CN219587190U - Wall-attached support pre-embedding device of climbing frame - Google Patents
Wall-attached support pre-embedding device of climbing frame Download PDFInfo
- Publication number
- CN219587190U CN219587190U CN202320555960.9U CN202320555960U CN219587190U CN 219587190 U CN219587190 U CN 219587190U CN 202320555960 U CN202320555960 U CN 202320555960U CN 219587190 U CN219587190 U CN 219587190U
- Authority
- CN
- China
- Prior art keywords
- wall
- sleeve
- climbing frame
- support
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to the technical field of construction of constructional engineering components and provides a wall attaching support pre-burying device of a climbing frame, which comprises a sleeve, a screw, a nut and an angular wall attaching support, wherein the sleeve is provided with internal threads, the bottom is provided with a sealing plate, 2-4 fixing supports are welded on the periphery of the sleeve, the screw is provided with a hexagonal end head, when the wall is used, an aluminum mould is perforated according to the installation position of the climbing frame, when the steel bar binding of the wall is completed, the open end of the sleeve passes through a template frame to stand on the template, the fixing support on the periphery of the sleeve is fixed with steel bars in a main structure by spot welding, the sleeve and the fixing support are buried in the wall after concrete is poured, the screw sleeved with the nut and the wall attaching support is penetrated in the sleeve, and the nut is adjusted to fix the wall attaching support on the wall, and the climbing frame is connected with the wall attaching support in an installation mode.
Description
Technical Field
The utility model relates to the technical field of construction of constructional engineering components, in particular to a novel wall-attached support pre-burying device for a climbing frame.
Background
With the development of the construction industry, new scaffold systems developed in recent years can be lifted or lowered along a building. When the climbing frame exceeds a certain height, a pull rod is arranged at intervals of a certain height to connect the climbing frame with the structure, so that the climbing frame is ensured to be vertical and firm, and instability is prevented. The wall-attached screw rod needs to be reserved at the wall-attached position of the climbing frame at present, and in the actual construction process, the conventional pre-buried wall-attached screw rod is overlong in length and can collide with steel bars in structures such as a beam body, so that the wall-attached screw rod cannot penetrate through the wall/column/beam, and is easy to be influenced by concrete vibration construction, the pre-buried screw rod is shifted, the position is inaccurate, the later stage is required to be perforated again according to the wall-attached position of the climbing frame, the shear wall structure is damaged, the construction period is influenced, and the cost is increased. Therefore, the novel wall-climbing support pre-burying device is convenient and practical, firm in installation and free from being influenced by the reinforcing steel bars.
Disclosure of Invention
The utility model aims to provide a climbing frame wall-attached support pre-burying device which has the characteristics of firm installation, convenience, practicability and flexible pre-burying position.
The utility model can be realized by the following technical scheme:
the utility model provides a climb a wall support pre-buried device that attaches, includes sleeve, screw rod and nut, the sleeve has internal thread, bottom has the shrouding, and 2 ~ 4 fixed bolster of telescopic periphery welding, screw rod and telescopic internal thread adaptation, screw rod have the hexagonal end, and the nut cup joints in the screw rod.
The optimization scheme is as follows: the wall attaching support is an angular iron block, one side of the wall attaching support is provided with a screw through hole, and the other side of the wall attaching support is provided with a climbing frame connecting hole.
When the wall body is used, the aluminum mould is perforated according to the installation position of the climbing frame, after the steel bars of the wall body are bound, the open end of the sleeve penetrates through the formwork frame to stand on the formwork, the fixing support at the periphery of the sleeve is fixed with the steel bars in the main body structure through spot welding, then concrete is poured to form the wall body, and the sleeve and the fixing support are buried in the wall body. The sleeve is internally penetrated and sleeved with a nut and a screw rod of the wall attaching support and is screwed, the wall attaching support is fixed on the sleeve and then the wall body by adjusting the nut, and the wall attaching support and the wall climbing frame are installed and connected through the wall climbing frame connecting hole.
The utility model is characterized in that the position of the wall-attached support is ensured to be firm, and the displacement caused by the vibration of the concrete in the later stage is avoided.
Drawings
Fig. 1 is a schematic structural view of the present utility model.
FIG. 2 is a schematic representation of the use of the present utility model.
Detailed Description
The utility model is further illustrated by the following specific examples:
example 1
Referring to fig. 1, a wall-attached support pre-embedding device for a climbing frame comprises a sleeve 1, a screw rod 2 and a nut 3, wherein the sleeve 1 is provided with an internal thread 10, a sealing plate (not shown in the figure) is arranged at the bottom, 4 fixing brackets 11 are welded on the periphery of the sleeve 1, the screw rod 2 is matched with the internal thread 10 of the sleeve 1, the screw rod 2 is provided with a hexagonal end, the nut 3 is sleeved on the screw rod 2, the wall-attached support 4 is an angular iron block, one side of the wall-attached support 4 is provided with a screw rod through hole 40, and the other side of the wall-attached support 4 is provided with a wall-attached connecting hole 41.
When the wall body 6 is used, the aluminum mould is perforated according to the installation position of the climbing frame, after the steel bars 5 of the wall body 6 are bound, the open ends of the sleeves 1 penetrate through the formwork frame to stand on the formwork, the fixed supports 11 on the periphery of the sleeves 1 are fixed with the steel bars 5 in the main body structure through spot welding, then concrete is poured to form the wall body 6, and the sleeves 1 and the fixed supports 11 are buried in the wall body 6.
Finally, the screw rod 2 sleeved with the nut 3 and the wall attaching support 4 is penetrated and screwed in the sleeve 1, the wall attaching support 4 is fixed on the sleeve 1 and then the wall 6 by adjusting the nut 3, and the wall attaching support 4 is connected with the climbing frame through the climbing frame connecting hole 41.
Claims (2)
1. The utility model provides a climb a wall support pre-buried device, its characterized in that: the novel screw bolt comprises a sleeve (1), a screw bolt (2) and a nut (3), wherein the sleeve (1) is provided with an internal thread (10), a sealing plate is arranged at the bottom, 2-4 fixing supports (11) are welded on the periphery of the sleeve (1), the screw bolt (2) is matched with the internal thread (10) of the sleeve (1), the screw bolt (2) is provided with a hexagonal end head, and the nut (3) is sleeved on the screw bolt (2).
2. The wall-attached support pre-burying device of a climbing frame according to claim 1, wherein: the wall-attached support (4) is an angular iron block, one side of the wall-attached support (4) is provided with a screw through hole (40), and the other side of the wall-attached support is provided with a climbing frame connecting hole (41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320555960.9U CN219587190U (en) | 2023-03-20 | 2023-03-20 | Wall-attached support pre-embedding device of climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320555960.9U CN219587190U (en) | 2023-03-20 | 2023-03-20 | Wall-attached support pre-embedding device of climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219587190U true CN219587190U (en) | 2023-08-25 |
Family
ID=87689914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320555960.9U Active CN219587190U (en) | 2023-03-20 | 2023-03-20 | Wall-attached support pre-embedding device of climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219587190U (en) |
-
2023
- 2023-03-20 CN CN202320555960.9U patent/CN219587190U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210216479U (en) | Positioning device for pre-embedding large foundation bolt group | |
CN111395641A (en) | Precast concrete external wallboard and construction method thereof | |
CN113323365A (en) | Elevator shaft protection platform and construction method | |
CN202000651U (en) | Adjustable wall-mounted supporting device for reinforcing upright columns | |
CN219587190U (en) | Wall-attached support pre-embedding device of climbing frame | |
CN205444889U (en) | Support arrangement for horizontal prefabricated component | |
CN212376021U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN215107164U (en) | Novel construction handling frame of encorbelmenting that can provide high position post to consolidate and use | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN213174742U (en) | Top bracing steel stand structure | |
CN112962945A (en) | Corner bracket structure and construction method | |
CN110965575A (en) | Foundation bolt mounting and fixing tool and method for equipment foundation | |
CN112049415A (en) | Construction method of cornice formwork | |
CN212019827U (en) | Steel construction welding operation platform | |
CN216641418U (en) | Preformed hole reinforcing steel bar template fixer | |
CN216238149U (en) | Tripod supporting device for pouring overhanging concrete panels on two sides of bridge | |
CN217106067U (en) | Building outer overhang vertical frame bearing structure | |
CN211229453U (en) | Novel scaffold for high-altitude construction of building engineering | |
CN212376020U (en) | Steel corbel and support-free installation connecting node comprising same | |
CN215829991U (en) | Support joint for climbing frame at hollow position | |
CN213112293U (en) | Tower crane attaches wall device | |
CN217105635U (en) | Damping device of building engineering structure | |
CN215717121U (en) | Adjustable dish is detained supporting wall pole that links of scaffold | |
JPH0115799Y2 (en) | ||
CN219993135U (en) | Adjustable welding screw building site reinforcing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |