CN219604645U - High-efficiency integrated suspended ceiling - Google Patents
High-efficiency integrated suspended ceiling Download PDFInfo
- Publication number
- CN219604645U CN219604645U CN202222177980.5U CN202222177980U CN219604645U CN 219604645 U CN219604645 U CN 219604645U CN 202222177980 U CN202222177980 U CN 202222177980U CN 219604645 U CN219604645 U CN 219604645U
- Authority
- CN
- China
- Prior art keywords
- main
- frame
- screwed
- matched
- adjusting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 abstract description 16
- 239000000725 suspension Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000012634 fragment Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
Landscapes
- Tents Or Canopies (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a high-efficiency integrated suspended ceiling, which comprises a main keel transversely arranged, wherein a hanging member is matched between the main keel and a roof, a plurality of hanging members are longitudinally arranged in parallel, buckling pieces are matched through the main keel, and a suspended ceiling plate is matched between the transversely adjacent buckling pieces; this device adopts many parallel main joists collocation fastener, and the furred ceiling board is installed through two horizontal adjacent fastener, adopts the main joist that quantity is less to hang wholly, and installation cost is lower to the installation degree of difficulty also greatly reduced, the installation is more efficient, and during the installation, only need guarantee the straightness that hangs down of fastener and main joist can, the installation degree of difficulty is lower, is fit for using widely.
Description
Technical Field
The utility model relates to a high-efficiency integrated suspended ceiling.
Background
The integrated furred ceiling is a very common furred ceiling form, and it includes fossil fragments and furred ceiling board, needs to adopt the fossil fragments of latticed to carry out the installation of furred ceiling board among the conventional art, and every furred ceiling board needs four limits to support, and it is higher to the requirement of building precision of fossil fragments when installing, slightly has the deviation and will lead to the installation to have great gap, perhaps can't carry out effectual support to the furred ceiling board.
Therefore, the high-efficiency integrated suspended ceiling which is easy to install and low in installation difficulty is designed.
Disclosure of Invention
The utility model aims to solve the technical problem of providing the high-efficiency integrated suspended ceiling which is easy to install and low in installation difficulty.
In order to solve the problems, the utility model adopts the following technical scheme:
the utility model provides a high-efficient integrated furred ceiling, includes the main joist that transversely sets up, the cooperation has the suspension element between main joist and the roof, the vertical parallel arrangement of main joist has many, through the main joist cooperation has the fastener, and the cooperation has the furred ceiling board between the transversely adjacent fastener.
Preferably, the suspension member comprises a frame, a sleeve is arranged at the upper end of the frame, the sleeve is provided with internal threads, an adjusting rod is connected with the upper threads of the sleeve, a connecting sleeve is arranged at the upper end of the adjusting rod, the adjusting rod is inserted into the connecting sleeve and then is rotationally connected with the connecting sleeve, an annular groove is arranged at the position, close to the upper end, of the outer wall of the adjusting rod, a positioning screw inserted into the annular groove is screwed into the outer wall of the connecting sleeve, a connecting plate for connecting a building is arranged at the upper end of the connecting sleeve, and an opening groove matched with the main keel is arranged at the outer wall of the frame.
According to the technical scheme, the hanging member is fixedly connected with the roof, the hanging height of the frame is adjusted in a mode of rotating the adjusting rod, after adjustment is completed, the main joists are matched in from the open grooves, and the main joists are supported through the frame.
Preferably, a fixing screw is longitudinally screwed on the outer side of the frame, and the fixing screw abuts against the main keel after being screwed in.
Preferably, a leveling screw is vertically screwed in the bottom of the frame, and the leveling screw is supported at the bottom of the main keel after being screwed in.
The leveling screw can realize the leveling of the main keel, and after the leveling is finished, the main keel is fixed by screwing in the fixing screw.
Preferably, the buckle piece is including connecting the plate of main joist, left and right sides face department of plate is provided with side portion, form the snap ring after the side portion turns over to inside arc, left and right sides form the clearance between the snap ring, the upper surface of furred ceiling board is close to both sides department and is provided with the turn-up part, the turn-up part is the arc, the turn-up part inserts via clearance department, the snap ring support in the inner arc face department of turn-up part.
According to the technical scheme, the suspended ceiling plate is directly pressed down from bottom to top, in the pressing process, the curled edge portion is inserted from a gap between clamping rings at two sides after being expanded outwards, and the suspended ceiling plate is supported through limiting the curled edge portion by the clamping ring.
The installation mode of the device is as follows:
firstly, installing a hanging member, then finishing the assembly of a main keel and the hanging member, leveling the main keel, then connecting a clamping piece with the main keel, and enabling the clamping piece to be vertical to the main keel; and finally, the ceiling plate is buckled into the buckling piece upwards to complete the installation.
The beneficial effects of the utility model are as follows:
this device adopts many parallel main joists collocation fastener, and the furred ceiling board is installed through two horizontal adjacent fastener, adopts the main joist that quantity is less to hang wholly, and installation cost is lower to the installation degree of difficulty also greatly reduced, the installation is more efficient, and during the installation, only need guarantee the straightness that hangs down of fastener and main joist can, the installation degree of difficulty is lower, is fit for using widely.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the utility model, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an enlarged view at A;
FIG. 3 is a front view of the suspension member;
FIG. 4 is a schematic illustration of the engagement of the suspension member with the main runner;
fig. 5 is a bottom view of the clip.
Detailed Description
All of the features disclosed in this specification, or all of the steps in a method or process disclosed, may be combined in any combination, except for mutually exclusive features and/or steps.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving the same, equivalent or similar purpose, unless expressly stated otherwise. That is, each feature is one example only of a generic series of equivalent or similar features, unless expressly stated otherwise.
In the description of the present utility model, it should be understood that the terms "one end," "the other end," "the outer side," "the upper," "the inner side," "the horizontal," "coaxial," "the center," "the end," "the length," "the outer end," and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, merely to facilitate description of the present utility model and simplify the description, and do not indicate or imply that the device or element being referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present utility model.
Furthermore, in the description of the present utility model, the meaning of "plurality" means at least two, for example, two, three, etc., unless specifically defined otherwise.
In the present utility model, unless explicitly specified and limited otherwise, the terms "disposed," "coupled," "connected," "plugged," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly, through intermediaries, or both, may be in communication with each other or in interaction with each other, unless expressly defined otherwise. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
Referring to fig. 1 to 5, an efficient integrated ceiling comprises a main keel 1 which is transversely arranged, a hanging member 2 is matched between the main keel 1 and a roof, a plurality of main keels 1 are longitudinally arranged in parallel, fastening pieces 3 are matched with the main keels 1, and a ceiling plate 4 is matched between the transversely adjacent fastening pieces 3.
In a preferred embodiment of the present utility model, the suspension member 2 includes a frame 21, a sleeve 22 is provided at an upper end of the frame 21, the sleeve 22 has an internal thread, an adjusting rod 23 is connected to an upper thread of the sleeve 22, a connecting sleeve 24 is provided at an upper end of the adjusting rod 23, the adjusting rod 23 is rotatably connected to the connecting sleeve 24 after being inserted into the connecting sleeve 24, an annular groove (not shown) is provided at a position near an upper end of an outer wall of the adjusting rod 23, a set screw 25 inserted into the annular groove is screwed into an outer wall of the connecting sleeve 24, a connecting plate 26 connected to a building is provided at an upper end of the connecting sleeve 24, and an open slot 27 matched with the main keel 1 is provided at an outer wall of the frame 21.
According to the technical scheme, the hanging member is fixedly connected with the roof, the hanging height of the frame is adjusted in a mode of rotating the adjusting rod, after adjustment is completed, the main joists are matched in from the open grooves, and the main joists are supported through the frame.
In a preferred embodiment of the present utility model, a fixing screw 211 is longitudinally screwed on the outer side of the frame 21, and the fixing screw 211 abuts against the main keel 1 after being screwed in.
In a preferred embodiment of the present utility model, a leveling screw 212 is vertically screwed into the bottom of the frame 21, and the leveling screw 212 is supported on the bottom of the main keel 1 after being screwed in.
The leveling screw can realize the leveling of the main keel, and after the leveling is finished, the main keel is fixed by screwing in the fixing screw.
In a preferred embodiment of the present utility model, the fastener 3 includes a plate 31 connected to the main keel 1, side portions 32 are disposed at left and right side surfaces of the plate 31, the side portions 32 are turned inward in an arc shape to form a snap ring, a gap 33 is formed between the snap rings at the left and right sides, a curled portion 41 is disposed at a position, close to two sides, of an upper surface of the ceiling plate 4, the curled portion 41 is in an arc shape, the curled portion 41 is inserted through the gap, and the snap ring is supported at an inner arc surface of the curled portion 41.
According to the technical scheme, the suspended ceiling plate is directly pressed down from bottom to top, in the pressing process, the curled edge portion is inserted from a gap between clamping rings at two sides after being expanded outwards, and the suspended ceiling plate is supported through limiting the curled edge portion by the clamping ring.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a high-efficient integrated furred ceiling, includes the main joist of horizontal setting, its characterized in that: the main joist is provided with a plurality of hanging members in parallel in the longitudinal direction, the main joist is provided with fastening pieces in a matched mode, and a ceiling board is matched between the fastening pieces adjacent in the transverse direction.
2. The high efficiency integrated ceiling of claim 1, wherein: the hanging component comprises a frame, wherein a sleeve is arranged at the upper end of the frame and is provided with internal threads, an adjusting rod is connected with the upper thread of the sleeve, a connecting sleeve is arranged at the upper end of the adjusting rod, the adjusting rod is inserted into the connecting sleeve and then is rotationally connected with the connecting sleeve, an annular groove is arranged at the position, close to the upper end, of the outer wall of the adjusting rod, a positioning screw inserted into the annular groove is screwed into the outer wall of the connecting sleeve, a connecting plate for connecting a building is arranged at the upper end of the connecting sleeve, and an opening groove matched with the main keel is arranged at the outer wall of the frame.
3. The high efficiency integrated ceiling of claim 2, wherein: and fixing screws are longitudinally screwed in the outer side of the frame and abut against the main keels after being screwed in.
4. The high efficiency integrated ceiling of claim 3 wherein: leveling screws are vertically screwed in the bottom of the frame, and the leveling screws are supported at the bottom of the main keel after being screwed in.
5. The high efficiency integrated ceiling of claim 1, wherein: the buckle spare is including connecting the plate of main joist, the left and right sides face department of plate is provided with side portion, form the snap ring after the side portion turns over the inboard arc, the left and right sides form the clearance between the snap ring, the upper surface of furred ceiling board is close to both sides department and is provided with the turn-up part, the turn-up part is the arc, the turn-up part inserts through clearance department, the snap ring support in the inner arc face department of turn-up part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222177980.5U CN219604645U (en) | 2022-08-18 | 2022-08-18 | High-efficiency integrated suspended ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222177980.5U CN219604645U (en) | 2022-08-18 | 2022-08-18 | High-efficiency integrated suspended ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219604645U true CN219604645U (en) | 2023-08-29 |
Family
ID=87738884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222177980.5U Active CN219604645U (en) | 2022-08-18 | 2022-08-18 | High-efficiency integrated suspended ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219604645U (en) |
-
2022
- 2022-08-18 CN CN202222177980.5U patent/CN219604645U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112443130A (en) | Multifunctional ceiling edge folding structure and mounting method | |
CN108179831B (en) | Close metal sheet curtain system of piecing together | |
CN113152818A (en) | Self-leveling dry hanging assembly and mounting method thereof | |
CN101200962B (en) | Adjustable spring mounting fastener and construction ceiling method thereof | |
CN219604645U (en) | High-efficiency integrated suspended ceiling | |
CN103526907A (en) | Inclined stone material dry-hanging structure and construction method thereof | |
CN212957412U (en) | Interior decoration wallboard | |
CN216713499U (en) | Supporting component and curtain wall | |
CN210622072U (en) | Suspended ceiling structure | |
CN112443064A (en) | Ceiling edge folding structure and mounting method | |
CN2499464Y (en) | Dovetail hanging piece for stone curtain wall | |
CN203499191U (en) | Tilted stone cladding structure | |
CN216195884U (en) | Module structure in middle of assembled furred ceiling | |
CN201292595Y (en) | Support framework for architectural decoration | |
CN217232358U (en) | Hanging assembly of flat-top low-level suspended ceiling | |
CN214462187U (en) | Multi-functional furred ceiling receives limit structure | |
CN215670470U (en) | But height-adjusting formula furred ceiling pendant | |
CN110374248B (en) | Suspended ceiling structure | |
CN212926645U (en) | Integrated suspended ceiling connecting piece | |
CN210342372U (en) | Unit type curtain wall adapter | |
CN209874218U (en) | Light keel decorative structure | |
CN220124437U (en) | Assembled curtain box | |
CN216276620U (en) | Assembled metal sheet wall structure | |
CN212388831U (en) | Connect stable novel furred ceiling fossil fragments plug connector | |
CN113638538B (en) | Assembled adjustable suspended ceiling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231205 Address after: Room 407-3, 4th Floor, Building 4, Mingshi 1, No. 7 Shucheng Road, Hongshan District, Wuhan City, Hubei Province, 430070 Patentee after: Hubei Honglang Construction Group Co.,Ltd. Address before: 431400 No. 76, banbian street, Jiujie village, Xinzhou District, Wuhan City, Hubei Province Patentee before: Hubei Honglang Construction Co.,Ltd. |