CN219623383U - Fixing device for pipeline construction - Google Patents

Fixing device for pipeline construction Download PDF

Info

Publication number
CN219623383U
CN219623383U CN202320504108.9U CN202320504108U CN219623383U CN 219623383 U CN219623383 U CN 219623383U CN 202320504108 U CN202320504108 U CN 202320504108U CN 219623383 U CN219623383 U CN 219623383U
Authority
CN
China
Prior art keywords
fixing
plate
nut
pipeline
rubber pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320504108.9U
Other languages
Chinese (zh)
Inventor
宋翔
蔡文华
徐赛臣
方小明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Chu'an Technology Achievement Promotion Co.,Ltd.
Original Assignee
Hubei Public Security Science And Technology Achievement Promotion Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Public Security Science And Technology Achievement Promotion Co ltd filed Critical Hubei Public Security Science And Technology Achievement Promotion Co ltd
Priority to CN202320504108.9U priority Critical patent/CN219623383U/en
Application granted granted Critical
Publication of CN219623383U publication Critical patent/CN219623383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a fixing device for pipeline construction, which comprises a base, wherein guide rails are fixedly arranged on two sides of the surface of the base, a roller is arranged at one end of each guide rail, a connecting shaft is arranged at one end of each roller, a supporting plate is fixedly connected with one end of each connecting shaft, a hydraulic cylinder is fixedly arranged on one side of the surface of the base, fixing mechanisms are arranged on two sides of each supporting plate, and a clamping mechanism is arranged above each supporting plate. This fixing device for pipeline construction, through guide rail, gyro wheel, connecting axle, backup pad, pneumatic cylinder's setting, when using, the backup pad can be through the back-and-forth movement of connecting axle and gyro wheel in the one end of guide rail, can control the removal of backup pad through the pneumatic cylinder, promote by the pneumatic cylinder, make things convenient for the pipeline after placing, can carry out the removal of a small margin, the butt joint work between the pipeline of being convenient for more.

Description

Fixing device for pipeline construction
Technical Field
The utility model relates to the technical field related to fire-fighting pipeline construction, in particular to a fixing device for pipeline construction.
Background
The fire-fighting pipeline is used for connecting fire-fighting equipment and equipment, and is used for conveying fire-fighting water, gas or other medium, the thickness and the material of the fire-fighting pipeline are required to be special due to special requirements, red paint is sprayed, the fire-fighting water is conveyed, the fire-fighting pipeline is installed in a multi-section splicing mode when being installed, the pipeline is required to be fixedly placed when being paved, most of fixing devices can only be used for fixing the pipeline, but the pipeline cannot be moved while being fixed, so that the butt joint work is difficult, more time and labor are consumed, and the fixing device for pipeline construction is particularly required.
However, the existing fixing device for pipeline construction needs to be fixed and placed when the pipeline is paved in the use process, most of the fixing devices can only fix the pipeline, but the pipeline cannot move when being fixed, so that the butt joint work is difficult to increase, and more time and labor are consumed.
Disclosure of Invention
The utility model aims to provide a fixing device for pipeline construction, which solves the problems that the prior fixing device for pipeline construction is proposed in the prior art, but the prior fixing device for pipeline construction needs to be tightly attached to a bracket in the laying process of a pipeline in the using process and keeps stable, otherwise, the pipeline shakes to collide with the bracket, noise is generated, and the installation stability of the bracket is influenced.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a fixing device for pipeline construction, includes the base, the equal fixed mounting in surface both sides of base has the guide rail, the one end of guide rail is provided with the gyro wheel, the one end of gyro wheel is provided with the connecting axle, the one end fixedly connected with backup pad of connecting axle, the surface one side fixed mounting of base has the pneumatic cylinder, the both sides of backup pad are provided with fixed establishment, the top of backup pad is provided with fixture.
Preferably, the connecting shaft forms a rolling structure through rollers and guide rails, and the output end of the hydraulic cylinder is fixedly connected with the supporting plate.
Preferably, the fixing mechanism comprises a movable groove, a first fixing bolt, a fixing plate and a first nut, wherein the movable groove is formed in two sides of the surface of the base, the first fixing bolt penetrates through one end of the movable groove, the fixing plate penetrates through one end of the first fixing bolt, and the first nut is connected to one end of the first fixing bolt.
Preferably, one end of the first fixing bolt penetrates through the fixing plate and the first nut in threaded connection, and one side of the fixing plate is fixedly connected with the supporting plate.
Preferably, the fixture includes bottom plate, fixed slot, first damping rubber pad, splint, second damping rubber pad, second fixing bolt and second nut, the top welding of backup pad has the bottom plate, the fixed slot has been seted up to surface one side of bottom plate, the one end bonding of fixed slot has first damping rubber pad, the top of bottom plate is provided with the splint, one side bonding of splint has the second damping rubber pad, the second fixing bolt has all been run through at the both ends of splint, the one end of second fixing bolt is connected with the second nut.
Preferably, the inner rings of the bottom plate and the clamping plate are of semicircular structures, and the second damping rubber pad is identical to the first damping rubber pad in structure.
Preferably, one end of the second fixing bolt penetrates through two ends of the bottom plate and is in threaded connection with the second nut.
Compared with the prior art, the utility model has the beneficial effects that: this fixing device for pipeline construction, through the setting of guide rail, the gyro wheel, the connecting axle, the backup pad, the pneumatic cylinder, when using, the backup pad can be through the connecting axle and the gyro wheel is carried out the back-and-forth movement at the one end of guide rail, can control the removal of backup pad through the pneumatic cylinder, promote by the pneumatic cylinder, make things convenient for the pipeline after placing, can carry out the removal of a small margin, the butt joint work between the pipeline of being convenient for more, through the movable groove, first fixing bolt, the setting of fixed plate and first nut, when the backup pad removes, can drive the fixed plate of both sides and remove simultaneously, after removing suitable position, can fix the position of fixed plate through the locking of first fixing bolt and first nut, thereby fix the backup pad position.
Drawings
FIG. 1 is a schematic diagram of a side view of the present utility model;
FIG. 2 is a schematic diagram of the mutual cooperation structure of the support plate and the hydraulic cylinder;
FIG. 3 is a schematic view of a clamping mechanism according to the present utility model;
fig. 4 is an enlarged schematic view of the structure of fig. 1 a according to the present utility model.
In the figure: 1. a base; 2. a guide rail; 3. a roller; 4. a connecting shaft; 5. a support plate; 6. a hydraulic cylinder; 7. a fixing mechanism; 701. a movable groove; 702. a first fixing bolt; 703. a fixing plate; 704. a first nut; 8. a clamping mechanism; 801. a bottom plate; 802. a fixing groove; 803. a first damping rubber pad; 804. a clamping plate; 805. a second damping rubber pad; 806. a second fixing bolt; 807. and a second nut.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides a fixing device for pipeline construction, includes base 1, the equal fixed mounting in surface both sides of base 1 has guide rail 2, and the one end of guide rail 2 is provided with gyro wheel 3, and the one end of gyro wheel 3 is provided with connecting axle 4, and the one end fixedly connected with backup pad 5 of connecting axle 4, the surface one side fixed mounting of base 1 have pneumatic cylinder 6, and the both sides of backup pad 5 are provided with fixed establishment 7, and the top of backup pad 5 is provided with fixture 8.
Further, connecting axle 4 constitutes rolling structure through gyro wheel 3 and guide rail 2, the output and the backup pad 5 fixed connection of pneumatic cylinder 6, through guide rail 2, gyro wheel 3, connecting axle 4, backup pad 5, the setting of pneumatic cylinder 6, when using, backup pad 5 can carry out the back-and-forth movement at the one end of guide rail 2 through connecting axle 4 and gyro wheel 3, can control the removal of backup pad 5 through pneumatic cylinder 6, promote by pneumatic cylinder 6, make things convenient for the pipeline after placing, can carry out the removal of a small margin, the butt joint work between the pipeline of being convenient for more.
Further, the fixing mechanism 7 includes a movable groove 701, a first fixing bolt 702, a fixing plate 703 and a first nut 704, the movable groove 701 is formed in two sides of the surface of the base 1, one end of the movable groove 701 is penetrated with the first fixing bolt 702, one end of the first fixing bolt 702 is penetrated with the fixing plate 703, one end of the first fixing bolt 702 is connected with the first nut 704, the fixing plate 703 can be driven to move simultaneously when the supporting plate 5 moves, and after moving to a proper position, the position of the fixing plate 703 can be fixed through the locking of the first fixing bolt 702 and the first nut 704, so that the position of the supporting plate 5 is fixed.
Further, one end of the first fixing bolt 702 penetrates through the fixing plate 703 and the first nut 704 in threaded connection, one side of the fixing plate 703 is fixedly connected with the supporting plate 5, and through the arrangement of the first fixing bolt 702, one end of the first fixing bolt 702 can penetrate through the movable groove 701, so that the fixing plate 703 can be conveniently locked at any position of the movable groove 701.
Further, fixture 8 includes bottom plate 801, fixed slot 802, first damping rubber pad 803, splint 804, second damping rubber pad 805, second fixing bolt 806 and second nut 807, the top welding of backup pad 5 has bottom plate 801, fixed slot 802 has been seted up to surface one side of bottom plate 801, the one end bonding of fixed slot 802 has first damping rubber pad 803, the top of bottom plate 801 is provided with splint 804, one side bonding of splint 804 has second damping rubber pad 805, the both ends of splint 804 all run through second fixing bolt 806, the one end of second fixing bolt 806 is connected with second nut 807, through the setting of bottom plate 801, fixed slot 802, first damping rubber pad 803, splint 804, second damping rubber pad 805, second fixing bolt 806 and second nut 807, when using, can lay the pipeline in the top of bottom plate 801, contact with first damping rubber pad, then in the top of pipeline, place splint 804, the hand is with splint 804 and bottom plate 801 through second fixing bolt 806 and second nut 807 locking, make first damping rubber pad 803 and second damping rubber pad 807 closely laminate, thereby the pipeline is fixed.
Further, the inner rings of the bottom plate 801 and the clamping plate 804 are of semicircular structures, the second damping rubber pad 805 is identical to the first damping rubber pad 803 in structure, and the damping and buffering effects on the pipeline can be achieved through the arrangement of the second damping rubber pad 805 and the first damping rubber pad 803.
Further, one end of the second fixing bolt 806 is threaded through both ends of the bottom plate 801 and the second nut 807, and the clamping plate 804 and the bottom plate 801 can be locked by the arrangement of the second fixing bolt 806 and the second nut 807.
Working principle: firstly, the pipeline is paved above the bottom plate 801 and contacted with the first damping rubber pad 803, then the clamping plate 804 is placed above the pipeline, the clamping plate 804 and the bottom plate 801 are locked by the second fixing bolt 806 and the second nut 807, the first damping rubber pad 803 and the second damping rubber pad 805 are tightly attached to the pipeline, so that the pipeline is fixed, secondly, the supporting plate 5 can move forwards and backwards at one end of the guide rail 2 through the connecting shaft 4 and the roller 3, the movement of the supporting plate 5 can be controlled through the hydraulic cylinder 6, the hydraulic cylinder 6 pushes the supporting plate 5, the pipeline can be conveniently moved by a small amplitude after being placed, finally, the fixing plates 703 at two sides can be driven to move simultaneously while the supporting plate 5 moves, and after the pipeline is moved to a proper position, the position of the fixing plates 703 can be fixed through the locking of the first fixing bolt 702 and the first nut 704, so that the fixing device for pipeline construction is completed.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a fixing device for pipeline construction, includes base (1), its characterized in that: the novel hydraulic lifting device is characterized in that guide rails (2) are fixedly installed on two sides of the surface of the base (1), idler wheels (3) are arranged at one ends of the guide rails (2), connecting shafts (4) are arranged at one ends of the idler wheels (3), supporting plates (5) are fixedly connected to one ends of the connecting shafts (4), hydraulic cylinders (6) are fixedly installed on one side of the surface of the base (1), fixing mechanisms (7) are arranged on two sides of the supporting plates (5), and clamping mechanisms (8) are arranged above the supporting plates (5).
2. The fixing device for pipeline construction according to claim 1, wherein the connecting shaft (4) forms a rolling structure through the roller (3) and the guide rail (2), and the output end of the hydraulic cylinder (6) is fixedly connected with the supporting plate (5).
3. The fixing device for pipeline construction according to claim 1, wherein the fixing mechanism (7) comprises a movable groove (701), a first fixing bolt (702), a fixing plate (703) and a first nut (704), the movable groove (701) is formed in two sides of the surface of the base (1), one end of the movable groove (701) penetrates through the first fixing bolt (702), one end of the first fixing bolt (702) penetrates through the fixing plate (703), and one end of the first fixing bolt (702) is connected with the first nut (704).
4. A fixing device for pipe construction according to claim 3, characterized in that one end of the first fixing bolt (702) penetrates through the fixing plate (703) and the first nut (704) to be in threaded connection, and one side of the fixing plate (703) is fixedly connected with the supporting plate (5).
5. The fixing device for pipeline construction according to claim 1, wherein the clamping mechanism (8) comprises a bottom plate (801), a fixing groove (802), a first damping rubber pad (803), a clamping plate (804), a second damping rubber pad (805), a second fixing bolt (806) and a second nut (807), the bottom plate (801) is welded above the supporting plate (5), the fixing groove (802) is formed in one side of the surface of the bottom plate (801), the first damping rubber pad (803) is adhered to one end of the fixing groove (802), the clamping plate (804) is arranged above the bottom plate (801), the second damping rubber pad (805) is adhered to one side of the clamping plate (804), the second fixing bolts (806) are respectively penetrated at two ends of the clamping plate (804), and the second nut (807) is connected to one end of the second fixing bolts (806).
6. The fixing device for pipeline construction according to claim 5, wherein the inner rings of the bottom plate (801) and the clamping plate (804) are of semicircular structures, and the second damping rubber pad (805) and the first damping rubber pad (803) are identical in structure.
7. The fixing device for pipe construction according to claim 5, wherein one end of the second fixing bolt (806) is threaded through both ends of the bottom plate (801) and the second nut (807).
CN202320504108.9U 2023-03-16 2023-03-16 Fixing device for pipeline construction Active CN219623383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320504108.9U CN219623383U (en) 2023-03-16 2023-03-16 Fixing device for pipeline construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320504108.9U CN219623383U (en) 2023-03-16 2023-03-16 Fixing device for pipeline construction

Publications (1)

Publication Number Publication Date
CN219623383U true CN219623383U (en) 2023-09-01

Family

ID=87771211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320504108.9U Active CN219623383U (en) 2023-03-16 2023-03-16 Fixing device for pipeline construction

Country Status (1)

Country Link
CN (1) CN219623383U (en)

Similar Documents

Publication Publication Date Title
CN202733170U (en) Pipeline mounting machine
CN111197675A (en) Bionic six-foot pipeline robot
CN219623383U (en) Fixing device for pipeline construction
CN113482126B (en) Underground pipeline laying device for municipal drainage construction and use method thereof
CN205329559U (en) Collect and walk to go and spacing adjustment function in gyro wheel dolly device of an organic whole
CN105464381A (en) Prestress carbon fiber cloth stretch-draw device for strengthening box-shaped steel beam with cracks
CN107476334B (en) Prefabricated pipe joint assembling equipment and construction method thereof
CN206592081U (en) Horizontal power cat road machine
CN213615016U (en) Adjustable welding equipment for steel structure
CN112719768B (en) Accurate positioner of simple and easy type electrodynamic type ring flange welding in colliery
CN211414211U (en) Device convenient to heavy pipeline of tunnel installation in pit
CN211902060U (en) Bionic six-foot pipeline robot
CN218400557U (en) PE pipeline transfer device for municipal construction
CN211028808U (en) Major diameter steel pipe welded platform
CN219062636U (en) Hydraulic machine for construction and installation of large-caliber PCCP (prestressed concrete cylinder pipe)
CN216943358U (en) Transport trolley in hole with angle steering
CN215172754U (en) Pipeline butt joint installation auxiliary device for water conservancy construction that can prevent skew
CN211805760U (en) Fixing mechanism for steel structure detection
CN210452237U (en) Automatic deruster of steel pipe
CN216889805U (en) Upper tube sliding auxiliary tool for pipeline of pipeline gallery
CN212371879U (en) Steel construction rust cleaning equipment
CN214570239U (en) Gantry crane ground beam
CN217130514U (en) Pipeline laying device for oil and gas field development
CN220863840U (en) Device convenient to track concatenation location
CN220523435U (en) Petroleum pipeline butt joint support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430000 No.2 Qingling Hubei Road, Qingling urban industrial park, Hongshan District, Wuhan City, Hubei Province

Patentee after: Hubei Chu'an Technology Achievement Promotion Co.,Ltd.

Country or region after: China

Address before: 430000 No.2 Qingling Hubei Road, Qingling urban industrial park, Hongshan District, Wuhan City, Hubei Province

Patentee before: Hubei public security science and technology achievement promotion Co.,Ltd.

Country or region before: China