or imply that the apparatus or element to be referred to must have a specific direction, be constructed and operated in the specific direction, and thus should not be construed as limiting the present utility model; the terms "first," "second," "third," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," "coupled," and the like are to be construed broadly, and may be fixedly coupled, detachably coupled, or integrally coupled, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1, one embodiment provided by the present utility model: the utility model provides a novel hole construction is reserved to piping shaft device, including fixed plate 1, fixed plate 1 top intermediate position runs through and is provided with threaded rod 2, the equal fixedly connected with of fixed plate 1 top left and right sides position second reinforcing bar 12 of even gathering, second reinforcing bar 12 external diameter top bottom and intermediate position all are provided with evenly distributed's fixed block 13, fixed block 13 left and right sides position equal fixedly connected with first reinforcing bar 11, fix first reinforcing bar 11 and second reinforcing bar 12 together through fixed block 13, fixed plate 1 top left and right sides position all is provided with concrete layer 14, concrete layer 14 top position all is provided with roof 10, fixed plate 1 top intermediate position is provided with PVC sleeve 5, PVC sleeve 5 external diameter top position fixedly connected with connecting plate 6, connecting plate 6 left and right sides position all runs through and sliding connection has dead lever 7, through dead lever 7 and connecting plate 6 together, threaded rod 2 external diameter top is close to intermediate position and runs through and sliding connection has leveling template 9, threaded rod 2 external diameter top position runs through and threaded connection has nut pair 3, slide leveling template 9 into threaded rod 2, then with nut pair 3 screw down, screw down the nut pair 3 is screwed into nut pair 3 and is moved down through the nut pair 3 and is moved down to make the leveling template 5 through the nut pair 5 and is moved down.
The bottom position of threaded rod 2 is provided with clamp 4, and threaded rod 2 is in the same place with fixed plate 1 through clamp 4, and first reinforcing bar 11 and second reinforcing bar 12 are located concrete layer 14 inside, packs first reinforcing bar 11 and second reinforcing bar 12 through the concrete, and two dead levers 7 run through and fixed connection with roof 10, and the vice 3 top position fixedly connected with carousel 15 of nut drives the vice 3 downwardly moving of nut through rotating carousel 15, and two dead lever 7 external diameter top positions all run through and threaded connection have fixation nut 8, and PVC sleeve pipe 5 is located concrete layer 14 inside.
Working principle: when the leveling device is used, firstly, the PVC sleeve 5 is processed and the leveling fixing support is manufactured and assembled, then the first steel bar 11 and the second steel bar 12 are fixed together through the fixing blocks 13, after the fixing is completed, the threaded rod 2 is fixed with the fixing plate 1 through the clamp 4, the PVC sleeve 5 is placed into a hole reserved by the first steel bar 11 and the second steel bar 12, the leveling template 9 is slid into the threaded rod 2, then the nut pair 3 is screwed into the threaded rod 2, the nut pair 3 is driven to move downwards through the rotating turntable 15, the leveling template 9 corrects the PVC sleeve 5 through the downward movement of the nut pair 3, after the correction is completed, the fixing rod 7 and the connecting plate 6 are fixed together through the fixing nut 8, the PVC sleeve 5 is prevented from moving, concrete is poured, and the leveling device is compact in vibration.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.
Claims (7)
1. Novel construction of reserved hole of piping shaft device, including fixed plate (1), its characterized in that: the utility model discloses a concrete leveling device for the concrete pile comprises a fixing plate (1), a threaded rod (2) is arranged in a penetrating way in the middle position of the top of the fixing plate (1), a second reinforcing steel bar (12) which is uniformly densely distributed is fixedly connected at the positions of the left side and the right side of the top of the fixing plate (1), a fixing block (13) which is uniformly distributed is arranged at the positions of the left side and the right side of the outer diameter of the second reinforcing steel bar (12), a first reinforcing steel bar (11) is fixedly connected at the positions of the left side and the right side of the fixing block (13), a concrete layer (14) is arranged at the positions of the left side and the right side of the top of the fixing plate (1), a top plate (10) is arranged at the positions of the top of the concrete layer (14), a PVC sleeve (5) is arranged at the middle position of the top of the fixing plate (1), a connecting plate (6) is fixedly connected at the positions of the outer diameter of the PVC sleeve (5), a fixing rod (7) is fixedly connected at the positions of the left side and the outer diameter of the connecting plate (6), a leveling template (9) is arranged at the positions of the outer diameter of the top of the threaded rod (2), and a nut (3) is arranged at the positions of the outer diameter of the threaded rod (2).
2. The novel pipe well reserved hole construction device according to claim 1, wherein: the bottom position of the threaded rod (2) is provided with a clamp (4).
3. The novel pipe well reserved hole construction device according to claim 1, wherein: the first steel bars (11) and the second steel bars (12) are positioned in the concrete layer (14).
4. The novel pipe well reserved hole construction device according to claim 1, wherein: the two fixing rods (7) penetrate through and are fixedly connected with the top plate (10).
5. The novel pipe well reserved hole construction device according to claim 1, wherein: the top of the nut pair (3) is fixedly connected with a rotary table (15).
6. The novel pipe well reserved hole construction device according to claim 1, wherein: the top positions of the outer diameters of the two fixing rods (7) are penetrated through and are in threaded connection with fixing nuts (8).
7. The novel pipe well reserved hole construction device according to claim 1, wherein: the PVC sleeve (5) is positioned inside the concrete layer (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320765300.3U CN219638402U (en) | 2023-04-10 | 2023-04-10 | Novel construction of reserved hole of piping shaft device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320765300.3U CN219638402U (en) | 2023-04-10 | 2023-04-10 | Novel construction of reserved hole of piping shaft device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219638402U true CN219638402U (en) | 2023-09-05 |
Family
ID=87820115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320765300.3U Active CN219638402U (en) | 2023-04-10 | 2023-04-10 | Novel construction of reserved hole of piping shaft device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219638402U (en) |
-
2023
- 2023-04-10 CN CN202320765300.3U patent/CN219638402U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112013165A (en) | Municipal pipeline construction structure and method thereof | |
CN219638402U (en) | Novel construction of reserved hole of piping shaft device | |
CN114725834A (en) | Construction method for laying, installing and constructing power engineering line | |
CN107313451B (en) | Inner supporting device of basement prefabricated slab forming die and construction method thereof | |
CN103325595B (en) | Bearing platform for adjusting switch operating mechanism in four directions | |
CN213741248U (en) | Underground chamber roof post-cast strip earthing structure in advance | |
CN211080297U (en) | Utility tunnel | |
CN217177662U (en) | Laying device for underground pipe network | |
CN114673190A (en) | Installation construction method for high-precision embedded bolt at column top | |
CN211074045U (en) | Production equipment with bottom for inspection well | |
CN206205289U (en) | Roof drain direct-burried bracing means | |
CN220060912U (en) | Municipal administration water supply and drainage pipeline connection structure | |
CN215055383U (en) | Template coupling assembling for civil engineering convenient to dismouting | |
CN218581184U (en) | Anti-tilting device for supporting building template | |
CN220470833U (en) | Water conservancy pipeline connecting device | |
CN219671572U (en) | Pre-buried structure is used in municipal administration sewer installation | |
CN109797635A (en) | A kind of automatic construction method of concrete-pouring template for construction of the highway and corollary apparatus | |
CN216275827U (en) | Protective plate for building well chamber | |
CN113385795B (en) | Positioning device for cutting elliptical groove of cable guide pipe | |
CN216382841U (en) | Pipeline strutting arrangement for construction | |
CN220980491U (en) | Circular pipe culvert installation construction adjusting device | |
CN110528956A (en) | A kind of intelligence mast base, mounting device and construction method | |
CN204826693U (en) | Brick -laying machine | |
KR20040076245A (en) | Wall structure with method of R.C steel reinforcing ground assembly(assembly plant) the method of estalishment with pulling up | |
CN214657193U (en) | Splicing device of precast concrete foundation for tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |