CN201292595Y - Support framework for architectural decoration - Google Patents
Support framework for architectural decoration Download PDFInfo
- Publication number
- CN201292595Y CN201292595Y CNU2008201905896U CN200820190589U CN201292595Y CN 201292595 Y CN201292595 Y CN 201292595Y CN U2008201905896 U CNU2008201905896 U CN U2008201905896U CN 200820190589 U CN200820190589 U CN 200820190589U CN 201292595 Y CN201292595 Y CN 201292595Y
- Authority
- CN
- China
- Prior art keywords
- skeleton
- elevator
- elevator spare
- architectural decoration
- clad
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
The utility model relates to a support framework for constructional decoration, which comprises a covering surface framework, a star-shaped framework and an elevator, the structures of the star-shaped framework and the elevator are matched, outward gibs at both sides of the lower part of the star-shaped framework are clamped with clamping hooks on four corners of the upper part of the elevator, clamping hooks on four corners of the lower part of the elevator are clamped with inward gibs at both sides of the upper part of the covering surface framework, and the upper part of the star-shaped framework is connected with a building by installation holes and suspension rods. The utility model has stability, reliability and convenient movement and adjustment, and is widely used for the suspended ceiling and supplementary walls in the trade of constructional decoration.
Description
Technical field
The utility model relates to the used accessory of architectural decoration, particularly a kind of support frame that is applicable in furred ceiling and the second wall.
Background technology
At present, the shortcoming of architectural decoration tradition U type lightgage steel joist bracing frame is that lifting takes up room greatly, has reduced the building space.Lifting is upright dress, and accessory is many, can't generally do second wall.Inconvenient multistage lifting and furred ceiling moulding, construction efficiency is low, poor stability.Hanging piece is monolateral stressed (two points), and insecure, consumptive material is many, the cost height.
The form of at present traditional direct clamping type lightgage steel joist bracing frame is a zigzag, and production process is many, and power consumption is big, and support strength is low, arranges size-constrained system between the bracing frame, causes construction inconvenience.
Summary of the invention
The purpose of this utility model provide a kind of simple in structure, easy to use, stablize firm architectural decoration support frame.
The purpose of this utility model is to be realized by following scheme:
A kind of architectural decoration support frame, include the clad can skeleton, unique distinction is: also include horizontal skeleton and elevator spare, the two structure is suitable, this horizontal skeleton is that the outward-dipping skeleton in back is intersected in a kind of dual-side top and both sides, top, the grab clamping mutually on the outside hook groove in its both sides, dual-side bottom and four jiaos on elevator spare top, grab that elevator spare bottom is four jiaos and the inside hook groove clamping mutually in both sides, clad can skeleton top, horizontal skeleton joins by installing hole and suspension rod and building body.
Above-mentioned horizontal skeleton and elevator spare are respectively equipped with installing hole.
Above-mentioned horizontal skeleton adopts the galvanizing steel band to make, and elevator spare adopts heat zinc coating plate to make.
The utility model is simple in structure, easy construction, and supporting ﹠ stablizing is firm.It is horizontal lightgage steel joist skeleton, has changed traditional vertical construction method.Quick construction is saved raw material and artificial.Furred ceiling and second wall are general, good stability, intensity height.Lifting is convenient, and suspension rod directly is fastened on the horizontal skeleton, saves accessory, less manpower.Traditional vertical method is used accessory more, takies the interior space.Vertical construction connects traditional clad can keel, and the bottom contact surface is little, and poor stability, former hanging piece are two some drop hangers, and be stressed not steady.Horizontal
Type lightgage steel joist frame and elevator spare contact surface are big.Elevator spare is that holding capacity is strong, good stability by four some drop hangers.The construction moulding is equipped convenient, adopt horizontal mode, the major and minor lightgage steel joist frame with elevator spare connection upper and lower can all around move and satisfy needed specification, this is that present direct clamping type keel can not be finished, and also being that the traditional vertical job practices is inaccessible stablizes firm degree.Horizontal
Type lightgage steel joist frame is used for fixing metope, connects traditional clad can keel frame reaches the construction second wall as base material insulation, heat insulation, acoustically effective with elevator spare.This is that traditional vertical installation of U type can't be finished.In addition,, clad can keel frame is installed, can be saved the interior space with direct fixed top of elevator spare and wall portion.Horizontal lightgage steel joist frame is with two ends limit, bottom cold roll forming, satisfies the needs of elevator spare lifting clad can keel frame, has also strengthened the rigidity of lightgage steel joist frame simultaneously.
Description of drawings
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the vertical view of Fig. 1.
Fig. 4 is the main TV structure schematic diagram of elevator spare 2.
Fig. 5 is the left view of Fig. 4.
Fig. 6 is the vertical view of Fig. 4.
The specific embodiment
The disclosed structure of above accompanying drawing is the structure of an embodiment of the utility model, and among the figure, 1 is
Type skeleton (being commonly called as lightgage steel joist), 1-1 are the hook groove, and 1-2 is an installing hole; 2 is elevator spare, and 2-1 is the top grab, and 2-2 is the bottom grab, and 2-3 is an installing hole; 3 are clad can skeleton (being commonly called as the clad can keel), and 3-1 is the hook groove.
Consult each accompanying drawing, horizontal light steel frame 1 adopts the galvanizing steel band of high-quality to make raw material,, cuts off by required length through scissors and to finish (see figure 1) by 13 groups of rolling cold roll formings through the mould roller of special use.Elevator spare 2 adopts heat zinc coating plate, through cold stamping shaped (see figure 4).This horizontal lightgage steel joist 1 and elevator spare 2 and traditional clad can keel 3 (see figure 7) that is assembled into one dexterously.The horizontal light steel in top is made main framing 1, and middle the lower part is traditional U type groove clad can skeleton 3 with elevator spare 2, is combined into vertical direction and assembles and finish integrally-built combination.
When assembling above three parts, can Open Side Down with horizontal lightgage steel joist 1, with suspension rod by the fastening location of installing hole.Size on demand moves and regulates position separately, the one end limit hook groove 1-1 drop hanger that will lift good horizontal lightgage steel joist 1 with elevator spare 2 is lived, and the hook groove 1-1 that firmly other end limit of elevator spare 2 is advanced to from bottom to top horizontal lightgage steel joist 1 other end limit finishes clamping.Suitably move and regulate needed size position, again upwards with traditional clad can keel 3 openings, traditional clad can keel 3 one end limit hook groove 3-1 drop hangers behind an end checkpost hook 2-2 of elevator spare 2 bottoms, are finished clamping on the same other end checkpost hook 2-2 that firmly clad can keel 3 other end limit hook groove 3-1 is advanced to from bottom to top elevator spare 2 bottoms.Clad can keel 3 rely on elevator spares 2, on horizontal lightgage steel joist 1 hook groove 3-1 by needed size laterally, directly to running fix, fix decoration panel and get final product.
Claims (3)
1. architectural decoration support frame, include clad can skeleton (3), it is characterized in that: also include horizontal skeleton (1) and elevator spare (2), the two structure is suitable, this horizontal skeleton (1) is that the outward-dipping skeleton in back is intersected in a kind of dual-side top and both sides, top, grab (2-1) clamping mutually on the outside hook groove (1-1) in its both sides, dual-side bottom and four jiaos on elevator spare (2) top, grab (2-2) that elevator spare (2) bottom is four jiaos and inside hook groove (3-1) clamping mutually in clad can skeleton (3) both sides, top, horizontal skeleton (1) joins by installing hole and suspension rod and building body.
2. by the described architectural decoration support frame of claim 1, it is characterized in that: above-mentioned horizontal skeleton (1) and elevator spare (2) are respectively equipped with installing hole (1-2) and reach (2-3).
3. by the described architectural decoration support frame of claim 1, it is characterized in that: above-mentioned horizontal skeleton (1) adopts the galvanizing steel band to make, and elevator spare (2) adopts heat zinc coating plate to make.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201905896U CN201292595Y (en) | 2008-09-01 | 2008-09-01 | Support framework for architectural decoration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201905896U CN201292595Y (en) | 2008-09-01 | 2008-09-01 | Support framework for architectural decoration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201292595Y true CN201292595Y (en) | 2009-08-19 |
Family
ID=41006066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201905896U Expired - Fee Related CN201292595Y (en) | 2008-09-01 | 2008-09-01 | Support framework for architectural decoration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201292595Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383563A (en) * | 2011-08-29 | 2012-03-21 | 上海丸瑞新型建材有限公司 | Two-in-one light steel keels capable of being bent |
CN104878868A (en) * | 2015-05-28 | 2015-09-02 | 广州市广京装饰材料有限公司 | Ceiling keel structure and mounting method |
CN106245840A (en) * | 2016-09-29 | 2016-12-21 | 范柏联 | A kind of overlap stable ceiling joist |
CN108487525A (en) * | 2018-03-20 | 2018-09-04 | 浙江建业幕墙装饰有限公司 | A kind of aluminium keel chaining part |
-
2008
- 2008-09-01 CN CNU2008201905896U patent/CN201292595Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102383563A (en) * | 2011-08-29 | 2012-03-21 | 上海丸瑞新型建材有限公司 | Two-in-one light steel keels capable of being bent |
CN104878868A (en) * | 2015-05-28 | 2015-09-02 | 广州市广京装饰材料有限公司 | Ceiling keel structure and mounting method |
CN106245840A (en) * | 2016-09-29 | 2016-12-21 | 范柏联 | A kind of overlap stable ceiling joist |
CN108487525A (en) * | 2018-03-20 | 2018-09-04 | 浙江建业幕墙装饰有限公司 | A kind of aluminium keel chaining part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201292595Y (en) | Support framework for architectural decoration | |
CN210177866U (en) | Wall keel | |
CN203097037U (en) | Large-area metal sheet curtain wall system | |
CN206987154U (en) | A kind of aluminium side being easily installed leads to grille ceiling furred ceiling | |
CN212957199U (en) | Semi-exposed frame ceiling structure | |
CN203821680U (en) | Fully invisible frame system structure | |
CN209817232U (en) | Adjustable light steel keel suspended ceiling | |
CN202299262U (en) | Installation mechanism for stone compound board | |
CN213773998U (en) | Vertical big line independent unit system | |
CN209874218U (en) | Light keel decorative structure | |
CN202390975U (en) | Sling curtain wall system with outer sunshade lines for bearing strength | |
CN203361434U (en) | Large-scale suspended ceiling structure with thin-wall metal plate | |
CN220124437U (en) | Assembled curtain box | |
CN215563774U (en) | Connecting structure of aluminum veneer and keel concealed frame | |
CN216766482U (en) | Adjustable keel fixing structure for wood decorations | |
CN210658900U (en) | Ceiling structure for high-grade decoration | |
CN205134691U (en) | Integrated furred ceiling of suspending free | |
CN219773320U (en) | Open type close spliced inserting hanging metal curtain wall device | |
CN217896954U (en) | Assembled furred ceiling basic unit construction | |
CN113668756B (en) | Large-span aluminum square tube multiple-drop-level modeling assembly type installation design structure | |
CN206859491U (en) | A kind of indoor decoration furred ceiling | |
CN212836200U (en) | Independent ceiling structure | |
CN211850182U (en) | Vertical keel hanging and partition wall fixing and mounting structure | |
CN214006182U (en) | Novel transparent glass curtain wall of suspension type | |
CN208347105U (en) | grid ceiling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090819 Termination date: 20110901 |