CN219569524U CN202320596560.2U CN202320596560U CN219569524U CN 219569524 U CN219569524 U CN 219569524U CN 202320596560 U CN202320596560 U CN 202320596560U CN 219569524 U CN219569524 U CN 219569524U
Authority
CN
China
Prior art keywords
scaffold
tube
support
frame
stay tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320596560.2U
Other languages
Chinese (zh)
Inventor
赵学振
滕飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202320596560.2U priority Critical patent/CN219569524U/en
Application granted granted Critical
Publication of CN219569524U publication Critical patent/CN219569524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the technical field of scaffolds, and particularly relates to a building combined scaffold, which comprises left and right top plates, wherein the left and right top plates are hinged through hinge sheets, the front side and the rear side of the outer part of the top plates are respectively provided with a support frame, each support frame consists of a first support tube and a second support tube, a positioning assembly for positioning the scaffold is arranged between the corresponding left and right support frames, when the scaffold is carried, the left and right support frames are moved inwards, the left and right top plates are mutually folded, the top plates are rotated at the moment, the two groups of top plates are received between the left and right support frames, and then the second support tubes are folded outside the first support tubes, so that the scaffold can be conveniently folded, the scaffold can be conveniently carried and transported, and meanwhile, the condition that parts are omitted in the carrying process of personnel is avoided or reduced.

Description

Building combined scaffold
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a building combined scaffold.
Background
The scaffold is a working platform erected for ensuring that each construction process is carried out smoothly, and is divided into an outer scaffold and an inner scaffold according to the erected positions; the wooden scaffold, the bamboo scaffold and the steel pipe scaffold can be divided according to different materials; the construction forms of the scaffold are upright type scaffold, bridge type scaffold, door type scaffold, suspension type scaffold, hanging type scaffold, picking type scaffold and climbing type scaffold.
The Chinese patent (the authorized bulletin number is CN 212507286U and the authorized bulletin day is 2021.02.09) proposes a combined scaffold for constructional engineering, the eight bolts are arranged in the combined scaffold for constructional engineering, two first fixing rods and two second fixing rods are convenient to install and detach respectively, the positions of four supporting legs are convenient to adjust respectively through four sliding blocks and four sliding grooves, the heights of the four supporting legs are convenient to fix through four first screws and four threaded holes, staff can climb conveniently through the stair assembly, and the L-shaped laminate can be installed and detached conveniently through four clamping blocks.
Although the above patent can be with convenient installing or dismantling the scaffold, there is the condition of forgetting to adorn certain part because of personnel's is great will when each part dress, needs personnel to go back to take the part of omission when leading to on-the-spot installation, and is consuming time hard, for convenient folding and conveniently carrying the scaffold is whole, avoids the omission condition, for this reason, we propose a building combination formula scaffold.
Disclosure of Invention
Aiming at the defects of the prior art, the utility model provides a building combined scaffold, which solves the problem of the background.
In order to achieve the above purpose, the utility model is realized by the following technical scheme:
the utility model provides a building combination formula scaffold frame, includes the roof of controlling the side, and the roof of controlling the side is articulated through the hinge piece, the outside front and back side of roof all is provided with the support frame, and the support frame comprises first stay tube and second stay tube, the front and back terminal surface of roof is all rotated and is installed the rotating block, fixed welding is on first stay tube on the rotating block, the second stay tube is established under first stay tube, the bottom side fixed surface welding of first stay tube has the fixed block, the top side fixed surface welding of second stay tube has fixed cover, fixed cover rotates with the fixed block to be connected, corresponds and installs the locating component who is used for carrying out location to this scaffold frame between the side support frame about.
Preferably, the positioning assembly comprises a connecting frame plate and a connecting plate, the connecting plate penetrates through the connecting frame plate, the middle of the connecting plate is rotationally connected with the middle of the connecting frame plate through a rotating shaft, the connecting plate and the connecting frame plate are arranged in a crossed mode, the outer surface of the first supporting tube is provided with a first through hole, the outer surface of the second supporting tube is provided with a second through hole, and the positioning assembly is mounted on the supporting frame through a fixing bolt.
Preferably, a plurality of crawling rods are fixedly welded between the first supporting pipes corresponding to the front side and the rear side, and a pedal frame is fixedly welded on the second supporting pipe.
Preferably, the upper end face of the top plate is provided with a mounting opening, and a steel wire mesh is arranged in the mounting opening.
Preferably, the top of first stay tube is formed with the jack, the fixed welding of bottom of second stay tube has the inserted bar, a plurality of locating holes have been seted up on the inserted bar, the surface screw thread of first stay tube wears to be equipped with a plurality of positioning bolts.
Preferably, the outer surfaces of the first support tube and the second support tube are coated with corrosion-resistant layers.
Advantageous effects
The utility model provides a building combined scaffold. Compared with the prior art, the method has the following beneficial effects:
1. this building combination formula scaffold, when carrying, will control the support frame of side and all move inwards, the roof of side will fold each other about this moment, and the roof will rotate simultaneously, and two sets of roof will be received between the support frame of side about, then fold the outside of first stay tube with the second stay tube, and then can conveniently fold this scaffold, conveniently carries the transportation with this scaffold, avoids or reduces personnel to carry the in-process condition that has the part to miss simultaneously.
2. When the scaffold is needed to be heightened, the inserting rod in the upper scaffold can be inserted into the inserting hole in the lower scaffold, and then the building combined scaffold is positioned through the positioning bolt, so that the height of the scaffold can be conveniently heightened.
Drawings
FIG. 1 is a schematic elevational view of the main body of the present utility model;
FIG. 2 is a schematic side view of the main body of the present utility model;
FIG. 3 is a schematic view of a folding structure of the main body of the present utility model;
FIG. 4 is an enlarged schematic view of the structure of FIG. 1A of the main body of the present utility model;
FIG. 5 is an enlarged schematic view of the structure of FIG. 2B of the body of the present utility model;
fig. 6 is an enlarged schematic view of the structure of fig. 2C of the body of the present utility model.
In the figure: 1. a first support tube; 2. a top plate; 3. a rod; 4. positioning holes; 5. a connecting plate; 6. connecting a frame plate; 7. a second support tube; 8. a crawling rod; 9. a first through hole; 10. a second through hole; 11. a steel wire mesh; 12. a rotating block; 13. a fixed block; 14. a jack; 15. a fixed sleeve; 16. a rotating shaft; 17. positioning bolts; 18. a fixing bolt; 19. a pedal frame.
Description of the embodiments
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, the present utility model provides a technical solution: the utility model provides a building combination formula scaffold frame, roof 2 including controlling the side, roof 2 of controlling the side is articulated through the hinge piece, the outside front and back side of roof 2 all is provided with the support frame, the support frame comprises first stay tube 1 and second stay tube 7, the front and back terminal surface of roof 2 all rotates and installs turning block 12, fixed welding is on first stay tube 1 on the turning block 12, second stay tube 7 is established under first stay tube 1, the bottom side fixed surface welding of first stay tube 1 has fixed block 13, the top side fixed surface welding of second stay tube 7 has fixed sleeve 15, fixed sleeve 15 rotates with fixed block 13 to be connected, install the locating component who is used for carrying out the location to this scaffold frame between the corresponding left and right sides support frame.
When carrying, will control the support frame of side and all inwards move, the roof 2 of side will fold each other about this moment, roof 2 will rotate simultaneously, two sets of roof 2 will be received between the support frame of side about, then fold the outside of first stay tube 1 with second stay tube 7, after folding, as shown in fig. 3, and then can conveniently fold this scaffold frame, conveniently carry this scaffold frame and transport, avoid or reduce personnel to carry the in-process and have the condition that the part was missed simultaneously, during the use, rotate the second stay tube 7 under the first stay tube 1 to will control the outside pulling of first stay tube 1 of side, roof 2 of side will open this moment, roof 2 will become the vertical state with first stay tube 1 simultaneously, finally fix a position the scaffold frame through locating component, practical installation.
The locating component comprises a connecting frame plate 6 and a connecting plate 5, the connecting plate 5 is arranged in the connecting frame plate 6 in a penetrating mode, the middle of the connecting plate 5 is connected with the middle of the connecting frame plate 6 in a rotating mode through a rotating shaft 16, the connecting plate 5 and the connecting frame plate 6 are arranged in a crossed mode, a first through hole 9 is formed in the outer surface of the first supporting tube 1, a second through hole 10 is formed in the outer surface of the second supporting tube 7, and the locating component is mounted on the supporting frame through a fixing bolt 18 through a bolt.
When using locating component, will connect frame board 6, connecting plate 5 and all install on the stay tube through fixing bolt 18 bolt, and then can carry out whole fixed with this scaffold frame, when carrying, can fold connecting plate 5 and connecting frame board 5, and then can conveniently carry locating component.
A plurality of crawling rods 8 are fixedly welded between the first supporting pipes 1 corresponding to the front side and the rear side, and a pedal frame 19 is fixedly welded on the second supporting pipe 7.
The climbing rod 8 is matched with the pedal frame 19, so that personnel can climb the scaffold conveniently.
The up end of roof 2 has seted up the installing port, and the internally mounted of installing port has wire net 11.
The weight of this scaffold can be alleviateed to the wire net 11 that sets up, and then can do benefit to personnel to carry.
The top of the first support tube 1 is provided with a jack 14, the bottom of the second support tube 7 is fixedly welded with a plug rod 3, a plurality of positioning holes 4 are formed in the plug rod 3, and a plurality of positioning bolts 17 are arranged on the outer surface of the first support tube 1 in a threaded manner.
When the scaffold needs to be heightened again, the inserted link 3 in the upper scaffold can be inserted into the insertion hole in the lower scaffold, and then the scaffold is positioned by the positioning bolt 17, so that the height of the scaffold can be conveniently heightened.
The outer surfaces of the first support tube 1 and the second support tube 7 are coated with corrosion resistant layers.
Working principle: when the scaffold is carried, the support frames on the left side and the right side are moved inwards, at the moment, the top plates 2 on the left side and the right side are mutually folded, meanwhile, the top plates 2 are rotated, two groups of top plates 2 are received between the support frames on the left side and the right side, then the second support tube 7 is folded outside the first support tube 1, and after the folding is finished, as shown in fig. 3, the scaffold can be conveniently folded, the scaffold is convenient to carry and transport, and meanwhile, the condition that parts are omitted in the carrying process of personnel is avoided or reduced;
when the scaffold is used, the second support tube 7 is rotated to be right below the first support tube 1, the left and right first support tubes 1 are pulled outwards, at the moment, the left and right top plates 2 are opened, the top plates 2 are perpendicular to the first support tubes 1, and finally, the connecting frame plates 6 and the connecting plates 5 are all mounted on the support tubes through the bolts of the fixing bolts 18, so that the scaffold can be integrally fixed, and the scaffold is fixedly mounted;
when the scaffold needs to be heightened again, the inserted link 3 in the upper scaffold can be inserted into the insertion hole in the lower scaffold, and then the scaffold is positioned by the positioning bolt 17, so that the height of the scaffold can be conveniently heightened.
And all that is not described in detail in this specification is well known to those skilled in the art.

Claims (6)

1. The utility model provides a building combination formula scaffold frame, roof (2) including the left and right sides, its characterized in that: the roof (2) of controlling the side are articulated through the hinge piece, the outside front and back side of roof (2) all is provided with the support frame, and the support frame comprises first stay tube (1) and second stay tube (7), terminal surface all rotates around roof (2) and installs rotating block (12), fixed welding is on first stay tube (1) on rotating block (12), second stay tube (7) are established under first stay tube (1), the downside fixed surface welding of first stay tube (1) has fixed block (13), the upside fixed surface welding of second stay tube (7) has fixed cover (15), fixed cover (15) are connected with fixed block (13) rotation, correspond and install the locating component that is used for carrying out the location to this scaffold frame between the side's the support frame about.
2. A building modular scaffolding according to claim 1, wherein: the locating component comprises a connecting frame plate (6) and a connecting plate (5), wherein the connecting plate (5) is arranged in the connecting frame plate (6) in a penetrating mode, the middle of the connecting plate (5) is connected with the middle of the connecting frame plate (6) in a rotating mode through a rotating shaft (16), the connecting plate (5) and the connecting frame plate (6) are arranged in a crossed mode, a first through hole (9) is formed in the outer surface of the first supporting tube (1), a second through hole (10) is formed in the outer surface of the second supporting tube (7), and the locating component is mounted on the supporting frame through a fixing bolt (18) through a bolt.
3. A building modular scaffolding according to claim 2, wherein: a plurality of crawling rods (8) are fixedly welded between the first supporting tubes (1) corresponding to the front side and the rear side, and a pedal frame (19) is fixedly welded on the second supporting tube (7).
4. A building modular scaffolding according to claim 3, wherein: the upper end face of the top plate (2) is provided with a mounting opening, and a steel wire mesh (11) is arranged in the mounting opening.
5. The building composite scaffolding of claim 4, wherein: the novel support is characterized in that a jack (14) is formed in the top end of the first support tube (1), a plug rod (3) is fixedly welded at the bottom of the second support tube (7), a plurality of positioning holes (4) are formed in the plug rod (3), and a plurality of positioning bolts (17) are threaded on the outer surface of the first support tube (1).
6. The building composite scaffolding of claim 5, wherein: the outer surfaces of the first supporting tube (1) and the second supporting tube (7) are coated with corrosion-resistant layers.
CN202320596560.2U 2023-03-24 2023-03-24 Building combined scaffold Active CN219569524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320596560.2U CN219569524U (en) 2023-03-24 2023-03-24 Building combined scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320596560.2U CN219569524U (en) 2023-03-24 2023-03-24 Building combined scaffold

Publications (1)

Publication Number Publication Date
CN219569524U true CN219569524U (en) 2023-08-22

Family

ID=87659681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320596560.2U Active CN219569524U (en) 2023-03-24 2023-03-24 Building combined scaffold

Country Status (1)

Country Link
CN (1) CN219569524U (en)

Similar Documents

Publication Publication Date Title
CN114412158B (en) Aluminum alloy-steel combined attached lifting scaffold and installation method thereof
CN106759863A (en) A kind of modularization steel house frame structure
CN219569524U (en) Building combined scaffold
CN212802428U (en) Portable lifting scaffold
CN210976512U (en) Building scaffold convenient to disassemble
CN206753009U (en) One kind building fabricated scaffold
CN220319071U (en) Suspension mechanism with adjustable distance of hanging basket
CN209778099U (en) Lifting and mounting integrated device for steel truss between sections of arc-shaped roof
CN218292741U (en) Assembled building tower crane promotes formula construction platform
CN108331370B (en) Reversible stair construction trestle
CN202954553U (en) Full assembly tool type attachment lifting scaffold
CN86203954U (en) Wall bearing self-lifting scaffold
CN211369478U (en) Door type structural hanging basket suspension structure mounting system
CN212002185U (en) Construction equipment is increased to landing leg behind hanging flower basket
CN112627480A (en) Laminated safety bearing frame for building construction
CN219196664U (en) Scaffold for hydropower installation
CN2193399Y (en) Simple scaffold board for building construction
CN215670944U (en) A operation platform that is used for high altitude to encorbelment roofing framework beam veneer construction
CN221461773U (en) Lightweight construction platform
CN213115437U (en) Wall-attached type operation platform module under overhanging roof
CN111350342A (en) High-altitude operation hanging basket
CN220365138U (en) Butt joint device for steel structure construction
CN214995770U (en) Portable scaffold support for constructional engineering
CN216921251U (en) Anti-tilting scaffold
CN112431404B (en) Large-gradient reinforced concrete inclined roof suspended aluminum alloy template and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant